Conversion Technology: Landfill GasFacility Size (Nameplate): 4.6 MWCapacity Factor: 0.856Generation/Year: 34,457,555 kWh/yearTotal Industry Output: $3,600,814 ($0.1045/kWh)Breakeven Total Industry Output: N/A (Profitable)Employees: 30Source: Environmental Protection Agency, Landfill Methane Outreach Program. 2005.Documents, Tools, and Resources. Energy Project Landfill Gas Utilization Software (E-Plus).Table B.3. IMPLAN Expenditures for Landfill GasIMPLANType Sector IMPLAN Sector Description Expenditures*Investment 41Other New Construction (Electricity GenerationInstallation & Other Costs, Gas TreatmentInstallation & Other Costs, Inter ConnectInstallation & Other Costs) $2,041,998Investment 205Iron, Steel Pipe & Tube from Purchased Steel(Pipe) $1,687,370Investment 239Metal Tank, Heavy Gauge, Manufacturing(Condensate Knockout) $112,638Investment 261Oil & Gas Field Machinery & Equipment (Well &Well Heads) $775,457Investment 275Air Purification Equipment Manufacturing(Filters) $16,577Investment 276Industrial & Commercial Fan and BlowerManufacturing (Blowers) $51,696Investment 277Heating Equipment, except Warm Air Furnaces(Radiator Costs) $238,008Investment 289Air & Gas Compressor Manufacturing(Compressor) $92,700Investment 298Industrial Process Furnace & Oven Manufacturing(Flares) $76,340Investment 316 Industrial Process Variable Instruments (Monitor) $1,021Electric Power & Specialty TransformerManufacturing (Substation Costs & IntertieInvestment 333 Wiring Costs) $320,985Investment 336Relay & Industrial Control Manufacturing(Protective Relays Costs) $47,099Investment 341Wiring Device Manufacturing (SystemDisconnect Costs) $99,182Investment 350Motor Vehicle Parts Manufacturing (IC LowEngine & Engineer Wiring Costs) $2,087,201Investment 442Computer Systems Design Services (SubstationTelemetry Costs) $10,025Operating 485Commercial Machinery Repair & Maintenance(Collection System Variable O&M, CompressionSystem Variable O&M,) $989,521Federal Renewable Energy Portfolio Standard Impacts on <strong>Florida</strong> B.7