39Dy.E.E.METHODOLOGY OF WORK(GENERAL GUIDELINES)Following methodology of work shall be adopted by the contractor in consultation withEngineer-in-charge.(1) At the onset of work, the Nabard information sign board of size 180 x 120 centimetershould be erected at starting point and end point of work.(2) Required camber correction and grade correction shall be carried out as per directivesof Engineer in charge.(3) The earthwork for gutter excavation shall be executed as directed by Engineer in charge.(4) The work of construction of new C.D. works 800 milimeter diameter NP-3 class pipeshall be done. The work of concreting for C.D. works shall be started only aftergetting the concrete mix design approved from the Engineer-in-charge.(5) The work of B.B.M. shall be carried out. The work of gutter shall be carried outsimultaneously. The work of side gutters & C.D. works as shown in drawing shall becarried out before starting the B.T. work. However, if execution of these itemsinvolve extra cost, either due to extra quantities of excavation or under-utilisation ofexcavated material such extra cost will have to be borne by the contractor.(6) After construction of BBM work of 20 mm thick premix carpet with liquid seal coatshall be done.(7) The work of filling side shoulders with 5% camber shall be done simultaneously assoon as after laying of B.B.M. layer. The side shoulders shall be compacted by staticroller and with watering.(8) The items for road side furniture shall be executed.(9) While doing B.T. work hot mix plant operation at plant site shall start at 8.00 A.M. inthe morning in presence of Engineer in charge or his assigned representative, (atplant) and laying shall be stopped before 5.30 P.M. The work of laying hot mixmaterial shall invariably be stopped at 5.30 P.M. in the evening.(10) Traffic plying at design speed shall not feel hump or jerk on any stretches. Contractorshall plan for all such location well before taking up work in such stretches anddifficulties in doing so, if any, be brought to the notice of the Engineer and only afterhis permission work proceeded further.Contractor No. of Corrections Executive Engineer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!