Appendix E - Technical Specifications for Drilling Operation.pdf
Appendix E - Technical Specifications for Drilling Operation.pdf
Appendix E - Technical Specifications for Drilling Operation.pdf
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
EnviroLogic Resources, Inc.the bottom of the borehole using a tremie pipe and filling the annular space upward from that point. Thedischarge end of the tremie pipe will be kept submerged below the surface of the grout while it is beingapplied. If the casing is pulled, the sealing material will be added to the borehole using a tremie pipe asthe casing is slowly withdrawn.The abandonment procedures will be recorded on the appropriate WRD <strong>for</strong>m and provided to WRDwithin 30 days.15