13.07.2015 Views

Under Jurisdiction of Nagpur Court only - Western Coalfields Limited

Under Jurisdiction of Nagpur Court only - Western Coalfields Limited

Under Jurisdiction of Nagpur Court only - Western Coalfields Limited

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

equipment. The Bidder shall stock sufficient fast moving & maintenance and otherspares in their Local Depots to ensure maximum availability <strong>of</strong> their equipmentB.5.3 Emergency Spare PartsThe Bidder shall ensure that Spare Parts required urgently by the Purchaser forrepair <strong>of</strong> breakdown equipment are supplied at over riding priority .B.5.4Lifetime Spare PartsThe Supplier undertakes and guarantees to produce and maintain stocks, to be availablefor purchase by the Purchaser under separate agreement, <strong>of</strong> all Spare Parts andConsumables as may be required for maintenance and repair <strong>of</strong> the Plant throughout itsworking life. In the event that the Supplier wishes to terminate production <strong>of</strong> such SpareParts, the Supplier shall:(a) give not less than six months notice in writing <strong>of</strong> it's intention to terminateproduction in order to permit the Purchaser reasonable time in which toprocure needed requirements; and(b) immediately following termination, provide to the Purchaser at no cost,manufacturing drawings material specifications and all necessary permissionsto facilitate manufacture <strong>of</strong> the Spare Parts elsewhere.In any event, the Supplier shall not seek to terminate manufacture <strong>of</strong> spare partsfor a period <strong>of</strong> not less than ten (10) years from taking-Over.B.5.5Oils, Lubricants and FluidsNot less than one (1) month before the scheduled date for Acceptance, the Suppliershall provide to the Purchaser a detailed schedule <strong>of</strong> all necessary oils, lubricants, fluidsand the like for the operation and maintenance <strong>of</strong> Equipment. The schedule shallindicate estimated annual consumption and specify the appropriate international standardnumber or the name and reference number <strong>of</strong> an equivalent available in India consideredto be acceptable by the Supplier.B.5 6 GeneralNothing in this Clause B.5 shall relieve the Supplier <strong>of</strong> any Guarantee,Availability, Performance or other obligations or liabilities under the Contract.B.6 Composite Warranty / GuaranteeThe Bidder shall warrant that the equipment supplied under this contract is:--a) In accordance with the contract specifications.b) The equipment shall have no defects arising out <strong>of</strong> design; material orworkmanship & the Complete Equipment shall be warranted for 12 monthsor 3000 Hrs (which is earlier) from the accepted date <strong>of</strong> commissioning.The warranty shall cover for total equipment so that ultimate responsibility lies <strong>only</strong>with the Equipment Bidder although components may be supplied by differentsuppliers to the Bidder.10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!