17.07.2015 Views

update NewS from dNv to the tANker INduStry No 02 2011 - Hays

update NewS from dNv to the tANker INduStry No 02 2011 - Hays

update NewS from dNv to the tANker INduStry No 02 2011 - Hays

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Impact of EEDI and SEEMPImpact of EEDI and SEEMPThe amendments <strong>to</strong> MARPOL Annex VI on CO2 emissions were adopted by IMOin July <strong>2011</strong> and will enter in<strong>to</strong> force in 2013. IMO commissioned a joint study byLloyd’s Register and DNV <strong>to</strong> estimate <strong>the</strong> impact of <strong>the</strong> new requirements.Text: Tore Longva, DNVThe results <strong>from</strong> <strong>the</strong> study show that, asnew ships are built, <strong>the</strong> EEDI will graduallyreduce <strong>the</strong> emissions <strong>from</strong> <strong>the</strong> world fleetby 3% in 2<strong>02</strong>0, 13% in 2030 and 30% in2050. The SEEMP will not directly mandatean emission reduction but, due <strong>to</strong>increased awareness of costs and reductionpotentials, <strong>the</strong> study estimated <strong>the</strong> reduction<strong>to</strong> be 5-10% <strong>from</strong> 2015 onwards.Effect of a Ship Energy EfficiencyManagement Plan (SEEMP) The EEDIwill mandate improvements in hull designand machinery, while <strong>the</strong> SEEMP willrequire ship owners <strong>to</strong> develop a plan for<strong>the</strong>ir ships. Operational measures havesignificant reduction potentials that, basedon current fuel prices, are cost-effective.However, <strong>the</strong>re seems <strong>to</strong> be limited uptakeof <strong>the</strong>se measures caused by non-financialbarriers, such as lack of competence, lackof cooperation between players and splitincentives. Higher fuel prices will onlylead <strong>to</strong> a limited extra implementationof measures, but over time <strong>the</strong>y will drivetechnology development and innovation.O<strong>the</strong>r incentives will have <strong>to</strong> be in place<strong>to</strong> implement <strong>the</strong> existing set of measures.The SEEMP will initiate moni<strong>to</strong>ring andtarget setting as well as <strong>the</strong> examinationof concrete measures <strong>to</strong> be implementedfor each vessel. Awareness of <strong>the</strong> potentialsavings is expected <strong>to</strong> increase <strong>the</strong> uptakeof measures.Pho<strong>to</strong>: DNVWaiver clause In <strong>the</strong> final negotiations,a clause was inserted in <strong>the</strong> regulations8 | Tanker UPDATE NO. 2 <strong>2011</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!