17.07.2015 Views

Developed Operational Strategy - Low Level Waste Repository Ltd

Developed Operational Strategy - Low Level Waste Repository Ltd

Developed Operational Strategy - Low Level Waste Repository Ltd

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

LLWR <strong>Developed</strong> <strong>Operational</strong> <strong>Strategy</strong>10009/LLWR/LTP Date: March 2010and has a building crane, which could support future maintenance and operations on the site. It islocated south of the vaults on the LLWR site and is unobtrusive in appearance.3. The Office Accommodation, B728, is proposed to be continually used and maintained as siteoffice accommodation to support the ongoing LLW operations and projects during theconstruction of future LLW vaults.The PCM project will continue to evaluate other facilities for beneficial re-use.The LLWR asset management team will advertise PCM equipment for beneficial re-use. The primarymethod to communicate these assets will be via the NDA asset database. This equipment is variedand in good condition. It includes:• Forklift trucks• Fire detection systems• Breathing air systems• Assay systems• Uninterruptible Power Supply (UPS) systems• Radiological monitoring equipment• Ventilation systems• CCTV systems• Lifting equipmentTABLE 8 - PCM DECOMMISSIONING KEY ACTIVITIESKey activitiesComplete Interim Decommissioning (Cold & Dark) 2012Start DatesAward Demolition Contract Linked to Vault 8CappingPage 53 of 62

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!