21.07.2015 Views

Sambhavi Energy & Coal Beneficiation Pvt. Limited - Seiaacg.org

Sambhavi Energy & Coal Beneficiation Pvt. Limited - Seiaacg.org

Sambhavi Energy & Coal Beneficiation Pvt. Limited - Seiaacg.org

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Sambhavi</strong> <strong>Energy</strong> & <strong>Coal</strong> <strong>Beneficiation</strong> <strong>Pvt</strong>. <strong>Limited</strong>Pre-feasibility report for <strong>Coal</strong> Washery6.6 Drinking Water Management:It is estimated that approx 4.0 KL/ Day of water will be required during operationof proposed plant. The desired amount of water will be drawn from ground watersources.6.7 Sewerage System.Domestic effluent collected through toilet blocks and other areas will be collectedthrough well designed sewer network and send to Septic tanks followed by soakpits. No effluent will be left-out after Soak pits.6.8 Industrial Waste Management.There will not be any industrial effluent generation from the proposed project as itis proposed to upgrade existing coal crushing unit to wet type of coal washery; inwhich we have proposed to implement closed circuit system. This activity doesn’tgenerate any effluent.6.9 Solid Waste Management.Only reject will be generating to the tune of 800 Tons/ Day or 240,000 Tons/ Year.The same will be given back to those units for whom we’ll beneficiate the coal.6.10 Power requirement & its source.No additional power will be required for operation of proposed up-gradation.However power requirement for existing unit approx. 1.0 – 1.5 MW is being drawnnearby CSPGCL grid.*****15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!