Planetary Gear Drive
Seisa Compower DP1000 Series Catalog - Sumitomo Drive ...
Seisa Compower DP1000 Series Catalog - Sumitomo Drive ...
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
E Technical Data ■<br />
● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ●<br />
■Painting Specifications<br />
Surface<br />
Condition<br />
Cast Iron<br />
Class 1<br />
Steel<br />
Plate<br />
Class 2<br />
Kind of Painting<br />
Painting Specification<br />
Class<br />
Painting of Days<br />
Coating<br />
Type<br />
Finish Coat<br />
(Thickness:µm)<br />
Type of Coating<br />
Standard painting<br />
1<br />
-<br />
Under<br />
Modified alkyd resin<br />
(20~40)<br />
0<br />
1<br />
Phallic acid Finish<br />
Alkyd resin paint<br />
(15~30)<br />
2<br />
-<br />
Under<br />
Modified alkyd resin<br />
Standard export<br />
(40~80)<br />
2<br />
panting<br />
1<br />
Modified epoxy Finish<br />
Vinyl modified epoxy resin<br />
(15~30)<br />
Modified epoxy 3<br />
Under<br />
1<br />
(20~40)<br />
Vinyl modified epoxy resin<br />
Finish<br />
2<br />
(30~60)<br />
Vinyl modified epoxy resin<br />
2<br />
Under<br />
Lead rust preventive paint<br />
Long of oil<br />
(40~70)<br />
7<br />
phallic<br />
2<br />
Finish<br />
Synthetics resin paint<br />
Special painting<br />
(30~60)<br />
(Including rust-<br />
2<br />
Under<br />
proof and heat<br />
(40~70)<br />
Lead rust preventive paint<br />
resisting painting)<br />
1<br />
Chloride rubber 10 Second<br />
One layer of<br />
(20~40)<br />
Phenol M.I.O. paint<br />
Modified alkyd<br />
2<br />
Finish<br />
resin Primer as the<br />
(40~70)<br />
Chloride rubber paint<br />
first prime<br />
2<br />
Under<br />
Lead rust preventive paint<br />
(40~70)<br />
Phenol 7<br />
2<br />
Finish<br />
Phenol resin enamel<br />
(30~60)<br />
Heat-proof silver 7<br />
Under<br />
1<br />
(20~40)<br />
Lead rust preventive paint<br />
Finish<br />
1<br />
(15~30)<br />
Aluminum paint<br />
1 Special permeability epoxy<br />
Under<br />
(50~60)<br />
aluminum paint<br />
Epoxy 10<br />
3<br />
Finish<br />
Polyamide epoxy<br />
Extra rust-proof<br />
(120~240)<br />
painting<br />
1 Special permeability epoxy<br />
Under<br />
(50~60)<br />
aluminum paint<br />
Polyurethane 10<br />
3<br />
Polyisocyanate urethane<br />
Finish<br />
(45~90)<br />
resin paint<br />
Extra rust-proof<br />
painting(Sand blast<br />
under coating)<br />
Thick film epoxy 12<br />
5<br />
(250~350)<br />
Thick film type modified epoxy<br />
resin paint<br />
Note: 1. Days mean extra days necessary for Special Painting in comparison with Standard Painting.<br />
2. Our standard color is Munsell 2.5G 6/3.<br />
■Rust Proof Standard<br />
Application<br />
Standard under coat<br />
Standard finish coat<br />
Export standard<br />
Moderate corrosive<br />
atmosphere, seaside,<br />
outdoor humid<br />
atmosphere, etc.<br />
Ocean-going vessels,<br />
bridge, seaside,<br />
outdoor humid<br />
atmosphere, etc.<br />
Ocean-going vessels,<br />
bridge, seaside,<br />
outdoor humid<br />
atmosphere, etc.<br />
In-and-outdoor of<br />
acid treating plant<br />
and chemical plant,<br />
etc.<br />
Heating<br />
furnace(120℃),<br />
etc.<br />
Nuclear power<br />
generation<br />
Nuclear power<br />
generation<br />
Submersible<br />
equipment, marine<br />
structure, etc.<br />
Rust proofing treatment has been conducted on all completely assembled models prior to shipment.<br />
1. Standard rust proofing specifications<br />
(1) Outside rust proofing specifications<br />
Rust proofing oil has been applied to products before shipment. Check the rust proofing conditions every 6 months after<br />
shipment, and conduct rust proofing treatment, if necessary.<br />
(2) Inside rust proofing specifications<br />
Rust proofing period 6 months<br />
Generally to be stored inside the warehouse, relatively free of humidity, dust, extreme temperature<br />
Storage condition fluctuation, corrosive gas, and similar atmosphere. After shipment, the product shall be operated<br />
5-10 minutes every 2-3 months with our recommended lubricants.<br />
2. Export rust proofing specifications<br />
Consult us for export rust proofing when export specifications or severe specifications are required.<br />
E―3