13.07.2015 Views

Appendix E - Technical Specifications for Drilling Operation.pdf

Appendix E - Technical Specifications for Drilling Operation.pdf

Appendix E - Technical Specifications for Drilling Operation.pdf

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

EnviroLogic Resources, Inc.TECHNICAL SPECIFICATIONS FOR DRILLING OPERATIONSRemedial Investigation/Feasibility StudyAstoria Area-Wide Petroleum SiteAstoria, Oregon1.0 INTRODUCTIONThese specifications describe the methods and procedures required <strong>for</strong> the drilling and sampling of soilborings and constructing monitoring wells. The soil borings will be advanced using GeoProbe TM directpush, or another hydraulically-powered drilling rig. The hollow-stem auger drilling method may be usedto drill and install monitoring wells. The proposed boring locations are located at the Astoria Area-Wide Petroleum Site in Astoria, Oregon, as shown on Figure 1. The maximum estimated depth of thesoil borings will be approximately 20 feet. Final design of monitoring wells and selection of theirlocations will be completed after the initial soil characterization phase.Soil borings will be drilled on behalf of Potentially Responsible Parties (PRPs) involved in conducting aremedial investigation at the Astoria Area-Wide site. Each PRP has retained a consultant to manage thework, as shown below:PRPChevron TexacoDelphia OilHarris/Van WestMcCall OilNiemi OilPort of AstoriaQwestShell OilCONSULTANTPNG Environmental, Inc.Maul Foster & Alongi, In.Kleinfelder, Inc.Anchor Environmental, LLCGeoEngineers, Inc.EnviroLogic Resources, Inc.Tetra Tech EM, Inc.Hart Crowser, Inc.1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!