13.07.2015 Views

Central Welland River Watershed Plan - Niagara Peninsula ...

Central Welland River Watershed Plan - Niagara Peninsula ...

Central Welland River Watershed Plan - Niagara Peninsula ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CENTRAL WELLAND RIVER WATERSHED PLANprovides an overall framework for development and planning in <strong>Niagara</strong> Region that therespective municipalities are to adhere to with further detail at a municipal level.Municipalities: Lower TierIn the <strong>Central</strong> <strong>Welland</strong> <strong>River</strong> watershed, the GGH identifies the City of <strong>Welland</strong> and Cityof Port Colborne as a Gateway Economic Centre. Its proximity to the United Statesborder and its location on the <strong>Welland</strong> Canal provide an opportunity for economicdiversity and increased opportunities for trade and tourism with the United States. TheGGH also identifies the area surrounding the built-up areas adjacent to the <strong>Welland</strong>Canal in Port Colborne and <strong>Welland</strong> as designated greenfields areas, making them thefocus area of future intensification with an overall minimum density target of 50 jobs andresidents per hectare.Accordingly, the RMN in partnership with the province and local municipalitiescommissioned a study to develop an action plan for the implementation of the GatewayEconomic Zone and Centre (GHK 2008) in <strong>Niagara</strong> Region. The Gateway EconomicCentre in the <strong>Central</strong> <strong>Welland</strong> <strong>River</strong> watershed includes all the settlement areas within<strong>Welland</strong> and Port Colborne and the linkage between the two municipalities, as well asthe <strong>Welland</strong> Canal. The Gateway Economic Zone does not fall within the <strong>Watershed</strong><strong>Plan</strong> study area.City of <strong>Welland</strong>Almost 20 percent of the <strong>Central</strong> <strong>Welland</strong> <strong>River</strong> watershed falls within the municipality ofthe City of <strong>Welland</strong>. The land use in this portion of the municipality is predominatelyresidential and commercial with some agricultural lands outside of the urban boundary.In 2007, the City of <strong>Welland</strong> adopted a Brownfield Community Improvement <strong>Plan</strong> (CIP)(RCI Consulting) to address the municipality‟s high number of brownfield areas. The CIPprovides incentive programs, strategies and actions that will promote brownfieldremediation, rehabilitation and redevelopment in the City of <strong>Welland</strong> (RCI Consulting2007). Currently it is estimated that over 200 hectares of brownfield sites exist along thecanal and throughout the city (City of <strong>Welland</strong> 2007).As indicated, <strong>Welland</strong> has been identified by the province in the GGH as a GatewayEconomic Centre. An economic gateway “is a place of interaction, opportunity andinterface; a place where opportunities for economic development are leveraged byproximity and geography” (Dillon 2010). In the City of <strong>Welland</strong>‟s Official <strong>Plan</strong> (subject toapproval by Regional <strong>Niagara</strong> [Dillon 2010]) numerous strategic directions are outlinedto support economic diversity and promote increased opportunities, including forexample, encouraging “cross-border trade and the efficient movement of people andgoods” and by encouraging “the provision of land and infrastructure for continuedsustainable development and tourist facilities” (Section 2.4.2 Dillon 2010).It is the intent of <strong>Welland</strong>‟s Official <strong>Plan</strong> to focus all urban development within the UrbanBoundary; which is comprised of the Built-Up Area (already developed lands) within theBuilt Boundary and Greenfield Area. The lands within the Urban Boundary are intendedto accommodate the majority of <strong>Welland</strong>‟s projected growth. These lands are already orintended to be serviced major roads, transit and piped sewer and water services(Section 3.4.2.2).32

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!