- Page 3 and 4: Dy.E.E.1GOVERNMENT OF MAHARASHTRAPU
- Page 5: 3Dy.E.E.¨É½þÉ®úɹ]Åõ É
- Page 9 and 10: 5Dy.E.E.GOVERNMENT OF MAHARASHTRAPU
- Page 11 and 12: 7Dy.E.E.1.2.5 For any assistance on
- Page 13 and 14: 9Dy.E.E.The same procedure holds tr
- Page 15 and 16: 11Dy.E.E.4. Online Bid Preparation
- Page 17 and 18: 13Dy.E.E.9. Tender Schedule ( Key D
- Page 19 and 20: 15Dy.E.E.Tender costing below 1 Cro
- Page 21 and 22: 17Dy.E.E.b) The Certificate of conc
- Page 23 and 24: 19Dy.E.E.1.6 SUBMISSION OF TENDER :
- Page 25 and 26: 21Dy.E.E.1.9 SECURITY DEPOSIT :The
- Page 27 and 28: Dy.E.E.231.15 CORRECTION :No correc
- Page 29 and 30: 25Dy.E.E.1.24 The Income Tax at 2.3
- Page 31 and 32: 27Dy.E.E.STATEMENT NO. 2DETAILS OF
- Page 33 and 34: 29STATEMENT NO. 2 „A‟ 1(TO BE I
- Page 35 and 36: 31Dy.E.E.STATEMENT NO.3DETAILS OF W
- Page 37 and 38: 33Dy.E.E.100 Rs.BondxɨÉÖxÉÉ
- Page 39 and 40: 35Dy.E.E.Rs.100/- Stamp PaperA G R
- Page 41 and 42: 37Dy.E.E.NAME OF WORK :- IMPROVEMEN
- Page 43 and 44: 39Dy.E.E.METHODOLOGY OF WORK(GENERA
- Page 45 and 46: 41Dy.E.E.FORM B-1PERCENTAGE RATE TE
- Page 47 and 48: 43Dy.E.E.7. No receipt for any paym
- Page 49 and 50: 45TENDER FOR WORKSI/We hereby tende
- Page 51 and 52: 47Dy.E.E.4. Should this tender be a
- Page 53 and 54: 49Dy.E.E.The security deposit will
- Page 55 and 56: 51Dy.E.E.Action whenwhole of securi
- Page 57 and 58:
53Dy.E.E.Contractorremains liableto
- Page 59 and 60:
55Dy.E.E.Payment atreduced rates on
- Page 61:
57Dy.E.E.Alterations inspecificatio
- Page 64 and 65:
60Dy.E.E.Time limit forunforeseencl
- Page 66:
62Dy.E.E.Contractor tosupply plant,
- Page 69 and 70:
65Dy.E.E.h) Every hoisting machine
- Page 71 and 72:
67Dy.E.E.Direction andcontrol of th
- Page 73 and 74:
Dy.E.E.69Clause 37 (A) :- The Contr
- Page 75 and 76:
71Dy.E.E.(iv) The Engineer-in-charg
- Page 77 and 78:
73Dy.E.E.Clause 51 :- The contracto
- Page 79 and 80:
75Dy.E.E.ADDITIONAL INSTRUCTIONS TO
- Page 81 and 82:
77Dy.E.E.6.1 CONTRACTOR TO INFORM H
- Page 83 and 84:
79Dy.E.E.CONSTRUCTION EQUIPMENT AND
- Page 85 and 86:
81Dy.E.E.6.5.8 Since all stones qua
- Page 87 and 88:
83Dy.E.E.(V)No material shall be re
- Page 89 and 90:
85Dy.E.E.(XIII) All road material s
- Page 91 and 92:
87Dy.E.E.6.10 ASSISTANCE IN PROCURI
- Page 93 and 94:
89Dy.E.E.In case of any dispute of
- Page 95 and 96:
91Dy.E.E.8.2 AMENITIES :1) Supporti
- Page 97 and 98:
93Dy.E.E.8.7 MEDICAL & SANITARY ARR
- Page 99 and 100:
95Dy.E.E.9.2 In case it becomes nec
- Page 101 and 102:
97Dy.E.E.12 TESTING ETC. :The Contr
- Page 103 and 104:
99Dy.E.E.15. STACKING AND STORAGE A
- Page 105 and 106:
101Dy.E.E.18.3 In case defects noti
- Page 107 and 108:
103Dy.E.E.c) Control should be exer
- Page 109 and 110:
105Dy.E.E.27. SUPPLY OF SAFETY JACK
- Page 111 and 112:
107Dy.E.E.Insurance Fund will be re
- Page 113 and 114:
109Dy.E.E.SPECIFICATIONS FOR BITUMI
- Page 115 and 116:
111Dy.E.E.5. Tack coat on bitumen s
- Page 117 and 118:
113Dy.E.E.Sr.No. Test Frequency1. Q
- Page 119 and 120:
Remarks115PROFORMAMIX TRANSPORTATIO
- Page 121 and 122:
117Dy.E.E.QUALITY ASSURANCE AND MAI
- Page 123 and 124:
119PRICE VARIATION CLAUSEDy.E.E.If
- Page 125 and 126:
121Dy.E.E.(E) Formula for T.M.T./HY
- Page 127 and 128:
123Dy.E.E.NAME OF WORK :- IMPROVEME
- Page 129 and 130:
125Dy.E.E.ADDITIONAL CONDITIONS FOR
- Page 131 and 132:
127Dy.E.E.13. All empty bags or emp
- Page 133 and 134:
129Dy.E.E.xÉÉånù´É½þÒ Gò
- Page 135 and 136:
131Dy.E.E.xÉÉånù´É½þÒ Gò
- Page 137 and 138:
133Dy.E.E.NAME OF WORK :- IMPROVEME
- Page 139 and 140:
135Dy.E.E.Estimated Quantity maybe
- Page 141 and 142:
137Dy.E.E.Estimated Quantity maybe
- Page 143 and 144:
139Dy.E.E.Estimated Quantity maybe
- Page 145 and 146:
141Dy.E.E.NAME OF WORK :- IMPROVEME
- Page 147 and 148:
143Dy.E.E.Item of workReference to
- Page 149 and 150:
145Dy.E.E.Item of workReference to
- Page 151 and 152:
147Dy.E.E.Item of workReference to
- Page 153 and 154:
149Dy.E.E.Item of workReference to
- Page 155 and 156:
151Dy.E.E.Item of workReference to
- Page 157 and 158:
153Dy.E.E.GUARANTEE BOND FOR SECURI
- Page 159 and 160:
155Dy.E.E.Annexure 'A'QUALITY CONTR
- Page 161 and 162:
157Dy.E.E.Annexure 'B'Construction
- Page 163 and 164:
159Dy.E.E.DECLARATION OF THE CONTRA
- Page 165 and 166:
161Dy.E.E.NAME OF WORK :- IMPROVEME
- Page 167 and 168: