N268AC Logs.pdf - Delta Aviation LLC
N268AC Logs.pdf - Delta Aviation LLC
N268AC Logs.pdf - Delta Aviation LLC
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
DATEARAPAHOEAERO19_12760 EAST CONTROL TOWER ROAD; ENGLEWOOD, COLORADO 80112 (303) 799-8386<strong>N268AC</strong> Mooney M20K SIN: 25-2024 Total Aircraft Time: 762.2001 October 2005 Tach Time: 762.20---\ 100 Hour I Annual Inspection completed this date using the Mooney M20K Maintenance Manual__-/ Inspection Form as a guide. Removed and installed new ELT remote switch battery. Next remote switchbatter replacement due September 2008. ELT tested in accordance with FAR 91.207(d)-no defects---I noted. ELT battery expires March 2011. Removed and installed new vacuum regulator filter. Checkedand verified correct operations ofclutch on rudder trim servo-no defects noted. Performed 200 Hour---I Inspection on speed brakes as outlined in Precise Flight Continued Airworthiness Instructions by cleaning---\ and lubricating worm gear and ring assembly-no defects noted and operational check satisfactory. Cleaned,inspected, resealed, and safetied fuel strainer. Complied with the following Mooney Service Bulletins:---/ SBM20-229 (fuel caps) by removing and replacing inner and outer o-ring seals and adjusting fuel cap---"'