13.07.2015 Views

View Tender Document - e-Tendering

View Tender Document - e-Tendering

View Tender Document - e-Tendering

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

17Dy.E.E.b) The Certificate of concerned Sub. Divisional Officer/Engineer (P.W. SubDivision, RAJAPUR) to the effect that the Plant to site of work (farthest point)by the shortest practicable route does not exceed 60 minutes will be final andconclusive. This certificate has to be submitted manually, failing which it will bepresumed that the Bidder‟s Plant does not fulfill the criteria of Plant to farthestpoint distance being within 60 minutes.c) Contractor should attached Valid inspection certificate for Modern drum mix plant,Sensor Paver Finisher/Paver Finisher, Vibratory Roller/Power Roller, MechanicalSprayer issued by Assistant Chief Engineer (Mechanical) that machinery is as perMORT & H Specifications.The Contractor shall submit an affidavit in original (as per proforma given inpage No. 33) to the tender accepting authority on the due date as per tenderschedule regarding availability of owned or hired machinery manually dulyNotarified. Affidavit not conforming to the contents in the prescribed format,will not be accepted and Envelope No.2 will not be opened.This information shall be given by the contractor in Envelope No.1 correctly andcompletely in the statement No.2(„A‟1) with reference of page No. otherwise hisEnvelope No.2 will not be opened.1.4.14 Certified copy of Registration of Partnership Deed and Power of Attorney or copy ofCompany Registration from the Competent Authority in case of a firm tendering forwork, Power of attorney shall be submitted. (True copy attested by a GazettedOfficer.)1.4.15 The contractor shall submit an affidavit in original (as per format given on PageNo.34) to the tender accepting authority on due date as per tender schedule regardingcompleteness, correctness and truthfulness of documents shall be submitted manuallyin Envelope No.1. Separate Affidavit shall be submitted for each work in original.Affidavit shall be compulsorily Notarified. Affidavit not confirming to theseconditions will not be accepted and Envelope No.2 will not be opened.1.4.16 The tenderer must have sufficient experience in the Road construction work.Contractor No. of Corrections Executive Engineer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!