13.07.2015 Views

Cost and Effective Analysis of the LINKAGES ... - Linkages Project

Cost and Effective Analysis of the LINKAGES ... - Linkages Project

Cost and Effective Analysis of the LINKAGES ... - Linkages Project

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5. Financial Data Collection5.1. <strong>LINKAGES</strong>’ <strong>Cost</strong>sData on total costs related to Jordan activities were collected from accounting records kept at <strong>the</strong><strong>LINKAGES</strong> DC <strong>of</strong>fice. Data were disaggregated by general DC <strong>of</strong>fice support/management, fieldbasedcosts, <strong>and</strong> by specific consultancies to support in-country activities.<strong>LINKAGES</strong>’ in-country (field-based) costs for activities during <strong>the</strong> study period were collected from<strong>the</strong> <strong>LINKAGES</strong>/Jordan monthly imprest reports. The majority <strong>of</strong> costs to support activities incountry are paid directly by <strong>the</strong> Jordan field <strong>of</strong>fice <strong>and</strong> are accounted for through monthly financialreports - imprests. These reports have detailed cost information for <strong>the</strong> study period readily available.<strong>Cost</strong> data was disaggregated by specific activities (such as <strong>the</strong> cost for a training on a line item basis),<strong>and</strong> for administrative costs (such as <strong>of</strong>fice equipment <strong>and</strong> supply expenditures).The data from <strong>the</strong> imprest reports were compared with aggregate figures <strong>of</strong> field-based costs from <strong>the</strong>general DC accounting system. There were some differences in field-based cost data collectedthrough imprest reports <strong>and</strong> <strong>the</strong> DC accounting system. Data collected from monthly imprest reportswere available with a high level <strong>of</strong> detail which allowed disaggregating <strong>of</strong> data by individual activity<strong>and</strong> excluding costs related to activities that took place outside <strong>the</strong> study period, but reported during<strong>the</strong> study period. Imprest data in DC accounting system are reported on an aggregated basis <strong>and</strong>include all costs reported in <strong>the</strong> imprest for <strong>the</strong> period, which may include both costs <strong>of</strong> <strong>the</strong> activitiesin <strong>the</strong> study period <strong>and</strong> costs for previous period activities. The difference <strong>the</strong>refore relates to <strong>the</strong>costs <strong>of</strong> previous period activities.Data on costs paid directly by <strong>the</strong> DC <strong>of</strong>fice were collected from <strong>the</strong> DC accounting system <strong>and</strong>whenever applicable cross-referenced with payment records for each vendor kept at <strong>the</strong> DC <strong>of</strong>fice.Those costs primarily include costs related to DC-based management, administrative, <strong>and</strong> technicalsupport costs, technical assistance trips <strong>and</strong> consultancies to support in-country activities. There werealso some in-country costs that were paid directly from <strong>LINKAGES</strong> DC <strong>of</strong>fice, including residentadvisor costs, direct payments for contracts that exceed maximum amount allowed for field-basedtransactions, <strong>and</strong> corporate equipment insurance payments.5.2. MOH/MCH Partner <strong>Cost</strong>sData on MOH/MCH partner costs were collected through interviews <strong>and</strong> financial data provided by<strong>the</strong> MOH/MCH. Data were collected on activities conducted, expenditures made, <strong>and</strong> estimates <strong>of</strong>staff time spent on LAM activities. Interviews were conducted with key MOH/MCH personnel,including project counterparts <strong>and</strong> trainers, to determine staff time spent on <strong>LINKAGES</strong> <strong>and</strong>MOH/MCH trainings, planning <strong>and</strong> reporting on LAM-related activities, integrated supervision visitsto health facilities, <strong>and</strong> LAM data collection.<strong>LINKAGES</strong> <strong>Project</strong>/AED 5. Data Collection 15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!