49 CONVEYING3.6. Elevator discharge atdifferent bucket speeds:A, too slow; B, optimum,C, too fast.satisfactory operational speed is 80 to 85% of <strong>the</strong> <strong>the</strong>oretical speed. Table 3.2 shows<strong>the</strong> recommended elevator speeds <strong>for</strong> different pulleys.Thus, elevator capacity may be calculated from 1) bucket capacity and recommendedspac<strong>in</strong>g found <strong>in</strong> Table 3.1, and 2) belt speed found <strong>in</strong> Table 3.2 as follows:Elevator capacity (m 3 /h) = (bucket capacity <strong>in</strong> m 3 /1,000,000) × (number ofbuckets per meter of belt) × (belt speed <strong>in</strong>meters/ m<strong>in</strong>ute) × (60 m<strong>in</strong>utes/ h);Table 3.2. Recommended elevator speeds <strong>for</strong> different size head pulleys.Pulley Average Head pulley rpmPulleycircum- bucketdiameterference projection Cal- Recom-(cm)(cm) (cm) culated mended30 94 10 6641 129 10 6051 160 10 5461 192 13 4976 239 15 4491 286 18 40122 383 20 36a Belt speed (m/m<strong>in</strong>) = (3.1416) × (pulley diameter <strong>in</strong> meters) × (recommended rpm).56514642313431Recommendedbeltspeed a(m/m<strong>in</strong>)536513808998119

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!