13.07.2015 Views

Florida Study - Bipartisan Policy Center

Florida Study - Bipartisan Policy Center

Florida Study - Bipartisan Policy Center

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Conversion Technology: Landfill GasFacility Size (Nameplate): 4.6 MWCapacity Factor: 0.856Generation/Year: 34,457,555 kWh/yearTotal Industry Output: $3,600,814 ($0.1045/kWh)Breakeven Total Industry Output: N/A (Profitable)Employees: 30Source: Environmental Protection Agency, Landfill Methane Outreach Program. 2005.Documents, Tools, and Resources. Energy Project Landfill Gas Utilization Software (E-Plus).Table B.3. IMPLAN Expenditures for Landfill GasIMPLANType Sector IMPLAN Sector Description Expenditures*Investment 41Other New Construction (Electricity GenerationInstallation & Other Costs, Gas TreatmentInstallation & Other Costs, Inter ConnectInstallation & Other Costs) $2,041,998Investment 205Iron, Steel Pipe & Tube from Purchased Steel(Pipe) $1,687,370Investment 239Metal Tank, Heavy Gauge, Manufacturing(Condensate Knockout) $112,638Investment 261Oil & Gas Field Machinery & Equipment (Well &Well Heads) $775,457Investment 275Air Purification Equipment Manufacturing(Filters) $16,577Investment 276Industrial & Commercial Fan and BlowerManufacturing (Blowers) $51,696Investment 277Heating Equipment, except Warm Air Furnaces(Radiator Costs) $238,008Investment 289Air & Gas Compressor Manufacturing(Compressor) $92,700Investment 298Industrial Process Furnace & Oven Manufacturing(Flares) $76,340Investment 316 Industrial Process Variable Instruments (Monitor) $1,021Electric Power & Specialty TransformerManufacturing (Substation Costs & IntertieInvestment 333 Wiring Costs) $320,985Investment 336Relay & Industrial Control Manufacturing(Protective Relays Costs) $47,099Investment 341Wiring Device Manufacturing (SystemDisconnect Costs) $99,182Investment 350Motor Vehicle Parts Manufacturing (IC LowEngine & Engineer Wiring Costs) $2,087,201Investment 442Computer Systems Design Services (SubstationTelemetry Costs) $10,025Operating 485Commercial Machinery Repair & Maintenance(Collection System Variable O&M, CompressionSystem Variable O&M,) $989,521Federal Renewable Energy Portfolio Standard Impacts on <strong>Florida</strong> B.7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!