13.07.2015 Views

N268AC Logs.pdf - Delta Aviation LLC

N268AC Logs.pdf - Delta Aviation LLC

N268AC Logs.pdf - Delta Aviation LLC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DATE19_RECORDINGTACNTIMETODAY'SFLIGHTTOTALTIME INSERVICEDescription of Inspections, Tests, Repairs and AlterationsEntries must be endorsed with Name, Rating and Certificate Number of Technician or RepairFacility. (See back pages for other specific entries.)11Airframe Log <strong>N268AC</strong> Date: 12-19-07Tach Time: 907.8Total Time: 907.8Removed the fwd and aft carpet. Removed side panels, disconnected all electrical connectorsin cabin and below floorboards, cleaned with alcohol and blew with shop air, reconnected.Reinstalled the side panels. Greased the main and nose gear zerk tittings. Removed insulationfrom baggage comp, reinstalled baggage comp panels. Removed gear act and DC motor.Cleaned, serviced and reinstalled, did gear retract test and emerg gear extension.Removed the flap motor, cleaned, dried and reinstalled. Test ran flaps.Replaced wheel races and bearings, disassembled, dried and reassembled wheel halves.Greased bearings and reinstalled on acft. Replaced worn out brake linings.Cleaned and lubed EJev trim chain. Vacuumed the cabin floor. Opened, dried and tested ELl'.RW1oved,co.vers from all .servos and dried with air, reinstalled covers.tJ~ /). Jiddu--­David B. Ketchum AP 273526609 Northwest Airtech WO# 3348 Phone#: (360) 501-4631\©ASA 1993

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!