13.07.2015 Views

Appendix E - Technical Specifications for Drilling Operation.pdf

Appendix E - Technical Specifications for Drilling Operation.pdf

Appendix E - Technical Specifications for Drilling Operation.pdf

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

EnviroLogic Resources, Inc.The Contractor will be responsible <strong>for</strong> any damage to the screen during development. The plumbnessof the well shall be verified during development by lowering the development tools and attached pipingto the bottom of the well without obstruction or resistance. If it is determined by the consultant that anymonitoring wells installed by the Contractor are to be abandoned due to negligence of Contractorand/or his subcontractors (including, but not limited to, non-plumb casing and screen and breachedscreen or casing), the Contractor shall abandon the unsatisfactory well using methods approved by theconsultant and consistent with WRD rules.17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!