13.07.2015 Views

Annual Report 2005 - English Version ( pdf file - 3340 kb in size)

Annual Report 2005 - English Version ( pdf file - 3340 kb in size)

Annual Report 2005 - English Version ( pdf file - 3340 kb in size)

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Limerick County Council <strong>Annual</strong> <strong>Report</strong> <strong>2005</strong>KILMALLOCKA section of Kilmallock Town Wall viewed from outsidethe town. Still largely <strong>in</strong>tact, it forms the westernboundary of the town to this day. The build<strong>in</strong>g of theTown Walls was fully complete by the end of the13th CenturyKilmallock Area CommitteeDur<strong>in</strong>g <strong>2005</strong> Kilmallock Area Committee held 7meet<strong>in</strong>gs, and <strong>in</strong> July Cllr. Pat McAuliffe assumed theChair for a period of 1 year.At this meet<strong>in</strong>g also the Committee approved plansfor the new Kilmallock Mach<strong>in</strong>ery Yard at Gotoon,Kilmallock. It is hoped that construction will start onthis early <strong>in</strong> 2006.Hous<strong>in</strong>g- Kilmallock Area Office cont<strong>in</strong>ued to ma<strong>in</strong>ta<strong>in</strong> an<strong>in</strong>creas<strong>in</strong>g Hous<strong>in</strong>g Stock.- On 12th December, 14 new Social Hous<strong>in</strong>g unitswere allocated at Church Glen, Ballylanders.- A scheme for the <strong>in</strong>stallation of Central Heat<strong>in</strong>g<strong>in</strong> Council houses was commenced <strong>in</strong> the KilmallockArea. This will cont<strong>in</strong>ue <strong>in</strong> 2006 and 2007.- Work commenced on the construction of 12 SocialHous<strong>in</strong>g units compris<strong>in</strong>g 6 family type and 6 smalltype houses at Knocklong.- Under the Voluntary Hous<strong>in</strong>g Scheme an extra 10units were provided at Dawn Court, Athlacca.- Construction commenced on 8 additional units <strong>in</strong>Hospital, and on the provision of a scheme at the OldGarda Barracks <strong>in</strong> Bruff.RoadsIn the Kilmallock Roads Area the follow<strong>in</strong>g works werecarried out:- Regional Road Reconstruction - 22,800m 2 at a cost of€333,000.- Regional Road Surface Dress<strong>in</strong>g - 46,715 m 2 at a costof €126,312.- Regional Road Specific Improvement - €30,000(Advance works for replacement of Knocklongrailway bridge).- Regional Road Discretionary Improvement - €74,000(footpaths and dra<strong>in</strong>age).- Local Roads Reconstruction -118,096 m 2 at a cost of€1,549,850.- Local Roads Surface Dress<strong>in</strong>g -180,515 m 2 at a cost of€433,236.- Local Roads Specific Improvements - €20,000(sightl<strong>in</strong>e improvement at Barna Cross, Galbally)- Local Roads Discretionary Improvements - €118,800(footpaths and dra<strong>in</strong>age).In addition a sum of €300,000 was allocated fromthe Development Fund for footpaths <strong>in</strong> Ballylanders,Knocklong and Kilmallock and dra<strong>in</strong>age <strong>in</strong> Granagh.4.00 km of the N20 was also overlaid with asphalt.Water Services- A total of 116 new Public Waterma<strong>in</strong> connectionswere carried out by the Kilmallock Water ServicesStaff- Refurbished Filter Beds were commissioned atJamestown, Kilmallock.- A new well was drilled for Herbertstown WaterSupply.- Exploration works were carried out for a new watersource for Hospital.Footpath Reconstruction <strong>in</strong> Kilmallock73

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!