13.07.2015 Views

Plug and Abandonment Basics - George E King Petroleum ...

Plug and Abandonment Basics - George E King Petroleum ...

Plug and Abandonment Basics - George E King Petroleum ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Procedures• Remove salvageable equipment.– NORM scale present? Leave the pipe in the well?– What pipe is needed for a barrier? How effective?• Set, at minimum, plugs required by regulations.Don’t hesitate to go beyond requirements.• Test to limits required.• Cap <strong>and</strong> identify as specified.3/14/2009 24<strong>George</strong> E. <strong>King</strong> EngineeringGEKEngineering.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!