Mission Operations Reference Model. Draft ... - CCSDS
Mission Operations Reference Model. Draft ... - CCSDS
Mission Operations Reference Model. Draft ... - CCSDS
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
DRAFT RECOMMENDED PRACTICE FOR MISSION OPERATIONS REFERENCE MODELNOTES1 Splitting of an abstract message into multiple fragments is a Transport layer issue andis not shown in this document.2 If multiple separate technologies are to be used by the Transport layer to transmit thefragments, then the coordinate of these separate technologies is an implementationdetail and is not shown here.3 Recombination of the message fragments is a responsibility of the Transport layer.4.6.1 MESSAGE SENDING SEQUENCEFigure 4-13 shows the message sending sequence for the Transport layer. It includes the errorcases as alternative fragments.MAL Transport Layer Access ControlDestination EntityTransmit messagePre-check messagealt Message check failureReturn transport erroralt If message from a ProviderTransmit error message to transaction sourceEncode messageDigitally sign messagealt Security check failureReturn transport errorEncrypt messageOpen connection to destinationalt Connection failureReturn transport errorTransmit messagealt Message transport failureReturn transport errorReturn okFigure 4-13: Transport Layer Sending Sequence<strong>CCSDS</strong> 520.1-R-1 Page 4-16 October 2009