13.07.2015 Views

Repairs to Scherzer Rolling Lift Bridge - Heavy Movable Structures ...

Repairs to Scherzer Rolling Lift Bridge - Heavy Movable Structures ...

Repairs to Scherzer Rolling Lift Bridge - Heavy Movable Structures ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The new rack support angles location based on the survey deviated greatly from the existinglocation, since the existing rack segments were out of alignment at the north side The difference wasso much that the new angles would interfere with structural connections at several locations Therack support angles had <strong>to</strong> be cus<strong>to</strong>mly fit around the gusset plates at those interference pointsSince the main pinion elevation depends on the track girder elevation and the segmental girderradii, the pinion elevation deviated a <strong>to</strong>tal of 1/4 inch throughout the entire travel of the opening Itwas decided <strong>to</strong> set the rack segments at the best fit with the pinion pitch line The rack segmentswere set so the two high points were the deepest engagement with the pinion. The pinion teeth ( witha circular pitch of greater than 4 inches ) were large enough and strong enough <strong>to</strong> compensate forthe varying pinion travel.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!