13.07.2015 Views

Florida Study - Bipartisan Policy Center

Florida Study - Bipartisan Policy Center

Florida Study - Bipartisan Policy Center

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Conversion Technology: Co-fire (15%) of Cellulosic Residues (Wood Residues) with CoalFacility Size (Co-fire Nameplate): 15.6 MWCapacity Factor: 0.800Generation/Year: 109,850,400 kWh/yearTotal Industry Output: $ 11,479,218($0.1045/kWh)Breakeven Total Industry Output: $12,448,826 ($0.1133/kWh)Employees: 7Source: English, B., J. Menard, M. Walsh, and K. Jensen. 2004. “Economic Impacts ofUsing Alternative Feedstocks in Coal-Fired Plants in the Southeastern United States”.Table B.4. IMPLAN Expenditures for: Co-fire (15%) of Cellulosic Residues (WoodResidues) with CoalIMPLANType Sector IMPLAN Sector Description Expenditures*Investment 41Other New Construction (Biomass HandlingSystem Installation, Civil Structural, Electrical) $2,346,421Investment 232Prefabricated Metal Buildings and Components(Wood Silo with Live Bottom) $75,243Investment 292Conveyor & Conveying EquipmentManufacturing (Conveyor #1, Radial Stacker,Radial Screw, Conveyor #2, etc.) $522,830Investment 298Industrial Process Furnace & Oven Manufacturing(Modification at Burners) $34,209Investment 316 Industrial Process Variable Instruments (Controls) $165,213Motor Vehicle Body Manufacturing (TruckInvestment 346 Tipper with Hopper and Feeder) $123,326Investment 425 Banking (Contingency (30%)) $907,930Architectural & Engineering ServicesInvestment 439 (Engineering @ 10%) $389,953Operating 14 Logging (Feedstock) $3,123,541Operating 485 Commercial Machinery Repair & Maintenance $282,178Other New Construction (Biomass HandlingDepreciation 41 System Installation, Civil Structural, Electrical) $234,642Depreciation 232Prefabricated Metal Buildings and Components(Wood Silo with Live Bottom) $3,762Depreciation 292Conveyor & Conveying EquipmentManufacturing (Conveyor #1, Radial Stacker,Radial Screw, Conveyor #2, etc.) $52,283Depreciation 298Industrial Process Furnace & Oven Manufacturing(Modification at Burners) $3,421Depreciation 316 Industrial Process Variable Instruments (Controls) $16,521Motor Vehicle Body Manufacturing (TruckDepreciation 346 Tipper with Hopper and Feeder) $12,333*2006 dollarsFederal Renewable Energy Portfolio Standard Impacts on <strong>Florida</strong> B.9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!