13.07.2015 Views

Tankless Water Heater - Waiwela

Tankless Water Heater - Waiwela

Tankless Water Heater - Waiwela

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Installing the water heater:Installation Check ListA. Indoor <strong>Water</strong> <strong>Heater</strong> Location❑ Close to area of vent termination.❑ Indoors and protected from freezing temperatures.❑ Proper clearance from combustible surfaces observed.❑ Sufficient fresh air supply for proper operation ofwater heater.❑ Air supply free of corrosive elements andflammable vapors.❑ Provisions made to protect area from water damage.❑ Sufficient room to service heater.❑ Combustible materials, such as clothing, cleaningmaterials, rags, etc. clear of the heater andvent piping.❑ <strong>Water</strong> heater is properly attached to the wall.B. <strong>Water</strong> Supply❑ <strong>Water</strong> supply has sufficient pressure.❑ Air purged from water heater and piping.❑ <strong>Water</strong> connections tight and free of leaks.❑ <strong>Water</strong> filter is clean and in place.❑ Materials used are as instructed in this manual.❑ <strong>Water</strong> pipes are insulated and protected fromfreezing.C. Gas Supply❑ Gas type matches rating plate.❑ Gas supply pressure is sufficient for the water heater.❑ Gas line equipped with shut-off valve, union andsediment trap.❑ Approved pipe joint compound used.❑ Soap and water solution used to check all connectionsand fittings for possible gas leak.❑ Gas Company inspected installation (if required).D. Relief Valve❑ Pressure Relief Valve properly installed and dischargeline run to open drain.❑ Discharge line protected from freezing.E. Co-Axial Venting❑ Vent pipe material should be category III and meetUL1738 in US and ULC S636 in Canada.❑ Connector(s) pitched (1/4” per foot of lengthminimum) downward or UPWARD totermination. If UPWARD, a condensate trap must beinstalled close to the heater. See page 13 and 14.❑ Connector(s) securely fastened together with hightemperature silicone (500°F [260°C]) andair-tight.❑ All co-axial vent runs are properly supported.❑ Vent terminal is properly installed.❑ Sufficient combustion air is available.❑ Maximum and minimum vent lengths are observed.F. Electrical Wiring❑ Voltage matches rating plate.❑ <strong>Water</strong> heater is properly grounded.❑ Supply cord and/or wiring meets all local codes.24AP14558-1 (09_08) DV 66 Manual.indd 249/17/2008 3:08:03 PM

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!