- Page 1: Rolling ShoresCommunityAssessment R
- Page 5: designed to help communities develo
- Page 8 and 9: Large ISTS (LISTS) cluster system w
- Page 10 and 11: Safety (ITPHS); assessing likelihoo
- Page 12 and 13: the type of structure existing on a
- Page 14 and 15: As documented in this section, the
- Page 16 and 17: 3.2 INDIVIDUAL SEWAGE TREATMENT SYS
- Page 18 and 19: confirmed at all properties in the
- Page 20 and 21: structures with little usable land.
- Page 22 and 23: o Disadvantages• High operation a
- Page 24 and 25: Design flows would impact permittin
- Page 26 and 27: further investigated. At this time
- Page 28 and 29: 3.5 SUMMARYThree alternatives are b
- Page 30 and 31: What can be noted from Table 5 is t
- Page 32 and 33: STEP system costs were calculated a
- Page 34 and 35: may have only a nominal $100 annual
- Page 36 and 37: addition, as in other tables, actua
- Page 38 and 39: o All properties install compliant
- Page 40 and 41: Figures
- Page 42 and 43: Bluffton75LegendCushing204DProject
- Page 44 and 45: !(!(!(!(!(!(!(!(!(!(!(Existing Clus
- Page 47 and 48: 920940920920920920940930920920920Ar
- Page 49 and 50: Mound SystemsMound systems are defi
- Page 51 and 52: Below-Grade SystemsBelow-grade syst
- Page 53 and 54:
1. Enter Number of Systems 1DRAFT -
- Page 55 and 56:
Appendix BParcel Data Spreadsheet a
- Page 57 and 58:
TILE OUTLET!(End Cap937.57!(SURFACI
- Page 59 and 60:
03.01358.14!(!(!(SUMP OUTLET!A!>SB
- Page 61 and 62:
!(NEW TANKS934.79703.01358.12!(!(!>
- Page 63 and 64:
!A!>SB 1936.26503.01358.10!(!(!(SUM
- Page 65 and 66:
!(SUMP OUTLETCambridge Dr03.01358.0
- Page 67 and 68:
!A!(SUMP OUTLET03.01358.05!(CLEAN O
- Page 69 and 70:
!ASB 1940.617!>SEWER CLEANOUT939.36
- Page 71 and 72:
03.01358.01Cambridge Dr!(!(!A!(SEWE
- Page 73:
Appendix CSeptic Tank Effluent Pump
- Page 76 and 77:
Date Completed:Completed By:Project
- Page 78 and 79:
Date Completed:Completed By:Project
- Page 80 and 81:
Date Completed:Completed By:Project
- Page 82 and 83:
Date Completed:Completed By:Project
- Page 84 and 85:
Date Completed:Completed By:Project
- Page 86 and 87:
Date Completed:Completed By:Project
- Page 88 and 89:
Date Completed:Completed By:Project
- Page 90 and 91:
Date Completed:Completed By:Project
- Page 92 and 93:
Date Completed:Completed By:Project
- Page 94 and 95:
Date Completed:Completed By:Project
- Page 96 and 97:
Date Completed:Completed By:Project
- Page 98 and 99:
Date Completed:Completed By:Project
- Page 100 and 101:
LISTS FlowEstimation:Existing Dwell
- Page 102 and 103:
MSTS FlowEstimation:Existing Dwelli
- Page 104 and 105:
Appendix FCost Analysis
- Page 106 and 107:
ESTIMATED MSTS CLUSTER CAPITAL COST
- Page 108 and 109:
OPERATION AND MAINTENANCE FOR LISTS
- Page 110 and 111:
OPERATION AND MAINTENANCE FOR CLUST
- Page 112 and 113:
September 7, 2012Wenck Associates I
- Page 114 and 115:
Property address: Cambridge Dr, Har
- Page 116 and 117:
Appendix HExisting Community Wastew
- Page 118 and 119:
• The “...installation, mainten