13.07.2015 Views

View Tender Document - e-Tendering

View Tender Document - e-Tendering

View Tender Document - e-Tendering

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

35Dy.E.E.Rs.100/- Stamp PaperA G R E E M E N TThis Agreement made on / /200 at .............................…….. betweenM/s .............................................................……….........……….............. having its officeat ................................................……….....………............................. (herein referred toparty of the first part)Where as the party of the second part is desires to take various works ofRoad Construction through contract with Public Works Department. Government ofMaharashtra and the party of the first part is having its Drum Mix Plant/ Sensor PaverFinisher with Electronic Sensing Device to operate Asphalt work as per GovernmentSpecifications.First part of the party and second part of the party have agreed to have Mutualagreement that in the event of any asphalt work required to be carried out in the work of "IMPROVEMENT AND BLACK TOPPING TO SOLGAON FATA TO DEVACHEGOTHANE KERAVALE ROAD MDR-60 IN KM. 32/000 TO 33/500 AND 34/500 TO35/000 (ACTUAL KM. 34/500 TO 36/500) IN TALUKA RAJAPUR DISTRICTRATNAGIRI. (UNDER NABARD-XVIII)." by the second part of the party, the first partof the party shall make their Drum Mix Plant/ Sensor Paver Finisher with ElectronicSensing Device confirming to Ministry of Road Transport & Highways, Specification.Fourth Revision, 2001 available for inspection, referred now in Para 1.4.7 of this tenderdocument and then provide the same approved after inspection, available to carry outlaying of asphalt work entrusted to the second part of the party (as per the specificationlaid down in the contract) on mutually agreed terms for this contract.The Agreement is valid for the actual period of physical completion of the saidwork for which this Agreement is made.In witness whereof, the first parties have executed this Agreement.WITNESS 1) ...........................................,2) ..........................................., Signature of First PartyWITNESS 1) ..........................................,2) .........................................., Signature of Second PartyContractor No. of Corrections Executive Engineer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!