21.07.2015 Views

Sambhavi Energy & Coal Beneficiation Pvt. Limited - Seiaacg.org

Sambhavi Energy & Coal Beneficiation Pvt. Limited - Seiaacg.org

Sambhavi Energy & Coal Beneficiation Pvt. Limited - Seiaacg.org

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Sambhavi</strong> <strong>Energy</strong> & <strong>Coal</strong> <strong>Beneficiation</strong> <strong>Pvt</strong>. <strong>Limited</strong>Pre-feasibility report for <strong>Coal</strong> Washery5.0 Planning Brief5.1 Planning Concept:It is proposed to upgrade and expansion existing coal crushing unit [0.60 MTPA] to0.96 MTPA <strong>Coal</strong> <strong>Beneficiation</strong> Plant within existing premises only.5.2 Population Projection:There are no major human settlements in the close vicinity of the project site. Themanpower requirement will be sourced from the local areas to the extent possible;hence not much of settlement of outside people in the area. However populationconcentration may increase around the project site due to increase in ancillaryactivities.5.3 Land use planning:About 12.85 Acres of land acquired for installation of existing coal crushing unit atVillage: Nawgawa and Gatori , Tehsil and District: Bilaspur [C.G.] and the proposedupgradation will be carried out within existing premises only. No additional landpurchasing is envisages for proposed project. The tentative land area statement ofproposed project is given as below:ItemArea in AcresBuilt up area [existing + Proposed] 2.40Internal roads 1.20Other Ancillary Area 1.20Storage yard 3.00Greenbelt 4.25Open area 0.80Total land 12.855.4 Amenities/Facilities.Facilities like canteen, rest room and indoor games facilities will be provided in theproposed plant as basic facilities to workers. No other additional facilities areproposed.*****13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!