13.07.2015 Views

View Tender Document - e-Tendering

View Tender Document - e-Tendering

View Tender Document - e-Tendering

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

45TENDER FOR WORKSI/We hereby tender for the execution, for the Governor of Maharashtra( here-in-before and here-inafter referred to as “ Government”) of thework specified in the under written memorandum within the timespecified in such memorandum at * _______________________percent Below/above the estimated rates entered in Schedule „B‟ (Memorandum showing items of work to be carried out ) and inaccordance in all respects with the specifications, designs, drawings,and instructions in writing referred to in Rule 1 hereof and in Clause12 of the annexed conditions of contract and agree that whenmaterials for the work are provided by the Government, such materialsand the rate to be paid for them shall be as provided in Schedule „A”hereto.* In figures aswell as in wordsDy.E.E.MEMORANDUM(a) NAME OF WORK:- IMPROVEMENT AND BLACKTOPPING TO SOLGAON FATA TODEVACHE GOTHANE KERAVALEROAD MDR-60 IN KM. 32/000 TO33/500 AND 34/500 TO 35/000 (ACTUALKM. 34/500 TO 36/500) IN TALUKARAJAPUR DISTRICT RATNAGIRI.(UNDER NABARD-XVIII)B) Estimated Cost : Rs. 38,68,839/-C) Earnest Money. : Rs. 39,000/-D) Security Deposit :I) Cash ( Not less than the amount Rs. 78,000/-of earnest money.)ii) To be deducted from : Rs. 78,000/-current bills.________________________Total Rs. 1,56,000/-_____E) Percentage, if any to be deducted frombills so as to make up the total amountrequired as security deposit by the time,half the work as measured by the costsis doneF) Time allowed for the workfrom the date of writtenorder to commence.FOUR PERCENT12 Calendar months(Twelve months)(including monsoon)A) If several subworks are includedthey should bedetailed in a separatelist.C) The amount ofearnest money to bedeposited shall be inaccordance with theprovisions of paras206 & 207 of theM.P.W. manual.D) This deposit shallbe in accordancewith paras 213 &214 of the M.P.W.Manual.E) This percentagewhere necessarydeposit is taken willvary from 5 percentto 10 percentaccording to therequirements of thecase. Where securitydeposit is taken seenote 1 to clause 1 ofconditions ofcontract.F) Give schedulewhere necessaryshowing dates bywhich the variousitems are to becompleted.Contractor No. of Corrections Executive Engineer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!