13.07.2015 Views

Appendix E - Technical Specifications for Drilling Operation.pdf

Appendix E - Technical Specifications for Drilling Operation.pdf

Appendix E - Technical Specifications for Drilling Operation.pdf

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EnviroLogic Resources, Inc.‣ Well construction diagram;‣ Development method(s), time spend on development, pumping rate and volume of waterproduced during development, clarity of water be<strong>for</strong>e and after development, record of fieldmeasurements of water quality made during development, method of disposal of developmentwater;‣ Results of location and elevation survey;‣ Static water level measured to the nearest 0.01 foot, with the date and time of measurement;and‣ Results of hydraulic conductivity tests, including raw data, test methods, analytical proceduresand data plots.Additionally, a geologic log will be developed by the consultant, including in<strong>for</strong>mation on the location ofthe well, penetration rate or standard penetration resistance, sampled intervals and percent recovery,stratigraphic and lithologic in<strong>for</strong>mation, aquifers, water-bearing zones and zones of high permeability orfracture encountered, contamination observed, and any other drilling observations including lostcirculation zones or other difficulties encountered during drilling. Unconsolidated deposits will beclassified on the log according to ASTM D-2488-00 as with subsurface boring logs. Rock will bedescribed by recording lithology, mineralogy, color, grain-size, degree of cementation, degree ofweathering, density and orientation of fractures, other primary and secondary features and physicalcharacteristics of the rock, and the rock quality designation.4.9 MONITORING WELL ABANDONMENTThe wells will be abandoned by first removing the well monument and surface seal material from thewells. The PVC well casing will be removed by overdrilling around the casing, pulling the casing, anddrilling the casing out completely. All casing, annular seal, and filter pack material will be removed byoverdrilling the well to the original total depth and borehole diameter prior to sealing. The overdrilledborehole will be filled with a sealing material (grout or bentonite) by piping the sealing material directly to14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!