29.08.2015 Views

Planetary Gear Drive

Seisa Compower DP1000 Series Catalog - Sumitomo Drive ...

Seisa Compower DP1000 Series Catalog - Sumitomo Drive ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

E Technical Data ■<br />

● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ●<br />

■Painting Specifications<br />

Surface<br />

Condition<br />

Cast Iron<br />

Class 1<br />

Steel<br />

Plate<br />

Class 2<br />

Kind of Painting<br />

Painting Specification<br />

Class<br />

Painting of Days<br />

Coating<br />

Type<br />

Finish Coat<br />

(Thickness:µm)<br />

Type of Coating<br />

Standard painting<br />

1<br />

-<br />

Under<br />

Modified alkyd resin<br />

(20~40)<br />

0<br />

1<br />

Phallic acid Finish<br />

Alkyd resin paint<br />

(15~30)<br />

2<br />

-<br />

Under<br />

Modified alkyd resin<br />

Standard export<br />

(40~80)<br />

2<br />

panting<br />

1<br />

Modified epoxy Finish<br />

Vinyl modified epoxy resin<br />

(15~30)<br />

Modified epoxy 3<br />

Under<br />

1<br />

(20~40)<br />

Vinyl modified epoxy resin<br />

Finish<br />

2<br />

(30~60)<br />

Vinyl modified epoxy resin<br />

2<br />

Under<br />

Lead rust preventive paint<br />

Long of oil<br />

(40~70)<br />

7<br />

phallic<br />

2<br />

Finish<br />

Synthetics resin paint<br />

Special painting<br />

(30~60)<br />

(Including rust-<br />

2<br />

Under<br />

proof and heat<br />

(40~70)<br />

Lead rust preventive paint<br />

resisting painting)<br />

1<br />

Chloride rubber 10 Second<br />

One layer of<br />

(20~40)<br />

Phenol M.I.O. paint<br />

Modified alkyd<br />

2<br />

Finish<br />

resin Primer as the<br />

(40~70)<br />

Chloride rubber paint<br />

first prime<br />

2<br />

Under<br />

Lead rust preventive paint<br />

(40~70)<br />

Phenol 7<br />

2<br />

Finish<br />

Phenol resin enamel<br />

(30~60)<br />

Heat-proof silver 7<br />

Under<br />

1<br />

(20~40)<br />

Lead rust preventive paint<br />

Finish<br />

1<br />

(15~30)<br />

Aluminum paint<br />

1 Special permeability epoxy<br />

Under<br />

(50~60)<br />

aluminum paint<br />

Epoxy 10<br />

3<br />

Finish<br />

Polyamide epoxy<br />

Extra rust-proof<br />

(120~240)<br />

painting<br />

1 Special permeability epoxy<br />

Under<br />

(50~60)<br />

aluminum paint<br />

Polyurethane 10<br />

3<br />

Polyisocyanate urethane<br />

Finish<br />

(45~90)<br />

resin paint<br />

Extra rust-proof<br />

painting(Sand blast<br />

under coating)<br />

Thick film epoxy 12<br />

5<br />

(250~350)<br />

Thick film type modified epoxy<br />

resin paint<br />

Note: 1. Days mean extra days necessary for Special Painting in comparison with Standard Painting.<br />

2. Our standard color is Munsell 2.5G 6/3.<br />

■Rust Proof Standard<br />

Application<br />

Standard under coat<br />

Standard finish coat<br />

Export standard<br />

Moderate corrosive<br />

atmosphere, seaside,<br />

outdoor humid<br />

atmosphere, etc.<br />

Ocean-going vessels,<br />

bridge, seaside,<br />

outdoor humid<br />

atmosphere, etc.<br />

Ocean-going vessels,<br />

bridge, seaside,<br />

outdoor humid<br />

atmosphere, etc.<br />

In-and-outdoor of<br />

acid treating plant<br />

and chemical plant,<br />

etc.<br />

Heating<br />

furnace(120℃),<br />

etc.<br />

Nuclear power<br />

generation<br />

Nuclear power<br />

generation<br />

Submersible<br />

equipment, marine<br />

structure, etc.<br />

Rust proofing treatment has been conducted on all completely assembled models prior to shipment.<br />

1. Standard rust proofing specifications<br />

(1) Outside rust proofing specifications<br />

Rust proofing oil has been applied to products before shipment. Check the rust proofing conditions every 6 months after<br />

shipment, and conduct rust proofing treatment, if necessary.<br />

(2) Inside rust proofing specifications<br />

Rust proofing period 6 months<br />

Generally to be stored inside the warehouse, relatively free of humidity, dust, extreme temperature<br />

Storage condition fluctuation, corrosive gas, and similar atmosphere. After shipment, the product shall be operated<br />

5-10 minutes every 2-3 months with our recommended lubricants.<br />

2. Export rust proofing specifications<br />

Consult us for export rust proofing when export specifications or severe specifications are required.<br />

E―3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!