13.07.2015 Views

Plug and Abandonment Basics - George E King Petroleum ...

Plug and Abandonment Basics - George E King Petroleum ...

Plug and Abandonment Basics - George E King Petroleum ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Setting Cement <strong>Plug</strong>s• A near 100% reliable system if cross flow canbe stopped.• Most cement plugs fail because of cross flow,density <strong>and</strong> viscosity mismatch, or failure to“break” the fluid momentum.• Full plug method described <strong>and</strong> field tested inSPE 11415 (published in SPE JPT Nov 1984, pp1897-1904) <strong>and</strong> SPE 7589.3/14/2009 16<strong>George</strong> E. <strong>King</strong> EngineeringGEKEngineering.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!