A <strong>Guide</strong> <strong>to</strong> <strong>Hydrocarbon</strong><br />

<strong>Licences</strong> <strong>in</strong> <strong>Denmark</strong><br />

<strong>Exploration</strong> <strong>and</strong> Drill<strong>in</strong>g Activities<br />

September 11


Contents<br />

Contents ...................................................................................................................... 1<br />

Colophon .................................................................................................................... 2<br />

Preface ......................................................................................................................... 3<br />

1. Government Adm<strong>in</strong>istration <strong>in</strong> the Oil <strong>and</strong> Gas Sec<strong>to</strong>r ........................... 4<br />

1.1 The Danish Energy Agency (DEA) ................................................................................................................ 4<br />

1.2 Other Relevant Authorities .............................................................................................................................. 6<br />

2. General Regulations, etc., for Oil <strong>and</strong> Gas Activities ............................. 10<br />

2.1 Important Legislation, etc. ............................................................................................................................. 10<br />

2.2 Establishment of bus<strong>in</strong>ess ............................................................................................................................ 12<br />

2.3 <strong>Guide</strong>l<strong>in</strong>es for Insurance of <strong>Exploration</strong> Activities (Model Licence Section 30) .................................... 12<br />

2.4 Reimbursement of Public Expenditure ........................................................................................................ 13<br />

2.5 F<strong>in</strong>ancial Information ..................................................................................................................................... 14<br />

2.6 Danish/English Language ............................................................................................................................. 14<br />

3. Pre-<strong>in</strong>vestigations (seismic surveys, site surveys, etc.) ....................... 15<br />

4. Drill<strong>in</strong>g Operations ........................................................................................... 16<br />

4.1 <strong>Exploration</strong> <strong>and</strong> Appraisal Drill<strong>in</strong>g Operations ........................................................................................... 16<br />

4.2 Production Drill<strong>in</strong>g Operations ..................................................................................................................... 16<br />

4.3 Submission of Geological Information ........................................................................................................ 16<br />

4.4 DEA Contact System for Drill<strong>in</strong>g Operations ............................................................................................. 17<br />

4.5 DEA Press Releases ..................................................................................................................................... 17<br />

5. Offshore Emergency Response Plans ........................................................ 18<br />

5.1. Regulations ..................................................................................................................................................... 18<br />

5.2. <strong>Guide</strong>l<strong>in</strong>es ....................................................................................................................................................... 18<br />

5.3 The Authorities’ Emergency Response Committee .................................................................................. 19<br />

5.4 Hydrogen Sulphide Emergency Response ................................................................................................ 20<br />

6. Environmental impact assessments (EIAs), consequence<br />

assessments etc. .................................................................................................... 21<br />

6.1. Regulations ..................................................................................................................................................... 21<br />

6.2. EIA .................................................................................................................................................................... 21<br />

6.3. Protection of <strong>in</strong>ternational nature conservation areas .............................................................................. 21<br />

6.4. Protection of certa<strong>in</strong> species ........................................................................................................................ 22<br />

6.5. Other ................................................................................................................................................................ 22<br />

6.6. Location of <strong>in</strong>ternational nature protection areas ...................................................................................... 22


Colophon<br />

Title: <strong>Guide</strong> <strong>to</strong> <strong>Hydrocarbon</strong> <strong>Licences</strong> <strong>in</strong> <strong>Denmark</strong> – <strong>Exploration</strong> <strong>and</strong> Drill<strong>in</strong>g,<br />

September 2011<br />

Publisher: Danish Energy Agency<br />

Edi<strong>to</strong>r: Steffen B. Olsen, the Danish Energy Agency<br />

Crea<strong>to</strong>r affiliation: Danish Energy Agency<br />

Contribu<strong>to</strong>rs: Danish Energy Agency (Layout), Rita Rosenberg Translation,<br />

Global<strong>Denmark</strong> Translations <strong>and</strong> the Danish Energy Agency (Translation)<br />

Language: English<br />

Date: 2011-09-30<br />

Format: pdf<br />

Danish Energy Agency<br />

Amaliegade 44<br />

DK-1256 Copenhagen K<br />

<strong>Denmark</strong><br />

Telephone (+45) 33 92 67 00<br />

Fax (+45) 33 11 47 43<br />

E-mail ens@ens.dk<br />

Homepage www.ens.dk<br />

2


Preface<br />

The purpose of this guide is <strong>to</strong> give an overview of the most important regulations<br />

<strong>and</strong> procedures <strong>to</strong> be followed when carry<strong>in</strong>g out hydrocarbon activities <strong>in</strong><br />

<strong>Denmark</strong>.<br />

The guide has been compiled ma<strong>in</strong>ly with activities <strong>in</strong> the traditional exploration<br />

areas <strong>in</strong> the North Sea <strong>in</strong> m<strong>in</strong>d.<br />

The guide does not <strong>in</strong>clude guidance on exploration projects onshore where<br />

regulations <strong>in</strong> many ways are different <strong>and</strong> other authorities are <strong>in</strong>volved.<br />

The Danish Energy Agency hopes that the guide will provide a better<br />

underst<strong>and</strong><strong>in</strong>g of the Danish oil <strong>and</strong> gas sec<strong>to</strong>r. It is our hope that the guide will be<br />

useful not only for present licensees, but also for companies <strong>in</strong>terested <strong>in</strong> start<strong>in</strong>g<br />

up oil <strong>and</strong> gas activities <strong>in</strong> <strong>Denmark</strong>.<br />

In case the contents of the guide should give rise <strong>to</strong> any questions, please do not<br />

hesitate <strong>to</strong> contact us for further <strong>in</strong>formation.<br />

The guide is only available <strong>in</strong> this pdf version <strong>and</strong> not as a pr<strong>in</strong>ted publication.<br />

3


1. Government Adm<strong>in</strong>istration <strong>in</strong> the Oil <strong>and</strong> Gas<br />

Sec<strong>to</strong>r<br />

1.1 The Danish Energy Agency (DEA)<br />

The Danish Energy Agency is a government body under the M<strong>in</strong>istry of Climate<br />

<strong>and</strong> Energy <strong>and</strong> was established by law <strong>in</strong> 1976. The DEA assists the M<strong>in</strong>ister for<br />

Climate <strong>and</strong> Energy <strong>and</strong> other government authorities <strong>in</strong> energy matters. It is the<br />

responsibility of the DEA <strong>to</strong> follow <strong>and</strong> evaluate the Danish <strong>and</strong> <strong>in</strong>ternational<br />

progress <strong>in</strong> the fields of energy production, supply <strong>and</strong> research. The DEA<br />

adm<strong>in</strong>isters energy legislation for power <strong>and</strong> heat<strong>in</strong>g supply, renewable energy,<br />

<strong>and</strong> exploration for <strong>and</strong> production of oil <strong>and</strong> natural gas.<br />

Matters relat<strong>in</strong>g <strong>to</strong> exploration for <strong>and</strong> production of oil <strong>and</strong> gas are dealt with by<br />

the Energy Resources division.<br />

1.1.1 The Functions of the DEA <strong>in</strong> the Oil <strong>and</strong> Gas Sec<strong>to</strong>r<br />

The DEA is authorised <strong>to</strong> exercise all the regulations <strong>and</strong> the adm<strong>in</strong>istration of<br />

hydrocarbon activities on the Danish cont<strong>in</strong>ental shelf. However, decisions made<br />

by the DEA can be referred <strong>to</strong> the M<strong>in</strong>ister for Climate <strong>and</strong> Energy.<br />

The DEA adm<strong>in</strong>isters <strong>and</strong> supervises exploration for <strong>and</strong> production of oil <strong>and</strong> gas,<br />

salt production, geothermal energy <strong>and</strong> s<strong>to</strong>rage accord<strong>in</strong>g <strong>to</strong> the Subsoil Act. In<br />

addition, the DEA adm<strong>in</strong>isters a number of other Acts: the Offshore Safety Act, the<br />

Pipel<strong>in</strong>es Act <strong>and</strong> the Act on the Cont<strong>in</strong>ental Shelf. These Acts deal with major<br />

hazards as well as occupational health <strong>and</strong> safety <strong>in</strong> connection with offshore oil<br />

<strong>and</strong> gas activities <strong>and</strong> the utilisation of onshore pipel<strong>in</strong>es from the oil <strong>and</strong> gas<br />

fields <strong>in</strong> the North Sea. The DEA also draws up proposals for rules <strong>and</strong> regulations<br />

with<strong>in</strong> this area. Health <strong>and</strong> safety <strong>in</strong> onshore activities are covered by the Work<strong>in</strong>g<br />

4


Environment Act <strong>and</strong> is adm<strong>in</strong>istered by the National Work<strong>in</strong>g Environment<br />

Authority (Arbejdstilsynet).<br />

The DEA, likewise, prepares the resource <strong>and</strong> f<strong>in</strong>ancial forecasts for oil <strong>and</strong> gas<br />

production <strong>and</strong> is responsible for prepar<strong>in</strong>g <strong>and</strong> implement<strong>in</strong>g licens<strong>in</strong>g rounds <strong>and</strong><br />

issu<strong>in</strong>g licences. The DEA also approves development plans <strong>and</strong> production<br />

profiles for the oil <strong>and</strong> gas fields.<br />

The DEA cooperates with correspond<strong>in</strong>g authorities <strong>in</strong> the other North Sea<br />

countries <strong>and</strong> participates <strong>in</strong> regula<strong>to</strong>ry work with<strong>in</strong> the EU concern<strong>in</strong>g oil <strong>and</strong> gas<br />

activities.<br />

Adm<strong>in</strong>istration <strong>and</strong> supervision of oil <strong>and</strong> gas related matters are taken care of by<br />

the Energy Resources Division of the DEA. Responsibilities for exploitation of<br />

resources <strong>and</strong> HSE (health, safety <strong>and</strong> environment) are divided between two<br />

separate units.<br />

Thus, the DEA approves pre-<strong>in</strong>vestigations (seismic surveys etc.) <strong>and</strong> drill<strong>in</strong>g<br />

operations <strong>and</strong> may approve deviations from work programmes. In addition the<br />

DEA approves the design of production <strong>in</strong>stallations <strong>and</strong> pipel<strong>in</strong>es <strong>and</strong> grants<br />

permits for operation of these <strong>in</strong>stallations as well as mobile offshore <strong>in</strong>stallations<br />

(drill<strong>in</strong>g rigs, lay barges, etc.) <strong>in</strong> co-operation with the Danish Maritime Authority.<br />

Moreover, the DEA supervises compliance with statu<strong>to</strong>ry orders etc. regard<strong>in</strong>g<br />

safety <strong>and</strong> health aspects of operation <strong>and</strong> design of offshore <strong>in</strong>stallations. The<br />

DEA also supervises that regulations <strong>and</strong> licence conditions are fulfilled (Subsoil<br />

Act sections 25-26). In this connection the DEA participates <strong>in</strong> operat<strong>in</strong>g <strong>and</strong><br />

technical committee meet<strong>in</strong>gs as an observer, cf. sections 18-19 of the Model<br />

Licence.<br />

F<strong>in</strong>ally, the DEA issues publications concern<strong>in</strong>g oil <strong>and</strong> gas activities <strong>in</strong> <strong>Denmark</strong><br />

i.e. reserve estimates, production forecasts <strong>and</strong> monthly production surveys.<br />

These <strong>to</strong>pics are <strong>in</strong>cluded <strong>in</strong> the DEA’s annual report on oil <strong>and</strong> gas activities <strong>in</strong><br />

<strong>Denmark</strong>.<br />

1.1.2 Contact<strong>in</strong>g the Danish Energy Agency<br />

By Mail: The Danish Energy Agency<br />

Amaliegade 44<br />

DK-1256 Copenhagen K<br />

By Telephone: (+45) 33 92 67 00 (Mo-Th 8:30-16:00, Fr 8:30-15:30, Local time)<br />

Contact system for drill<strong>in</strong>g operations (outside office hours):<br />

(+45) 33 92 79 18. A recorded message will <strong>in</strong>form about the DEA<br />

person on duty.<br />

By Facsimile: (+45) 33 11 47 43<br />

E-mail: ens@ens.dk (General)<br />

<strong>in</strong>dv<strong>in</strong>d<strong>in</strong>gsekr@ens.dk (Energy Resources Division)<br />

5


Contact Persons for Specific Activities:<br />

Seismic Surveys/Site Surveys:<br />

Mar<strong>in</strong>a Skriver (ms@ens.dk) / Steffen Bjørn Olsen (sbo@ens.dk)<br />

Drill<strong>in</strong>g Operations <strong>and</strong> Programmes:<br />

Søren Frederiksen (sf@ens.dk) / Rolf Kallesøe (rk@ens.dk)<br />

Safety <strong>and</strong> Approval of Mobile Offshore Units:<br />

Gert Neuchs Christensen (gnc@ens.dk) / Mohamed El Halimi (mha@ens.dk)<br />

Emergency Response Plans for Offshore Operations:<br />

Gert Neuchs Christensen (gnc@ens.dk)<br />

Legislation:<br />

Lene Dalsgaard (ld@ens.dk) / Ann Christ<strong>in</strong> Lia (acl@ens.dk) (resources)<br />

Hans Erik Christensen (hec@ens.dk) (health <strong>and</strong> safety)<br />

Economic Issues:<br />

Jens Skov-Spill<strong>in</strong>g (jsk@ens.dk)<br />

Insurance:<br />

Jens-Birger Chris<strong>to</strong>phersen (jbc@ens.dk)<br />

Environmental Impact Assessments <strong>and</strong> nature conservation:<br />

Katja Scharmann (ksc@ens.dk) / Kirsten Lundt Erichsen (kle@ens.dk) /<br />

Ulla Elm-Larsen (ue@ens.dk)<br />

1.2 Other Relevant Authorities<br />

Apart from the Danish Energy Agency functions <strong>in</strong> the oil <strong>and</strong> gas sec<strong>to</strong>r, the<br />

activities of the licensees are subject <strong>to</strong> approval from other Danish authorities. In<br />

the follow<strong>in</strong>g a list of these authorities is presented <strong>to</strong>gether with a brief description<br />

of the ma<strong>in</strong> function of the authority <strong>in</strong> the oil <strong>and</strong> gas sec<strong>to</strong>r. Especially the<br />

environmental regulations <strong>and</strong> the approval procedures for oil spill cont<strong>in</strong>gency<br />

plans should be considered.<br />

1.2.1 Other Authorities <strong>and</strong> their Ma<strong>in</strong> Functions <strong>in</strong> the Oil <strong>and</strong> Gas<br />

Sec<strong>to</strong>r<br />

De Nationale Geologiske Undersøgelser for Danmark og Grønl<strong>and</strong> (The<br />

Geological Survey of <strong>Denmark</strong> <strong>and</strong> Greenl<strong>and</strong>)<br />

Homepage: www.geus.dk<br />

The Geological Survey collects samples <strong>and</strong> <strong>in</strong>formation from subsoil activities<br />

pursuant <strong>to</strong> section 34 of the Subsoil Act. Furthermore, the Geological Survey<br />

h<strong>and</strong>les the access <strong>to</strong> <strong>and</strong> sales of released well <strong>in</strong>formation <strong>and</strong> seismic data.<br />

6


Arbejdstilsynet (The National Work<strong>in</strong>g Environment Authority)<br />

Website: www.arbejdstilsynet.dk<br />

Supervision of health <strong>and</strong> safety on onshore activities accord<strong>in</strong>g <strong>to</strong> the Work<strong>in</strong>g<br />

Environment Act.<br />

Farv<strong>and</strong>svæsenet (The Royal Danish Adm<strong>in</strong>istration of Navigation <strong>and</strong><br />

Hydrography)<br />

Website: www.fomfrv.dk<br />

Receives notification from the DEA about seismic <strong>in</strong>vestigations <strong>and</strong> site surveys<br />

offshore <strong>and</strong> about the location of mobile offshore units.<br />

Fiskeridirek<strong>to</strong>ratet (The Danish Direc<strong>to</strong>rate of Fisheries)<br />

Website: www.fiskeridirek<strong>to</strong>ratet.dk<br />

Receives notification from the DEA about seismic <strong>in</strong>vestigations <strong>and</strong> site surveys<br />

offshore.<br />

Forsvarsm<strong>in</strong>isteriet (The Danish M<strong>in</strong>istry of Defence)<br />

Website: www.forsvarsm<strong>in</strong>isteriet.dk<br />

Receives notification from the DEA about seismic <strong>in</strong>vestigations <strong>and</strong> site surveys<br />

offshore.<br />

IT- og Telestyrelsen (The National IT <strong>and</strong> Telecom Agency)<br />

Website: http://en.itst.dk/<br />

Kystdirek<strong>to</strong>ratet (Danish Coastal Authority)<br />

Website: www.kyst.dk<br />

Grants permits for establisment of certa<strong>in</strong> pipel<strong>in</strong>es, for telecommunication cables<br />

<strong>and</strong> for certa<strong>in</strong> surveys <strong>in</strong> the terri<strong>to</strong>rial waters.<br />

Miljøstyrelsen (The Danish Environmental Protection Agency)<br />

Website: www.mst.dk<br />

Discharge <strong>to</strong> the sea from offshore <strong>in</strong>stallations. Use of OSPAR-listed chemicals<br />

on offshore <strong>in</strong>stallations. Emergency plans <strong>in</strong> case of spills from the offshore<br />

<strong>in</strong>stallations.<br />

7


Naturstyrelsen (Nature Agency)<br />

Website: www.nst.dk<br />

Protection of nature <strong>and</strong> grant<strong>in</strong>g of permits for exploration <strong>and</strong> exploitation of raw<br />

materials <strong>in</strong> the seabed. Receives notification from the DEA about seismic surveys<br />

<strong>and</strong> site surveys offshore.<br />

Nordsøfonden (The Danish North Sea Fund)<br />

Website: www.nordsoeen.dk<br />

The Danish North Sea Fund was established <strong>in</strong> 2005 <strong>to</strong> exercise the state<br />

participation <strong>in</strong> new licences.<br />

SKAT, S<strong>to</strong>re selskaber<br />

Website: www.skat.dk<br />

SKAT is the Danish government body responsible for collect<strong>in</strong>g taxes <strong>and</strong> duties.<br />

Statens Institut for Strålebeskyttelse (The National Institute of Radiation<br />

Protection)<br />

Website: www.sis.dk (only <strong>in</strong> Danish)<br />

Grants permits for use <strong>and</strong> s<strong>to</strong>rage of radioactive materials <strong>and</strong> ionis<strong>in</strong>g radiation<br />

sources.<br />

Sundhedsstyrelsen (The National Board of Health)<br />

Website: www.sundhedsstyrelsen.dk<br />

Education of medics. Design of the sick bay <strong>and</strong> medical equipment on offshore<br />

<strong>in</strong>stallations.<br />

Søfartsstyrelsen (The Danish Maritime Authority)<br />

Website: www.dma.dk<br />

Construction, strength, buoyancy, maritime design <strong>and</strong> equipment on mobile<br />

offshore drill<strong>in</strong>g units <strong>and</strong> other mobile offshore units.<br />

Life sav<strong>in</strong>g appliances <strong>and</strong> their launch<strong>in</strong>g equipment on production <strong>in</strong>stallations.<br />

Div<strong>in</strong>g operations <strong>in</strong>clud<strong>in</strong>g div<strong>in</strong>g equipment <strong>and</strong> professional div<strong>in</strong>g operations.<br />

Søværnets Operative Komm<strong>and</strong>o (Admiral Danish Fleet)<br />

Telephone: (+45) 89 43 30 99 (24 hour service)<br />

Website <strong>in</strong> English: http://forsvaret.dk/sok/eng/Pages/default.aspx<br />

Responsible for rescue operations. Alarm centre <strong>in</strong> case of emergency situations<br />

offshore.<br />

8


Trafikstyrelsen (Danish Transport Authority)<br />

Website: www.trafikstyrelsen.dk<br />

Approval of helidecks.<br />

9


2. General Regulations, etc., for Oil <strong>and</strong> Gas<br />

Activities<br />

2.1 Important Legislation, etc.<br />

Important legislation govern<strong>in</strong>g Danish oil <strong>and</strong> gas activities <strong>in</strong>cludes the follow<strong>in</strong>g<br />

acts, orders, guidel<strong>in</strong>es, etc. Please contact the DEA for <strong>in</strong>formation on possible<br />

subsequent updates.<br />

Act No. 293 of 10 June 1981 as revised by Consolidated Act No. 960 of 13<br />

September 2011 on the Use of the Danish Subsoil (the Subsoil Act).<br />

By Act No. 541 of 30 June 2011 the Subsoil Act was amended <strong>to</strong> <strong>in</strong>clude<br />

changes due <strong>to</strong> the implementation of Directive 2009/31/EC of the European<br />

Parliament <strong>and</strong> the Council of 23 April 2009 on geological s<strong>to</strong>rage of carbon<br />

dioxide, a revision of article 5 concern<strong>in</strong>g prioritiz<strong>in</strong>g the use of the subsoil, a<br />

revision of article 16 regard<strong>in</strong>g pr<strong>in</strong>ciples for third party access <strong>to</strong> exist<strong>in</strong>g<br />

<strong>in</strong>frastructure, <strong>and</strong> <strong>in</strong>troduction of new articles on the procedure for issuance of<br />

licenses for exploration for <strong>and</strong> recovery of geothermal energy.<br />

The Subsoil Act lays down the basic framework for oil <strong>and</strong> gas exploration <strong>and</strong><br />

production. The Act is formulated as a ‘general terms act’ allow<strong>in</strong>g for<br />

adaptations <strong>and</strong> more detailed regulations. It regulates exploitation <strong>and</strong><br />

recovery activities <strong>in</strong> the Danish subsoil <strong>and</strong> on the Danish Cont<strong>in</strong>ental Shelf<br />

concern<strong>in</strong>g raw materials, <strong>and</strong> specifically hydrocarbons. The Act covers:<br />

Prospect<strong>in</strong>g, exploration for <strong>and</strong> recovery of raw materials, <strong>and</strong> hydrocarbons<br />

<strong>in</strong> particular, government rights for purchas<strong>in</strong>g liquid hydrocarbons, other use<br />

of the subsoil, supervision <strong>and</strong> other provisions.<br />

The Subsoil Act implements Directive 94/22/EC of the European Parliament<br />

<strong>and</strong> of the Council of 30 May 1994 on the conditions for grant<strong>in</strong>g <strong>and</strong> us<strong>in</strong>g<br />

authorizations for the prospection, exploration <strong>and</strong> production of hydrocarbons,<br />

parts of Council Directive 85/337/EEC of 27 June 1985 on assessments of the<br />

environmental consequences, parts of Council Directive 2009/147/EC of 20<br />

November 2009 on the conservation of wild birds, parts of Council Directive<br />

92/43/EEC of 21 May 1992 on the conservation of natural habitats <strong>and</strong> of wild<br />

fauna <strong>and</strong> flora <strong>and</strong> parts of Directive 2009/31/EC of the European Parliament<br />

<strong>and</strong> the Council of 23 April 2009 on geological s<strong>to</strong>rage of carbon dioxide.<br />

• Directive 94/22/EC of the European Parliament <strong>and</strong> of the Council of 30 May<br />

1994 on the Conditions for Grant<strong>in</strong>g <strong>and</strong> Us<strong>in</strong>g Authorizations for the<br />

Prospection, <strong>Exploration</strong> <strong>and</strong> Production of <strong>Hydrocarbon</strong>s.<br />

• Act No. 1424 of 21 December 2005 on Safety, etc. on Offshore Installations for<br />

<strong>Exploration</strong>, Extraction <strong>and</strong> Transport of <strong>Hydrocarbon</strong>s (Offshore Safety Act).<br />

The Offshore Safety Act has later been amended by Act No. 107 of 7 February<br />

2007, section 32 <strong>in</strong> Act No. 512 of 6 June 2007 <strong>and</strong> section 1 <strong>in</strong> Act No. 1400<br />

of 27 December 2008.<br />

An un-authorized compilation of the Offshore Safety Act with the above<br />

amendments is <strong>in</strong>cluded. Subsequent <strong>to</strong> this compilation the Offshore Safety<br />

Act has been amended by Act No. 287 of 15 April 2009 <strong>and</strong> by Act No. 467 of<br />

18 June 2011. Under the Offshore Safety Act a number of regulations are<br />

10


issued. They are updated regularly <strong>and</strong> can be found on the DEA website. On<br />

the webpage those regulations that are translated <strong>in</strong><strong>to</strong> English are marked.<br />

Act No. 291 of 10 June 1981, as revised by Consolidated Act No. 957 of 9<br />

September ber 2011 on the Establishment <strong>and</strong> Use of a Pipel<strong>in</strong>e for Transport<br />

of Crude Oil <strong>and</strong> Condensate.<br />

• Consolidated Act No. 412 of 3 May 2006 on Taxation of Income Orig<strong>in</strong>at<strong>in</strong>g<br />

from Production of <strong>Hydrocarbon</strong>s <strong>in</strong> <strong>Denmark</strong> (the <strong>Hydrocarbon</strong> Tax Act).<br />

Consolidated Act No. 413 of 3 May 2006 on the Assessment <strong>and</strong> Collection of<br />

Taxes <strong>in</strong> connection with Production of <strong>Hydrocarbon</strong>s (Act on Assessment <strong>and</strong><br />

Collection).<br />

Both the <strong>Hydrocarbon</strong> Tax Act <strong>and</strong> the Act on Assessment <strong>and</strong> Collection have<br />

subsequently been amended. Detailed <strong>in</strong>formation on this legislation <strong>and</strong> the<br />

amendments are available from the M<strong>in</strong>istry of Taxation (www.skm.dk).<br />

The M<strong>in</strong>istry of Taxation’s website conta<strong>in</strong>s an unofficial English translation of a<br />

compilation of the <strong>Hydrocarbon</strong> Tax Act from 2003 <strong>and</strong> of the bill from 2003 <strong>to</strong><br />

amend the <strong>Hydrocarbon</strong> Tax Act <strong>and</strong> the Act on Assessment <strong>and</strong> Collection,<br />

etc. of Taxes <strong>in</strong> connection with <strong>Hydrocarbon</strong> Production.<br />

• Executive Order No. 1032 of 23 August 2007 on Reimbursement of Expenses<br />

related <strong>to</strong> the Authorities’ Adm<strong>in</strong>istration <strong>in</strong> connection with <strong>Hydrocarbon</strong><br />

Activities, etc.<br />

• Executive Order No. 56 of February 4, 2002 on Submission of Samples <strong>and</strong><br />

other Information about the Danish Subsoil.<br />

• Executive Order No. 419 of 2 June 2005 on the Payment of Fees connected<br />

with Certa<strong>in</strong> <strong>Licences</strong> Issued pursuant <strong>to</strong> the Act on the Use of the Danish<br />

Subsoil.<br />

• Executive Order No. 684 of 23 June 2011 on EIA, consequence assessment<br />

concern<strong>in</strong>g <strong>in</strong>ternational nature conservation areas <strong>and</strong> protection of certa<strong>in</strong><br />

species <strong>in</strong> connection with projects about offshore exploration for <strong>and</strong><br />

production of hydrocarbons, s<strong>to</strong>rage <strong>in</strong> the subsoil, pipel<strong>in</strong>es etc.<br />

• Executive Order No. 657 of 30 December 1985 on Safety Zones <strong>and</strong> Zones for<br />

the Observance of Order <strong>and</strong> the Prevention of Danger.<br />

In addition <strong>to</strong> the above acts <strong>and</strong> orders general regulations <strong>and</strong> guidel<strong>in</strong>es for oil<br />

<strong>and</strong> gas activities are set out. The most important are:<br />

• Model Licence – 6th Licens<strong>in</strong>g Round.<br />

• Model Licence – Open Door Procedure.<br />

• Model Jo<strong>in</strong>t Operat<strong>in</strong>g Agreement <strong>and</strong> Account<strong>in</strong>g Procedure (JOA) .<br />

The content of the JOA <strong>and</strong> Account<strong>in</strong>g Procedure is - apart from stipulations<br />

<strong>to</strong> secure the rights of the State Participant - negotiable between the parties <strong>to</strong><br />

a licence. The JOA is subject <strong>to</strong> approval by the DEA, ref. section 18 of the<br />

licence.<br />

•<br />

Conditions regard<strong>in</strong>g Pre-<strong>in</strong>vestigations Offshore<br />

11


• National Environmental Research Institute - Best practice for pre-<strong>in</strong>vestigations<br />

offshore<br />

• Conditions Regard<strong>in</strong>g Pre-<strong>in</strong>vestigations Onshore (available on request).<br />

• <strong>Guide</strong>l<strong>in</strong>es for Drill<strong>in</strong>g, <strong>Exploration</strong>.<br />

The translations of the Danish acts, orders, general regulations <strong>and</strong> guidel<strong>in</strong>es are<br />

unofficial. In case of discrepancy the orig<strong>in</strong>al Danish text shall prevail.<br />

2.2 Establishment of bus<strong>in</strong>ess<br />

In connection with obta<strong>in</strong><strong>in</strong>g a licence for exploration for <strong>and</strong> production of<br />

hydrocarbons companies participat<strong>in</strong>g <strong>in</strong> the licence must have registered with the<br />

taxation authorities <strong>in</strong> <strong>Denmark</strong> <strong>and</strong> provide the necessary <strong>in</strong>formation for that<br />

purpose. Companies can e.g. establish a Danish subsidiary or register a bus<strong>in</strong>ess<br />

address <strong>in</strong> <strong>Denmark</strong>. The address can be at a lawyer or an account<strong>in</strong>g firm <strong>in</strong><br />

<strong>Denmark</strong>. For further <strong>in</strong>formation please contact the taxation authorities at<br />

kulbr<strong>in</strong>te@skat.dk.<br />

2.3 <strong>Guide</strong>l<strong>in</strong>es for Insurance of <strong>Exploration</strong> Activities<br />

(Model Licence Section 30)<br />

2.3.1 Introduction<br />

These guidel<strong>in</strong>es apply <strong>to</strong> <strong>in</strong>surance of all activities <strong>in</strong> licens<strong>in</strong>g rounds <strong>and</strong> the<br />

Open Door Procedure.<br />

As provided <strong>in</strong> section 30, subsection (1), of the model licence, the Licensee's<br />

liability for damages under the Subsoil Act shall be covered by <strong>in</strong>surance.<br />

Section 35 of the Subsoil Act states that the Licensee is strictly liable for damages<br />

caused by any third party when perform<strong>in</strong>g activities <strong>in</strong> connection with the licence.<br />

The liability for damages <strong>in</strong>cludes personal <strong>in</strong>jury as well as <strong>in</strong>jury <strong>to</strong> property. It is<br />

assumed that the Licensee's strict liability also <strong>in</strong>cludes persons who usually are<br />

not regarded as third party e.g. the Licensee's employees <strong>and</strong> contract<strong>in</strong>g parties.<br />

2.3.2 Insurance Coverage<br />

The Licensee's <strong>in</strong>surances shall cover the follow<strong>in</strong>g issues:<br />

• Injury <strong>to</strong> the Licensee's own employees.<br />

• Injury <strong>to</strong> any third party (<strong>in</strong>clud<strong>in</strong>g damage <strong>to</strong> property of a third party).<br />

• Pollution damages caused by the activities.<br />

The coverage for damages shall <strong>in</strong>clude all <strong>in</strong>surances which the Licensee is<br />

obliged <strong>to</strong> take out under Danish law i.e. work <strong>in</strong>jury, mo<strong>to</strong>r vehicles, aircrafts <strong>and</strong><br />

<strong>in</strong>surance of ships' oil pollution liability. In addition the coverage for damages shall<br />

<strong>in</strong>clude <strong>in</strong>surances otherwise required <strong>in</strong> accordance with section 30 of the<br />

12


Licence (cf. section 35 of the Subsoil Act) <strong>in</strong> order <strong>to</strong> cover the general third party<br />

liability.<br />

Accord<strong>in</strong>g <strong>to</strong> section 30, subsection (2), of the Licence, the DEA may require that<br />

additional <strong>in</strong>surance coverage must be taken out <strong>in</strong> case the DEA does not<br />

consider the <strong>in</strong>surance coverage <strong>to</strong> be sufficiently extensive.<br />

The <strong>in</strong>surance coverage must provide a reasonable coverage, based on the risks<br />

<strong>in</strong>volved <strong>in</strong> the operation of the enterprise <strong>and</strong> the premiums <strong>to</strong> be paid.<br />

2.3.3 Insurance Declaration<br />

Pursuant <strong>to</strong> section 30 of the Model Licence the DEA has <strong>in</strong>troduced an Opera<strong>to</strong>rs<br />

Insurance Declaration form. With this form the opera<strong>to</strong>r declares <strong>to</strong> have received<br />

<strong>in</strong>surance certificates or declaration of self <strong>in</strong>surance from all co-licensees<br />

(<strong>in</strong>clud<strong>in</strong>g the opera<strong>to</strong>rs own certificate) <strong>and</strong> that the <strong>in</strong>surances satisfy a number<br />

of conditions.<br />

The form must be submitted <strong>to</strong> the DEA not later than 1 March of the covered<br />

year. If it is not possible <strong>to</strong> submit the form by this date, the DEA must be <strong>in</strong>formed<br />

<strong>in</strong> due time, <strong>and</strong> a new arrangement made.<br />

The Opera<strong>to</strong>rs Insurance Declaration form is attached <strong>to</strong> this guide <strong>and</strong> is<br />

available also as an Excel-file.<br />

2.4 Reimbursement of Public Expenditure<br />

2.4.1 Introduction<br />

Licensees must reimburse the DEA for the <strong>in</strong>curred expenses <strong>in</strong> connection with<br />

the adm<strong>in</strong>istration of the hydrocarbon activities of the licensees, accord<strong>in</strong>g <strong>to</strong> the<br />

Subsoil Act, section 25. Similar provisions are <strong>in</strong>cluded <strong>in</strong> the Offshore Safety Act,<br />

ref. section 65 of the act.<br />

The specific rules are listed <strong>in</strong> Order No. 1032 of 23 August 2007 on<br />

Reimbursement of Expenses related <strong>to</strong> the Authorities’ Adm<strong>in</strong>istration <strong>in</strong><br />

connection with <strong>Hydrocarbon</strong> Activities, etc.<br />

2.4.2 Procedure<br />

Reimbursement of the DEA expenditure for adm<strong>in</strong>istration is based on the<br />

follow<strong>in</strong>g procedure:<br />

The licensees encompassed by the Subsoil Act shall reimburse public authority<br />

expenditure for adm<strong>in</strong>istrative case h<strong>and</strong>l<strong>in</strong>g, <strong>in</strong>clud<strong>in</strong>g supervision.<br />

Public authority expenditure for adm<strong>in</strong>istrative case h<strong>and</strong>l<strong>in</strong>g are calculated on the<br />

basis of records enumerat<strong>in</strong>g the number of hours on perform<strong>in</strong>g each <strong>in</strong>dividual<br />

task.<br />

13


2.4.3 Collection of the Reimbursement<br />

Normally the reimbursement will take place every three months. Upon the expiry of<br />

each quarter the DEA submits <strong>in</strong>terim bills for the expenditure <strong>in</strong>curred <strong>in</strong><br />

connection with the case h<strong>and</strong>l<strong>in</strong>g.<br />

After the end of every f<strong>in</strong>ancial year, the DEA draws up a statement of the amount<br />

payable for the year <strong>in</strong> question. The f<strong>in</strong>al statement shall be submitted <strong>to</strong> the<br />

party liable <strong>to</strong> pay no later than four months after the end of the f<strong>in</strong>ancial year.<br />

2.5 F<strong>in</strong>ancial Information<br />

Pursuant <strong>to</strong> section 21 of the Model Licence the licensee shall submit annual<br />

f<strong>in</strong>ancial statements <strong>to</strong> the DEA. The DEA has issued detailed rules for submission<br />

of this <strong>in</strong>formation.<br />

Accord<strong>in</strong>g <strong>to</strong> these rules the Licensee shall, on an annual basis, submit f<strong>in</strong>ancial<br />

statements <strong>and</strong>/or disclosure forms <strong>to</strong> the DEA concern<strong>in</strong>g expenditures <strong>and</strong><br />

expected activities.<br />

The rules <strong>and</strong> the disclosure forms for the <strong>Exploration</strong>, Development <strong>and</strong><br />

Production Phases are attached.<br />

The forms can be downloaded <strong>in</strong> Excel format from the DEA’s website.<br />

2.6 Danish/English Language<br />

<strong>Licences</strong>, approvals, permits etc., from the DEA will as a pr<strong>in</strong>cipal rule be issued <strong>in</strong><br />

Danish.<br />

Unofficial English translations of regulations etc. may be issued <strong>to</strong> the extent<br />

possible.<br />

The Danish text is, however, the only official text when expound<strong>in</strong>g documents<br />

from the DEA.<br />

Applications for licences, approvals <strong>and</strong> permits must be submitted <strong>in</strong> Danish or<br />

English, unless otherwise agreed.<br />

14


3. Pre-<strong>in</strong>vestigations (seismic surveys, site<br />

surveys, etc.)<br />

Surveys are subject <strong>to</strong> approval by the DEA accord<strong>in</strong>g <strong>to</strong> section 28 of the Subsoil<br />

Act.<br />

For surveys extend<strong>in</strong>g outside the licence area <strong>and</strong> speculative surveys a special<br />

permit will be issued by the DEA accord<strong>in</strong>g <strong>to</strong> section 3 of the Subsoil Act.<br />

Concern<strong>in</strong>g the fee <strong>to</strong> be paid for a section 3 permit reference is made <strong>to</strong><br />

Executive Order No. 419 of 2 June 2005 on the Payment of Fees connected with<br />

Certa<strong>in</strong> <strong>Licences</strong> Issued pursuant <strong>to</strong> the Act on the Use of the Danish Subsoil.<br />

In order <strong>to</strong> obta<strong>in</strong> an approval for a pre-<strong>in</strong>vestigation programme an application<br />

<strong>to</strong>gether with a completed <strong>in</strong> annex 1 <strong>and</strong> a map show<strong>in</strong>g the outl<strong>in</strong>e of the survey<br />

must be forwarded <strong>to</strong> the DEA.<br />

Applications for approval of offshore pre-<strong>in</strong>vestigation programs must <strong>in</strong>clude the<br />

necessary <strong>in</strong>formation about the project <strong>in</strong> relation <strong>to</strong> the project’s impact on<br />

<strong>in</strong>ternational nature protection areas for the DEA’s decision about necessity of a<br />

consequence assessment <strong>and</strong> the necessary <strong>in</strong>formation about the project <strong>in</strong><br />

relation <strong>to</strong> the projects disturbance of certa<strong>in</strong> species; ref. section 6 below. If any<br />

mitigation measures of relevance are planned (e.g. soft start procedures <strong>in</strong><br />

connection with the use of noise generat<strong>in</strong>g equipment), they should be described<br />

<strong>in</strong> the application.<br />

Dur<strong>in</strong>g the process<strong>in</strong>g of the application the DEA will obta<strong>in</strong> comments <strong>to</strong> the<br />

programme from the M<strong>in</strong>istry of Defence, the Direc<strong>to</strong>rate of Fisheries <strong>and</strong> the<br />

Nature Agency.<br />

Approvals/permits are subject <strong>to</strong>:<br />

• St<strong>and</strong>ard conditions issued by the DEA. A copy of the st<strong>and</strong>ard conditions for<br />

offshore surveys is <strong>in</strong>cluded. St<strong>and</strong>ard conditions for onshore surveys are<br />

available on request.<br />

Similar conditions apply <strong>to</strong> surveys carried out based on permits granted <strong>in</strong><br />

pursuance of section 3 of the Subsoil Act.<br />

• Possible special conditions, e.g. based on comments received by the DEA from<br />

other authorities.<br />

• Soft start procedures will be required for surveys us<strong>in</strong>g noise generat<strong>in</strong>g<br />

equipment. Reference is made <strong>to</strong> the attached “Best practice for pre<strong>in</strong>vestigations<br />

offshore” prepared by the National Environmental Research<br />

Institute.<br />

• Executive Order No. 56 of 4 February 2002 on Submission of Samples <strong>and</strong><br />

other Information about the Danish Subsoil.<br />

Special <strong>and</strong> more time-consum<strong>in</strong>g procedures will be applicable regard<strong>in</strong>g the<br />

approval of foreign state owned vessels.<br />

15


4. Drill<strong>in</strong>g Operations<br />

4.1 <strong>Exploration</strong> <strong>and</strong> Appraisal Drill<strong>in</strong>g Operations<br />

Drill<strong>in</strong>g operations are subject <strong>to</strong> approval <strong>in</strong> pursuance of section 28 of the Danish<br />

Subsoil Act. Approval is granted by the DEA which supervises the operations. The<br />

supervision is concerned with safety as well as other aspects of the drill<strong>in</strong>g<br />

operations.<br />

Information on adm<strong>in</strong>istrative matters as well as on requirements with regard <strong>to</strong><br />

safety, data collection, submission of samples <strong>and</strong> report<strong>in</strong>g can be found <strong>in</strong> the<br />

attached DEA publication ‘<strong>Guide</strong>l<strong>in</strong>es for Drill<strong>in</strong>g, <strong>Exploration</strong>’.<br />

These guidel<strong>in</strong>es must be taken <strong>in</strong><strong>to</strong> consideration when plann<strong>in</strong>g <strong>and</strong> perform<strong>in</strong>g<br />

drill<strong>in</strong>g operations. It must, however, be noted that responsibility for safe <strong>and</strong><br />

efficient performance of operations rests with the opera<strong>to</strong>r. The DEA should be<br />

consulted if the opera<strong>to</strong>r f<strong>in</strong>ds it possible <strong>to</strong> perform operations <strong>in</strong> a safer or more<br />

efficient way by deviat<strong>in</strong>g from the guidel<strong>in</strong>es.<br />

Applications for approval of drill<strong>in</strong>g programs for offshore well must <strong>in</strong>clude the<br />

necessary <strong>in</strong>formation about the project <strong>in</strong> relation <strong>to</strong> the project’s impact on<br />

<strong>in</strong>ternational nature protections areas for the DEA’s decision about necessity of a<br />

consequence assessment <strong>and</strong> the necessary <strong>in</strong>formation about the project <strong>in</strong><br />

relation <strong>to</strong> the projects disturbance of certa<strong>in</strong> species; ref. section 6 below. If any<br />

mitigation measures of relevance are planned (e.g. soft start procedures <strong>in</strong><br />

connection with the use of noise generat<strong>in</strong>g equipment), they should be described<br />

<strong>in</strong> the application.<br />

4.2 Production Drill<strong>in</strong>g Operations<br />

The DEA must approve <strong>and</strong> supervise all drill<strong>in</strong>g <strong>and</strong> ma<strong>in</strong>tenance operations<br />

connected <strong>to</strong> wells used for production or similar purposes. The adm<strong>in</strong>istration is<br />

<strong>in</strong> pr<strong>in</strong>ciple as described for exploration drill<strong>in</strong>g operations.<br />

4.3 Submission of Geological Information<br />

Report<strong>in</strong>g procedures <strong>and</strong> guidel<strong>in</strong>es on seismic surveys <strong>and</strong> drill<strong>in</strong>g operations<br />

are stated <strong>in</strong> terms stipulated <strong>in</strong>:<br />

• Each license; for seismic surveys cf. terms regard<strong>in</strong>g pre-<strong>in</strong>vestigations <strong>in</strong> preparation<br />

for exploration <strong>and</strong> production of hydrocarbons; for drill<strong>in</strong>g operations cf.<br />

section 4.1 <strong>and</strong> 4.2.<br />

• Executive Order No. 56 of 4 February 2002 on Submission of Samples <strong>and</strong><br />

other Information about the Danish Subsoil.<br />

• <strong>Guide</strong>l<strong>in</strong>es for Drill<strong>in</strong>g, <strong>Exploration</strong>.<br />

16


4.4 DEA Contact System for Drill<strong>in</strong>g Operations<br />

Deviation from approved drill<strong>in</strong>g programmes may require the approval of the<br />

DEA. For this purpose the DEA has established an around the clock contact<br />

system for drill<strong>in</strong>g operations. Outside office hours – weekends <strong>and</strong> holidays<br />

<strong>in</strong>cluded – a member of the DEA drill<strong>in</strong>g team will be on duty. When call<strong>in</strong>g (+45)<br />

33 92 79 18 a recorded message will <strong>in</strong>form about the person on duty.<br />

Drill<strong>in</strong>g programs, amendments <strong>and</strong> daily drill<strong>in</strong>g reports are <strong>to</strong> be sent <strong>to</strong> the<br />

drill<strong>in</strong>g team’s mail box at ddr@ens.dk.<br />

4.5 DEA Press Releases<br />

Follow<strong>in</strong>g the completion of an exploration well the DEA publishes by rout<strong>in</strong>e a<br />

press release with <strong>in</strong>formation about opera<strong>to</strong>r, licence group, well name, drill<strong>in</strong>g<br />

platform, drill<strong>in</strong>g period, drill<strong>in</strong>g location, water depth, <strong>to</strong>tal well depth <strong>in</strong> geological<br />

<strong>and</strong> measured terms, ma<strong>in</strong> <strong>in</strong>formation on results (dry, shows, discovery, tested,<br />

not tested).<br />

17


5. Offshore Emergency Response Plans<br />

5.1. Regulations<br />

Regulations concern<strong>in</strong>g emergency response plans are found <strong>in</strong> section 45 <strong>in</strong> the<br />

Offshore Safety Act <strong>and</strong> <strong>in</strong> chapter 3 of Executive Order no. 1501 of 15 December<br />

2010 on Emergency Response etc. on offshore <strong>in</strong>stallations.<br />

In case of possible or verified hydrogen sulphide occurrence the emergency<br />

response plan must <strong>in</strong>clude measures <strong>to</strong> meet such danger (see also section 5.4).<br />

For oil spill plans the M<strong>in</strong>istry of Environment’s Order no. 395 of 17 July 1984 on<br />

Preparedness <strong>in</strong> Case of Pollution of the Sea from Certa<strong>in</strong> Offshore Installations<br />

must be observed (can be obta<strong>in</strong>ed from the Danish Environmental Protection<br />

Agency).<br />

For emergency response plans required by other authorities (The Danish Maritime<br />

Authority, The Danish Transport Authority, The Royal Danish Adm<strong>in</strong>istration of<br />

Navigation <strong>and</strong> Hydrography (RDANH) <strong>and</strong> The National IT <strong>and</strong> Telecom Agency)<br />

reference is made <strong>to</strong> the authorities <strong>in</strong> question (see section 1.2.1 for contact<br />

<strong>in</strong>formation).<br />

In case of major offshore accidents the Authorities’ Emergency Response<br />

Committee will convene, cf. section 59 of the Offshore Safety Act. The ma<strong>in</strong><br />

functions of the committee should be familiar <strong>to</strong> the opera<strong>to</strong>r <strong>in</strong> case of an<br />

emergency. The authorities <strong>and</strong> functions of the Committee are presented <strong>in</strong><br />

section 5.3 below.<br />

5.1.1. St<strong>and</strong>-by Vessels<br />

Regulations regard<strong>in</strong>g st<strong>and</strong>-by vessels are laid down <strong>in</strong> Chapter VIII of Executive<br />

Order no. 1501 of 15 December 2010 on Emergency Response etc. on offshore<br />

<strong>in</strong>stallations.<br />

5.2. <strong>Guide</strong>l<strong>in</strong>es<br />

5.2.1. Introduction<br />

Pursuant <strong>to</strong> section 45 of the Offshore Safety Act emergency response measures<br />

on offshore <strong>in</strong>stallations must be established <strong>to</strong> meet the consequences of<br />

accidents.<br />

For this purpose, the opera<strong>to</strong>r or the operat<strong>in</strong>g company shall prepare an<br />

emergency response plan for accidents <strong>and</strong> dangerous situations dur<strong>in</strong>g the<br />

operation. The plan shall upon request be forwarded <strong>to</strong> the Danish Energy<br />

Agency. Section 4 of Executive Order no. 1501 of 15 December 2010 prescribes<br />

<strong>in</strong> more detail the requirements <strong>to</strong> the emergency response plan. Similar plans for<br />

oil spill situations must be forwarded <strong>to</strong> the Danish Environmental Protection<br />

Agency (DEPA).<br />

18


5.2.2. Procedure for the Submission of the Emergency Response Plans<br />

(Emergency <strong>and</strong> Oil Spill)<br />

Unless special circumstances call for another procedure the emergency response<br />

plans shall be forwarded <strong>to</strong> the Danish Energy Agency <strong>and</strong> the Danish<br />

Environmental Protection Agency no later than 3-4 weeks before the start up of<br />

the operation.<br />

F<strong>in</strong>ally, it must be emphasised that the emergency response plans must be kept<br />

up <strong>to</strong> date <strong>and</strong> essential changes must be submitted <strong>to</strong> the authorities. At any time<br />

the Danish Energy Agency <strong>and</strong> the Danish Environmental Protection Agency may<br />

require changes <strong>in</strong> the plan.<br />

5.3 The Authorities’ Emergency Response Committee<br />

In case of major offshore accidents on the <strong>in</strong>stallations the Authorities’ Emergency<br />

Response Committee will convene. The function of the Committee is regulated by<br />

Executive Order No. 1184 of 9 Oc<strong>to</strong>ber 2007 on Rules of Procedure for the<br />

Authorities’ Emergency Response Committee <strong>in</strong> Pursuance of the Offshore Safety<br />

Act.<br />

5.3.1 Call out Procedure<br />

1. The Admiral Danish Fleet (“Søværnets Operative Komm<strong>and</strong>o” abbreviated<br />

“SOK”) will immediately notify the Authorities’ Emergency Response<br />

Committee through its Chairman, Deputy Chairman or Secretary or, <strong>in</strong> the<br />

alternative, the person on st<strong>and</strong>by at the Danish Energy Agency.<br />

2. SOK will also notify the police <strong>in</strong> Esbjerg, the Danish Environmental Protection<br />

Agency <strong>and</strong> the licensee/opera<strong>to</strong>r/the operation company.<br />

3. The representative of the Authorities’ Emergency Response Committee/the<br />

Danish Energy Agency notified will contact the rema<strong>in</strong><strong>in</strong>g members of the<br />

Action Committee.<br />

4. The licensee/opera<strong>to</strong>r/the operat<strong>in</strong>g company will notify the Authorities’<br />

Emergency Response Committee/the Danish Energy Agency separately, as<br />

stated under po<strong>in</strong>ts 1 <strong>and</strong> 2.<br />

5. The Chairman of the Authorities’ Emergency Response Committee or his<br />

deputy will decide whether 1) <strong>to</strong> convene the Committee immediately, 2) <strong>to</strong><br />

hold a telephone conference, 3) <strong>to</strong> establish other contacts, or 4) <strong>to</strong> keep the<br />

Committee on st<strong>and</strong>by.<br />

6. The Chairman of the Authorities’ Emergency Response Committee is <strong>to</strong> notify<br />

the M<strong>in</strong>istry of Climate <strong>and</strong> Energy.<br />

19


ALARM<br />

Opera<strong>to</strong>r/<br />

Operat<strong>in</strong>g company<br />

ALARM<br />

Admiral Danish Fleet<br />

(SOK)<br />

Authorities' Emergency<br />

Response Committee<br />

M<strong>in</strong>istry of<br />

Climate <strong>and</strong><br />

Energy<br />

5.4 Hydrogen Sulphide Emergency Response<br />

The Danish Energy Agency f<strong>in</strong>ds it necessary <strong>to</strong> safeguard aga<strong>in</strong>st potential risk<br />

from hydrogen sulphide when a well penetrates horizons which have not already<br />

been proven <strong>to</strong> be free from hydrogen sulphide at that specific location.<br />

Plans, equipment <strong>and</strong> personnel organisation, education <strong>and</strong> tra<strong>in</strong><strong>in</strong>g must allow<br />

for safe detection, warn<strong>in</strong>g, rescue, evacuation <strong>and</strong> combat, tak<strong>in</strong>g <strong>in</strong><strong>to</strong> account<br />

the specifics of the drill<strong>in</strong>g location <strong>and</strong> - where relevant - the conditions <strong>in</strong> the<br />

surround<strong>in</strong>g area.<br />

20<br />

Esbjerg Police<br />

Danish Environmental<br />

Protection Agency<br />

Simplified Call out Procedure


6. Environmental impact assessments (EIAs),<br />

consequence assessments etc.<br />

6.1. Regulations<br />

6.2. EIA<br />

Sections 28 a, 28 b <strong>and</strong> 28 c <strong>in</strong> the Danish Subsoil Act conta<strong>in</strong> provisions on<br />

approval of offshore projects that are assumed <strong>to</strong> have a significant impact on the<br />

environment <strong>and</strong> provisions regulat<strong>in</strong>g the protection of <strong>in</strong>ternational nature<br />

conservation areas <strong>and</strong> the protection of certa<strong>in</strong> species.<br />

More detailed provisions are laid down <strong>in</strong> Executive Order No. 684 of 23 June<br />

2011 on EIA, consequence assessment concern<strong>in</strong>g <strong>in</strong>ternational nature<br />

conservation areas <strong>and</strong> protection of certa<strong>in</strong> species <strong>in</strong> connection with projects<br />

about offshore exploration for <strong>and</strong> production of hydrocarbons, s<strong>to</strong>rage <strong>in</strong> the<br />

subsoil, pipel<strong>in</strong>es etc.<br />

Similar regulations apply for onshore projects. The onshore regulations are not<br />

adm<strong>in</strong>istered by the Danish Energy Agency but by the local municipalities <strong>and</strong> by<br />

the Danish M<strong>in</strong>istry of the Environment.<br />

<strong>Exploration</strong> activities like pre-<strong>in</strong>vestigations (e.g. seismic surveys) <strong>and</strong> drill<strong>in</strong>g will<br />

normally not require the preparation of an EIA.<br />

Sections 3-8 of Executive Order no. 684 of 23 June 2011 <strong>in</strong>clude more detailed<br />

provisions on EIAs, i.e. offshore projects that necessitate the preparation of an<br />

EIA, requirements concern<strong>in</strong>g the contents, other <strong>in</strong>formation <strong>to</strong> be submitted,<br />

procedures <strong>to</strong> follow, etc.<br />

6.3. Protection of <strong>in</strong>ternational nature conservation areas<br />

Offshore projects that are assumed <strong>to</strong> have a significant impact on <strong>in</strong>ternational<br />

nature conservation areas can only be approved based on a consequence<br />

assessment of the project on the site <strong>in</strong> view of the site’s conservation objectives<br />

<strong>and</strong> provided that the consequence assessment shows that the project will not<br />

damage the conservation area.<br />

More detailed provisions are <strong>in</strong>cluded <strong>in</strong> sections 9-11 of Executive Order no. 684<br />

of 23 June 2011.<br />

The Danish Energy Agency decides if a consequence assessment must be<br />

submitted <strong>to</strong>gether with an application for approval of an offshore project. When<br />

apply<strong>in</strong>g for approval of e.g. programs for drill<strong>in</strong>g of exploration wells or programs<br />

for seismic surveys, the applicant must submit the necessary <strong>in</strong>formation about the<br />

project’s impact on <strong>in</strong>ternational nature conservation areas for the DEA’s decision<br />

about the necessity of a consequence assessment.<br />

If any mitigation measures (e.g. soft start procedures <strong>in</strong> connection with the use of<br />

noise generat<strong>in</strong>g equipment) of relevance are planned, they should be described<br />

<strong>in</strong> the application.<br />

21


6.4. Protection of certa<strong>in</strong> species<br />

Species (e.g. whales, <strong>in</strong>clud<strong>in</strong>g harbour porpoises) adopted <strong>in</strong> annex 4 of<br />

Executive Order No. 684 of 23 June 2011 may not deliberately be disturbed <strong>in</strong><br />

their natural area of occurrence <strong>in</strong> connection with carry<strong>in</strong>g out offshore projects,<br />

hereunder exploration projects, comprised by section 1 of the order.<br />

Permits <strong>and</strong> approvals <strong>in</strong> pursuance of sections 10, 17, 23 <strong>and</strong> 28 <strong>in</strong> the Danish<br />

Subsoil Act cannot be granted, if the project applied for will disturb the species.<br />

More detailed provisions about the protection of these species are <strong>in</strong>cluded <strong>in</strong><br />

sections 12-14 of the order.<br />

When apply<strong>in</strong>g for approval of e.g. programs for drill<strong>in</strong>g of offshore exploration<br />

wells or programs for offshore seismic surveys, the applicant must submit the<br />

necessary <strong>in</strong>formation <strong>and</strong> assessments for the DEA’s decision, ref. section 13 (2)<br />

of the Order.<br />

If any mitigation measures (e.g. soft start procedures <strong>in</strong> connection with the use of<br />

noise generat<strong>in</strong>g equipment) of relevance are planned, they should be described<br />

<strong>in</strong> the application.<br />

6.5. Other<br />

If a project is approved, the approval of the project may be subject <strong>to</strong> certa<strong>in</strong><br />

conditions for the purpose of protect<strong>in</strong>g the nature, the environment <strong>and</strong> the<br />

cultural heritage, ref. section 16 of Executive Order No. 684 of 23 June 2011. Such<br />

conditions may impose limitations on a project, e.g. seismic survey<strong>in</strong>g may be<br />

prevented from be<strong>in</strong>g carried out dur<strong>in</strong>g the breed<strong>in</strong>g season for species protected<br />

<strong>in</strong> the designated nature protection area.<br />

6.6. Location of <strong>in</strong>ternational nature protection areas<br />

Information about <strong>in</strong>ternational nature protection areas with<strong>in</strong> the EU is available<br />

via this l<strong>in</strong>k: http://natura2000.eea.europa.eu/<br />

Please visit the Nature Agency’s webpage (www.nst.dk) or contact the Nature<br />

Agency for <strong>in</strong>formation about Danish nature protection areas <strong>and</strong> protected<br />

species.<br />

22


Unofficial translation of Consolidated Act No. 960 of 13 September 2011. In case of discrepancy, the orig<strong>in</strong>al Danish<br />

text shall prevail.<br />

Consolidated Act on the Use of the Danish Subsoil 1)<br />

The Act on the Use of the Danish Subsoil, see Consolidated Act No. 889 of 4 July 2007, as amended by section 2<br />

of Act No. 1400 of 27 December 2008, section 51 of Act No. 718 of 25 June 2010 <strong>and</strong> Act No. 541 of 30 May 2011, is<br />

hereby promulgated.<br />

Part 1<br />

General Provisions<br />

1.-(1) The purpose of this Act is <strong>to</strong> ensure appropriate use <strong>and</strong> exploitation of the Danish subsoil<br />

<strong>and</strong> its natural resources.<br />

(2) This Act shall apply <strong>to</strong><br />

(i) prelim<strong>in</strong>ary <strong>in</strong>vestigations, the exploration for <strong>and</strong> production of raw materials <strong>in</strong> the<br />

Danish subsoil that were not subject <strong>to</strong> private commercial exploitation <strong>in</strong> this country<br />

prior <strong>to</strong> 23 February 1932,<br />

(ii) use of the subsoil for s<strong>to</strong>rage or for purposes other than the production of raw materials,<br />

<strong>and</strong><br />

(iii) scientific <strong>in</strong>vestigations of the subsoil that are of importance <strong>to</strong> the activities referred<br />

<strong>to</strong> <strong>in</strong> paragraphs (i) <strong>and</strong> (ii) above.<br />

(3) The Act also applies <strong>in</strong> the Danish exclusive economic zone <strong>and</strong> <strong>in</strong> the Danish cont<strong>in</strong>ental<br />

shelf area.<br />

2. The raw materials referred <strong>to</strong> <strong>in</strong> section 1 above shall belong <strong>to</strong> the Danish state. The exploration<br />

for <strong>and</strong> production of the said raw materials by any other party shall be subject <strong>to</strong> a licence be<strong>in</strong>g<br />

granted by the M<strong>in</strong>ister for Climate <strong>and</strong> Energy under the provisions conta<strong>in</strong>ed <strong>in</strong> this Act. The<br />

activities referred <strong>to</strong> <strong>in</strong> section 1(2) (ii) <strong>and</strong> (iii) of above shall be subject <strong>to</strong> a licence be<strong>in</strong>g granted<br />

by the M<strong>in</strong>ister for Climate <strong>and</strong> Energy.<br />

2a. The M<strong>in</strong>ister for Climate <strong>and</strong> Energy shall lay down rules or make decisions for the purpose<br />

of implement<strong>in</strong>g or us<strong>in</strong>g <strong>in</strong>ternational conventions <strong>and</strong> EU rules on matters covered by this Act,<br />

<strong>in</strong>clud<strong>in</strong>g regulations, directives <strong>and</strong> decisions regard<strong>in</strong>g protection <strong>and</strong> conservation of the Danish<br />

1) This Act conta<strong>in</strong>s provisions <strong>to</strong> implement Directive 94/22/EC of the European Parliament <strong>and</strong> of the Council of 30<br />

May 1994 (Official Journal 1994, L164, p. 3), parts of Council Directive 92/43/EEC of 21 May 1992 (Official Journal<br />

1992, L206, p. 7), as most recently amended by Regulation (EC) No. 1882/2003 of the European Parliament <strong>and</strong> of<br />

the Council of 29 September 2003 (Official Journal 2003, L284, p. 1), parts of Council Directive 85/337/EEC of 27<br />

June 1985 (Official Journal 1985, L175, p. 40), as most recently amended by Directive 2003/35/EC of the European<br />

Parliament <strong>and</strong> of the Council of 26 May 2003 (Official Journal 2003, L156, p. 17), parts of Directive 2008/99/EC of<br />

the European Parliament <strong>and</strong> of the Council of 19 November 2008 (Official Journal 2008, L328, p. 28), parts of Directive<br />

2009/28/EC of the European Parliament <strong>and</strong> of the Council of 23 April 2009 (Official Journal 2009, L140, p.<br />

16), parts of Directive 2009/31/EC of the European Parliament <strong>and</strong> of the Council of 23 April 2009 (Official Journal<br />

2009, L140, p. 114) <strong>and</strong> parts of Directive 2009/147/EC of the European Parliament <strong>and</strong> of the Council of 30 November<br />

2009 (Official Journal 2010, L20, p. 7)


mar<strong>in</strong>e environment <strong>in</strong> the Danish exclusive economic zone <strong>and</strong> <strong>in</strong> the Danish cont<strong>in</strong>ental shelf<br />

area.<br />

Part 2<br />

Prelim<strong>in</strong>ary Investigations<br />

3. The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may grant licences for a term of up <strong>to</strong> three years for perform<strong>in</strong>g<br />

specific types of prelim<strong>in</strong>ary <strong>in</strong>vestigations <strong>in</strong> order <strong>to</strong> explore for <strong>and</strong> produce raw materials<br />

<strong>in</strong>cluded under this Act, or <strong>to</strong> use the subsoil for s<strong>to</strong>rage or purposes other than the production of<br />

raw materials. Such licences shall <strong>in</strong>dicate the areas <strong>to</strong> which they apply.<br />

4.-(1) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may lay down terms <strong>and</strong> conditions applicable <strong>to</strong> the<br />

licence, <strong>in</strong>clud<strong>in</strong>g terms <strong>and</strong> conditions regard<strong>in</strong>g the payment of taxes <strong>and</strong> fees <strong>and</strong> report<strong>in</strong>g on<br />

the progress <strong>and</strong> results of <strong>in</strong>vestigations.<br />

(2) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may lay down provisions regard<strong>in</strong>g the payment of a fee<br />

for the issuance of licences.<br />

Part 3<br />

<strong>Exploration</strong> for <strong>and</strong> Production of Raw Materials<br />

5.-(1) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may grant a licence conferr<strong>in</strong>g an exclusive right on<br />

the holder <strong>to</strong> explore for <strong>and</strong> <strong>to</strong> produce one or more raw materials with<strong>in</strong> a def<strong>in</strong>ed area <strong>and</strong> subject<br />

<strong>to</strong> specific terms <strong>and</strong> conditions. Separate licences may be granted for exploration <strong>and</strong> production,<br />

respectively. An exploration licence may grant the licensee a preferential right <strong>to</strong> a production licence.<br />

(2) An exploration licence may lay down provisions on a gradual reduction of the area comprised<br />

by the licence <strong>and</strong> may set out any work obligations <strong>to</strong> be met by the licensee.<br />

(3) The licences referred <strong>to</strong> <strong>in</strong> subsection (1) hereof shall only be granted <strong>to</strong> applicants that are<br />

deemed <strong>to</strong> have the necessary expertise <strong>and</strong> f<strong>in</strong>ancial resources, <strong>and</strong> who can be expected <strong>to</strong> carry<br />

on the activities <strong>in</strong> a manner so as <strong>to</strong> ensure that society ga<strong>in</strong>s maximum <strong>in</strong>sight <strong>in</strong><strong>to</strong> <strong>and</strong> benefit from<br />

the activities.<br />

(4) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may refuse <strong>to</strong> consider an application for a licence<br />

pursuant <strong>to</strong> subsection (1) if the exploration for or production of the relevant raw material cannot be<br />

expected <strong>to</strong> be compatible with other ongo<strong>in</strong>g or planned use of the subsoil or with appropriate<br />

exploitation of the subsoil <strong>in</strong> other respects.<br />

(5) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may lay down provisions on the payment of a fee for apply<strong>in</strong>g<br />

for the licences referred <strong>to</strong> <strong>in</strong> subsection (1) above.<br />

6.-(1) The licences referred <strong>to</strong> <strong>in</strong> section 5 above shall be issued upon be<strong>in</strong>g submitted for approval<br />

<strong>to</strong> a committee set up by the Danish Parliament.<br />

(2) As <strong>and</strong> when determ<strong>in</strong>ed by the M<strong>in</strong>ister for Climate <strong>and</strong> Energy or by the chairman of the<br />

committee concerned, the members of the committee <strong>and</strong> any other parties present dur<strong>in</strong>g the committee's<br />

discussions shall keep confidential any <strong>in</strong>formation that may come <strong>to</strong> their knowledge as a<br />

consequence of consider<strong>in</strong>g licences submitted <strong>in</strong> accordance with subsection (1) hereof.<br />

(3) If the committee does not grant its approval for a licence, see subsection (1) above, the committee<br />

shall <strong>in</strong>form the M<strong>in</strong>ister of the reasons for withhold<strong>in</strong>g its approval, if the M<strong>in</strong>ister so requests.


7. The term of a licence granted <strong>in</strong> pursuance of section 5 above shall be fixed with due regard be<strong>in</strong>g<br />

paid <strong>to</strong> the nature of the raw material(s) covered by the licence. The licence term cannot exceed<br />

50 years.<br />

8.-(1) A licence granted <strong>in</strong> pursuance of section 5 above may stipulate that the state or a stateowned<br />

company shall be entitled <strong>to</strong> take part <strong>in</strong> the activity covered by the licence, subject <strong>to</strong> specific<br />

terms <strong>and</strong> conditions.<br />

(2) Where the state or a state-owned company participates <strong>in</strong> activities under a licence <strong>to</strong> explore<br />

for <strong>and</strong> produce hydrocarbons granted pursuant <strong>to</strong> section 5 above <strong>and</strong> issued after 1 July 1995, <strong>in</strong><br />

exercis<strong>in</strong>g its vot<strong>in</strong>g rights the state or the state-owned may only safeguard such <strong>in</strong>terests as are<br />

with<strong>in</strong> the purview of this Act, <strong>and</strong> may not exercise its vot<strong>in</strong>g rights <strong>to</strong> prevent the licensee from<br />

bas<strong>in</strong>g its activities on commercial pr<strong>in</strong>ciples. The state or a state-owned company may not be <strong>in</strong>formed<br />

about or exercise its vot<strong>in</strong>g rights <strong>in</strong> respect of decisions on the licensee's choice of suppliers.<br />

Nor may the state or a state-owned company exercise any majority vot<strong>in</strong>g right <strong>to</strong>gether with<br />

one or more Danish public-sec<strong>to</strong>r participants <strong>in</strong> respect of any other decisions.<br />

(3) Notwithst<strong>and</strong><strong>in</strong>g the provision of subsection (2) above, it may be stipulated as a condition for<br />

such a licence that any decisions made by the licensee that fail <strong>to</strong> comply with licence terms regard<strong>in</strong>g<br />

the protection of resources or the state's f<strong>in</strong>ancial <strong>in</strong>terests shall not be b<strong>in</strong>d<strong>in</strong>g on the state participant,<br />

provided that such participant <strong>in</strong>forms its co-licensees, with<strong>in</strong> a specific time limit, that it<br />

opposes the decision <strong>in</strong> question. The right <strong>to</strong> oppose a decision shall be exercised nondiscrim<strong>in</strong>a<strong>to</strong>rily,<br />

<strong>in</strong> particular with regard <strong>to</strong> decisions on <strong>in</strong>vestments <strong>and</strong> the licensee's choice of<br />

suppliers.<br />

(4) Where state participation takes place through a state-owned company that also holds licences<br />

of the nature referred <strong>to</strong> <strong>in</strong> subsection (2) above or holds shares <strong>in</strong> licences that it has acquired on a<br />

different basis, the state-owned company shall keep separate accounts of the activities carried on<br />

under each category of shares <strong>in</strong> a licence. Further, the company shall ensure that the division of the<br />

company manag<strong>in</strong>g the state participation does not disclose any <strong>in</strong>formation <strong>to</strong> the division of the<br />

company that has acquired licence shares on a different basis. If the division of the company manag<strong>in</strong>g<br />

the state participation engages the division of the company that acquired licences on a different<br />

basis as its consultant, the former division of the company may make such <strong>in</strong>formation available<br />

<strong>to</strong> the latter division as is required <strong>to</strong> perform the consult<strong>in</strong>g services. The other holders of the licences<br />

<strong>to</strong> which such <strong>in</strong>formation relates shall be notified <strong>in</strong> advance which <strong>in</strong>formation will be<br />

passed on <strong>in</strong> this way, <strong>and</strong> they shall be given sufficient time <strong>to</strong> raise any objections.<br />

(5) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may lay down more specific rules regulat<strong>in</strong>g the matters<br />

referred <strong>to</strong> <strong>in</strong> subsections (2) <strong>and</strong> (4) above, such rules be<strong>in</strong>g <strong>in</strong>corporated <strong>in</strong><strong>to</strong> the licence terms or<br />

<strong>in</strong><strong>to</strong> special agreements concluded between the M<strong>in</strong>ister for Climate <strong>and</strong> Energy <strong>and</strong> the company<br />

manag<strong>in</strong>g the state participation.<br />

9. A licence granted pursuant <strong>to</strong> section 5 above shall stipulate the consideration <strong>to</strong> be paid by the<br />

licensee <strong>to</strong> the state. In this connection, it may be stipulated that a periodic charge shall be paid<br />

based on the size of the area covered by the licence (area rental), <strong>and</strong> that a tax shall be levied on<br />

the volume of raw materials produced (royalty). Moreover, the licence terms may stipulate that a<br />

share of the profit from the activities covered by the licence shall be payable <strong>to</strong> the state.<br />

10.-(1) <strong>Exploration</strong> <strong>and</strong> production shall be carried on <strong>in</strong> a safe <strong>and</strong> appropriate manner that prevents<br />

any waste of raw materials.<br />

(2) Before production <strong>and</strong> measures aimed at production are <strong>in</strong>itiated, a plan for the production activities,<br />

<strong>in</strong>clud<strong>in</strong>g the organization of production <strong>and</strong> the layout of production <strong>in</strong>stallations <strong>and</strong> any<br />

pipel<strong>in</strong>es (production measures, etc.), shall be approved by the M<strong>in</strong>ister for Climate <strong>and</strong> Energy.


(3) Substantial changes <strong>and</strong> supplements <strong>to</strong> an approved plan for the production activities are<br />

subject <strong>to</strong> approval by the M<strong>in</strong>ister for Climate <strong>and</strong> Energy before they are <strong>in</strong>itiated.<br />

(4) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may lay down terms <strong>and</strong> conditions for approvals<br />

granted pursuant <strong>to</strong> subsections (2) <strong>and</strong> (3).<br />

11.-(1) Where an accumulation of hydrocarbons extends <strong>in</strong><strong>to</strong> the areas of several licensees, the<br />

relevant licensees shall coord<strong>in</strong>ate exploration <strong>and</strong> any subsequent production activities. Agreements<br />

<strong>in</strong> this respect shall be subject <strong>to</strong> the approval of the M<strong>in</strong>ister for Climate <strong>and</strong> Energy. Where<br />

the parties fail <strong>to</strong> reach an agreement on coord<strong>in</strong>ation of such activities with<strong>in</strong> a reasonable time<br />

limit, the M<strong>in</strong>ister for Climate <strong>and</strong> Energy may order such coord<strong>in</strong>ation <strong>and</strong> lay down the applicable<br />

terms <strong>and</strong> conditions.<br />

(2) Where an accumulation of hydrocarbons extends <strong>in</strong><strong>to</strong> another country's sovereign terri<strong>to</strong>ry <strong>and</strong><br />

an agreement on the coord<strong>in</strong>ation of exploration <strong>and</strong> production is made with the relevant country,<br />

the M<strong>in</strong>ister for Climate <strong>and</strong> Energy may order the licensee whose licence <strong>in</strong>cludes the Danish<br />

share of the accumulation <strong>to</strong> take part <strong>in</strong> such coord<strong>in</strong>ation, <strong>and</strong> may lay down the applicable terms<br />

<strong>and</strong> conditions. Any agreements on coord<strong>in</strong>ation made by licensees shall be subject <strong>to</strong> the approval<br />

of the M<strong>in</strong>ister for Climate <strong>and</strong> Energy.<br />

(3) Upon submitt<strong>in</strong>g the matter <strong>to</strong> a committee set up by the Danish Parliament, the M<strong>in</strong>ister for<br />

Climate <strong>and</strong> Energy shall be authorized <strong>to</strong> enter <strong>in</strong><strong>to</strong> an agreement with the relevant country’s authorities<br />

about the coord<strong>in</strong>ation of exploration <strong>and</strong> production of the accumulations mentioned <strong>in</strong><br />

subsection (2) above, <strong>and</strong> <strong>to</strong> grant the necessary exemptions from the provisions of this Act <strong>and</strong> the<br />

Act on Safety, etc. for Offshore Installations for the <strong>Exploration</strong> for, Production of <strong>and</strong> Transportation<br />

of <strong>Hydrocarbon</strong>s (Offshore Safety Act).<br />

Part 4<br />

Special Provisions on <strong>Exploration</strong> for <strong>and</strong> Production of <strong>Hydrocarbon</strong>s<br />

12.-(1) The licences for hydrocarbon exploration <strong>and</strong> production mentioned <strong>in</strong> section 5 above<br />

shall be granted <strong>in</strong> one of the ways described <strong>in</strong> paragraphs (a) <strong>to</strong> (d) below, as determ<strong>in</strong>ed by the<br />

M<strong>in</strong>ister for Climate <strong>and</strong> Energy:<br />

(a) Follow<strong>in</strong>g a notice <strong>in</strong>vit<strong>in</strong>g applications from the public. The <strong>in</strong>vitation shall be published <strong>in</strong> the<br />

Danish Official Gazette <strong>and</strong> <strong>in</strong> the Official Journal of the European Union at least 90 days before<br />

the clos<strong>in</strong>g date for applications.<br />

(b) Where an application for a licence has been submitted for a specific area without a prior <strong>in</strong>vitation<br />

<strong>to</strong> the public, see paragraph (a) above, <strong>and</strong> the M<strong>in</strong>ister for Climate <strong>and</strong> Energy f<strong>in</strong>ds that the application<br />

should be considered, the M<strong>in</strong>ister shall publish a notice concern<strong>in</strong>g the application <strong>in</strong> the<br />

Danish Official Gazette <strong>and</strong> the Official Journal of the European Union. Other <strong>in</strong>terested parties<br />

shall be granted a period of at least 90 days after the date of such publication <strong>in</strong> which <strong>to</strong> submit<br />

applications. As a m<strong>in</strong>imum, the notices referred <strong>to</strong> <strong>in</strong> paragraph (a) <strong>and</strong> the first <strong>and</strong> second sentences<br />

of paragraph (b) shall specify that applicants may apply for an exclusive right <strong>to</strong> explore for<br />

<strong>and</strong> produce hydrocarbons, <strong>and</strong> shall <strong>in</strong>dicate the areas for which applications may be or have been<br />

submitted, the expected date for grant<strong>in</strong>g licences, <strong>and</strong> from where <strong>in</strong>formation on the licence<br />

terms, etc. can be obta<strong>in</strong>ed. Any change <strong>in</strong> the licence terms, etc. shall be notified <strong>to</strong> all parties <strong>in</strong>volved.<br />

(c) Where the employment of the procedures set out <strong>in</strong> paragraphs (a) or (b) above is not considered<br />

appropriate, the M<strong>in</strong>ister for Climate <strong>and</strong> Energy may grant licences with<strong>in</strong> specific areas, <strong>and</strong> possibly<br />

with<strong>in</strong> specific time limits, without <strong>in</strong>itiat<strong>in</strong>g the procedures set out <strong>in</strong> paragraphs (a) <strong>and</strong> (b)<br />

above. Such a procedure shall be <strong>in</strong>troduced through the issuance of a special Executive Order,


which shall take effect when a notice concern<strong>in</strong>g the employment of this procedure has been published<br />

<strong>in</strong> the Official Journal of the European Union. As a m<strong>in</strong>imum, such notice shall <strong>in</strong>dicate the<br />

areas for which applications may be submitted, <strong>and</strong> from where more detailed <strong>in</strong>formation on the<br />

licence terms can be obta<strong>in</strong>ed. Any amendments <strong>to</strong> the Executive Order shall be published <strong>in</strong> the<br />

same way.<br />

(d) Where warranted by geological or production considerations, the M<strong>in</strong>ister for Climate <strong>and</strong> Energy<br />

may grant a licence for an area <strong>to</strong> holders of licences for any adjo<strong>in</strong><strong>in</strong>g area without employ<strong>in</strong>g the<br />

procedures set out <strong>in</strong> paragraphs (a) <strong>to</strong> (c) above. In such cases, the holders of licences for all other<br />

adjo<strong>in</strong><strong>in</strong>g areas shall be given an opportunity <strong>to</strong> submit applications <strong>and</strong> sufficient time <strong>to</strong> do so,<br />

<strong>and</strong> they shall have access <strong>to</strong> <strong>in</strong>formation on the terms <strong>and</strong> conditions, etc. applicable <strong>to</strong> such licences.<br />

(2) Before applications are <strong>in</strong>vited <strong>in</strong> pursuance of subsection (1)(a) or (b) or under an Executive<br />

Order <strong>in</strong> pursuance of paragraph (c), the M<strong>in</strong>ister for Climate <strong>and</strong> Energy shall submit a statement<br />

<strong>to</strong> a committee set up by the Danish Parliament, <strong>in</strong>dicat<strong>in</strong>g for which areas or blocks applications<br />

are <strong>in</strong>tended <strong>to</strong> be <strong>in</strong>vited <strong>and</strong> the general terms <strong>and</strong> conditions on which licences are <strong>in</strong>tended <strong>to</strong> be<br />

granted. Members of the committee <strong>and</strong> any other parties present dur<strong>in</strong>g the committee's discussions<br />

about such statements shall keep confidential any <strong>in</strong>formation that may come <strong>to</strong> their knowledge<br />

through the committee with respect <strong>to</strong> the terms on which licences are <strong>to</strong> be granted based on<br />

the procedure outl<strong>in</strong>ed <strong>in</strong> subsection (1)(a), until the date on which an <strong>in</strong>vitation is made <strong>to</strong> the public.<br />

(3) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may refra<strong>in</strong> from grant<strong>in</strong>g a licence on the basis of the<br />

applications received when the procedures referred <strong>to</strong> <strong>in</strong> subsection (1)(a) <strong>and</strong> (b) above are employed.<br />

(4) The terms <strong>and</strong> conditions on which licences are <strong>to</strong> be granted when employ<strong>in</strong>g the procedure<br />

outl<strong>in</strong>ed <strong>in</strong> subsection (1)(a) may not be published until the date on which an <strong>in</strong>vitation is made <strong>to</strong><br />

the public.<br />

12a.-(1) The licences mentioned <strong>in</strong> section 12(1) above shall be granted on the basis of selection<br />

criteria concern<strong>in</strong>g:<br />

(a) the applicant’s expertise <strong>and</strong> f<strong>in</strong>ancial base, <strong>and</strong><br />

(b) the exploration activities that the applicants <strong>in</strong>tend <strong>to</strong> carry out, or the way <strong>in</strong> which the applicants<br />

<strong>in</strong>tend <strong>to</strong> carry out production <strong>in</strong> the area <strong>in</strong> question.<br />

(2) Moreover, the M<strong>in</strong>ister for Climate <strong>and</strong> Energy may decide that the amount that applicants are<br />

prepared <strong>to</strong> pay for the issuance of a licence shall form part of the selection criteria.<br />

(3) Further, the M<strong>in</strong>ister for Climate <strong>and</strong> Energy may set up other relevant, objective <strong>and</strong> nondiscrim<strong>in</strong>a<strong>to</strong>ry<br />

criteria, <strong>in</strong> order <strong>to</strong> make a f<strong>in</strong>al choice among applicants considered <strong>to</strong> have equal<br />

merit based on an evaluation made accord<strong>in</strong>g <strong>to</strong> the selection criteria established <strong>in</strong> subsection<br />

(1)(a) <strong>and</strong> (b), <strong>and</strong> possibly subsection (2).<br />

(4) In addition <strong>to</strong> the criteria mentioned <strong>in</strong> subsections (1)-(3) above, when evaluat<strong>in</strong>g applications<br />

the M<strong>in</strong>ister for Climate <strong>and</strong> Energy may attach weight <strong>to</strong> any lack of efficiency or non-compliance<br />

with obligations under previous licences.<br />

(5) Where the M<strong>in</strong>ister for Climate <strong>and</strong> Energy stipulates that the procedure for grant<strong>in</strong>g licences<br />

shall <strong>in</strong>clude a provision <strong>to</strong> the effect that the M<strong>in</strong>ister shall determ<strong>in</strong>e the composition of any<br />

groups of companies jo<strong>in</strong>tly <strong>to</strong> be granted the licences mentioned <strong>in</strong> subsection (1), the composition<br />

shall be determ<strong>in</strong>ed on the basis of one or more of the criteria established <strong>in</strong> subsections (1)-(4).<br />

(6) Where the M<strong>in</strong>ister for Climate <strong>and</strong> Energy stipulates that the procedure for grant<strong>in</strong>g licences<br />

shall <strong>in</strong>clude a provision <strong>to</strong> the effect that the M<strong>in</strong>ister shall appo<strong>in</strong>t the opera<strong>to</strong>r of a group of com-


panies that is granted licences jo<strong>in</strong>tly, such appo<strong>in</strong>tment shall be made on the basis of the opera<strong>to</strong>r’s<br />

expertise <strong>and</strong> possibly on the basis of one or more of the criteria established <strong>in</strong> subsections (1)-(4).<br />

(7) The criteria established <strong>in</strong> subsections (1)-(6) shall be published <strong>to</strong>gether with the notices <strong>in</strong>vit<strong>in</strong>g<br />

applications referred <strong>to</strong> <strong>in</strong> section 12(1)(a) <strong>to</strong> (c) above. Any changes made <strong>to</strong> these criteria<br />

shall be published <strong>in</strong> the same way.<br />

13.-(1) The hydrocarbon exploration <strong>and</strong> production licences referred <strong>to</strong> <strong>in</strong> section 5 shall be<br />

granted for a term of up <strong>to</strong> six years, which term may be extended by up <strong>to</strong> two years at a time for<br />

the purpose of further exploration, where warranted by special circumstances. The <strong>to</strong>tal term of exploration<br />

may only exceed ten years <strong>in</strong> exceptional cases.<br />

(2) When the pert<strong>in</strong>ent terms <strong>and</strong> conditions <strong>in</strong> a licence granted pursuant <strong>to</strong> subsection (1) above<br />

have been met, the licensee shall be entitled <strong>to</strong> an extension of the licence with a view <strong>to</strong> production.<br />

In special cases, the M<strong>in</strong>ister for Climate <strong>and</strong> Energy may extend the term of a licence notwithst<strong>and</strong><strong>in</strong>g<br />

that the conditions for an extension have not been met. The licence term may only be<br />

extended for those parts of the area that conta<strong>in</strong> commercial accumulations that the licensee plans <strong>to</strong><br />

exploit, <strong>and</strong> not by more than 30 years. In case of major uncerta<strong>in</strong>ty about the extent, <strong>in</strong> terms of area,<br />

of the production potential from one or more of the accumulations <strong>in</strong> an area covered by a licence <strong>to</strong> be<br />

extended for the purpose of production, the M<strong>in</strong>ister for Climate <strong>and</strong> Energy may decide, when<br />

grant<strong>in</strong>g the extension, that the del<strong>in</strong>eation of the accumulation shall be temporary. As a condition for<br />

extend<strong>in</strong>g the licence, the M<strong>in</strong>ister for Climate <strong>and</strong> Energy may stipulate that an application for<br />

approval pursuant <strong>to</strong> section 10 shall be submitted with<strong>in</strong> a specific time limit.<br />

(3) If necessary from a resource po<strong>in</strong>t of view or due <strong>to</strong> economic considerations or <strong>in</strong> the <strong>in</strong>terests<br />

of society, the M<strong>in</strong>ister for Climate <strong>and</strong> Energy may order a licensee covered by this Act <strong>to</strong> submit<br />

an adequate plan with<strong>in</strong> a specified time limit for the production measures, etc., see section 10, <strong>to</strong><br />

be undertaken <strong>in</strong> respect of an accumulation that is considered commercially exploitable. Upon approv<strong>in</strong>g<br />

the plan, the M<strong>in</strong>ister for Climate <strong>and</strong> Energy may order the licensee <strong>to</strong> <strong>in</strong>itiate production.<br />

At the same time, the licence term shall be extended for the purpose of production from that part of<br />

the area that conta<strong>in</strong>s the accumulation, but not by more than 30 years.<br />

(4) The term for production, as fixed <strong>in</strong> pursuance of subsections (2) <strong>and</strong> (3), or <strong>in</strong> the relevant licence,<br />

may be prolonged where warranted by special circumstances. In the event that the <strong>to</strong>tal licence<br />

term will thus exceed 50 years, the provisions of section 6 shall apply mutatis mut<strong>and</strong>is.<br />

(5) Where required due <strong>to</strong> special circumstances, the M<strong>in</strong>ister for Climate <strong>and</strong> Energy may grant<br />

licenses for a term exceed<strong>in</strong>g the number of years mentioned <strong>in</strong> subsections (2) <strong>and</strong> (3) above.<br />

14. In connection with approv<strong>in</strong>g production measures, etc. <strong>in</strong> pursuance of section 10, the date of<br />

production startup shall be fixed so as <strong>to</strong> ensure that the accumulation contributes <strong>to</strong> <strong>Denmark</strong>'s<br />

energy supply <strong>in</strong> an expedient manner <strong>and</strong> that exist<strong>in</strong>g or planned process<strong>in</strong>g <strong>and</strong> transportation<br />

systems are utilized.<br />

15.-(1) In grant<strong>in</strong>g approval for the production of hydrocarbons pursuant <strong>to</strong> section 10, the M<strong>in</strong>ister<br />

for Climate <strong>and</strong> Energy shall stipulate the quantities that may be produced for periods of at least<br />

six months. Unless new <strong>in</strong>formation about the accumulation has been obta<strong>in</strong>ed, the M<strong>in</strong>ister shall<br />

base such stipulations on the production plan approved <strong>in</strong> pursuance of section 10 above.<br />

(2) Where warranted by concern for safe, appropriate or efficient production, or necessitated by<br />

weighty considerations for society, the M<strong>in</strong>ister for Climate <strong>and</strong> Energy may make changes <strong>in</strong> approved<br />

production plans <strong>and</strong> regulate production.<br />

16.-(1) Follow<strong>in</strong>g negotiations with the licensees, the M<strong>in</strong>ister for Climate <strong>and</strong> Energy may order<br />

that <strong>in</strong>stallations for the production, process<strong>in</strong>g <strong>and</strong> transport of hydrocarbons, etc. established <strong>in</strong>


pursuance of an approval or a permit granted accord<strong>in</strong>g <strong>to</strong> this Act may be used by other licensees<br />

where warranted by resource or economic considerations or the <strong>in</strong>terests of society. It is a condition<br />

that the exist<strong>in</strong>g <strong>and</strong> planned users’ projected use is not unreasonably impaired or obstructed as a<br />

consequence.<br />

(2) Follow<strong>in</strong>g negotiations with the licensees, the M<strong>in</strong>ister for Climate <strong>and</strong> Energy may order that<br />

the exploitation of two or more hydrocarbon accumulations shall be coord<strong>in</strong>ated where warranted<br />

by resource or economic considerations or the <strong>in</strong>terests of society.<br />

(3) Agreements regard<strong>in</strong>g the use by other licensees of <strong>in</strong>stallations for the production, process<strong>in</strong>g<br />

<strong>and</strong> transport of hydrocarbons, etc. established pursuant <strong>to</strong> an approval or a permit accord<strong>in</strong>g <strong>to</strong> this<br />

Act <strong>and</strong> regard<strong>in</strong>g the coord<strong>in</strong>ated exploitation of two or more hydrocarbon accumulations shall be<br />

submitted <strong>to</strong> the M<strong>in</strong>ister for Climate <strong>and</strong> Energy immediately follow<strong>in</strong>g their conclusion.<br />

(4) Where an agreement regard<strong>in</strong>g the use by other licensees of <strong>in</strong>stallations for the production,<br />

process<strong>in</strong>g <strong>and</strong> transport of hydrocarbons, etc. established pursuant <strong>to</strong> an approval or a permit<br />

accord<strong>in</strong>g <strong>to</strong> this Act or regard<strong>in</strong>g coord<strong>in</strong>ated exploitation of two or more hydrocarbon<br />

accumulation cannot be reached with<strong>in</strong> a reasonable period of time, the M<strong>in</strong>ister for Climate <strong>and</strong><br />

Energy may lay down terms <strong>and</strong> conditions <strong>in</strong> this respect, <strong>in</strong>clud<strong>in</strong>g about payment. The M<strong>in</strong>ister<br />

for Climate <strong>and</strong> Energy may dem<strong>and</strong> that the parties disclose the <strong>in</strong>formation required for lay<strong>in</strong>g<br />

down such terms <strong>and</strong> conditions.<br />

(5) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may lay down rules regard<strong>in</strong>g the use by other licensees<br />

of <strong>in</strong>stallations for the production, process<strong>in</strong>g <strong>and</strong> transport of hydrocarbons, etc., the procurement<br />

of <strong>in</strong>formation <strong>in</strong> this respect, the arrangement of negotiations, etc. concern<strong>in</strong>g third-party use of<br />

<strong>in</strong>stallations <strong>and</strong> regard<strong>in</strong>g publication of the key po<strong>in</strong>ts of the agreements made.<br />

(6) Subsections (1)-(5) do not apply <strong>to</strong> upstream pipel<strong>in</strong>e networks for natural gas.<br />

17.-(1) The establishment <strong>and</strong> operation of pipel<strong>in</strong>e facilities for use <strong>in</strong> the activities comprised by<br />

this Act may only take place pursuant <strong>to</strong> a licence from the M<strong>in</strong>ister for Climate <strong>and</strong> Energy.<br />

(2) A licence may be granted subject <strong>to</strong> specific conditions on the rout<strong>in</strong>g, dimensions <strong>and</strong> ownership<br />

of the pipel<strong>in</strong>e, as well as the right for other parties <strong>to</strong> use the pipel<strong>in</strong>e, payment for this, fees<br />

payable <strong>to</strong> the state, etc.<br />

(3) Subsections (1) <strong>and</strong> (2) shall not apply <strong>to</strong> local pipel<strong>in</strong>es that form part of <strong>in</strong>stallations used <strong>in</strong><br />

the production from an <strong>in</strong>dividual field.<br />

18. The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may decide that a royalty fixed <strong>in</strong> pursuance of section<br />

9, see section 13, shall be paid <strong>in</strong> the form of extracted hydrocarbons. Any such decision shall take<br />

effect at the earliest six months after the licensee has been notified of the decision.<br />

Part 4a<br />

Special Provisions regard<strong>in</strong>g <strong>Exploration</strong> for <strong>and</strong> Production of Geothermal Energy<br />

18a.-(1) <strong>Licences</strong> pursuant <strong>to</strong> section 5 for exploration <strong>and</strong> production of geothermal energy shall<br />

be granted follow<strong>in</strong>g an <strong>in</strong>vitation of applications from the public.<br />

(2) Before applications are <strong>in</strong>vited <strong>in</strong> pursuance of subsection (1), the M<strong>in</strong>ister for Climate <strong>and</strong><br />

Energy shall submit a statement <strong>to</strong> a committee set up by the Danish Parliament, <strong>in</strong>dicat<strong>in</strong>g for<br />

which areas applications are <strong>in</strong>tended <strong>to</strong> be <strong>in</strong>vited <strong>and</strong> the general terms <strong>and</strong> conditions on which<br />

licences are <strong>in</strong>tended <strong>to</strong> be granted. Members of the committee <strong>and</strong> any other parties present dur<strong>in</strong>g<br />

the committee's discussions about such statements shall keep confidential any <strong>in</strong>formation that may<br />

come <strong>to</strong> their knowledge through the committee with respect <strong>to</strong> the terms on which licences are <strong>to</strong><br />

be granted, until the date on which an <strong>in</strong>vitation is made <strong>to</strong> the public.


(3) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may refra<strong>in</strong> from grant<strong>in</strong>g a licence on the basis of the<br />

applications received based on the <strong>in</strong>vitation <strong>to</strong> the public pursuant <strong>to</strong> subsection (1).<br />

(4) The terms <strong>and</strong> conditions on which licences are <strong>to</strong> be granted follow<strong>in</strong>g an <strong>in</strong>vitation <strong>to</strong> the<br />

public, see subsection (1), may not be published until the date on which applications are <strong>in</strong>vited<br />

from the public.<br />

18b.-(1) <strong>Licences</strong> for exploration <strong>and</strong> production of geothermal energy shall be granted on the<br />

basis of selection criteria concern<strong>in</strong>g<br />

(a) the applicants’ expertise <strong>and</strong> f<strong>in</strong>ancial base, <strong>and</strong><br />

(b) the exploration activities that the applicants offer <strong>to</strong> carry out, or the way <strong>in</strong> which the applicants<br />

<strong>in</strong>tend <strong>to</strong> carry out production <strong>in</strong> the area <strong>in</strong> question.<br />

(2) Moreover, the M<strong>in</strong>ister for Climate <strong>and</strong> Energy may decide that the amount that applicants are<br />

prepared <strong>to</strong> pay for the issuance of a licence shall form part of the selection criteria.<br />

(3) Further, the M<strong>in</strong>ister for Climate <strong>and</strong> Energy may set up other relevant, objective <strong>and</strong> nondiscrim<strong>in</strong>a<strong>to</strong>ry<br />

criteria, <strong>in</strong> order <strong>to</strong> make a f<strong>in</strong>al choice among applicants considered <strong>to</strong> have equal merit<br />

based on an evaluation made accord<strong>in</strong>g <strong>to</strong> the selection criteria established <strong>in</strong> subsection (1)(a) <strong>and</strong> (b),<br />

<strong>and</strong> possibly subsection (2).<br />

(4) In addition <strong>to</strong> the criteria mentioned <strong>in</strong> subsections (1)-(3) above, when evaluat<strong>in</strong>g applications<br />

the M<strong>in</strong>ister for Climate <strong>and</strong> Energy may attach weight <strong>to</strong> any lack of efficiency or non-compliance<br />

with obligations under previous licences.<br />

(5) Klima- og energim<strong>in</strong>isteren kan fastsætte, at det i en procedure for meddelelse af tilladelser<br />

skal <strong>in</strong>dgå, at sammensætn<strong>in</strong>g af grupper af virksomheder, der i foren<strong>in</strong>g meddeles tilladelser som<br />

nævnt i stk. 1, foretages af m<strong>in</strong>isteren. The composition of such groups shall be determ<strong>in</strong>ed on the<br />

basis of one or more of the criteria established <strong>in</strong> subsections (1)-(4).<br />

(6) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may stipulate that a procedure for grant<strong>in</strong>g licences shall<br />

<strong>in</strong>clude a provision <strong>to</strong> the effect that the M<strong>in</strong>ister shall appo<strong>in</strong>t the opera<strong>to</strong>r of a group of companies<br />

<strong>to</strong> be granted licences jo<strong>in</strong>tly. The appo<strong>in</strong>tment shall be based on the opera<strong>to</strong>r’s expertise <strong>and</strong> possibly<br />

other of the criteria established <strong>in</strong> subsections (1)-(4).<br />

(7) The criteria pursuant <strong>to</strong> subsections (1)-(6) shall be published <strong>in</strong> connection with <strong>in</strong>vit<strong>in</strong>g<br />

applications <strong>in</strong> accordance with section 18(a)(1). Any changes made <strong>to</strong> these criteria shall be published<br />

<strong>in</strong> the same way.<br />

18c.-(1) <strong>Licences</strong> pursuant <strong>to</strong> section 5 for the exploration for <strong>and</strong> production of geothermal<br />

energy shall be granted for a term of up <strong>to</strong> six years.<br />

(2) When the terms <strong>and</strong> conditions of a licence granted pursuant <strong>to</strong> subsection (1) above have<br />

been met, the licensee shall be entitled <strong>to</strong> an extension of the licence with a view <strong>to</strong> production In<br />

special cases, the M<strong>in</strong>ister for Climate <strong>and</strong> Energy may extend the term of a licence notwithst<strong>and</strong><strong>in</strong>g<br />

that the conditions for an extension have not been met. The licence term may only be extended for<br />

those parts of the area from which it is <strong>in</strong>tended <strong>to</strong> recover geothermal energy, <strong>and</strong> not by more than<br />

30 years. As a condition for extend<strong>in</strong>g the licence, the M<strong>in</strong>ister for Climate <strong>and</strong> Energy may stipulate<br />

that an application for approval of a plan for the production activities pursuant <strong>to</strong> section 10<br />

shall be submitted with<strong>in</strong> a specific time limit.<br />

(3) Where warranted by special circumstances, the M<strong>in</strong>ster for Climate <strong>and</strong> Energy may grant<br />

licences for a term extend<strong>in</strong>g beyond the periods mentioned <strong>in</strong> subsections (1) <strong>and</strong> (2).<br />

18d. Upon approval of plans for production measures, etc. <strong>in</strong> pursuance of section 10, the date of<br />

production startup shall be determ<strong>in</strong>ed.


Part 5<br />

The State's Right <strong>to</strong> Purchase Liquid <strong>Hydrocarbon</strong>s<br />

19.-(1) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may decide that the state or a state-owned company<br />

shall be entitled <strong>to</strong> purchase up <strong>to</strong> half a licensee's ongo<strong>in</strong>g production of liquid hydrocarbons. Any<br />

such decision shall take effect six months at the earliest after the seller has been notified of the decision.<br />

The hydrocarbons produced shall be supplied at a reasonable market price, at the time <strong>and</strong><br />

place where delivery is effected, <strong>and</strong> on the usual terms of delivery.<br />

(2) Decisions made <strong>in</strong> pursuance of subsection (1) above may not be made <strong>in</strong> respect of production<br />

that is carried on under licences granted after 1 January 1995.<br />

20.-(1) If the buyer <strong>and</strong> the seller have not arrived at an agreement on the price or on the basis for<br />

its calculation with<strong>in</strong> three months of the seller’s receipt of the notification referred <strong>to</strong> <strong>in</strong> section 19<br />

above, either party may br<strong>in</strong>g the matter before the Oil Board.<br />

(2) The parties shall be entitled <strong>to</strong> dem<strong>and</strong> that negotiations be held at six-month <strong>in</strong>tervals <strong>to</strong> review<br />

the price or the basis for its calculation. Where the buyer <strong>and</strong> seller have not arrived at an<br />

agreement on the price or the basis for its calculation with<strong>in</strong> one month of the dem<strong>and</strong> be<strong>in</strong>g made,<br />

either party may br<strong>in</strong>g the matter before the Oil Board.<br />

(3) In the event that the buyer <strong>and</strong> the seller fail <strong>to</strong> agree on the other terms of delivery, <strong>in</strong>clud<strong>in</strong>g<br />

the time <strong>and</strong> place of delivery, either party may br<strong>in</strong>g the matter before the Oil Board.<br />

21.-(1) The Oil Board, which is set up by the M<strong>in</strong>ister for Climate <strong>and</strong> Energy, shall be composed<br />

of a chairman <strong>and</strong> two other members. The chairman shall be appo<strong>in</strong>ted on the recommendation of<br />

the President of the Danish Supreme Court. The two other members shall have special knowledge<br />

of the oil trade. The members <strong>and</strong> their deputies shall be appo<strong>in</strong>ted for a term of four years.<br />

(2) Decisions made by the Oil Board cannot be brought before any other adm<strong>in</strong>istrative authority.<br />

(3) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy shall lay down detailed rules regulat<strong>in</strong>g the activities of<br />

the Board.<br />

22. A decision <strong>to</strong> buy oil made <strong>in</strong> pursuance of section 19 above shall not restrict the state’s right<br />

<strong>to</strong> make decisions <strong>to</strong> sell <strong>and</strong> supply liquid hydrocarbons <strong>in</strong> pursuance of other legislation.<br />

Part 6<br />

Other Use<br />

23.-(1)The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may grant a licence for a def<strong>in</strong>ed part of the subsoil<br />

that gives the licensee an exclusive right of exploration <strong>and</strong> use of the subsoil for s<strong>to</strong>rage or purposes<br />

other than production, subject <strong>to</strong> specific terms <strong>and</strong> conditions. <strong>Exploration</strong> licences may be<br />

granted for a term of up <strong>to</strong> six years, which term may be extended by up <strong>to</strong> two years at a time for<br />

the purpose of further exploration, where warranted by special circumstances. The <strong>to</strong>tal term of exploration<br />

may only exceed ten years <strong>in</strong> exceptional cases.<br />

(2) <strong>Licences</strong> pursuant <strong>to</strong> subsection (1) shall be granted separately for exploration <strong>and</strong> for use of<br />

the subsoil for s<strong>to</strong>rage or purposes other than production.<br />

(3) An exploration licence may grant the licensee a preferential right <strong>to</strong> use the subsoil for s<strong>to</strong>rage<br />

or purposes other than production, provided that exploration of the relevant area has been<br />

completed, that all conditions <strong>in</strong> the exploration licence have been met, <strong>and</strong> that the application for


a licence for s<strong>to</strong>rage or purposes other than production was submitted dur<strong>in</strong>g the term of the<br />

exploration licence.<br />

(4) An exploration licence may lay down provisions on the work obligations <strong>to</strong> be met by the licensee.<br />

(5) <strong>Licences</strong> pursuant <strong>to</strong> subsection (1) may only be granted <strong>to</strong> an applicant considered <strong>to</strong> be<br />

f<strong>in</strong>ancially sound, reliable <strong>and</strong> technically competent <strong>to</strong> operate <strong>and</strong> manage the activities<br />

comprised by the licence, <strong>and</strong> provided the applicant can ensure specialized <strong>and</strong> technical<br />

<strong>in</strong>struction <strong>and</strong> tra<strong>in</strong><strong>in</strong>g of the opera<strong>to</strong>r <strong>and</strong> all personnel.<br />

(6) Dur<strong>in</strong>g the term of the licence, the licensees shall at all times be able <strong>to</strong> substantiate that they<br />

are f<strong>in</strong>ancially sound <strong>and</strong> possess or have access <strong>to</strong> the requisite technical competence <strong>to</strong> operate<br />

<strong>and</strong> manage the activities pursuant <strong>to</strong> subsection (1).<br />

(7) Where an agreement has been concluded between the licensee <strong>and</strong> opera<strong>to</strong>r regard<strong>in</strong>g the<br />

latter’s opera<strong>to</strong>rship of the activities pursuant <strong>to</strong> subsection (1), documentation substantiat<strong>in</strong>g the<br />

existence of the pert<strong>in</strong>ent written agreements shall be available at all times. The opera<strong>to</strong>r shall be<br />

able <strong>to</strong> substantiate the specialized <strong>and</strong> technical <strong>in</strong>struction <strong>and</strong> tra<strong>in</strong><strong>in</strong>g of its personnel; see<br />

subsection (5).<br />

(8) The licences referred <strong>to</strong> <strong>in</strong> subsection (1) above shall be issued upon be<strong>in</strong>g submitted for approval<br />

<strong>to</strong> a committee set up by the Danish Parliament. Section 6(2) shall apply mutatis mut<strong>and</strong>is.<br />

(9) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may lay down more detailed rules <strong>and</strong> regulations regard<strong>in</strong>g<br />

the payment of a fee for the process<strong>in</strong>g of applications pursuant <strong>to</strong> subsection (1) above.<br />

(10) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may lay down more detailed rules <strong>and</strong> regulations regard<strong>in</strong>g<br />

use of the subsoil pursuant <strong>to</strong> subsection (1) above.<br />

23a. A licence granted pursuant <strong>to</strong> section 23 above shall stipulate the consideration <strong>to</strong> be paid by<br />

the licensee <strong>to</strong> the state.<br />

23b.-(1) <strong>Licences</strong> pursuant <strong>to</strong> section 23 shall be granted <strong>in</strong> one of the follow<strong>in</strong>g ways, as<br />

determ<strong>in</strong>ed by the M<strong>in</strong>ister for Climate <strong>and</strong> Energy:<br />

(i) Follow<strong>in</strong>g a notice <strong>in</strong>vit<strong>in</strong>g applications from the public.<br />

(ii) Where the employment of the procedure set out <strong>in</strong> paragraph (i) above is not considered<br />

expedient, the M<strong>in</strong>ister for Climate <strong>and</strong> Energy may grant licences with<strong>in</strong> specific areas, <strong>and</strong><br />

possibly with<strong>in</strong> specific time limits, without <strong>in</strong>itiat<strong>in</strong>g the procedure set out <strong>in</strong> paragraph (i).<br />

Such a procedure shall be <strong>in</strong>troduced through the issuance of a special Executive Order, which<br />

cannot take effect until a notice concern<strong>in</strong>g the employment of this procedure has been<br />

published. As a m<strong>in</strong>imum, such notice shall conta<strong>in</strong> <strong>in</strong>formation about the areas for which<br />

applications can be submitted <strong>and</strong> how <strong>to</strong> obta<strong>in</strong> more detailed <strong>in</strong>formation about the terms <strong>and</strong><br />

conditions. Any amendments <strong>to</strong> the Executive Order shall be published <strong>in</strong> the same way.<br />

(iii) Where warranted by geological or s<strong>to</strong>rage considerations, the M<strong>in</strong>ister for Climate <strong>and</strong> Energy<br />

may grant a licence for an area <strong>to</strong> holders of licences for any adjo<strong>in</strong><strong>in</strong>g area without employ<strong>in</strong>g<br />

the procedures set out <strong>in</strong> paragraphs (i) <strong>and</strong> (ii) above. In such cases, the holders of licences for<br />

all other adjo<strong>in</strong><strong>in</strong>g areas shall be given an opportunity <strong>to</strong> submit applications <strong>and</strong> sufficient time<br />

<strong>to</strong> do so, <strong>and</strong> they shall have access <strong>to</strong> <strong>in</strong>formation on the terms <strong>and</strong> conditions, etc. applicable<br />

<strong>to</strong> such licences.<br />

(2) Before applications are <strong>in</strong>vited <strong>in</strong> pursuance of subsection (1)(i), or an Executive Order pursuant<br />

<strong>to</strong> subsection (1)(ii) is issued, the M<strong>in</strong>ister for Climate <strong>and</strong> Energy shall submit a statement <strong>to</strong> a<br />

committee set up by the Danish Parliament, <strong>in</strong>dicat<strong>in</strong>g for which areas or blocks applications are<br />

<strong>in</strong>tended <strong>to</strong> be <strong>in</strong>vited <strong>and</strong> the general terms <strong>and</strong> conditions on which licences are <strong>in</strong>tended <strong>to</strong> be<br />

granted. Members of the committee <strong>and</strong> any other parties present dur<strong>in</strong>g the committee's discus-


sions about such statements shall keep confidential any <strong>in</strong>formation that may come <strong>to</strong> their knowledge<br />

through the committee with respect <strong>to</strong> the terms on which licences are <strong>to</strong> be granted based on<br />

the procedure outl<strong>in</strong>ed <strong>in</strong> subsection (1)(i), until the date on which an <strong>in</strong>vitation is made <strong>to</strong> the public.<br />

(3) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may refra<strong>in</strong> from grant<strong>in</strong>g a licence on the basis of the<br />

applications received when the procedure referred <strong>to</strong> <strong>in</strong> subsection (1)(i) above is employed.<br />

(4) The terms <strong>and</strong> conditions on which licences are <strong>to</strong> be granted when employ<strong>in</strong>g the procedure<br />

outl<strong>in</strong>ed <strong>in</strong> subsection (1)(i) may not be published until the date on which an <strong>in</strong>vitation is made <strong>to</strong><br />

the public.<br />

(5) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy shall lay down more detailed rules <strong>and</strong> regulations about<br />

the grant<strong>in</strong>g of licences pursuant <strong>to</strong> section 23, <strong>in</strong>clud<strong>in</strong>g about the <strong>in</strong>formation <strong>to</strong> be submitted <strong>in</strong><br />

applications for exploration <strong>and</strong> s<strong>to</strong>rage licences.<br />

23c.-(1) The licences mentioned <strong>in</strong> section 23b(1) above shall be granted on the basis of selection<br />

criteria concern<strong>in</strong>g:<br />

(a) the applicants’ expertise <strong>and</strong> f<strong>in</strong>ancial base, <strong>and</strong><br />

(b) the exploration activities that the applicants offer <strong>to</strong> carry out, or the way <strong>in</strong> which the applicants<br />

<strong>in</strong>tend <strong>to</strong> carry out s<strong>to</strong>rage or other use of the subsoil <strong>in</strong> the area <strong>in</strong> question.<br />

(2) Moreover, the M<strong>in</strong>ister for Climate <strong>and</strong> Energy may decide that the amount that applicants are<br />

prepared <strong>to</strong> pay for the issuance of a licence shall form part of the selection criteria.<br />

(3) Further, the M<strong>in</strong>ister for Climate <strong>and</strong> Energy may set up other relevant, objective <strong>and</strong> nondiscrim<strong>in</strong>a<strong>to</strong>ry<br />

criteria, <strong>in</strong> order <strong>to</strong> make a f<strong>in</strong>al choice among applicants considered <strong>to</strong> have equal merit<br />

based on an evaluation made accord<strong>in</strong>g <strong>to</strong> the selection criteria established <strong>in</strong> subsection (1)(a) <strong>and</strong> (b),<br />

<strong>and</strong> possibly subsection (2).<br />

(4) In addition <strong>to</strong> the criteria mentioned <strong>in</strong> subsections (1)-(3) above, when evaluat<strong>in</strong>g applications<br />

the M<strong>in</strong>ister for Climate <strong>and</strong> Energy may attach weight <strong>to</strong> any lack of efficiency or non-compliance<br />

with obligations under previous licences.<br />

(5) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may stipulate that a procedure for grant<strong>in</strong>g licences shall<br />

<strong>in</strong>clude a provision <strong>to</strong> the effect that the M<strong>in</strong>ister shall determ<strong>in</strong>e the composition of any groups of<br />

companies jo<strong>in</strong>tly <strong>to</strong> be granted the licences mentioned <strong>in</strong> subsection (1). The composition of such<br />

groups shall be determ<strong>in</strong>ed on the basis of one or more of the criteria established <strong>in</strong> subsections (1)-<br />

(4).<br />

(6) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may stipulate that a procedure for grant<strong>in</strong>g licences shall<br />

<strong>in</strong>clude a provision <strong>to</strong> the effect that the M<strong>in</strong>ister shall appo<strong>in</strong>t the opera<strong>to</strong>r of a group of companies<br />

jo<strong>in</strong>tly <strong>to</strong> be granted licences. The appo<strong>in</strong>tment shall be based on the opera<strong>to</strong>r’s expertise <strong>and</strong> possibly<br />

other of the criteria established <strong>in</strong> subsections (1)-(4).<br />

(7) The criteria pursuant <strong>to</strong> subsections (1)-(6) shall be published <strong>to</strong>gether with the notices<br />

<strong>in</strong>vit<strong>in</strong>g the applications referred <strong>to</strong> section 23(b)(1). Any changes made <strong>to</strong> these criteria shall be<br />

published <strong>in</strong> the same way.<br />

23d.-(1) <strong>Exploration</strong> <strong>and</strong> s<strong>to</strong>rage or other use of the subsoil shall be carried on <strong>in</strong> a safe <strong>and</strong><br />

appropriate manner.<br />

(2) Before s<strong>to</strong>rage or other use of the subsoil <strong>and</strong> any measures aimed at such activities are<br />

<strong>in</strong>itiated, a plan for the activities, <strong>in</strong>clud<strong>in</strong>g the organization of production <strong>and</strong> the layout of<br />

<strong>in</strong>stallations, as well as a plan for corrective measures <strong>in</strong> case of leakages or significant<br />

irregularities that <strong>in</strong>volve a risk of leakage from a s<strong>to</strong>rage complex shall be approved by the<br />

M<strong>in</strong>ister for Climate <strong>and</strong> Energy.


(3) The holder of a licence pursuant <strong>to</strong> section 23 shall notify the M<strong>in</strong>ister for Climate <strong>and</strong> Energy<br />

of any planned changes <strong>to</strong> the operation of the activities. Where required, the M<strong>in</strong>ister shall issue an<br />

updated licence.<br />

(4) Substantial changes <strong>and</strong> supplements <strong>to</strong> the plan for the activities, see subsection (2), shall be<br />

approved by the M<strong>in</strong>ister for Climate <strong>and</strong> Energy before be<strong>in</strong>g <strong>in</strong>itiated. The M<strong>in</strong>ister shall issue a<br />

new or updated licence.<br />

(5) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may lay down terms <strong>and</strong> conditions <strong>in</strong> connection with<br />

grant<strong>in</strong>g approvals <strong>and</strong> licences pursuant <strong>to</strong> subsections (2) <strong>to</strong> (4).<br />

(6) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may lay down rules regard<strong>in</strong>g plans, see subsection (2),<br />

for s<strong>to</strong>rage or other use of the subsoil.<br />

Part 6a<br />

Special Provisions regard<strong>in</strong>g Geological S<strong>to</strong>rage <strong>and</strong> Piped Transport of CO2 (Carbon Dioxide)<br />

23e.-(1) For the purposes of this Part, the follow<strong>in</strong>g def<strong>in</strong>itions shall apply:<br />

(i) “waste” means the substances def<strong>in</strong>ed as waste <strong>in</strong> Executive Order No. 1632 of 21 December<br />

2010 on Waste;<br />

(ii) “CO2 s<strong>to</strong>rage site” means a def<strong>in</strong>ed volume area with<strong>in</strong> a geological formation used for the<br />

geological s<strong>to</strong>rage of CO2 <strong>and</strong> associated surface <strong>and</strong> <strong>in</strong>jection facilities;<br />

(iii) “CO2 stream” means a flow of substances that results from CO2 capture processes, <strong>to</strong> be<br />

<strong>in</strong>jected <strong>in</strong><strong>to</strong> a CO2 s<strong>to</strong>rage site;<br />

(iv) “CO2 transport network” means a network of pipel<strong>in</strong>es <strong>in</strong>clud<strong>in</strong>g associated booster stations<br />

or the like, for the transport of CO2 <strong>to</strong> the CO2 s<strong>to</strong>rage site;<br />

(v) “geological formation” means a lithostratigraphical subdivision with<strong>in</strong> which dist<strong>in</strong>ct rock<br />

layers can be found <strong>and</strong> mapped;<br />

(vi) “geological s<strong>to</strong>rage of CO2” means <strong>in</strong>jection of CO2 streams accompanied by s<strong>to</strong>rage of CO2<br />

<strong>in</strong> underground formations;<br />

(vii) “hydraulic unit” means a hydraulically connected pore space where pressure communication<br />

can be measured by technical means <strong>and</strong> which is bordered by flow barriers, such as faults,<br />

salt domes, lithological boundaries, or by the wedg<strong>in</strong>g out or outcropp<strong>in</strong>g of the formation;<br />

(viii) “s<strong>to</strong>rage complex“ means the CO2 s<strong>to</strong>rage site <strong>and</strong> surround<strong>in</strong>g geological doma<strong>in</strong> which can<br />

have an effect on overall s<strong>to</strong>rage <strong>in</strong>tegrity <strong>and</strong> security, that is, secondary conta<strong>in</strong>ment<br />

formations;<br />

(ix) “closure of a CO2 s<strong>to</strong>rage site” means the def<strong>in</strong>itive cessation of CO2 <strong>in</strong>jection <strong>in</strong><strong>to</strong> that CO2<br />

s<strong>to</strong>rage site;<br />

(x) “corrective measures” means any measures taken <strong>to</strong> correct significant irregularities or <strong>to</strong><br />

close leakages <strong>in</strong> order <strong>to</strong> prevent or s<strong>to</strong>p the release of CO2 from the s<strong>to</strong>rage complex;<br />

(xi) “leakage” means any release of CO2 from the s<strong>to</strong>rage complex;<br />

(xii) “significant risk” means a comb<strong>in</strong>ation of the probability of occurrence of damage <strong>and</strong> a<br />

magnitude of damage that cannot be disregarded without call<strong>in</strong>g <strong>in</strong><strong>to</strong> question the purpose of<br />

Directive 2009/31/EC of the European Parliament <strong>and</strong> of the Council of 23 April 2009 for the<br />

s<strong>to</strong>rage site concerned;<br />

(xiii) “significant irregularity” means any irregularity <strong>in</strong> the CO2 <strong>in</strong>jection or s<strong>to</strong>rage operations or<br />

<strong>in</strong> the condition of the CO2 s<strong>to</strong>rage complex itself, which implies the risk of a leakage or risk<br />

<strong>to</strong> the environment or human health.<br />

23f.-(1) The suitability of the subsoil for geological s<strong>to</strong>rage of CO2 shall be determ<strong>in</strong>ed through a<br />

characterization <strong>and</strong> assessment of the potential s<strong>to</strong>rage complex <strong>and</strong> surround<strong>in</strong>g area.


(2) A geological formation <strong>in</strong> the subsoil shall only be selected as a CO2 s<strong>to</strong>rage site, if under the<br />

<strong>in</strong>tended conditions of use there is no significant risk of leakage, <strong>and</strong> if no significant environmental<br />

or health risks exit.<br />

(3) In the case of more than one CO2 s<strong>to</strong>rage site <strong>in</strong> the same hydraulic unit, the potential pressure<br />

<strong>in</strong>teractions shall be such that both sites can simultaneously meet the requirements of this Act <strong>and</strong><br />

provisions laid down <strong>in</strong> pursuance hereof.<br />

(4) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy shall lay down more detailed rules <strong>and</strong> regulations<br />

regard<strong>in</strong>g the criteria for a characterization <strong>and</strong> assessment of the suitability of a geological<br />

formation for use as a CO2 s<strong>to</strong>rage site.<br />

23g.-(1) A CO2 stream shall consist overwhelm<strong>in</strong>gly of carbon dioxide. No waste or other matter<br />

may be added for the purpose of dispos<strong>in</strong>g of that waste or other matter.<br />

(2) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy shall lay down more detailed rules <strong>and</strong> regulations<br />

regard<strong>in</strong>g criteria <strong>and</strong> procedures for the composition of CO2 streams.<br />

23h.-(1) The holder of a licence for a CO2 s<strong>to</strong>rage site shall establish <strong>and</strong> ma<strong>in</strong>ta<strong>in</strong> a register of<br />

the quantities of CO2 delivered <strong>and</strong> <strong>in</strong>jected as well as the properties <strong>and</strong> composition of the CO2<br />

stream. In case of <strong>in</strong>jection of CO2 streams, they shall be deemed <strong>to</strong> have been s<strong>to</strong>red immediately<br />

follow<strong>in</strong>g <strong>in</strong>jection.<br />

(2) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy shall lay down more detailed rules <strong>and</strong> regulations<br />

regard<strong>in</strong>g the content of the register.<br />

23i.-(1) The holder of a licence for a CO2 s<strong>to</strong>rage site shall set up a programme for moni<strong>to</strong>r<strong>in</strong>g the<br />

<strong>in</strong>jection facilities <strong>and</strong> s<strong>to</strong>rage complex before the <strong>in</strong>jection of CO2 is <strong>in</strong>itiated. The programme<br />

shall describe the licensee’s measures <strong>to</strong> ensure appropriate operation of the s<strong>to</strong>rage site. The<br />

licensee shall ensure compliance with the moni<strong>to</strong>r<strong>in</strong>g programme <strong>and</strong> ensure that it is checked<br />

appropriately. At least once a year, the licensee shall submit a report <strong>to</strong> the M<strong>in</strong>ister for Climate <strong>and</strong><br />

Energy that describes the programme <strong>and</strong> programme checks. The report is subject <strong>to</strong> approval by<br />

the M<strong>in</strong>ister for Climate <strong>and</strong> Energy.<br />

(2) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy shall lay down more detailed rules <strong>and</strong> regulations<br />

regard<strong>in</strong>g the matters mentioned <strong>in</strong> subsection (1), <strong>in</strong>clud<strong>in</strong>g about the content of the moni<strong>to</strong>r<strong>in</strong>g<br />

programme <strong>and</strong> the procedure for check<strong>in</strong>g it <strong>and</strong> submitt<strong>in</strong>g reports.<br />

23j.-(1) In case of leakages or significant irregularities which imply the risk of leakage from a<br />

CO2 s<strong>to</strong>rage complex, the licensee shall immediately notify the M<strong>in</strong>ister for Climate <strong>and</strong> Energy.<br />

(2) The licensee shall take the necessary corrective measures for the s<strong>to</strong>rage complex, <strong>in</strong>clud<strong>in</strong>g<br />

measures related <strong>to</strong> the protection of human health. As a m<strong>in</strong>imum, the corrective measures shall be<br />

taken on the basis of a corrective measures plan; see section 23d(2).<br />

(3) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may at any time require the licensee <strong>to</strong> take the necessary<br />

corrective measures as well as measures related <strong>to</strong> the protection of human health, <strong>in</strong>clud<strong>in</strong>g<br />

measures additional <strong>to</strong> those laid out <strong>in</strong> the corrective measures plan; see section 23d(2).<br />

(4) If the licensee fails <strong>to</strong> take the necessary corrective measures with<strong>in</strong> a reasonable period of<br />

time, the M<strong>in</strong>ister for Climate <strong>and</strong> Energy shall take the necessary corrective measures <strong>and</strong> order<br />

the licensee <strong>to</strong> pay the associated costs.<br />

23k.-(1) Closure of a CO2 s<strong>to</strong>rage site may only take place follow<strong>in</strong>g the approval of the M<strong>in</strong>ister<br />

for Climate <strong>and</strong> Energy.<br />

(2) A CO2 s<strong>to</strong>rage site shall be closed:<br />

(i) if the relevant conditions stated <strong>in</strong> the CO2 s<strong>to</strong>rage licence have been met;


(ii) follow<strong>in</strong>g an application from the licensee; or<br />

(iii) if the M<strong>in</strong>ister for Climate <strong>and</strong> Energy so decides pursuant <strong>to</strong> section 23n(1) after the<br />

withdrawal of a CO2 s<strong>to</strong>rage licence.<br />

(3) After a CO2 s<strong>to</strong>rage site has been closed, the licensee shall be responsible for seal<strong>in</strong>g the<br />

s<strong>to</strong>rage site <strong>and</strong> remov<strong>in</strong>g the <strong>in</strong>jection facilities.<br />

(4) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may lay down more detailed rules <strong>and</strong> regulations<br />

regard<strong>in</strong>g the conditions applicable <strong>to</strong> closure of a CO2 s<strong>to</strong>rage site.<br />

23l.-(1) The licensee shall draw up <strong>and</strong> comply with a post-closure plan for the period follow<strong>in</strong>g<br />

closure of the CO2 s<strong>to</strong>rage site before responsibility is transferred <strong>in</strong> pursuance of section 23o. The<br />

post-closure plan shall be approved by the M<strong>in</strong>ister for Climate <strong>and</strong> Energy.<br />

(2) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may lay down more detailed rules <strong>and</strong> regulations<br />

regard<strong>in</strong>g the content of the post-closure plan.<br />

23m.-(1) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy shall review <strong>and</strong> where necessary update or, as a<br />

last resort, withdraw the CO2 s<strong>to</strong>rage licence;<br />

(i) if any leakages or significant irregularities occur or there is a risk of such leakages or<br />

irregularities occurr<strong>in</strong>g; or<br />

(ii) if it is necessary on the basis of the latest scientific f<strong>in</strong>d<strong>in</strong>gs <strong>and</strong> technological progress.<br />

(2) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy shall lay down more detailed rules <strong>and</strong> regulations for<br />

review<strong>in</strong>g, updat<strong>in</strong>g <strong>and</strong> withdraw<strong>in</strong>g CO2 s<strong>to</strong>rage licences.<br />

23n.-(1) If a CO2 s<strong>to</strong>rage licence is withdrawn pursuant <strong>to</strong> section 23m or section 30(1), the<br />

M<strong>in</strong>ister for Climate <strong>and</strong> Energy shall either issue a new s<strong>to</strong>rage licence <strong>to</strong> another licensee or close<br />

the CO2 s<strong>to</strong>rage site.<br />

(2) Until a new CO2 s<strong>to</strong>rage licence has been issued, the M<strong>in</strong>ister for Climate <strong>and</strong> Energy shall<br />

temporarily take over all obligations relat<strong>in</strong>g <strong>to</strong> the CO2 s<strong>to</strong>rage site.<br />

(3) If the M<strong>in</strong>ister for Climate <strong>and</strong> Energy decides <strong>to</strong> close the CO2 s<strong>to</strong>rage site, the M<strong>in</strong>ister for<br />

Climate <strong>and</strong> Energy shall take over the responsibility for such site.<br />

(4) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may order the previous licensee <strong>to</strong> pay the costs<br />

associated with transferr<strong>in</strong>g the obligations regard<strong>in</strong>g the CO2 s<strong>to</strong>rage site pursuant <strong>to</strong> subsection (2)<br />

<strong>and</strong> the responsibility for the CO2 s<strong>to</strong>rage site pursuant <strong>to</strong> subsection (3).<br />

23o.-(1) Where a CO2 s<strong>to</strong>rage site has been closed pursuant <strong>to</strong> section 23(k)(2)(i) <strong>and</strong> (ii), all legal<br />

obligations relat<strong>in</strong>g <strong>to</strong> the s<strong>to</strong>rage site shall be transferred <strong>to</strong> the M<strong>in</strong>ister for Climate <strong>and</strong> Energy on<br />

the M<strong>in</strong>ister’s <strong>in</strong>itiative or upon request from the licensee, provided the follow<strong>in</strong>g conditions are<br />

met:<br />

(i) all available evidence <strong>in</strong>dicates that the s<strong>to</strong>red CO2 will be completely <strong>and</strong> permanently<br />

conta<strong>in</strong>ed;<br />

(ii) a period of no less than 20 years after the closure of the CO2 s<strong>to</strong>rage site has elapsed, unless the<br />

licensee can substantiate that the criterion set up <strong>in</strong> paragraph (i) above has been complied with<br />

before the end of such period;<br />

(iii) the payment obligation pursuant <strong>to</strong> 23r has been fulfilled;<br />

(iv) the CO2 s<strong>to</strong>rage site has been sealed <strong>and</strong> the <strong>in</strong>jection facilities have been removed.<br />

(2) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may lay down more detailed rules <strong>and</strong> regulations<br />

regard<strong>in</strong>g the transfer of responsibility for CO2 s<strong>to</strong>rage sites pursuant <strong>to</strong> subsection (1) <strong>and</strong><br />

regard<strong>in</strong>g the documentation <strong>to</strong> be made available before the transfer of responsibility can be<br />

deemed <strong>to</strong> have taken place.


23p.-(1) Where a CO2 s<strong>to</strong>rage site has been closed pursuant <strong>to</strong> section 23k(2)(iii), transfer of<br />

responsibility shall be deemed <strong>to</strong> have taken place if <strong>and</strong> when all available evidence <strong>in</strong>dicates that<br />

the s<strong>to</strong>red CO2 will be completely <strong>and</strong> permanently conta<strong>in</strong>ed, <strong>and</strong> after the CO2 s<strong>to</strong>rage site has<br />

been sealed <strong>and</strong> the <strong>in</strong>jection facilities have been removed.<br />

(2) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may lay down more detailed rules <strong>and</strong> regulations<br />

regard<strong>in</strong>g the transfer of responsibility for CO2 s<strong>to</strong>rage sites pursuant <strong>to</strong> subsection (1) <strong>and</strong><br />

regard<strong>in</strong>g the documentation <strong>to</strong> be made available before the transfer of responsibility can be<br />

deemed <strong>to</strong> have taken place.<br />

23q.-(1) A holder of a licence for a CO2 s<strong>to</strong>rage site shall provide valid <strong>and</strong> effective f<strong>in</strong>ancial<br />

security or any other equivalent for the estimated costs of all obligations follow<strong>in</strong>g from the licence<br />

for CO2 s<strong>to</strong>rage. The f<strong>in</strong>ancial security or any other equivalent shall be periodically adjusted <strong>to</strong> take<br />

account of changes <strong>to</strong> the assessed risk of leakage <strong>and</strong> the estimated costs of all obligations aris<strong>in</strong>g<br />

under the licence for s<strong>to</strong>rage of CO2. The f<strong>in</strong>ancial security or any other equivalent shall be valid<br />

<strong>and</strong> effective before commencement of <strong>in</strong>jection <strong>in</strong><strong>to</strong> a CO2 s<strong>to</strong>rage site.<br />

(2) The f<strong>in</strong>ancial security or any other equivalent, see subsection (1), shall rema<strong>in</strong> valid <strong>and</strong><br />

effective:<br />

(i) after a CO2 s<strong>to</strong>rage site has been closed pursuant <strong>to</strong> section 23k(2)(i) <strong>and</strong> (ii) until the<br />

responsibility for the s<strong>to</strong>rage site is transferred <strong>to</strong> the M<strong>in</strong>ister for Climate <strong>and</strong> Energy, see<br />

section 23o; <strong>and</strong><br />

(ii) after the withdrawal of a CO2, s<strong>to</strong>rage licence, see section 23m or section 30(1);<br />

(a) until a new licence for s<strong>to</strong>rage of CO2 has been issued <strong>to</strong> another licensee; or<br />

(b) where the s<strong>to</strong>rage site is closed pursuant <strong>to</strong> section 23n(1) until the transfer of responsibility<br />

has taken place pursuant <strong>to</strong> section 23o, provided the payment stipulated <strong>in</strong> section 23r has<br />

been effected.<br />

(3) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may lay down more detailed rules <strong>and</strong> regulations<br />

regard<strong>in</strong>g the establishment, adjustment <strong>and</strong> ma<strong>in</strong>tenance of the f<strong>in</strong>ancial security or any other<br />

equivalent <strong>and</strong> regard<strong>in</strong>g the calculation of coverage of such security.<br />

23r.-(1) Before the transfer of responsibility pursuant <strong>to</strong> section 23o, the licensee shall pay an<br />

amount <strong>to</strong> the M<strong>in</strong>ister for Climate <strong>and</strong> Energy <strong>to</strong> cover the expected moni<strong>to</strong>r<strong>in</strong>g costs for a period<br />

of 30 years. No other costs may be imposed follow<strong>in</strong>g the transfer of responsibility, but see section<br />

23s.<br />

(2) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may lay down more detailed rules <strong>and</strong> regulations regard<strong>in</strong>g<br />

the calculation <strong>and</strong> payment of the costs referred <strong>to</strong> <strong>in</strong> subsection (1) above.<br />

23s. If, before or <strong>in</strong> connection with the transfer of responsibility, the holder of a licence for a CO2<br />

s<strong>to</strong>rage site is guilty of provid<strong>in</strong>g deficient data, has concealed relevant <strong>in</strong>formation, displayed<br />

negligence or deceit or has failed <strong>to</strong> exercise due diligence, the M<strong>in</strong>ister for Climate <strong>and</strong> Energy<br />

shall order the previous licensee <strong>to</strong> pay the costs <strong>in</strong>curred after the transfer of responsibility.<br />

23t.-(1) Potential users are entitled <strong>to</strong> use CO2 transport networks <strong>and</strong> CO2 s<strong>to</strong>rage sites aga<strong>in</strong>st<br />

payment, but see subsection (3).<br />

(2) The prices <strong>and</strong> conditions for transport <strong>in</strong> CO2 transport networks <strong>and</strong> s<strong>to</strong>rage at CO2 s<strong>to</strong>rage<br />

sites pursuant <strong>to</strong> subsection (1) shall be determ<strong>in</strong>ed by the CO2 transport network company <strong>and</strong> the<br />

s<strong>to</strong>rage company, respectively. The companies shall publish their tariffs <strong>and</strong> conditions for use of<br />

CO2 transport networks <strong>and</strong> CO2 s<strong>to</strong>rage sites.


(3) CO2 transport network <strong>and</strong> s<strong>to</strong>rage companies may refuse access <strong>to</strong> CO2 transport networks<br />

<strong>and</strong> CO2 s<strong>to</strong>rage sites pursuant <strong>to</strong> subsection (1) if the necessary capacity or connection is not<br />

available <strong>to</strong> the companies. Duly substantiated reasons shall be given for any such refusal.<br />

(4) CO2 transport network <strong>and</strong> s<strong>to</strong>rage companies that refuse access on the grounds of lack of<br />

capacity or a lack of connection shall make any necessary enhancements as far as it is economic <strong>to</strong><br />

do so or when a potential cus<strong>to</strong>mer is will<strong>in</strong>g <strong>to</strong> pay for them, provided this would not negatively<br />

impact on the environmental security of transport <strong>and</strong> geological s<strong>to</strong>rage of CO2.<br />

(5) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may lay down more detailed rules <strong>and</strong> regulations<br />

regard<strong>in</strong>g the access <strong>to</strong> CO2 transport networks <strong>and</strong> CO2 s<strong>to</strong>rage sites.<br />

(6) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy shall lay down rules regard<strong>in</strong>g the settlement of disputes<br />

concern<strong>in</strong>g access <strong>to</strong> CO2 transport networks <strong>and</strong> CO2 s<strong>to</strong>rage sites.<br />

23u.-(1) The establishment <strong>and</strong> operation of pipel<strong>in</strong>e facilities for transport<strong>in</strong>g <strong>and</strong> s<strong>to</strong>r<strong>in</strong>g CO2<br />

may only take place pursuant <strong>to</strong> a licence from the M<strong>in</strong>ister for Climate <strong>and</strong> Energy.<br />

(2) A licence may be granted subject <strong>to</strong> conditions regard<strong>in</strong>g rout<strong>in</strong>g, dimensions, ownership <strong>and</strong><br />

payment for use.<br />

(3) Subsections (1) <strong>and</strong> (2) shall not apply <strong>to</strong> local pipel<strong>in</strong>es form<strong>in</strong>g part of facilities used for<br />

s<strong>to</strong>r<strong>in</strong>g CO2.<br />

23v. The M<strong>in</strong>ister for Climate <strong>and</strong> Energy shall lay down rules regard<strong>in</strong>g the establishment <strong>and</strong><br />

ma<strong>in</strong>tenance of a register of licences granted for s<strong>to</strong>rage of CO2 <strong>and</strong> of closed CO2 s<strong>to</strong>rage sites.<br />

Part 7<br />

Scientific Investigations<br />

24. The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may grant licences for scientific <strong>in</strong>vestigations of the<br />

subsoil; see section 1(2)(iii) above.<br />

Part 8<br />

Supervision, etc.<br />

25.-(1) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy shall supervise compliance with the provisions of this<br />

present Act <strong>and</strong> with the rules <strong>and</strong> regulations, terms <strong>and</strong> conditions drawn up <strong>in</strong> pursuance of this Act.<br />

The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may issue enforcement notices order<strong>in</strong>g compliance with this<br />

Act <strong>and</strong> with regulations issued <strong>in</strong> pursuance hereof.<br />

(2) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may lay down more detailed rules <strong>and</strong> regulations regard<strong>in</strong>g<br />

performance of the supervision.<br />

(3) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may order licensees <strong>to</strong> pay the expenses associated with<br />

public authority case h<strong>and</strong>l<strong>in</strong>g pursuant <strong>to</strong> this Act, <strong>in</strong>clud<strong>in</strong>g for a public consultation procedure as<br />

referred <strong>to</strong> <strong>in</strong> section 28a(1) below, <strong>and</strong> the M<strong>in</strong>ister may lay down more detailed rules <strong>and</strong> regulations<br />

<strong>in</strong> this respect.<br />

26.-(1) Licensees shall submit all <strong>in</strong>formation required for the M<strong>in</strong>ister for Climate <strong>and</strong> Energy’s<br />

supervision of the activities covered by this Act. For the purpose of his supervision, the M<strong>in</strong>ister for<br />

Climate <strong>and</strong> Energy may order a licensee <strong>to</strong> submit samples, raw data, process<strong>in</strong>g results, <strong>in</strong>terpretations<br />

<strong>and</strong> assessments as well as technical <strong>and</strong> f<strong>in</strong>ancial <strong>in</strong>formation.


(2) Licensees shall submit all <strong>in</strong>formation regard<strong>in</strong>g protection of the environment <strong>and</strong> natural resources<br />

that is required for the M<strong>in</strong>ister of Transport <strong>and</strong> Energy’s supervision of the activities covered<br />

by this Act. In this connection, the M<strong>in</strong>ister may order a licensee <strong>to</strong> submit <strong>in</strong>formation about<br />

or make <strong>in</strong>vestigations <strong>in</strong><strong>to</strong> specific matters regard<strong>in</strong>g the protection of natural resources.<br />

(3) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may not order a licensee <strong>to</strong> submit <strong>in</strong>formation on its actual<br />

or <strong>in</strong>tended suppliers, except where this is done with a view <strong>to</strong> meet<strong>in</strong>g the objectives set out <strong>in</strong><br />

Article 30 of the EU Treaty.<br />

(4) Any <strong>in</strong>formation received by the supervisory authority under subsection (1) above shall be<br />

subject <strong>to</strong> confidentiality; see sections 152, section 152a, the first sentence, <strong>and</strong> section 152c of the<br />

Danish Crim<strong>in</strong>al Code.<br />

27.-(1) Where an imm<strong>in</strong>ent risk of <strong>in</strong>appropriate use or exploitation of the subsoil is deemed <strong>to</strong><br />

exist, the staff of the supervisory authority shall have access, without a prior court order, <strong>to</strong> all parts<br />

of the licensee's bus<strong>in</strong>ess aga<strong>in</strong>st duly show<strong>in</strong>g proof of their identity.<br />

(2) A licence granted <strong>in</strong> pursuance of section 5 above may provide that a representative of the supervisory<br />

authority shall be entitled <strong>to</strong> attend meet<strong>in</strong>gs held by the licensees’ decision-mak<strong>in</strong>g bodies.<br />

Part 9<br />

Other Provisions<br />

28. Any works <strong>to</strong> be carried out <strong>in</strong> connection with activities covered by this Act, <strong>in</strong>clud<strong>in</strong>g drill<strong>in</strong>g<br />

wells, s<strong>in</strong>k<strong>in</strong>g shafts, <strong>and</strong> driv<strong>in</strong>g adits <strong>and</strong> drifts, may not be <strong>in</strong>itiated until the approval of the<br />

M<strong>in</strong>ister for Climate <strong>and</strong> Energy has been obta<strong>in</strong>ed for equipment, work<strong>in</strong>g programme <strong>and</strong> work<strong>in</strong>g<br />

methods <strong>in</strong> each <strong>in</strong>dividual case.<br />

28a.-(1) <strong>Licences</strong> <strong>and</strong> approvals for offshore projects under this Act that are assumed <strong>to</strong> have a<br />

major impact on the environment may only be granted follow<strong>in</strong>g an assessment of the effects on the<br />

environment <strong>and</strong> after the members of the public, authorities <strong>and</strong> organizations that are affected<br />

have been given an opportunity <strong>to</strong> express their op<strong>in</strong>ion. If the project, either alone or <strong>in</strong> conjunction<br />

with other projects or plans, is assumed <strong>to</strong> have a major impact on designated <strong>in</strong>ternational nature<br />

protection areas, the licence or approval may only be granted follow<strong>in</strong>g an assessment of the<br />

impact of the project on the site, with due consideration paid <strong>to</strong> the objectives for conservation of<br />

the site. If deemed necessary by the M<strong>in</strong>ister for Climate <strong>and</strong> Energy, an assessment of the impact<br />

on the site shall be <strong>in</strong>cluded <strong>in</strong> the material that has been submitted <strong>to</strong> the general public, authorities<br />

<strong>and</strong> organizations for consultation.<br />

(2) When submitt<strong>in</strong>g applications <strong>and</strong> assessments pursuant <strong>to</strong> subsection (1) above, the applicant<br />

shall <strong>in</strong>clude all <strong>in</strong>formation necessary for the consideration of the relevant application or assessment.<br />

For use <strong>in</strong> consider<strong>in</strong>g the application or assessment, the M<strong>in</strong>ister for Climate <strong>and</strong> Energy<br />

may order the applicant <strong>to</strong> submit <strong>in</strong>formation about or make <strong>in</strong>vestigations <strong>in</strong><strong>to</strong> specific matters.<br />

(3) <strong>Licences</strong> or approvals may only be granted pursuant <strong>to</strong> this Act if<br />

(i) the project does not adversely affect the <strong>in</strong>tegrity of an <strong>in</strong>ternational nature protection<br />

area; or<br />

(ii) weighty societal considerations, <strong>in</strong>clud<strong>in</strong>g of a social or economic nature, make it imperative<br />

<strong>to</strong> implement the project because no alternative solutions exist; but see subsection<br />

(4) below.<br />

(4) In case of <strong>in</strong>ternational nature protection areas with a priority natural habitat type or a priority<br />

species, a licence or approval for a project covered by subsection (3)(ii) may only be granted if


(i) this is necessary <strong>in</strong> the <strong>in</strong>terest of human health, public safety or significant beneficial<br />

effects on the environment; or<br />

(ii) other weighty societal considerations make it imperative <strong>to</strong> implement the project.<br />

(5) A licence or approval pursuant <strong>to</strong> subsection (4)(ii) may be granted only upon submitt<strong>in</strong>g the<br />

matter for the op<strong>in</strong>ion of the European Commission.<br />

(6) When licences or approvals are granted pursuant <strong>to</strong> subsection (3)(ii) or subsection (4), the<br />

M<strong>in</strong>ister for Climate <strong>and</strong> Energy shall lay down terms <strong>and</strong> conditions regard<strong>in</strong>g appropriate compensa<strong>to</strong>ry<br />

measures. The expenses for such compensa<strong>to</strong>ry measures shall be covered by the project<br />

applicant. The M<strong>in</strong>ister shall notify the European Commission of the compensa<strong>to</strong>ry measures taken.<br />

28b. In connection with offshore projects, the M<strong>in</strong>ister for Climate <strong>and</strong> Energy shall take appropriate<br />

measures, <strong>in</strong>clud<strong>in</strong>g by lay<strong>in</strong>g down terms <strong>and</strong> conditions, issu<strong>in</strong>g enforcement notices or<br />

prohibition notices, <strong>to</strong> avoid deteriorat<strong>in</strong>g natural habitat types <strong>and</strong> the natural habitats of the species<br />

<strong>in</strong> <strong>in</strong>ternational nature protection areas <strong>and</strong> disturb<strong>in</strong>g the species for whose protection the areas<br />

have been designated if such disturbances have major consequences for the objectives set out <strong>in</strong><br />

Council Directive 92/43/EEC of 21 May 1992 on the conservation of natural habitats <strong>and</strong> of wild<br />

fauna <strong>and</strong> flora (the Habitats Directive).<br />

28c.-(1) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy shall lay down detailed rules <strong>and</strong> regulations regard<strong>in</strong>g<br />

the projects fall<strong>in</strong>g under section 28a(1), the content <strong>and</strong> scope of assessments pursuant <strong>to</strong><br />

section 28a(1), applications for <strong>and</strong> the grant<strong>in</strong>g of licences <strong>and</strong> approvals for the projects covered,<br />

the m<strong>in</strong>imum <strong>in</strong>formation <strong>and</strong> <strong>in</strong>vestigations required for mak<strong>in</strong>g an assessment of the effects on the<br />

environment <strong>and</strong> of the impact on <strong>in</strong>ternational nature protection areas, the notification <strong>and</strong> consultation<br />

of the members of the public, authorities <strong>and</strong> organizations affected <strong>in</strong> respect of assessments<br />

made pursuant <strong>to</strong> section 28a(1), <strong>and</strong> regard<strong>in</strong>g terms <strong>and</strong> conditions, compensa<strong>to</strong>ry measures <strong>and</strong><br />

enforcement notices.<br />

(2) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may stipulate that decisions pursuant <strong>to</strong> section 26(2)<br />

<strong>and</strong> sections 28a <strong>and</strong> 28b shall be subject <strong>to</strong> an op<strong>in</strong>ion be<strong>in</strong>g obta<strong>in</strong>ed from the M<strong>in</strong>ister for the<br />

Environment, or from an agency duly authorized by the M<strong>in</strong>ister, on issues relat<strong>in</strong>g <strong>to</strong> protection of<br />

the environment <strong>and</strong> natural resources.<br />

29.-(1) <strong>Licences</strong> may not be assigned <strong>to</strong> any other party, neither directly nor <strong>in</strong>directly, unless the<br />

M<strong>in</strong>ister for Climate <strong>and</strong> Energy allows such assignment <strong>and</strong> approves the pert<strong>in</strong>ent terms <strong>and</strong> conditions.<br />

(2) A licence granted under the provisions of this Act shall not be available <strong>to</strong> the recourse of<br />

credi<strong>to</strong>rs.<br />

30.-(1) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may revoke any licence granted under this Act<br />

(i) <strong>in</strong> case of non-compliance with the provisions of this Act or with any provisions, terms<br />

<strong>and</strong> conditions or enforcement notices issued <strong>in</strong> pursuance of the Act;<br />

(ii) where an application for a licence conta<strong>in</strong>s <strong>in</strong>correct or mislead<strong>in</strong>g <strong>in</strong>formation;<br />

(iii) where a licensee files a petition for suspension of payments or is declared bankrupt.<br />

(2) Where the matter can be rectified by the licensee, a licence may not be revoked <strong>in</strong> accordance<br />

with subsection (1)(i) above until the M<strong>in</strong>ister for Climate <strong>and</strong> Energy has issued an enforcement<br />

notice specify<strong>in</strong>g a time limit with<strong>in</strong> which the matter shall be rectified, <strong>and</strong> the licensee fails <strong>to</strong><br />

comply with such enforcement notice.


31. It may be stipulated <strong>in</strong> a licence that a dispute between the M<strong>in</strong>ister for Climate <strong>and</strong> Energy<br />

<strong>and</strong> the licensee as <strong>to</strong> whether the licensee has complied with the licence terms shall be brought<br />

before an arbitral tribunal, whose decision shall be f<strong>in</strong>al <strong>and</strong> conclusive.<br />

32. A licence shall stipulate the extent <strong>to</strong> which the licensee's obligations shall cont<strong>in</strong>ue <strong>to</strong> exist<br />

after the expiry, rel<strong>in</strong>quishment, laps<strong>in</strong>g or revocation of the licence. Further, it may be stipulated<br />

that if a work obligation or other obligations are not fulfilled, the M<strong>in</strong>ister for Climate <strong>and</strong> Energy<br />

may dem<strong>and</strong> that the licensee shall pay the amount, <strong>in</strong> whole or <strong>in</strong> part, that it would have cost <strong>to</strong><br />

fulfil the relevant obligation.<br />

33. <strong>Licences</strong> granted <strong>in</strong> pursuance of this Act shall lay down detailed provisions on the action <strong>to</strong><br />

be taken <strong>in</strong> respect of <strong>in</strong>stallations established by the licensee when the licence expires, is rel<strong>in</strong>quished,<br />

lapses or is revoked, as well as the action <strong>to</strong> be taken <strong>in</strong> respect of <strong>in</strong>stallations that become<br />

obsolete prior <strong>to</strong> such time.<br />

34.-(1) The Geological Survey of <strong>Denmark</strong> <strong>and</strong> Greenl<strong>and</strong> <strong>and</strong> the Danish Energy Agency shall<br />

collect all <strong>in</strong>formation available about the Danish subsoil. With a view here<strong>to</strong>, samples <strong>and</strong> other<br />

<strong>in</strong>formation about the subsoil obta<strong>in</strong>ed <strong>in</strong> connection with the performance of activities covered by<br />

this Act shall be submitted <strong>to</strong> them <strong>in</strong> accordance with rules <strong>and</strong> regulations laid down by the M<strong>in</strong>ister<br />

for Climate <strong>and</strong> Energy.<br />

(2) <strong>Licences</strong> granted <strong>in</strong> pursuance of this Act may lay down provisions on confidentiality with regard<br />

<strong>to</strong> the samples <strong>and</strong> <strong>in</strong>formation submitted <strong>in</strong> pursuance of subsection (1) above.<br />

34a.(1) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may lay down rules <strong>to</strong> the effect that specific <strong>in</strong>ternational<br />

regulations <strong>and</strong> technical specifications conta<strong>in</strong><strong>in</strong>g requirements regard<strong>in</strong>g companies, <strong>in</strong>stallations,<br />

facilities, formats, etc. that are referred <strong>to</strong> <strong>in</strong> rules issued under this Act shall not be recorded<br />

<strong>in</strong> the Official Gazette.<br />

(2) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy shall lay down rules describ<strong>in</strong>g how <strong>to</strong> obta<strong>in</strong> <strong>in</strong>formation<br />

about the <strong>in</strong>ternational regulations <strong>and</strong> technical specifications that are not recorded <strong>in</strong> the Official<br />

Gazette; see subsection (1).<br />

35.-(1) A licensee shall be liable <strong>to</strong> pay damages for any loss, damage or <strong>in</strong>jury caused by the activities<br />

carried on under the licence, even though such loss, damage or <strong>in</strong>jury was caused accidentally.<br />

(2) In the event that the <strong>in</strong>jured party contributed <strong>to</strong> the loss, damage or <strong>in</strong>jury, either <strong>in</strong>tentionally<br />

or through gross negligence, the damages payable may be reduced or lapse.<br />

36.-(1) To the extent necessary, the M<strong>in</strong>ister for Climate <strong>and</strong> Energy may permit the compulsory<br />

acquisition of real property for the purpose of activities covered by this Act.<br />

(2) Compulsory acquisition <strong>in</strong> accordance with subsection (1) above shall take place subject <strong>to</strong> the<br />

provisions of the Act on the Procedure for the Compulsory Acquisition of Real Property.<br />

(3) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may allow short-term surveys undertaken <strong>in</strong> order <strong>to</strong> carry<br />

out any of the activities covered by this Act <strong>to</strong> be made on third-party property, although this<br />

may result <strong>in</strong> damage or <strong>in</strong>convenience, aga<strong>in</strong>st payment of compensation <strong>in</strong> full for any such damage<br />

or <strong>in</strong>convenience. In the absence of agreement on the amount of compensation payable, such<br />

compensation shall be fixed <strong>in</strong> accordance with the provisions referred <strong>to</strong> <strong>in</strong> subsection (2) above.


37. The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may authorize the Danish Energy Agency <strong>and</strong> other<br />

governmental authorities <strong>to</strong> exercise the powers conferred on the M<strong>in</strong>ister for Climate <strong>and</strong> Energy<br />

under this Act.<br />

37a.-(1) The Energy Board of Appeal shall consider compla<strong>in</strong>ts about decisions made by the M<strong>in</strong>ister<br />

for Climate <strong>and</strong> Energy pursuant <strong>to</strong> this Act or rules or regulations laid down pursuant <strong>to</strong> this<br />

Act.<br />

(2) Any party hav<strong>in</strong>g a substantial <strong>and</strong> <strong>in</strong>dividual <strong>in</strong>terest <strong>in</strong> the decision may file an appeal<br />

aga<strong>in</strong>st decisions made pursuant <strong>to</strong> this Act.<br />

(3) Moreover, local <strong>and</strong> natural associations or organizations whose ma<strong>in</strong> objective is <strong>to</strong> protect<br />

nature <strong>and</strong> the environment, or whose objective is <strong>to</strong> safeguard substantial, recreational <strong>in</strong>terests,<br />

where the decision affects these <strong>in</strong>terests, have a right <strong>to</strong> appeal aga<strong>in</strong>st the environmental issues<br />

relat<strong>in</strong>g <strong>to</strong> decisions made pursuant <strong>to</strong> sections 10, 17, 23d, 23u <strong>and</strong> 28, provided the decisions are<br />

also comprised by sections 28a <strong>and</strong> 28b. No later than at the time of fil<strong>in</strong>g their appeal, the relevant<br />

local <strong>and</strong> national associations or organizations shall submit their byelaws <strong>to</strong> the Energy Board of<br />

Appeal <strong>to</strong> substantiate that they are locally based or have nationwide coverage <strong>and</strong> that their<br />

objectives meet the requirements stipulated.<br />

(4) The compla<strong>in</strong>t shall be lodged <strong>in</strong> writ<strong>in</strong>g <strong>to</strong> the Energy Board of Appeal with<strong>in</strong> four weeks<br />

from the time when the decision has been announced. If the decision has been published, the time<br />

limit shall always be reckoned from the date of publication. If the time limit for lodg<strong>in</strong>g appeals<br />

expires on a Saturday or a holiday, the time limit shall be extended <strong>to</strong> the next follow<strong>in</strong>g weekday.<br />

(5) A licence pursuant <strong>to</strong> sections 10, 17, 23d, 23u <strong>and</strong> 28, where such licence is also comprised<br />

by sections 28a <strong>and</strong> 28b, may not be utilized until the time for lodg<strong>in</strong>g appeals has expired.<br />

(6) Appeals aga<strong>in</strong>st a licence granted for a project comprised by subsection (5) above shall not<br />

have a suspensive effect unless otherwise determ<strong>in</strong>ed by the Energy Board of Appeal.<br />

(7) Decisions made by the Danish Energy Agency or another state authority <strong>to</strong> which the M<strong>in</strong>ister<br />

has transferred his powers cannot be brought before an adm<strong>in</strong>istrative authority other than the<br />

Energy Board of Appeal.<br />

37b.-(1) When consider<strong>in</strong>g the decisions referred <strong>to</strong> <strong>in</strong> section 37a above, the representatives appo<strong>in</strong>ted<br />

<strong>to</strong> the Energy Board of Appeal on the recommendation of the Confederation of Danish Industries<br />

<strong>and</strong> the Agricultural Council of <strong>Denmark</strong> shall be replaced by one expert <strong>in</strong> exploration <strong>and</strong><br />

production of the relevant raw material or <strong>in</strong> the relevant form of s<strong>to</strong>rage or other use of the subsoil,<br />

<strong>and</strong> by one expert <strong>in</strong> mar<strong>in</strong>e environmental issues. These two members shall be appo<strong>in</strong>ted by the<br />

M<strong>in</strong>ister for Climate <strong>and</strong> Energy.<br />

(2) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may lay down rules on the procedure <strong>to</strong> be adopted by<br />

the Energy Board of Appeal <strong>in</strong> hear<strong>in</strong>g appeals lodged <strong>in</strong> accordance with section 37a <strong>and</strong> on the<br />

payment of fees for fil<strong>in</strong>g such appeals.<br />

Part 10<br />

Penalties <strong>and</strong> Commencement Provisions, etc.<br />

38.-(1) Any party<br />

(i) carry<strong>in</strong>g on the activities referred <strong>to</strong> <strong>in</strong> sections 1(2) <strong>and</strong> 17 without a licence issued by<br />

the M<strong>in</strong>ister for Climate <strong>and</strong> Energy,<br />

(ii) transgress<strong>in</strong>g the provisions of section 26(1) or fail<strong>in</strong>g <strong>to</strong> submit the samples <strong>and</strong> other <strong>in</strong>formation<br />

required accord<strong>in</strong>g <strong>to</strong> section 34,


(iii) disregard<strong>in</strong>g enforcement notices issued <strong>in</strong> accordance with this Act or regulations laid<br />

down <strong>in</strong> pursuance of this Act,<br />

shall be punishable by a f<strong>in</strong>e or imprisonment for a term of up <strong>to</strong> four months.<br />

(2) Any regulations issued <strong>in</strong> pursuance of this Act may <strong>in</strong>clude penalty provisions impos<strong>in</strong>g a<br />

f<strong>in</strong>e or imprisonment for a term of up <strong>to</strong> four months for any transgression of the provisions laid<br />

down <strong>in</strong> such regulations.<br />

(3) Companies, etc. (legal persons) may be held crim<strong>in</strong>ally liable <strong>in</strong> accordance with the provisions<br />

laid down <strong>in</strong> Part 5 of the Danish Crim<strong>in</strong>al Code.<br />

39. In case of non-payment, the taxes <strong>and</strong> fees payable under this Act shall be recoverable through<br />

execution proceed<strong>in</strong>gs.<br />

40.-(1) This Act shall come <strong>in</strong><strong>to</strong> force on 1 July 1981.<br />

(2) Any concessions <strong>and</strong> licences granted under Act No. 181 of 8 May 1950 on the <strong>Exploration</strong><br />

for <strong>and</strong> Production of Raw Materials <strong>in</strong> the Subsoil of the K<strong>in</strong>gdom of <strong>Denmark</strong>, with associated<br />

pro<strong>to</strong>cols, contracts <strong>and</strong> agreements, shall rema<strong>in</strong> <strong>in</strong> force subject <strong>to</strong> the amendments follow<strong>in</strong>g<br />

from this Act, but the provisions of sections 19 through 22 shall not apply <strong>to</strong> such concessions <strong>and</strong><br />

licences. Section 13 of the Sole Concession of 8 July 1962 <strong>to</strong> Explore for <strong>and</strong> Recover <strong>Hydrocarbon</strong>s<br />

from the Danish Subsoil shall not be changed as a result of section 29. The provisions laid<br />

down <strong>in</strong> the above-mentioned concessions <strong>and</strong> licences regard<strong>in</strong>g confidentiality shall cont<strong>in</strong>ue <strong>to</strong><br />

apply <strong>to</strong> <strong>in</strong>formation submitted <strong>in</strong> pursuance of section 34(1) above. As concerns activities undertaken<br />

<strong>in</strong> pursuance of the Sole Concession of 8 July 1962 <strong>to</strong> Explore for <strong>and</strong> Recover <strong>Hydrocarbon</strong>s<br />

from the Danish Subsoil, with appurtenant pro<strong>to</strong>cols <strong>and</strong> agreements, any decisions made by the<br />

M<strong>in</strong>ister for Climate <strong>and</strong> Energy that fix dates of production startup pursuant <strong>to</strong> section 14 above,<br />

see section 10, <strong>and</strong> change approved production plans <strong>and</strong> regulate production pursuant <strong>to</strong> section<br />

15(2) may be referred by the Concessionaires <strong>to</strong> the Board of Arbitration mentioned <strong>in</strong> Section<br />

14(2) of the Concession; see Executive Order No. 372 of 7 November 1963, as subsequently<br />

amended.<br />

41. Act No. 181 of 8 May 1950 on the <strong>Exploration</strong> for <strong>and</strong> Production of Raw Materials <strong>in</strong> the<br />

Subsoil of the K<strong>in</strong>gdom of <strong>Denmark</strong> shall be repealed.<br />

42. Any concessions <strong>and</strong> licences, etc. granted <strong>in</strong> pursuance of Act No. 181 of 8 May 1950 on the<br />

<strong>Exploration</strong> for <strong>and</strong> Production of Raw Materials <strong>in</strong> the Subsoil of the K<strong>in</strong>gdom of <strong>Denmark</strong> may<br />

be revoked <strong>in</strong> accordance with the provisions of section 30 above, <strong>in</strong> the event that the concessionaires<br />

or licensees fail <strong>to</strong> comply with the provisions of such concessions <strong>and</strong> licences, <strong>in</strong>clud<strong>in</strong>g the<br />

associated pro<strong>to</strong>cols, contracts <strong>and</strong> agreements, or with terms <strong>and</strong> conditions or enforcement notices<br />

issued <strong>in</strong> pursuance thereof.<br />

43. This Act shall not extend <strong>to</strong> Greenl<strong>and</strong> <strong>and</strong> the Faroe Isl<strong>and</strong>s.<br />

Act No. 310 of 17 May 1995 <strong>to</strong> amend the Act on the Use of the Danish Subsoil, 2)<br />

which<br />

amended section 5(4), section 6(3), section 8(2)-(5), sections 9, 12, <strong>and</strong> 12a, section 13(1), section<br />

19(2), section 26(2) <strong>and</strong> (3), <strong>and</strong> sections 28a <strong>and</strong> 33, conta<strong>in</strong>s the follow<strong>in</strong>g commencement provision:<br />

Section 2


(1) This Act shall come <strong>in</strong><strong>to</strong> force on 1 July 1995, but see subsection (2) below.<br />

(2) The provisions of sections 12 <strong>and</strong> 12a of the Subsoil Act, as embodied <strong>in</strong> section 1(v) <strong>and</strong> (vi),<br />

of this Amendment Act, shall not apply <strong>to</strong> the licences for hydrocarbon exploration <strong>and</strong> production<br />

mentioned <strong>in</strong> section 5 that are granted before 31 December 2012 for those areas <strong>to</strong> which the exclusive<br />

right lapses on 8 July 2012 upon the expiry of the Sole Concession of 8 July 1962 <strong>to</strong> Explore<br />

for <strong>and</strong> Recover <strong>Hydrocarbon</strong>s from the Danish Subsoil. Such licences shall be granted on the<br />

basis of objective <strong>and</strong> non-discrim<strong>in</strong>a<strong>to</strong>ry pr<strong>in</strong>ciples.<br />

Act No. 447 of 31 May 2000 <strong>to</strong> amend certa<strong>in</strong> environmental Acts, 3)<br />

whose section 6 amended<br />

sections 37a <strong>and</strong> 37b of the Subsoil Act, conta<strong>in</strong>s the follow<strong>in</strong>g commencement provision:<br />

Section 14<br />

(1) This Act shall come <strong>in</strong><strong>to</strong> force on 15 September 2000, but see subsections (2)-(4) below.<br />

(2) The provisions of this Act regard<strong>in</strong>g the right <strong>to</strong> appeal aga<strong>in</strong>st decisions shall apply <strong>to</strong> cases<br />

decided by courts of first <strong>in</strong>stance after the commencement of this Act. The provisions regard<strong>in</strong>g the<br />

right <strong>to</strong> appeal aga<strong>in</strong>st the rejection of requests for access <strong>to</strong> documents pursuant <strong>to</strong> section 4(5) of<br />

the Environmental Information Act, as amended by section 1(x) of this present Act, shall likewise<br />

apply <strong>to</strong> rejections issued after the commencement of this Act.<br />

Subsections (3) <strong>and</strong> (4) omitted.<br />

Act No. 74 of 12 February 2002 <strong>to</strong> amend the Act on the Use of the Danish Subsoil, the Act on<br />

the Establishment <strong>and</strong> Use of a Pipel<strong>in</strong>e for Transport of Crude Oil <strong>and</strong> Condensate, <strong>and</strong> the Act on<br />

Certa<strong>in</strong> Offshore Installations, 4)<br />

whose section 1 amended section 6(1), section 11(2) <strong>and</strong> (3), section<br />

12(2), the head<strong>in</strong>g of Part 8, section 25(3) <strong>and</strong> section 38, conta<strong>in</strong>s the follow<strong>in</strong>g commencement<br />

provision:<br />

Section 4<br />

This Act shall come <strong>in</strong><strong>to</strong> force on 15 March 2002.<br />

Act No. 1230 of 27 February 2003 <strong>to</strong> amend the Act on the Use of the Danish Subsoil, 5)<br />

which<br />

amended section 13(4) <strong>and</strong> (5), conta<strong>in</strong>s the follow<strong>in</strong>g commencement provision:<br />

Section 2<br />

This Act shall come <strong>in</strong><strong>to</strong> force on the day after the promulgation <strong>in</strong> the Danish Law Gazette.


Act No. 442 of 9 June 2004 on Due Process Protection <strong>in</strong> connection with the Public Adm<strong>in</strong>istration’s<br />

Use of Compulsory Measures <strong>and</strong> Duties of Disclosure, 6)<br />

whose section 12 amended section<br />

27(1) of the Subsoil Act, conta<strong>in</strong>s the follow<strong>in</strong>g commencement provision:<br />

Section 24<br />

This Act shall come <strong>in</strong><strong>to</strong> force on 1 January 2005.<br />

Act No. 548 of 6 June 2007 <strong>to</strong> amend the Act on the Use of the Danish Subsoil, the Act on Electricity<br />

Supply, the Act on Coastl<strong>in</strong>e Protection, the Act on Harbours <strong>and</strong> various other Acts, 7)<br />

whose<br />

section 1 amended the footnote <strong>to</strong> the title, section 2a, section 11(3), section 26(2)-(4), sections 28a-<br />

28c, <strong>and</strong> section 37a(1) of the Subsoil Act, conta<strong>in</strong>s the follow<strong>in</strong>g commencement provision:<br />

Section 9<br />

(1) This Act shall come <strong>in</strong><strong>to</strong> force on the day after the promulgation <strong>in</strong> the Danish Law Gazette.<br />

Subsection (2) omitted.<br />

Act no. 1400 of 27 December 2008 <strong>to</strong> amend various Acts with<strong>in</strong> the adm<strong>in</strong>istrative sphere of the<br />

M<strong>in</strong>istry of Climate <strong>and</strong> Energy, 8) section 2 of which amended section 34a of the Subsoil Act,<br />

conta<strong>in</strong>s the follow<strong>in</strong>g commencement provision.<br />

Section 9<br />

This Act shall come <strong>in</strong><strong>to</strong> force on 1 January 2009.<br />

Act No. 718 of 25 June 2010 <strong>to</strong> amend the Insolvency Act <strong>and</strong> various other Acts, of which section<br />

51 amended section 30(1)(iii) of the Subsoil Act, conta<strong>in</strong>s the follow<strong>in</strong>g commencement provision:<br />

Section 55<br />

(1) The M<strong>in</strong>ister of Justice shall determ<strong>in</strong>e when the Act shall come <strong>in</strong><strong>to</strong> force.9)<br />

(2)-(10) (Omitted)


Act No. 541 of 30 May 2011 <strong>to</strong> amend the Act on the Use of the Danish Subsoil,10) which<br />

amended section 1(3), section 2a, section 5(4), section 10, section 12a(3), section 13(2), section 16,<br />

sections 18a-18d, sections 23-23v, sections 28a, 28b, 37a <strong>and</strong> 37b, conta<strong>in</strong>s the follow<strong>in</strong>g commencement<br />

provision:<br />

Section 2<br />

(1) This Act shall come <strong>in</strong><strong>to</strong> force on 1 June 2011.<br />

(2) (Omitted)<br />

The Danish Energy Agency, 13 September 2011<br />

IB LARSEN<br />

/Jens Skov-Spill<strong>in</strong>g<br />

2) The Amendment Act conta<strong>in</strong>s provisions implement<strong>in</strong>g the Directive of the European Parliament <strong>and</strong> of the Council on the conditions for grant<strong>in</strong>g<br />

<strong>and</strong> us<strong>in</strong>g authorizations for the prospection, exploration <strong>and</strong> production of hydrocarbons (the <strong>Hydrocarbon</strong>s Licens<strong>in</strong>g Directive), <strong>and</strong> parts of the<br />

Council Directive on the assessment of the effects of certa<strong>in</strong> public <strong>and</strong> private projects on the environment (the EIA Directive).<br />

3) The Amendment Act implements the Convention of 25 June 1999 on Access <strong>to</strong> Information, Public Participation <strong>in</strong> Decision-mak<strong>in</strong>g <strong>and</strong> Access <strong>to</strong><br />

Justice <strong>in</strong> Environmental Matters (the Aarhus Convention).<br />

4) The Amendment Act authorizes The M<strong>in</strong>ister for Climate <strong>and</strong> Energy <strong>to</strong> enter <strong>in</strong><strong>to</strong> agreements with other countries <strong>to</strong> coord<strong>in</strong>ate the exploration for<br />

<strong>and</strong> production of hydrocarbon accumulations extend<strong>in</strong>g <strong>in</strong><strong>to</strong> the sovereign terri<strong>to</strong>ry of the relevant country (border-straddl<strong>in</strong>g accumulations). In<br />

addition, the Amendment Act modernizes <strong>and</strong> clarifies the rules regard<strong>in</strong>g the reimbursement of public authority expenditure for adm<strong>in</strong>istrative case<br />

h<strong>and</strong>l<strong>in</strong>g under the Subsoil Act.<br />

5) The Amendment Act, which came <strong>in</strong><strong>to</strong> force on 31 December 2003, implements the agreement of 29 September 2003 made between the M<strong>in</strong>ister<br />

for Economic <strong>and</strong> Bus<strong>in</strong>ess Affairs <strong>and</strong> A.P. Møller – Mærsk A/S regard<strong>in</strong>g exploration <strong>and</strong> production of hydrocarbons <strong>in</strong> the Danish subsoil. The<br />

amendment permits licences for exploration <strong>and</strong> production that already from the date of issue have a longer duration, but no more than 50 years, than<br />

permitted under the provisions hither<strong>to</strong>. In addition, the Amendment Act renders it possible <strong>to</strong> extend exist<strong>in</strong>g licences beyond 50 years.<br />

6) Pursuant <strong>to</strong> the Danish Act on Due Process Protection <strong>in</strong> connection with the Public Adm<strong>in</strong>istration’s Use of Compulsory Measures <strong>and</strong> Duties of<br />

Disclosure the supervisory authority must deem an imm<strong>in</strong>ent risk of <strong>in</strong>appropriate exploitation of the subsoil <strong>to</strong> exist for the supervisory authority <strong>to</strong><br />

have access <strong>to</strong> the licensee’s bus<strong>in</strong>ess without a prior court order.<br />

7) The Amendment Act, which came <strong>in</strong><strong>to</strong> force on 8 June 2007, conta<strong>in</strong>s provisions implement<strong>in</strong>g parts of the Council Directive on the conservation<br />

of natural habitats <strong>and</strong> of wild fauna <strong>and</strong> flora (the Habitats Directive) <strong>and</strong> parts of the Council Directive on the conservation of wild birds (the Birds<br />

Directive).<br />

8) The Amendment Act authorizes the M<strong>in</strong>ister for Climate <strong>and</strong> Energy <strong>to</strong> lay down rules regard<strong>in</strong>g an exemption from the obligation <strong>to</strong> <strong>in</strong>clude<br />

records of technical specifications, etc. <strong>in</strong> the Danish Law Gazette.<br />

9) Section 51 of Act no. 718 of 25 June 2010 <strong>to</strong> amend the Insolvency Act <strong>and</strong> various other Acts came <strong>in</strong><strong>to</strong> force on 1 April, see Executive Order No.<br />

208 of 15 March 2011 on the Commencement of the Amendment of the Insolvency Act <strong>and</strong> various other Acts (Restructur<strong>in</strong>g, etc.)<br />

10) The amendment implements parts of the Directive of the European Parliament <strong>and</strong> of the Council on the promotion of the use of energy from<br />

renewable sources <strong>and</strong> parts of the Directive of the European Parliament <strong>and</strong> of the Council on the geological s<strong>to</strong>rage of carbon dioxide. Moreover,<br />

the amendment makes it possible for the M<strong>in</strong>ister <strong>to</strong> refuse <strong>to</strong> consider an application for the exploration for <strong>and</strong> production of one or more raw<br />

materials where such activities cannot be expected <strong>to</strong> be compatible with other ongo<strong>in</strong>g or planned use of the subsoil or with appropriate exploitation<br />

of the subsoil <strong>in</strong> other respects. At the same time, it is proposed that various provisions regard<strong>in</strong>g the grant<strong>in</strong>g of licences for the exploration for <strong>and</strong><br />

production of geothermal energy be laid down. Furthermore, the provision authoriz<strong>in</strong>g the M<strong>in</strong>ister <strong>to</strong> stipulate coord<strong>in</strong>ated production <strong>and</strong> utilization<br />

of <strong>in</strong>stallations for produc<strong>in</strong>g <strong>and</strong> transport<strong>in</strong>g oil <strong>and</strong> gas has been revised.


DIRECTIVE 94/22/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 30<br />

May 1994 on the conditions for grant<strong>in</strong>g <strong>and</strong> us<strong>in</strong>g authorizations for the prospection, exploration<br />

<strong>and</strong> production of hydrocarbons<br />

THE EUROPEAN PARLIAMENT AND THE COUNCIL OF THE EUROPEAN UNION,<br />

Hav<strong>in</strong>g regard <strong>to</strong> the Treaty establish<strong>in</strong>g the European Community <strong>and</strong> <strong>in</strong> particular Article 57, first<br />

<strong>and</strong> third sentences, Articles 66 <strong>and</strong> 100a thereof,<br />

Hav<strong>in</strong>g regard <strong>to</strong> the proposal from the Commission,<br />

Hav<strong>in</strong>g regard <strong>to</strong> the op<strong>in</strong>ion of the Economic <strong>and</strong> Social Committee,<br />

Act<strong>in</strong>g <strong>in</strong> accordance with the procedure referred <strong>to</strong> <strong>in</strong> Article 189b of the Treaty,<br />

Whereas the <strong>in</strong>ternal market comprises an area without <strong>in</strong>ternal frontiers <strong>in</strong> which the free<br />

movement of goods, services, persons <strong>and</strong> capital is ensured; whereas the necessary measures must<br />

be adopted for its operation;<br />

Whereas <strong>in</strong> its resolution of 16 September 1986, the Council identified as an objective of the energy<br />

policy of the Community <strong>and</strong> the Member States the greater <strong>in</strong>tegration, free from barriers <strong>to</strong> trade,<br />

of the <strong>in</strong>ternal energy market with a view <strong>to</strong> improv<strong>in</strong>g security of supply, reduc<strong>in</strong>g costs <strong>and</strong><br />

improv<strong>in</strong>g economic competitiveness;<br />

Whereas the Community largely depends on imports for its hydrocarbon supply; whereas it is<br />

consequently advisable <strong>to</strong> encourage the best possible prospection, exploration <strong>and</strong> production of<br />

the resources located <strong>in</strong> the Community;<br />

Whereas Member States have sovereignty <strong>and</strong> sovereign rights over hydrocarbon resources on their<br />

terri<strong>to</strong>ries;<br />

Whereas the Community is a signa<strong>to</strong>ry <strong>to</strong> the United Nations Convention on the Law of the Sea;<br />

Whereas steps must be taken <strong>to</strong> ensure the non-discrim<strong>in</strong>a<strong>to</strong>ry access <strong>to</strong> <strong>and</strong> pursuit of activities<br />

relat<strong>in</strong>g <strong>to</strong> the prospection, exploration <strong>and</strong> production of hydrocarbons under conditions which<br />

encourage greater competition <strong>in</strong> this sec<strong>to</strong>r <strong>and</strong> thereby <strong>to</strong> favour the best prospection, exploration<br />

<strong>and</strong> production of resources <strong>in</strong> Member States <strong>and</strong> <strong>to</strong> re<strong>in</strong>force the <strong>in</strong>tegration of the <strong>in</strong>ternal energy<br />

market;<br />

Whereas, for this purpose, it is necessary <strong>to</strong> set up common rules for ensur<strong>in</strong>g that the procedures<br />

for grant<strong>in</strong>g authorizations for the prospection, exploration <strong>and</strong> production of hydrocarbons must be<br />

open <strong>to</strong> all entities possess<strong>in</strong>g the necessary capabilities; whereas authorizations must be granted on<br />

the basis of objective, published criteria; whereas the conditions under which authorizations are<br />

granted must likewise be known <strong>in</strong> advance by all entities tak<strong>in</strong>g part <strong>in</strong> the procedure;<br />

Whereas Member States must reta<strong>in</strong> the options <strong>to</strong> limit the access <strong>to</strong> <strong>and</strong> the exercise of these<br />

activities for reasons justified by public <strong>in</strong>terest <strong>and</strong> <strong>to</strong> subject <strong>to</strong> the payment of a f<strong>in</strong>ancial<br />

contribution or a contribution <strong>in</strong> hydrocarbons, the detailed arrangements of the said contribution<br />

hav<strong>in</strong>g <strong>to</strong> be fixed <strong>in</strong> such a way as not <strong>to</strong> <strong>in</strong>terfere <strong>in</strong> the management of entities; whereas these<br />

options must be used <strong>in</strong> a non-discrim<strong>in</strong>a<strong>to</strong>ry way; whereas, with the exception of the obligations<br />

related <strong>to</strong> the use of this option, steps must be taken <strong>to</strong> avoid impos<strong>in</strong>g on entities, conditions <strong>and</strong>


obligations which are not justified by the need <strong>to</strong> perform this activity properly; whereas the<br />

activities of entities must be moni<strong>to</strong>red only <strong>to</strong> the extent necessary <strong>to</strong> ensure their compliance with<br />

these obligations <strong>and</strong> conditions;<br />

Whereas the extent of the areas covered by an authorization <strong>and</strong> the duration of the authorization<br />

must be limited with a view <strong>to</strong> prevent<strong>in</strong>g the reservation <strong>to</strong> a s<strong>in</strong>gle entity of an exclusive right<br />

over an area which can be prospected, explored <strong>and</strong> brought <strong>in</strong><strong>to</strong> production more efficiently by<br />

several entities;<br />

Whereas Member States' entities should enjoy <strong>in</strong> third countries a treatment comparable <strong>to</strong> that<br />

enjoyed by third countries' entities <strong>in</strong> the Community by virtue of this Directive; whereas it is<br />

necessary <strong>to</strong> lay down a procedure <strong>to</strong> this end;<br />

Whereas this Directive should apply <strong>to</strong> authorizations issued after the date by which Member States<br />

have <strong>to</strong> br<strong>in</strong>g <strong>in</strong><strong>to</strong> force the laws, regulations <strong>and</strong> adm<strong>in</strong>istrative provisions necessary <strong>to</strong> comply<br />

with this Directive;<br />

Whereas Council Directive 90/531/EEC of 17 September 1990 on the procurement procedures of<br />

entities operat<strong>in</strong>g <strong>in</strong> the water, energy, transport <strong>and</strong> telecommunications sec<strong>to</strong>rs <strong>and</strong> Council<br />

Directive 93/38/EEC of 14 June 1993 coord<strong>in</strong>at<strong>in</strong>g the procurement procedures of entities operat<strong>in</strong>g<br />

<strong>in</strong> the water, energy, transport <strong>and</strong> telecommunications sec<strong>to</strong>rs apply <strong>to</strong> the entities <strong>in</strong> the energy<br />

sec<strong>to</strong>r as regards their procurement of supplies, of works <strong>and</strong> of services; whereas the application of<br />

the alternative arrangements provided for under Article 3 of Directive 90/531/EEC is subject <strong>in</strong><br />

particular <strong>to</strong> the condition that, <strong>in</strong> the Member State request<strong>in</strong>g the application of these<br />

arrangements, authorizations be granted <strong>in</strong> a non-discrim<strong>in</strong>a<strong>to</strong>ry <strong>and</strong> transparent manner; whereas a<br />

Member State fulfils this condition from the moment when <strong>and</strong> for as long as it complies with the<br />

requirements of this Directive; whereas it is consequently necessary <strong>to</strong> amend Directive<br />

90/531/EEC;<br />

Whereas Article 36 of Directive 90/531/EEC provides for a review with<strong>in</strong> four years, <strong>in</strong> the light of<br />

developments concern<strong>in</strong>g <strong>in</strong> particular progress <strong>in</strong> market open<strong>in</strong>g <strong>and</strong> the level of competition, of<br />

the field of application of that Directive. This review of the field of application <strong>in</strong>cludes<br />

hydrocarbon exploration <strong>and</strong> extraction;<br />

Whereas <strong>Denmark</strong> is <strong>in</strong> a special situation, due <strong>to</strong> the fact that it is obliged <strong>to</strong> enter <strong>in</strong><strong>to</strong> negotiations<br />

on a possible cont<strong>in</strong>uation of the activities after the expiry of the concession, issued on 8 July 1962,<br />

concern<strong>in</strong>g the areas which are rel<strong>in</strong>quished on 8 July 2012 <strong>and</strong> that <strong>Denmark</strong> will thus be accorded<br />

a derogation concern<strong>in</strong>g these areas,<br />

HAVE ADOPTED THIS DIRECTIVE:<br />

For the purposes of this Directive:<br />

Article 1<br />

1. ‘competent authorities’ means the public authorities, as def<strong>in</strong>ed <strong>in</strong> Article 1 (1) of Directive<br />

90/531/EEC, which are responsible for grant<strong>in</strong>g authorization <strong>and</strong>/or moni<strong>to</strong>r<strong>in</strong>g use thereof;<br />

2. ‘entity’ means any natural or legal person or any group of such persons which applies for, is<br />

likely <strong>to</strong> apply for or holds an authorization;


3. ‘authorization’ means any law, regulation, adm<strong>in</strong>istrative or contractual provision or <strong>in</strong>strument<br />

issued there under by which the competent authorities of a Member State entitle an entity <strong>to</strong><br />

exercise, on its own behalf <strong>and</strong> at its own risk, the exclusive right <strong>to</strong> prospect or explore for or<br />

produce hydrocarbons <strong>in</strong> a geographical area. An authorization may be granted for each activity<br />

separately or for several activities at a time;<br />

4. ‘public entity’ means a public undertak<strong>in</strong>g as def<strong>in</strong>ed <strong>in</strong> Article 1 (2) of Directive 90/531/EEC.<br />

Article 2<br />

1. Member States reta<strong>in</strong> the right <strong>to</strong> determ<strong>in</strong>e the areas with<strong>in</strong> their terri<strong>to</strong>ry <strong>to</strong> be made available<br />

for the exercise of the activities of prospect<strong>in</strong>g, explor<strong>in</strong>g for <strong>and</strong> produc<strong>in</strong>g hydrocarbons.<br />

2. Whenever an area is made available for the exercise of the activities set out <strong>in</strong> paragraph 1,<br />

Member States shall ensure that there is no discrim<strong>in</strong>ation between entities as regards access <strong>to</strong> <strong>and</strong><br />

exercise of these activities.<br />

However, Member States may refuse, on grounds of national security, <strong>to</strong> allow access <strong>to</strong> <strong>and</strong><br />

exercise of these activities <strong>to</strong> any entity which is effectively controlled by third countries or third<br />

country nationals.<br />

Article 3<br />

1. Member States shall take the necessary measures <strong>to</strong> ensure that authorizations are granted<br />

follow<strong>in</strong>g a procedure <strong>in</strong> which all <strong>in</strong>terested entities may submit applications <strong>in</strong> accordance either<br />

with paragraph 2 or 3.<br />

2. This procedure shall be <strong>in</strong>itiated:<br />

(a) either at the <strong>in</strong>itiative of the competent authorities by means of a notice <strong>in</strong>vit<strong>in</strong>g applications, <strong>to</strong><br />

be published <strong>in</strong> the Official Journal of the European Communities at least 90 days before the<br />

clos<strong>in</strong>g date for applications;<br />

(b) or by means of a notice <strong>in</strong>vit<strong>in</strong>g applications, <strong>to</strong> be published <strong>in</strong> the Official Journal of the<br />

European Communities follow<strong>in</strong>g submission of an application by an entity without prejudice <strong>to</strong><br />

Article 2 (1). Other <strong>in</strong>terested entities shall have a period of at least 90 days after the date of<br />

publication <strong>in</strong> which <strong>to</strong> submit an application.<br />

Notices shall specify the type of authorization, the geographical area or areas <strong>in</strong> part or all of which<br />

an application has been or may be made <strong>and</strong> the proposed date or time limit for grant<strong>in</strong>g<br />

authorization.<br />

Where preference is given <strong>to</strong> applications by entities which are s<strong>in</strong>gle natural or legal persons, the<br />

notice shall so specify.<br />

3. Member States may grant authorizations without <strong>in</strong>itiat<strong>in</strong>g a procedure under paragraph 2 where<br />

the area for which authorization is requested:<br />

(a) is available on a permanent basis; or


(b) has been the subject of a previous procedure accord<strong>in</strong>g <strong>to</strong> paragraph 2 which has not resulted <strong>in</strong><br />

the grant of an authorization; or<br />

(c) has been rel<strong>in</strong>quished by an entity <strong>and</strong> does not fall au<strong>to</strong>matically under (a).<br />

A Member State wish<strong>in</strong>g <strong>to</strong> apply this paragraph shall with<strong>in</strong> three months of the adoption of this<br />

Directive or, <strong>in</strong> case of Member States who have not yet <strong>in</strong>troduced such procedures, without delay<br />

arrange for the publication <strong>in</strong> the Official Journal of the European Communities of a notice<br />

<strong>in</strong>dicat<strong>in</strong>g the areas with<strong>in</strong> its terri<strong>to</strong>ry which are available under this paragraph <strong>and</strong> where detailed<br />

<strong>in</strong>formation <strong>in</strong> this regard can be obta<strong>in</strong>ed. Any significant change <strong>in</strong> this <strong>in</strong>formation shall be the<br />

subject of an additional notice. However, no application for an authorization under this paragraph<br />

can be considered until after the publication of the relevant notice under this text.<br />

4. A Member State may decide not <strong>to</strong> apply the provisions of paragraph 1 if <strong>and</strong> <strong>to</strong> the extent that<br />

geological or production considerations justify the grant<strong>in</strong>g of the authorization for an area <strong>to</strong> the<br />

holder of an authorization for a contiguous area. The Member State concerned shall ensure that the<br />

holders of authorizations for any other contiguous areas are able <strong>to</strong> submit applications <strong>in</strong> such a<br />

case <strong>and</strong> are given sufficient time <strong>to</strong> do so.<br />

5. The follow<strong>in</strong>g shall not be considered as the grant of an authorization with<strong>in</strong> the mean<strong>in</strong>g of<br />

paragraph 1:<br />

(a) the grant of an authorization solely by reason of a change of name or ownership of an entity<br />

hold<strong>in</strong>g an exist<strong>in</strong>g authorization, a change <strong>in</strong> the composition of such an entity or a transfer of an<br />

authorization;<br />

(b) the grant of an authorization <strong>to</strong> an entity hav<strong>in</strong>g another form of authorization where the<br />

possession of the latter authorization implies a right <strong>to</strong> the grant of the former authorization;<br />

(c) the decision of the competent authorities taken with<strong>in</strong> the framework of an authorization<br />

(whether or not such authorization was granted before the date fixed <strong>in</strong> Article 14) <strong>and</strong> relat<strong>in</strong>g <strong>to</strong><br />

the commencement, <strong>in</strong>terruption, prolongation or cessation of the activities or <strong>to</strong> the prolongation of<br />

the authorization itself.<br />

6. Notwithst<strong>and</strong><strong>in</strong>g the <strong>in</strong>itiation of the procedures mentioned <strong>in</strong> paragraph 2, Member States reta<strong>in</strong><br />

the option <strong>to</strong> refuse the grant<strong>in</strong>g of authorizations, whilst ensur<strong>in</strong>g that this option does not give rise<br />

<strong>to</strong> discrim<strong>in</strong>ation between entities.<br />

Article 4<br />

Member States shall take the necessary measures <strong>to</strong> ensure that:<br />

(a) if the geographical areas are not delimited on the basis of a prior geometric division of the<br />

terri<strong>to</strong>ry, the extent of each area is determ<strong>in</strong>ed <strong>in</strong> such a way that it does not exceed the area<br />

justified by the best possible exercise of the activities from the technical <strong>and</strong> economic po<strong>in</strong>ts of<br />

view. In the case of authorizations granted follow<strong>in</strong>g the procedures laid down <strong>in</strong> Article 3 (2),<br />

objective criteria shall be established <strong>to</strong> this end <strong>and</strong> shall be made available <strong>to</strong> the entities prior <strong>to</strong><br />

the submission of applications;<br />

(b) the duration of an authorization does not exceed the period necessary <strong>to</strong> carry out the activities<br />

for which the authorization is granted. However, the competent authorities may prolong the


authorization where the stipulated duration is <strong>in</strong>sufficient <strong>to</strong> complete the activity <strong>in</strong> question <strong>and</strong><br />

where the activity has been performed <strong>in</strong> accordance with the authorization;<br />

(c) entities do not reta<strong>in</strong> exclusive rights <strong>in</strong> the geographical area for which they have received an<br />

authorization for longer than is necessary for the proper performance of the authorized activities.<br />

Article 5<br />

Member States shall take the necessary measures <strong>to</strong> ensure that:<br />

1. authorizations are granted on the basis of criteria concern<strong>in</strong>g, <strong>in</strong> all cases:<br />

(a) the technical <strong>and</strong> f<strong>in</strong>ancial capability of the entities; <strong>and</strong><br />

(b) the way <strong>in</strong> which they propose <strong>to</strong> prospect, <strong>to</strong> explore <strong>and</strong>/or <strong>to</strong> br<strong>in</strong>g <strong>in</strong><strong>to</strong> production the<br />

geographical area <strong>in</strong> question;<br />

<strong>and</strong>, where applicable:<br />

(c) if the authorization is put up for sale, the price which the entity is prepared <strong>to</strong> pay <strong>in</strong> order <strong>to</strong><br />

obta<strong>in</strong> the authorizations;<br />

(d) if, follow<strong>in</strong>g evaluation under the criteria (a), (b) <strong>and</strong>, where applicable, (c), two or more<br />

applications have equal merit, other relevant objective <strong>and</strong> non-discrim<strong>in</strong>a<strong>to</strong>ry criteria, <strong>in</strong> order <strong>to</strong><br />

make a f<strong>in</strong>al choice among these applications.<br />

The competent authorities may also take account, when apprais<strong>in</strong>g applications, of any lack of<br />

efficiency <strong>and</strong> responsibility displayed by the applicants <strong>in</strong> operations under previous<br />

authorizations.<br />

Where the competent authorities determ<strong>in</strong>e the composition of an entity <strong>to</strong> which they may grant an<br />

authorization, they shall make that determ<strong>in</strong>ation on the basis of objective <strong>and</strong> non-discrim<strong>in</strong>a<strong>to</strong>ry<br />

criteria.<br />

Where the competent authorities determ<strong>in</strong>e the opera<strong>to</strong>r of an entity <strong>to</strong> which they may grant an<br />

authorization, they shall make that determ<strong>in</strong>ation on the basis of objective <strong>and</strong> non-discrim<strong>in</strong>a<strong>to</strong>ry<br />

criteria.<br />

The criteria shall be drawn up <strong>and</strong> published <strong>in</strong> the Official Journal of the European Communities<br />

before the start of the period for submission of applications. Member States which have already<br />

published the criteria <strong>in</strong> their official journals may limit the publication <strong>in</strong> the Official Journal of the<br />

European Communities <strong>to</strong> a reference <strong>to</strong> the publication <strong>in</strong> their official journals. However, any<br />

change <strong>in</strong> criteria shall be published <strong>in</strong> full <strong>in</strong> the Official Journal of the European Communities;<br />

2. the conditions <strong>and</strong> requirements concern<strong>in</strong>g the exercise or term<strong>in</strong>ation of the activity which<br />

apply <strong>to</strong> each type of authorizations by virtue of the laws, regulations <strong>and</strong> adm<strong>in</strong>istrative provisions<br />

<strong>in</strong> force at the time of submission of the applications, whether conta<strong>in</strong>ed <strong>in</strong> the authorization or<br />

be<strong>in</strong>g one of the conditions <strong>to</strong> be accepted prior <strong>to</strong> the grant of such authorization, are established<br />

<strong>and</strong> made available <strong>to</strong> <strong>in</strong>terested entities at all times. In the case provided for <strong>in</strong> Article 3 (2) (a),<br />

they may be made available only from the date start<strong>in</strong>g from which applications for authorization<br />

may be submitted;


3. any changes made <strong>to</strong> the conditions <strong>and</strong> requirements <strong>in</strong> the course of the procedure are, notified<br />

<strong>to</strong> all <strong>in</strong>terested entities;<br />

4. the criteria, conditions <strong>and</strong> requirements referred <strong>to</strong> <strong>in</strong> this Article are applied <strong>in</strong> a<br />

non-discrim<strong>in</strong>a<strong>to</strong>ry manner;<br />

5. any entity whose application for an authorization is unsuccessful is, if the entity so wishes,<br />

<strong>in</strong>formed of the reasons for the decision.<br />

Article 6<br />

1. Member States shall ensure that the conditions <strong>and</strong> requirements referred <strong>to</strong> <strong>in</strong> Article 5 (2) <strong>and</strong><br />

the detailed obligations for use of a specific authorization are justified exclusively by the need <strong>to</strong><br />

ensure the proper performance of the activities <strong>in</strong> the area for which an authorization is requested,<br />

by the application of paragraph 2 or by the payment of a f<strong>in</strong>ancial contribution or a contribution <strong>in</strong><br />

hydrocarbons.<br />

2. Member States may, <strong>to</strong> the extent justified by national security, public safety, public health,<br />

security of transport, protection of the environment, protection of biological resources <strong>and</strong> of<br />

national treasures possess<strong>in</strong>g artistic, his<strong>to</strong>ric or archaeological value, safety of <strong>in</strong>stallations <strong>and</strong> of<br />

workers, planned management of hydrocarbon resources (for example the rate at which<br />

hydrocarbons are depleted or the optimization of their recovery) or the need <strong>to</strong> secure tax revenues,<br />

impose conditions <strong>and</strong> requirements on the exercise of the activities set out <strong>in</strong> Article 2 (1).<br />

3. The rules for payment of contributions referred <strong>to</strong> <strong>in</strong> paragraph 1, <strong>in</strong>clud<strong>in</strong>g any requirement for<br />

State participation, shall be fixed by Member States <strong>in</strong> such a way as <strong>to</strong> ensure that the<br />

<strong>in</strong>dependence of management of entities is ma<strong>in</strong>ta<strong>in</strong>ed.<br />

However, where the grant of authorizations is subject <strong>to</strong> the State's participation <strong>in</strong> the activities <strong>and</strong><br />

where a legal person has been entrusted with the management of this participation or where the<br />

State itself manages the participation, neither the legal person nor the State shall be prevented from<br />

assum<strong>in</strong>g the rights <strong>and</strong> obligations associated with such participation, equivalent <strong>to</strong> the importance<br />

of the participation provided that the legal person or the State shall not be party <strong>to</strong> <strong>in</strong>formation nor<br />

exercise any vot<strong>in</strong>g rights on decisions regard<strong>in</strong>g sources of procurement for entities, that the legal<br />

person or the State <strong>in</strong> comb<strong>in</strong>ation with any public entity or entities shall not exercise a majority<br />

vot<strong>in</strong>g right on other decisions <strong>and</strong> that any vote by the State or the legal person shall be based<br />

exclusively on transparent, objective <strong>and</strong> non-discrim<strong>in</strong>a<strong>to</strong>ry pr<strong>in</strong>ciples, <strong>and</strong> shall not prevent the<br />

management decisions of the entity from be<strong>in</strong>g based on normal commercial pr<strong>in</strong>ciples.<br />

However, the provisions of the preced<strong>in</strong>g sub-paragraph shall not prevent the legal person or the<br />

State from oppos<strong>in</strong>g a decision by the holders of an authorization which would not respect the<br />

conditions <strong>and</strong> requirements, specified <strong>in</strong> the authorization, regard<strong>in</strong>g depletion policy <strong>and</strong><br />

protection of the f<strong>in</strong>ancial <strong>in</strong>terests of the State.<br />

The option <strong>to</strong> oppose a decision shall be exercised <strong>in</strong> a non-discrim<strong>in</strong>a<strong>to</strong>ry manner, particularly<br />

regard<strong>in</strong>g <strong>in</strong>vestment decisions <strong>and</strong> sources of supply of entities. Where the State's participation <strong>in</strong><br />

the activities is managed by a legal person which also holds the authorizations, the Member State<br />

shall put <strong>in</strong> place arrangements requir<strong>in</strong>g that legal person <strong>to</strong> keep separate accounts for its<br />

commercial role <strong>and</strong> its role as manager of the State's participation <strong>and</strong> guarantee<strong>in</strong>g that there is no<br />

flow of <strong>in</strong>formation from the part of the legal person responsible for the management of the State's


participation <strong>to</strong> the part of the legal person which holds authorizations <strong>in</strong> its own right. However,<br />

where the part of the legal person responsible for the management of the State's participation<br />

engages the part of the legal person which holds authorization as a consultant, the former may make<br />

available any <strong>in</strong>formation which is necessary for the consultancy work <strong>to</strong> be carried out. The<br />

holders of all authorizations <strong>to</strong> which the <strong>in</strong>formation relates shall be <strong>in</strong>formed <strong>in</strong> advance of what<br />

<strong>in</strong>formation will be given <strong>in</strong> this way <strong>and</strong> shall be given sufficient time <strong>to</strong> raise objections.<br />

4. Member States shall ensure that the moni<strong>to</strong>r<strong>in</strong>g of entities under an authorization is limited <strong>to</strong><br />

that necessary <strong>to</strong> ensure compliance with the conditions, requirements <strong>and</strong> obligations referred <strong>to</strong> <strong>in</strong><br />

paragraph 1. In particular, they shall take the measures necessary <strong>to</strong> ensure that no entity is<br />

required, by any law, regulation or adm<strong>in</strong>istrative requirement, or by any agreement or undertak<strong>in</strong>g,<br />

<strong>to</strong> provide <strong>in</strong>formation on its <strong>in</strong>tended or actual sources of procurement, except at the request of the<br />

competent authorities <strong>and</strong> exclusively with a view <strong>to</strong> the objectives set out <strong>in</strong> Article 36 of the<br />

Treaty.<br />

Article 7<br />

Without prejudice <strong>to</strong> the provisions concern<strong>in</strong>g or conta<strong>in</strong>ed <strong>in</strong> <strong>in</strong>dividual authorizations <strong>and</strong> <strong>to</strong> the<br />

provisions of Article 3 (5) (b) legal, regula<strong>to</strong>ry <strong>and</strong> adm<strong>in</strong>istrative provisions which reserve <strong>to</strong> a<br />

s<strong>in</strong>gle entity the right <strong>to</strong> obta<strong>in</strong> authorizations <strong>in</strong> a specific geographical area with<strong>in</strong> the terri<strong>to</strong>ry of<br />

a Member State shall be abolished by the Member States concerned before 1 January 1997.<br />

Article 8<br />

1. Member States shall <strong>in</strong>form the Commission of any general difficulty encountered, de jure or de<br />

fac<strong>to</strong>, by entities <strong>in</strong> access <strong>to</strong> or exercise of the activities of prospect<strong>in</strong>g, explor<strong>in</strong>g for <strong>and</strong><br />

produc<strong>in</strong>g hydrocarbons <strong>in</strong> third countries, which have been brought <strong>to</strong> their attention. Member<br />

States <strong>and</strong> the Commission shall ensure that commercial confidentiality is respected.<br />

2. The Commission shall report <strong>to</strong> the European Parliament <strong>and</strong> the Council before 31 December<br />

1994, <strong>and</strong> periodically thereafter, on the situation of entities <strong>in</strong> third countries <strong>and</strong> on the state of<br />

any negotiations undertaken pursuant <strong>to</strong> paragraph 3 with those countries or <strong>in</strong> the framework of<br />

<strong>in</strong>ternational organizations.<br />

3. Whenever the Commission establishes, either on the basis of the reports referred <strong>to</strong> <strong>in</strong> paragraph<br />

2 or on the basis of other <strong>in</strong>formation, that a third country is not grant<strong>in</strong>g Community entities, as<br />

regards access <strong>to</strong> or exercise of the activities referred <strong>to</strong> <strong>in</strong> paragraph 1, treatment comparable <strong>to</strong><br />

that which the Community grants entities from that third country, the Commission may submit<br />

proposals <strong>to</strong> the Community for the appropriate m<strong>and</strong>ate for negotiation with a view <strong>to</strong> obta<strong>in</strong><strong>in</strong>g<br />

comparable competitive opportunities for Community entities. The Council shall decide by<br />

qualified majority.<br />

4. In the circumstances described <strong>in</strong> paragraph 3, the Commission may at any time propose that the<br />

Council authorize one or more Member States <strong>to</strong> refuse an authorization <strong>to</strong> an entity which is<br />

effectively controlled by the third country concerned <strong>and</strong>/or by nationals of that third country.<br />

The Commission may make such a proposal on its own <strong>in</strong>itiative or at the request of a Member<br />

State.<br />

The Council shall act by qualified majority as soon as possible.


5. Measures taken pursuant <strong>to</strong> this Article shall be without prejudice <strong>to</strong> the Community's obligations<br />

under any <strong>in</strong>ternational agreement govern<strong>in</strong>g access <strong>to</strong> an exercise of the activities of prospect<strong>in</strong>g,<br />

explor<strong>in</strong>g for <strong>and</strong> produc<strong>in</strong>g hydrocarbons.<br />

Article 9<br />

Each Member State shall publish <strong>and</strong> communicate <strong>to</strong> the Commission an annual report which shall<br />

<strong>in</strong>clude <strong>in</strong>formation on the geographical areas which have been opened for prospect<strong>in</strong>g, exploration<br />

<strong>and</strong> production, authorizations granted, entities hold<strong>in</strong>g authorizations <strong>and</strong> the composition thereof<br />

<strong>and</strong> the estimated reserves conta<strong>in</strong>ed <strong>in</strong> its terri<strong>to</strong>ry.<br />

This provision does not imply any obligation for Member States <strong>to</strong> publish <strong>in</strong>formation of a<br />

commercially confidential nature.<br />

Article 10<br />

Member States shall notify the Commission, no later than 1 May 1995, of the competent authorities.<br />

Member States shall notify the Commission without delay of any subsequent changes. The<br />

Commission shall publish the list of competent authorities <strong>and</strong> any changes there<strong>to</strong> <strong>in</strong> the Official<br />

Journal of the European Communities.<br />

Article 11<br />

This Directive applies <strong>to</strong> authorizations granted from the date laid down <strong>in</strong> Article 14.<br />

Article 12<br />

The follow<strong>in</strong>g paragraph shall be added <strong>to</strong> Article 3 of Directive 90/531/EEC:<br />

‘5. As regards the exploitation of geographical areas for the purpose of prospect<strong>in</strong>g for or extract<strong>in</strong>g<br />

oil or gas, paragraphs 1 <strong>to</strong> 4 shall apply as follows from the date on which the Member State<br />

concerned has complied with the provisions of the European Parliament <strong>and</strong> Council Directive<br />

94/22/EC of 30 May on the conditions for grant<strong>in</strong>g <strong>and</strong> us<strong>in</strong>g authorizations for the prospection,<br />

exploration <strong>and</strong> production of hydrocarbons: (a) the conditions laid down <strong>in</strong> paragraph 1 shall be<br />

considered <strong>to</strong> be satisfied with effect from that date without prejudice <strong>to</strong> paragraph 3; (b) with effect<br />

from that date, the Member State referred <strong>to</strong> <strong>in</strong> paragraph 4 shall be required <strong>to</strong> communicate only<br />

the provisions relat<strong>in</strong>g <strong>to</strong> compliance with the conditions referred <strong>to</strong> <strong>in</strong> paragraphs 2 <strong>and</strong> 3.’<br />

Article 13<br />

The provisions of Articles 3 <strong>and</strong> 5 shall not apply <strong>to</strong> new authorizations granted by <strong>Denmark</strong> before<br />

31 December 2012, <strong>in</strong> respect of the areas which are rel<strong>in</strong>quished on 8 July 2012 upon expiry of the<br />

authorization issued on 8 July 1962. The new authorizations shall be granted on the basis of<br />

objective <strong>and</strong> non-discrim<strong>in</strong>a<strong>to</strong>ry pr<strong>in</strong>ciples.<br />

Consequently, this Article shall not create any precedent for Member States.<br />

Article 14<br />

Member States shall br<strong>in</strong>g <strong>in</strong><strong>to</strong> force the laws, regulations <strong>and</strong> adm<strong>in</strong>istrative provisions necessary<br />

<strong>to</strong> comply with this Directive by 1 July 1995. They shall forthwith <strong>in</strong>form the Commission thereof.


When Member States adopt these measures they shall conta<strong>in</strong> a reference <strong>to</strong> this Directive or shall<br />

be accompanied by such reference at the time of their official publication. The methods of mak<strong>in</strong>g<br />

such reference shall be laid down by Member States.<br />

Article 15<br />

This Directive shall enter <strong>in</strong><strong>to</strong> force on the day of its publication <strong>in</strong> the Official Journal of the<br />

European Communities.<br />

This Directive is addressed <strong>to</strong> the Member States.<br />

Done at Brussels, 30 May 1994.<br />

For the European Parliament<br />

The President<br />

E. KLEPSCH<br />

For the Council<br />

The President<br />

C. SIMITIS<br />

Article 16


Act on Safety, etc. for Offshore Installations for <strong>Exploration</strong>, Extraction <strong>and</strong><br />

Transport of <strong>Hydrocarbon</strong>s (Offshore Safety Act) i<br />

(Unofficial translation. In case of discrepancy, the orig<strong>in</strong>al Danish text shall prevail)<br />

Act No. 1424 of December 21, 2005 with subsequent amendments. Non-authorised compilation.<br />

This compilation comprises:<br />

� Act No. 1424 of December 21, 2005 that came <strong>in</strong><strong>to</strong> force on July 1, 2006.<br />

� Act No. 107 of February 7, 2007 that came <strong>in</strong><strong>to</strong> force on February 9, 2007.<br />

� Section 32 <strong>in</strong> Act No. 512 of June 6, 2007 that came <strong>in</strong><strong>to</strong> force on August 15, 2007.<br />

� Section 1 <strong>in</strong> Act No. 1400 of December 27, 2008 that came <strong>in</strong><strong>to</strong> force on January 1, 2009.<br />

WE, MARGRETHE THE SECOND, by the Grace of God Queen of <strong>Denmark</strong>, Make Known: The Folket<strong>in</strong>g has<br />

passed <strong>and</strong> We have granted our Royal Assent <strong>to</strong> the follow<strong>in</strong>g act:<br />

Part I<br />

Object, Scope <strong>and</strong> Def<strong>in</strong>itions<br />

1. The object of this Act is<br />

i) <strong>to</strong> promote a high level for health <strong>and</strong> safety offshore which is <strong>in</strong> keep<strong>in</strong>g with the technical <strong>and</strong><br />

social development of society, <strong>and</strong><br />

ii) <strong>to</strong> form a framework for mak<strong>in</strong>g it possible for the companies <strong>to</strong> solve health <strong>and</strong> safety issues<br />

offshore themselves.<br />

2. Offshore <strong>in</strong>stallations that are subject <strong>to</strong> this Act shall be construed as:<br />

i) Platforms or other facilities,<br />

a) from where exploration or extraction of hydrocarbons is carried out from the subsoil below<br />

the seabed,<br />

b) used for accommodation of persons employed on or at the facilities mentioned <strong>in</strong> a) above,<br />

or<br />

c) used <strong>in</strong> connection with transport of hydrocarbons <strong>and</strong> other substances <strong>and</strong> materials<br />

through pipel<strong>in</strong>es between the platforms <strong>and</strong> facilities mentioned <strong>in</strong> a) above or between<br />

these <strong>and</strong> onshore <strong>in</strong>stallations.<br />

ii) Facilities used for s<strong>to</strong>rage <strong>and</strong> offload<strong>in</strong>g of hydrocarbons produced by a facility mentioned <strong>in</strong> i)<br />

a) <strong>and</strong> which is permanently attached <strong>to</strong> such a facility.<br />

(2) Vessels are not covered by the def<strong>in</strong>ition <strong>in</strong> subsection (1) except for drill ships <strong>and</strong> float<strong>in</strong>g<br />

production, s<strong>to</strong>rage <strong>and</strong> offload<strong>in</strong>g units, cf. however section 3(3), (4) <strong>and</strong> (5).<br />

(3) A mobile offshore <strong>in</strong>stallation shall be construed as any offshore <strong>in</strong>stallation which can be<br />

moved from one position <strong>to</strong> another by mov<strong>in</strong>g or <strong>to</strong>wage <strong>and</strong> which is <strong>in</strong>tended <strong>to</strong> be used on<br />

various positions dur<strong>in</strong>g its lifetime.<br />

(4) A fixed offshore <strong>in</strong>stallation shall be construed as any offshore <strong>in</strong>stallation which is not a<br />

mobile offshore <strong>in</strong>stallation.


(5) Fixed offshore <strong>in</strong>stallations, which are bridge l<strong>in</strong>ked <strong>to</strong> each other <strong>and</strong> have the same licensee<br />

or owner, shall be regarded as one <strong>in</strong>stallation.<br />

3. This Act shall apply <strong>to</strong> offshore <strong>in</strong>stallations situated <strong>in</strong> Danish terri<strong>to</strong>rial waters or on the<br />

Danish cont<strong>in</strong>ental shelf <strong>and</strong> <strong>to</strong> fixed offshore <strong>in</strong>stallations that are planned <strong>to</strong> be used <strong>in</strong> these<br />

areas.<br />

(2) The M<strong>in</strong>ister for Transport <strong>and</strong> Energy can lay down rules as <strong>to</strong> what extent sections 5-10, 12-<br />

15, 18-23, 25-27, 28(1), 29, 31, 33-35, 37, 40(1), 41-43, 45(4), 45(5), 52, 56, 57, 59-62 <strong>and</strong> 64-77<br />

with<strong>in</strong> the terri<strong>to</strong>rial waters <strong>and</strong> cont<strong>in</strong>ental shelf, <strong>in</strong>clud<strong>in</strong>g belts <strong>and</strong> sounds, shall apply <strong>to</strong><br />

pipel<strong>in</strong>es used <strong>in</strong> connection with transport of hydrocarbons <strong>and</strong> other substances <strong>and</strong> materials<br />

through pipel<strong>in</strong>es between offshore <strong>in</strong>stallations <strong>and</strong> onshore <strong>in</strong>stallations or between several<br />

offshore <strong>in</strong>stallations.<br />

(3) The M<strong>in</strong>ister for Transport <strong>and</strong> Energy can lay down rules as <strong>to</strong> what extent sections 5(2), 7, 8,<br />

11-17, 20-24, 25(1), 26, 34, 36, 37, 40(1), 41-43, 45(1)-45(3),45(5), 46, 48-50, 52(1), 59 <strong>and</strong> 61-77<br />

shall apply <strong>to</strong> accommodation on vessels <strong>and</strong> facilities that are not subject <strong>to</strong> the def<strong>in</strong>ition <strong>in</strong><br />

section 2(1), <strong>and</strong> on which persons work<strong>in</strong>g on an offshore <strong>in</strong>stallation are accommodated, <strong>to</strong> the<br />

extent that it is significant for the health <strong>and</strong> safety of accommodated persons.<br />

(4) Vessels <strong>and</strong> facilities, mentioned <strong>in</strong> subsection (3) <strong>and</strong> on which persons work<strong>in</strong>g on an<br />

offshore <strong>in</strong>stallation are accommodated for a longer period of time, shall further be subject <strong>to</strong><br />

section 38(3) <strong>and</strong> 43.<br />

(5) The M<strong>in</strong>ister for Transport <strong>and</strong> Energy can lay down rules as <strong>to</strong> what extent sections 5(2), 7-<br />

18, 20-22, 24, 25(1), 25(3), 26, 33(2), 34, 35, 37, 40(1), 41-43, 45(1)-45(3), 45(5), 46, 48-50, 52(1),<br />

53-55, 59-62 <strong>and</strong> 64-77—for vessels <strong>and</strong> facilities other than those mentioned <strong>in</strong> subsection (3) <strong>and</strong><br />

(4) above, which are not subject <strong>to</strong> the def<strong>in</strong>ition <strong>in</strong> section 2(1) <strong>and</strong> which carry on activities<br />

connected with offshore <strong>in</strong>stallations—shall apply <strong>to</strong> the activities that are carried out from here <strong>and</strong><br />

<strong>to</strong> the equipment used, <strong>to</strong> the extent that the activities or the equipment affect the health <strong>and</strong> safety<br />

conditions on adjo<strong>in</strong><strong>in</strong>g offshore <strong>in</strong>stallations.<br />

4. Licensee shall be construed as the company or group of companies that have permission for<br />

exploration <strong>and</strong> production (extraction) of hydrocarbons pursuant <strong>to</strong> the Act on the Use of<br />

<strong>Denmark</strong>’s Subsoil. For pipel<strong>in</strong>es where there is no licensee as referred <strong>to</strong> <strong>in</strong> the first sentence<br />

hereof, the owner of the pipel<strong>in</strong>e shall be considered licensee.<br />

(2) Opera<strong>to</strong>r shall be construed as the company that, on behalf of the licensee, carries out<br />

exploration <strong>and</strong> extraction of hydrocarbons, <strong>in</strong>clud<strong>in</strong>g transport of hydrocarbons through pipel<strong>in</strong>es.<br />

(3) Operat<strong>in</strong>g company shall be construed as the company that is responsible for the day-<strong>to</strong>-day<br />

operation of an offshore <strong>in</strong>stallation, a pipel<strong>in</strong>e, cf. section 3(2), or a vessel or other facilities, cf.<br />

section 3(5). For vessels <strong>and</strong> facilities covered by section 3(3) <strong>and</strong> (4), the operat<strong>in</strong>g company shall<br />

be construed as the company that is responsible for the day-<strong>to</strong>-day operation of the offshore<br />

<strong>in</strong>stallation on which the persons accommodated on the vessel or facility are work<strong>in</strong>g.<br />

(4) Contrac<strong>to</strong>r shall be construed as the company carry<strong>in</strong>g out work for another company.<br />

(5) Employer shall be construed as the company that is authorised <strong>to</strong> <strong>in</strong>struct the employees who<br />

carry out work on offshore <strong>in</strong>stallations.<br />

(6) Company manager shall be construed as any person who by virtue of his position participates<br />

<strong>in</strong> the ord<strong>in</strong>ary, general management of the company.<br />

(7) Supervisor shall be construed as any person whose work solely or essentially consists of<br />

manag<strong>in</strong>g or supervis<strong>in</strong>g the work on behalf of his employer <strong>in</strong> his company or part thereof.<br />

(8) Offshore <strong>in</strong>stallation manager shall be construed as the supervisor who, on behalf of the<br />

operat<strong>in</strong>g company, is <strong>in</strong> charge of the day-<strong>to</strong>-day operation of an offshore <strong>in</strong>stallation.


Part II<br />

General Duties<br />

Distribution of Responsibility between the Individual Types of Companies<br />

5. The licensee shall ensure that health <strong>and</strong> safety risks on an offshore <strong>in</strong>stallation, covered by<br />

section 2(1)(i)(a) <strong>and</strong> (b), <strong>and</strong> (ii), have been identified, assessed <strong>and</strong> reduced as much as reasonably<br />

practicable.<br />

(2) The licensee shall ensure that the opera<strong>to</strong>r can fulfil the health <strong>and</strong> safety duties that rest with<br />

him.<br />

(3) For offshore <strong>in</strong>stallations that are subject <strong>to</strong> section 2(1)(i)(c), the duty pursuant <strong>to</strong> subsection<br />

(1) shall rest with the owner of the <strong>in</strong>stallation.<br />

(4) For comb<strong>in</strong>ations of the offshore <strong>in</strong>stallations mentioned <strong>in</strong> subsections (1) <strong>and</strong> (3), the duty<br />

pursuant <strong>to</strong> subsection (1) shall rest with the licensee <strong>and</strong> owner <strong>to</strong>gether.<br />

(5) The owner pursuant <strong>to</strong> subsection (3) shall ensure that the operat<strong>in</strong>g company is <strong>in</strong> a position<br />

<strong>to</strong> fulfil the health <strong>and</strong> safety duty that rest with the company.<br />

6. The licensee shall ensure that supervision is carried out as <strong>to</strong> whether operation of an offshore<br />

<strong>in</strong>stallation which is subject <strong>to</strong> section 2(1)(i)(a) <strong>and</strong> (b), <strong>and</strong> ii), takes place <strong>in</strong> accordance with this<br />

Act <strong>and</strong> rules laid down pursuant <strong>to</strong> the said Act.<br />

(2) For offshore <strong>in</strong>stallations that are subject <strong>to</strong> section 2(1)(i)(c), the duty pursuant <strong>to</strong> subsections<br />

(1) <strong>and</strong> (2) shall rest with the owner of the <strong>in</strong>stallation.<br />

(3) For comb<strong>in</strong>ations of the offshore <strong>in</strong>stallations mentioned <strong>in</strong> subsection (1) <strong>and</strong> (2), the duty<br />

pursuant <strong>to</strong> subsection (1) shall rest with the licensee or owner <strong>to</strong>gether.<br />

7. The opera<strong>to</strong>r shall ensure that the necessary health <strong>and</strong> safety <strong>in</strong>structions are given <strong>to</strong><br />

contrac<strong>to</strong>rs work<strong>in</strong>g for the opera<strong>to</strong>r, especially <strong>to</strong> the operat<strong>in</strong>g company <strong>in</strong> cases where this<br />

company is not the opera<strong>to</strong>r. Furthermore, the opera<strong>to</strong>r shall ensure that supervision is carried out as<br />

<strong>to</strong> whether these companies plan <strong>and</strong> carry out their work <strong>in</strong> accordance with the requirements of<br />

the legislation <strong>and</strong> as <strong>to</strong> whether the health <strong>and</strong> safety risks have been identified, assessed <strong>and</strong><br />

reduced as much as reasonably practicable.<br />

8. On manned offshore <strong>in</strong>stallations the operat<strong>in</strong>g company shall appo<strong>in</strong>t an offshore <strong>in</strong>stallation<br />

manager.<br />

(2) The operat<strong>in</strong>g company shall ensure that the necessary health <strong>and</strong> safety <strong>in</strong>structions are given<br />

<strong>to</strong> contrac<strong>to</strong>rs work<strong>in</strong>g for the operat<strong>in</strong>g company. Furthermore, the operat<strong>in</strong>g company shall ensure<br />

that supervision is carried out as <strong>to</strong> whether these companies plan <strong>and</strong> carry out their work <strong>in</strong> a<br />

manner that identifies, assesses <strong>and</strong> reduces health <strong>and</strong> safety risks as much as reasonably<br />

practicable.<br />

(3) The operat<strong>in</strong>g company shall ensure that work <strong>to</strong> promote health <strong>and</strong> safety, which is carried<br />

out by several contrac<strong>to</strong>rs on the offshore <strong>in</strong>stallation, is co-ord<strong>in</strong>ated <strong>and</strong> that the offshore<br />

<strong>in</strong>stallation manager can fulfil the special duties that rest with him.<br />

(4) The operat<strong>in</strong>g company shall ensure that health <strong>and</strong> safety risks on the offshore <strong>in</strong>stallation<br />

have been identified, assessed <strong>and</strong> reduced as much as reasonably practicable before the <strong>in</strong>stallation<br />

commences operation.<br />

(5) The operat<strong>in</strong>g company shall ensure that equipment, before put <strong>in</strong><strong>to</strong> service, fulfils exist<strong>in</strong>g<br />

legislation.


(6) The operat<strong>in</strong>g company shall ensure that health risks <strong>in</strong> connection with use of substances <strong>and</strong><br />

materials have been identified, assessed <strong>and</strong> reduced as much as reasonably practicable.<br />

9. The <strong>in</strong>dividual contrac<strong>to</strong>r shall ensure that the necessary health <strong>and</strong> safety <strong>in</strong>structions are given<br />

<strong>to</strong> contrac<strong>to</strong>rs work<strong>in</strong>g for him. Furthermore, the contrac<strong>to</strong>r <strong>in</strong> question shall ensure that supervision<br />

is carried out as <strong>to</strong> whether these companies plan <strong>and</strong> carry out their work <strong>in</strong> a manner that<br />

identifies, assesses <strong>and</strong> reduces health <strong>and</strong> safety risks as much as reasonably practicable.<br />

Distribution of Responsibility with<strong>in</strong> the Individual Companies with Employees<br />

10. The employer shall ensure that health <strong>and</strong> safety risks connected with the work have been<br />

identified, assessed <strong>and</strong> reduced as much as reasonably practicable.<br />

(2) The employer shall ensure that supervision is carried out as <strong>to</strong> whether the risks referred <strong>to</strong> <strong>in</strong><br />

subsection (1) have been identified, assessed <strong>and</strong> reduced as much as reasonably practicable.<br />

(3) The employer shall <strong>in</strong>form his employees of the health <strong>and</strong> safety risks that may be connected<br />

with their work. Furthermore, the employer shall ensure that his employees receive the necessary<br />

tra<strong>in</strong><strong>in</strong>g <strong>and</strong> <strong>in</strong>structions <strong>in</strong> perform<strong>in</strong>g their work so as <strong>to</strong> identify, assess <strong>and</strong> reduce the risks as<br />

much as reasonably practicable.<br />

(4) If conditions speak <strong>in</strong> favour of this, the employer shall make sure that surveys, tests <strong>and</strong><br />

<strong>in</strong>spections, possibly by experts, are carried out <strong>to</strong> f<strong>in</strong>d out whether the duties referred <strong>to</strong> <strong>in</strong><br />

subsection (1) have been fulfilled.<br />

(5) If there are more than one employer on the same offshore <strong>in</strong>stallation, these employers shall<br />

co-operate with each other on conditions that are important <strong>to</strong> health <strong>and</strong> safety. This co-operation<br />

shall be established by the operat<strong>in</strong>g company, cf. section 8(3).<br />

(6) The provisions <strong>in</strong> subsections (1)-(5) on the duties of the employer shall also apply <strong>to</strong><br />

company managers.<br />

11. The offshore <strong>in</strong>stallation manager shall be overall responsible for the health <strong>and</strong> safety<br />

conditions on the offshore <strong>in</strong>stallation <strong>and</strong> ensure that the <strong>in</strong>stallation is operated <strong>in</strong> accordance with<br />

exist<strong>in</strong>g legislation.<br />

(2) The offshore <strong>in</strong>stallation manager shall ensure that health <strong>and</strong> safety risks <strong>in</strong> connection with<br />

the activities on the <strong>in</strong>stallation have been identified, assessed <strong>and</strong> reduced as much as reasonably<br />

practicable.<br />

(3) The offshore <strong>in</strong>stallation manager shall ensure that operation, ma<strong>in</strong>tenance <strong>and</strong> changes of the<br />

<strong>in</strong>stallation take place <strong>in</strong> accordance with the management system mentioned <strong>in</strong> section 20 below.<br />

(4) If the offshore <strong>in</strong>stallation manager becomes aware of conditions that imply a risk of accidents<br />

or illness, he shall make sure that such risk is removed or reduced.<br />

12. Each supervisor shall assist <strong>in</strong> identify<strong>in</strong>g, assess<strong>in</strong>g <strong>and</strong> reduc<strong>in</strong>g health <strong>and</strong> safety risks <strong>in</strong><br />

connection with the work as much as reasonably practicable with<strong>in</strong> his own work area. The<br />

supervisor shall ensure that measures taken <strong>to</strong> reduce such health <strong>and</strong> safety risks have the desired<br />

effect.<br />

(2) If the supervisor becomes aware of conditions that imply a risk of accidents or illness, the<br />

supervisor shall ensure that this risk is removed or reduced. If the risk cannot be removed or<br />

reduced by <strong>in</strong>tervention on site, the offshore <strong>in</strong>stallation manager shall be <strong>in</strong>formed of this<br />

immediately.<br />

(3) The supervisor shall participate <strong>in</strong> the co-operation on health <strong>and</strong> safety, cf. section 46 below.


13. The employees shall participate <strong>in</strong> the co-operation on health <strong>and</strong> safety, cf. section 46 below.<br />

Furthermore, the employees shall assist <strong>in</strong> identify<strong>in</strong>g, assess<strong>in</strong>g <strong>and</strong> reduc<strong>in</strong>g the health <strong>and</strong> safety<br />

risks as much as reasonably practicable with<strong>in</strong> their own work area, <strong>and</strong> ensure that measures taken<br />

<strong>to</strong> reduce such health <strong>and</strong> safety risks have the desired effect.<br />

(2) If the employees become aware of conditions that imply a risk of accidents or illness, which<br />

they cannot correct themselves, they shall <strong>in</strong>form their supervisor, offshore <strong>in</strong>stallation manager or<br />

the employee who represent them <strong>in</strong> health <strong>and</strong> safety matters.<br />

(3) An employee shall be entitled <strong>to</strong> leave his workplace or a hazardous area <strong>in</strong> case of a serious<br />

or immediate danger that cannot be avoided.<br />

(4) The employee shall not be subject <strong>to</strong> a reduction of his conditions of employment due <strong>to</strong> the<br />

fact that the employee leaves his workplace or a hazardous area, cf. subsection (3).<br />

(5) Employees whose rights are <strong>in</strong>fr<strong>in</strong>ged pursuant <strong>to</strong> subsection (4) can be awarded<br />

compensation.<br />

14. The employer shall ensure that an employee, <strong>in</strong> consideration of his knowledge <strong>and</strong> access <strong>to</strong><br />

work equipment can take appropriate measures himself with a view <strong>to</strong> avoid<strong>in</strong>g consequences of a<br />

serious <strong>and</strong> immediate danger <strong>to</strong> his own or others’ safety when it is not possible <strong>to</strong> contact the<br />

supervisor or the offshore <strong>in</strong>stallation manager.<br />

(2) The employee shall not be subject <strong>to</strong> a reduction of his employment conditions due <strong>to</strong> the fact<br />

that the employee has <strong>in</strong>itiated measures pursuant <strong>to</strong> subsection (1), unless the employee <strong>in</strong> that<br />

connection has acted <strong>in</strong>tentionally or grossly negligently.<br />

(3) Employees whose rights have been <strong>in</strong>fr<strong>in</strong>ged pursuant <strong>to</strong> subsection (2) can be awarded<br />

compensation.<br />

15. The provisions <strong>in</strong> section 13(3)-(5) <strong>and</strong> section 14 shall not apply if a collective agreement<br />

gives an employee similar or better rights.<br />

16. All persons on board an offshore <strong>in</strong>stallation shall conform <strong>to</strong> the procedures that are<br />

determ<strong>in</strong>ed for work <strong>and</strong> stay on the <strong>in</strong>stallation <strong>and</strong> respect the measures taken concern<strong>in</strong>g health<br />

<strong>and</strong> safety matters.<br />

17. The M<strong>in</strong>ister for Transport <strong>and</strong> Energy can lay down detailed rules on the duties of the<br />

employer, offshore <strong>in</strong>stallation manager <strong>and</strong> other supervisors as well as employees.<br />

Suppliers, etc.<br />

18. Suppliers, etc. transferr<strong>in</strong>g or h<strong>and</strong><strong>in</strong>g over mach<strong>in</strong>es, mach<strong>in</strong>e parts, conta<strong>in</strong>ers, prefabricated<br />

structures, apparatuses, <strong>to</strong>ols, other equipment or substances <strong>and</strong> materials for use on the <strong>in</strong>stallation<br />

shall ensure that the equipment as well as substances <strong>and</strong> materials conform <strong>to</strong> exist<strong>in</strong>g EU<br />

legislation on arrangement, packag<strong>in</strong>g <strong>and</strong> labell<strong>in</strong>g when h<strong>and</strong>ed over. Furthermore, suppliers, etc.<br />

transferr<strong>in</strong>g or h<strong>and</strong><strong>in</strong>g over shall ensure that data sheets as well as <strong>in</strong>structions <strong>in</strong> the use of the<br />

equipment or substances <strong>and</strong> materials <strong>and</strong> <strong>in</strong> ma<strong>in</strong>tenance, transport <strong>and</strong> <strong>in</strong>stallation of the<br />

equipment are <strong>in</strong>cluded on delivery <strong>and</strong> conform <strong>to</strong> exist<strong>in</strong>g EU legislation as regards health <strong>and</strong><br />

safety matters.<br />

(2) If equipment is made for use on an offshore <strong>in</strong>stallation accord<strong>in</strong>g <strong>to</strong> the recipient’s written,<br />

detailed <strong>in</strong>structions, the duties pursuant <strong>to</strong> subsection (1) shall rest with the recipient.<br />

(3) If mach<strong>in</strong>es, mach<strong>in</strong>e parts, conta<strong>in</strong>ers, prefabricated structures, apparatuses, <strong>to</strong>ols, other<br />

equipment or substances <strong>and</strong> materials are delivered <strong>to</strong> an offshore <strong>in</strong>stallation from a supplier<br />

outside the EU, the duties pursuant <strong>to</strong> subsection (1) shall rest with the recipient.


(4) The person <strong>in</strong>vit<strong>in</strong>g tenders for services shall ensure when prepar<strong>in</strong>g his tender documents that<br />

health <strong>and</strong> safety <strong>in</strong> connection with performance of the work are considered. Furthermore, the<br />

person <strong>in</strong>vit<strong>in</strong>g tenders shall ensure that the tender documents conta<strong>in</strong> relevant <strong>in</strong>formation about<br />

special, essential health <strong>and</strong> safety matters connected with the performance of the work with a view<br />

<strong>to</strong> the person perform<strong>in</strong>g the task becom<strong>in</strong>g acqua<strong>in</strong>ted with this.<br />

(5) The person <strong>in</strong>vit<strong>in</strong>g tenders shall otherwise assist <strong>in</strong> ensur<strong>in</strong>g that the task put up for tender<br />

can be performed justifiably <strong>in</strong> terms of health <strong>and</strong> safety by the employer who has been awarded<br />

the contract.<br />

(6) The M<strong>in</strong>ister for Transport <strong>and</strong> Energy can lay down more specific rules on the duties<br />

pursuant <strong>to</strong> subsections (1)-(5) above.<br />

Part III<br />

Management of Health <strong>and</strong> Safety<br />

Management System for Health <strong>and</strong> Safety<br />

19. For fixed offshore <strong>in</strong>stallations the opera<strong>to</strong>r shall ensure that a management system for health<br />

<strong>and</strong> safety is established <strong>and</strong> ma<strong>in</strong>ta<strong>in</strong>ed, ensur<strong>in</strong>g <strong>and</strong> document<strong>in</strong>g that the design, fabrication,<br />

<strong>in</strong>stallation, change or dismantl<strong>in</strong>g of the <strong>in</strong>stallation conform <strong>to</strong> requirements laid down <strong>in</strong> or<br />

pursuant <strong>to</strong> this Act.<br />

(2) The management system shall be based on recognised norms <strong>and</strong> st<strong>and</strong>ards for management<br />

systems or other similar systems <strong>and</strong> shall be established before plann<strong>in</strong>g or dismantl<strong>in</strong>g of the<br />

<strong>in</strong>stallation is commenced.<br />

(3) The opera<strong>to</strong>r shall ensure supervision of compliance with the management system.<br />

20. The operat<strong>in</strong>g company shall establish <strong>and</strong> ma<strong>in</strong>ta<strong>in</strong> a management system for health <strong>and</strong><br />

safety, which ensures <strong>and</strong> documents that offshore <strong>in</strong>stallations, their condition, operation <strong>and</strong><br />

ma<strong>in</strong>tenance as well as the performance of the work conform <strong>to</strong> the health <strong>and</strong> safety requirements<br />

laid down <strong>in</strong> or pursuant <strong>to</strong> this Act.<br />

(2) The management system shall be based on recognised norms <strong>and</strong> st<strong>and</strong>ards for management<br />

systems or other similar systems <strong>and</strong> shall be established before operation of the <strong>in</strong>stallation is<br />

commenced.<br />

(3) The operat<strong>in</strong>g company shall ensure supervision of compliance with the management system.<br />

21. Independent verification that the <strong>in</strong>stallation, parts thereof or its equipment fulfil requirements<br />

laid down <strong>in</strong> or pursuant <strong>to</strong> this Act can partially replace the systems mentioned <strong>in</strong> sections 19 <strong>and</strong><br />

20.<br />

(2) Such verification shall be made by experts recognised by the supervisory body.<br />

22. The M<strong>in</strong>ister for Transport <strong>and</strong> Energy may lay down more specific rules on the contents of<br />

the systems mentioned <strong>in</strong> sections 19 <strong>and</strong> 20, <strong>in</strong>clud<strong>in</strong>g rules on report<strong>in</strong>g rout<strong>in</strong>es as well as audit<br />

<strong>and</strong> control procedures. Furthermore, the M<strong>in</strong>ister for Transport <strong>and</strong> Energy can lay down more<br />

specific rules on the verification system referred <strong>to</strong> <strong>in</strong> section 21 above, <strong>in</strong>clud<strong>in</strong>g rules determ<strong>in</strong><strong>in</strong>g<br />

that some parts of the <strong>in</strong>stallation must be verified.<br />

Health <strong>and</strong> Safety Case<br />

23. The opera<strong>to</strong>r shall ensure that a health <strong>and</strong> safety case is prepared for a fixed offshore<br />

<strong>in</strong>stallation which, as a m<strong>in</strong>imum <strong>in</strong>cludes:


i) Identification of the risks that are connected with the offshore <strong>in</strong>stallation, <strong>in</strong>clud<strong>in</strong>g any activity<br />

<strong>in</strong> connection with the offshore <strong>in</strong>stallation <strong>and</strong> its dismantl<strong>in</strong>g, <strong>and</strong> which may have serious<br />

consequences for the health <strong>and</strong> safety of the employees<br />

ii) Assessment of the risks mentioned <strong>in</strong> i).<br />

iii)Particulars <strong>to</strong> demonstrate that the risks mentioned <strong>in</strong> i) have been identified, assessed <strong>and</strong><br />

reduced as much as reasonably practicable, <strong>in</strong>clud<strong>in</strong>g that the maximum <strong>and</strong> m<strong>in</strong>imum mann<strong>in</strong>g<br />

for operation of the <strong>in</strong>stallation have been determ<strong>in</strong>ed <strong>and</strong> that an efficient <strong>and</strong> controlled<br />

evacuation of the offshore <strong>in</strong>stallation can take place <strong>in</strong> critical situations.<br />

iv) Particulars <strong>to</strong> demonstrate that the management system, cf. sections 19 <strong>and</strong> 20, ensures <strong>and</strong><br />

documents that the requirements <strong>in</strong> this Act <strong>and</strong> <strong>in</strong> rules laid down pursuant <strong>to</strong> this Act are<br />

complied with <strong>in</strong> normal as well as critical situations.<br />

(2) The health <strong>and</strong> safety case shall be prepared <strong>in</strong> connection with the design of a fixed offshore<br />

<strong>in</strong>stallation <strong>and</strong> conta<strong>in</strong> the <strong>in</strong>formation mentioned <strong>in</strong> subsection (1), <strong>to</strong> the extent that it is possible<br />

at the time of design.<br />

(3) The health <strong>and</strong> safety case shall be updated regularly concurrently with details concern<strong>in</strong>g<br />

health <strong>and</strong> safety matters becom<strong>in</strong>g available <strong>in</strong> connection with design, fabrication, <strong>in</strong>stallation,<br />

operation <strong>and</strong> dismantl<strong>in</strong>g of the <strong>in</strong>stallation.<br />

24. The operat<strong>in</strong>g company shall ensure that a health <strong>and</strong> safety case is prepared for a mobile<br />

offshore <strong>in</strong>stallation which, as a m<strong>in</strong>imum, <strong>in</strong>cludes:<br />

i) Identification of the risks that are connected with the offshore <strong>in</strong>stallation, <strong>in</strong>clud<strong>in</strong>g any activity<br />

<strong>in</strong> connection with the offshore <strong>in</strong>stallation <strong>and</strong> which may have serious consequences for the<br />

health <strong>and</strong> safety of the employees.<br />

ii)Assessment of the risks mentioned <strong>in</strong> i).<br />

iii) Particulars <strong>to</strong> demonstrate that the risks mentioned <strong>in</strong> i) have been reduced as much as<br />

reasonably practicable, <strong>in</strong>clud<strong>in</strong>g that the maximum <strong>and</strong> m<strong>in</strong>imum mann<strong>in</strong>g for operation of the<br />

<strong>in</strong>stallation have been determ<strong>in</strong>ed <strong>and</strong> that an efficient <strong>and</strong> controlled evacuation of the offshore<br />

<strong>in</strong>stallation can take place <strong>in</strong> critical situations.<br />

iv) Particulars <strong>to</strong> demonstrate that the management system, cf. section 20, ensures <strong>and</strong> documents<br />

that the requirements <strong>in</strong> this Act <strong>and</strong> <strong>in</strong> rules laid down pursuant <strong>to</strong> this Act are complied with<br />

<strong>in</strong> normal as well as critical situations.<br />

(2) The health <strong>and</strong> safety case shall be prepared before the offshore <strong>in</strong>stallation is put <strong>in</strong><strong>to</strong><br />

operation.<br />

25. Dur<strong>in</strong>g operation of an offshore <strong>in</strong>stallation the operat<strong>in</strong>g company shall ensure that the health<br />

<strong>and</strong> safety case is updated <strong>in</strong> case of essential changes of the offshore <strong>in</strong>stallation, its layout,<br />

equipment or operational conditions.<br />

(2) If operation of a fixed offshore <strong>in</strong>stallation is planned <strong>to</strong> proceed after the expiry of its design<br />

life, it shall be demonstrated <strong>in</strong> the health <strong>and</strong> safety case that safety risks orig<strong>in</strong>at<strong>in</strong>g from the<br />

support<strong>in</strong>g structures of the <strong>in</strong>stallation <strong>in</strong> the planned operation period have been identified,<br />

assessed <strong>and</strong> reduced as much as reasonably practicable. The length of the planned operation period<br />

shall appear from the health <strong>and</strong> safety case.<br />

(3) The health <strong>and</strong> safety case shall be available on the offshore <strong>in</strong>stallation <strong>and</strong> be accessible <strong>to</strong><br />

the management of the <strong>in</strong>stallation <strong>and</strong> its personnel <strong>and</strong> <strong>to</strong> the supervis<strong>in</strong>g authority.<br />

26. The M<strong>in</strong>ister for Transport <strong>and</strong> Energy shall lay down more specific rules on the contents of<br />

the health <strong>and</strong> safety cases mentioned <strong>in</strong> sections 23 <strong>and</strong> 24 <strong>and</strong> on updat<strong>in</strong>g of these accord<strong>in</strong>g <strong>to</strong><br />

section 25(1) above.


Approvals, Permits, etc.<br />

27. Before fabrication of a fixed offshore <strong>in</strong>stallation is commenced, the opera<strong>to</strong>r shall make sure<br />

that approval from the supervis<strong>in</strong>g authority of the overall design of the <strong>in</strong>stallation is obta<strong>in</strong>ed. The<br />

application for this shall be accompanied by the health <strong>and</strong> safety case mentioned <strong>in</strong> section 23(1)<br />

<strong>and</strong> overall schedules for fabrication <strong>and</strong> <strong>in</strong>stallation of the offshore <strong>in</strong>stallation.<br />

28. Before operation of an offshore <strong>in</strong>stallation is commenced, the opera<strong>to</strong>r shall ensure that<br />

permission from the supervis<strong>in</strong>g authority has been obta<strong>in</strong>ed. The application for this shall <strong>in</strong>clude<br />

<strong>in</strong>formation about the time of the expected commencement of operation <strong>and</strong> as for mobile offshore<br />

<strong>in</strong>stallations <strong>in</strong>formation about the desired duration of the permit <strong>and</strong> be accompanied by an updated<br />

health <strong>and</strong> safety case, cf. sections 23 <strong>and</strong> 24.<br />

(2) The permit for mobile offshore <strong>in</strong>stallations pursuant <strong>to</strong> subsection (1) can be extended upon<br />

application for this accompanied by an updated health <strong>and</strong> safety case, cf. section 24. Among other<br />

th<strong>in</strong>gs, the application shall <strong>in</strong>clude <strong>in</strong>formation about the desired duration of the extension.<br />

(3) The permit for mobile offshore <strong>in</strong>stallations pursuant <strong>to</strong> subsection (1) or the extension<br />

pursuant <strong>to</strong> subsection (2) can be granted for a period of five years at a maximum.<br />

(4) A document that is accepted or approved by a foreign authority with a content correspond<strong>in</strong>g<br />

<strong>to</strong> the health <strong>and</strong> safety case can replace wholly or partly the updated health <strong>and</strong> safety case<br />

accord<strong>in</strong>g <strong>to</strong> a decision made by the supervis<strong>in</strong>g authority.<br />

29. The operat<strong>in</strong>g company shall, prior <strong>to</strong> any changes <strong>to</strong> an offshore <strong>in</strong>stallation or the<br />

operational conditions of the <strong>in</strong>stallation that will be of essential importance <strong>to</strong> the risk of major<br />

accidents, obta<strong>in</strong> permission from the supervis<strong>in</strong>g authority. The application for permission shall be<br />

accompanied by an updated health <strong>and</strong> safety case, cf. section 25(1).<br />

30. Before a mobile offshore <strong>in</strong>stallation is moved from one position <strong>to</strong> another, the opera<strong>to</strong>r of<br />

the <strong>in</strong>stallation shall <strong>in</strong>form the supervis<strong>in</strong>g authority of the new position.<br />

31. Before a fixed offshore <strong>in</strong>stallation subject <strong>to</strong> section 2(1)(i)(a) <strong>and</strong> (b), <strong>and</strong> section 2(1)(ii), is<br />

dismantled, the licensee shall ensure that permission from the supervis<strong>in</strong>g authority is obta<strong>in</strong>ed. The<br />

application for permission shall be accompanied by an updated health <strong>and</strong> safety case, cf. section<br />

23.<br />

(2) For offshore <strong>in</strong>stallations subject <strong>to</strong> section 2(1)(i)(c), the duty accord<strong>in</strong>g <strong>to</strong> subsection (1)<br />

shall rest with the owner of the <strong>in</strong>stallation.<br />

32. At the request of the operat<strong>in</strong>g company the supervis<strong>in</strong>g authority can promise <strong>to</strong> grant an<br />

operation permit for a mobile offshore <strong>in</strong>stallation, cf. section 28(1) above.<br />

(2) The validity of such promise pursuant <strong>to</strong> subsection (1) above shall be maximum five years.<br />

(3) The condition for consider<strong>in</strong>g such a request pursuant <strong>to</strong> subsection (1) is that the operat<strong>in</strong>g<br />

company pays the expenses <strong>in</strong>curred by the supervis<strong>in</strong>g authority <strong>in</strong> accordance with rules on<br />

payment laid down pursuant <strong>to</strong> section 65(2) below.<br />

32 a. The M<strong>in</strong>ister for Transport <strong>and</strong> Energy can lay down further rules on the contents of an<br />

application accord<strong>in</strong>g <strong>to</strong> sections 27, 28(1)-(2), 29 <strong>and</strong> 31 that requests a promise for the grant of an<br />

operation permit pursuant <strong>to</strong> section 32, <strong>and</strong> on the necessity of a permit pursuant <strong>to</strong> section 29.<br />

Furthermore, the M<strong>in</strong>ister for Transport <strong>and</strong> Energy can lay down further rules on conditions <strong>in</strong><br />

connection with permits <strong>and</strong> approvals.


Part IV<br />

Construction, Arrangement, Equipment, Operation <strong>and</strong> Dismantl<strong>in</strong>g<br />

Risk Assessment<br />

33. In connection with the design of a fixed offshore <strong>in</strong>stallation <strong>and</strong> changes <strong>to</strong> this, the opera<strong>to</strong>r<br />

shall ensure that the health <strong>and</strong> safety risks that are connected with the construction, layout,<br />

equipment of the <strong>in</strong>stallation <strong>and</strong> all activities connected with the <strong>in</strong>stallations have been identified,<br />

assessed <strong>and</strong> reduced as much as reasonably practicable. The design shall reasonably consider any<br />

future needs for extension of the capacity <strong>and</strong> function of the <strong>in</strong>stallation. Tak<strong>in</strong>g <strong>in</strong><strong>to</strong> account the<br />

design life of the <strong>in</strong>stallation, among other th<strong>in</strong>gs, it shall as far as possible be endeavoured <strong>to</strong> use<br />

the best possible technology.<br />

(2) On enter<strong>in</strong>g <strong>in</strong><strong>to</strong> an agreement on use of a mobile offshore <strong>in</strong>stallation, the opera<strong>to</strong>r shall<br />

ensure that the construction, layout <strong>and</strong> equipment of the <strong>in</strong>stallation are fully justifiable <strong>in</strong> terms of<br />

health <strong>and</strong> safety.<br />

(3) In connection with plann<strong>in</strong>g of changes <strong>to</strong> a mobile offshore <strong>in</strong>stallation, the operat<strong>in</strong>g<br />

company shall ensure that the health <strong>and</strong> safety risks connected with the change have been<br />

identified, assessed <strong>and</strong> reduced as much as reasonably practicable.<br />

34. The operat<strong>in</strong>g company shall <strong>in</strong> connection with operation of offshore <strong>in</strong>stallations ensure that<br />

the health <strong>and</strong> safety risks connected with the activities on the offshore <strong>in</strong>stallation <strong>and</strong> all activities<br />

connected with the <strong>in</strong>stallations have been identified, assessed <strong>and</strong> reduced as much as reasonably<br />

practicable.<br />

(2) The operat<strong>in</strong>g company shall constantly seek <strong>to</strong> improve the health <strong>and</strong> safety level through<br />

cont<strong>in</strong>ued reduction of the health <strong>and</strong> safety risks mentioned <strong>in</strong> subsection (1).<br />

35. The <strong>in</strong>dividual employer shall, before the work is commenced, ensure that the health <strong>and</strong><br />

safety risks <strong>in</strong> connection with the performance of the work have been identified, assessed <strong>and</strong><br />

reduced as much as reasonably practicable.<br />

36. The operat<strong>in</strong>g company shall ensure that the health risks on the <strong>in</strong>stallation, which are not<br />

related <strong>to</strong> the performance of the work <strong>and</strong> layout of workplaces have been identified, assessed <strong>and</strong><br />

reduced as much as reasonably practicable.<br />

37. The M<strong>in</strong>ister for Transport <strong>and</strong> Energy can lay down more specific rules on risk assessment<br />

<strong>and</strong> current improvement of the health <strong>and</strong> safety level.<br />

Construction, Arrangement <strong>and</strong> Equipment<br />

38. In connection with construction of a fixed offshore <strong>in</strong>stallation the accommodation shall as far<br />

as possible be separated from the ma<strong>in</strong> activities, i.e. drill<strong>in</strong>g <strong>and</strong> production.<br />

(2) With regard <strong>to</strong> the danger of fire <strong>and</strong> explosion, the offshore <strong>in</strong>stallation shall be subdivided<br />

<strong>in</strong><strong>to</strong> areas accord<strong>in</strong>g <strong>to</strong> the degree of danger. The <strong>in</strong>stallation shall be constructed <strong>and</strong> used <strong>in</strong><br />

accordance with the subdivision of areas made.<br />

(3) The accommodation of the offshore <strong>in</strong>stallations shall be tailored <strong>to</strong> the number of persons<br />

expected <strong>to</strong> stay on the <strong>in</strong>stallation <strong>and</strong> shall be arranged so as <strong>to</strong> ensure that the employees can rest<br />

<strong>and</strong> recuperate undisturbed so as <strong>to</strong> make sure that they can attend <strong>to</strong> their tasks fully justifiably<br />

with regard <strong>to</strong> health <strong>and</strong> safety.


39. On permanently manned offshore <strong>in</strong>stallations suitable treatment rooms shall be established so<br />

as <strong>to</strong> ensure that sick <strong>and</strong> <strong>in</strong>jured persons can receive the necessary treatment before they, if<br />

required, are transported ashore <strong>to</strong> a hospital or the like.<br />

(2) Access routes on the offshore <strong>in</strong>stallation shall be designed so that transport of sick <strong>and</strong><br />

<strong>in</strong>jured persons on stretchers <strong>to</strong> treatment rooms <strong>and</strong> evacuation sites can take place <strong>in</strong> an efficient<br />

manner.<br />

40. An offshore <strong>in</strong>stallation shall be provided with equipment necessary for fulfilment of the<br />

purpose of the <strong>in</strong>stallation. The equipment shall be placed, arranged <strong>and</strong> be able <strong>to</strong> be used so as <strong>to</strong><br />

reduce the health <strong>and</strong> safety risks after identification <strong>and</strong> assessment as much as reasonably<br />

practicable.<br />

(2) The equipment shall be designed <strong>and</strong> used <strong>in</strong> accordance with the subdivision of areas, cf.<br />

section 38(2).<br />

41. Current ma<strong>in</strong>tenance of the offshore <strong>in</strong>stallation shall take place so as <strong>to</strong> ensure that the<br />

<strong>in</strong>stallation <strong>and</strong> its equipment fulfil the health <strong>and</strong> safety requirements laid down <strong>in</strong> this Act or <strong>in</strong><br />

rules laid down <strong>in</strong> pursuance thereof.<br />

42. Recognised norms <strong>and</strong> st<strong>and</strong>ards that are important <strong>to</strong> health <strong>and</strong> safety shall be followed <strong>in</strong><br />

connection with the conditions mentioned <strong>in</strong> sections 38-41 above.<br />

(2) Norms <strong>and</strong> st<strong>and</strong>ards accord<strong>in</strong>g <strong>to</strong> subsection (1) may be deviated from <strong>in</strong> cases where it is<br />

convenient for obta<strong>in</strong><strong>in</strong>g a higher level of health <strong>and</strong> safety or <strong>to</strong> be <strong>in</strong> keep<strong>in</strong>g with the technical<br />

development. It is presumed by the deviation that health <strong>and</strong> safety risks are reduced as much as<br />

reasonably practicable.<br />

43. The M<strong>in</strong>ister for Transport <strong>and</strong> Energy can lay down more specific rules on the structure of<br />

the offshore <strong>in</strong>stallation, <strong>in</strong>clud<strong>in</strong>g rules on separation of the accommodation from drill<strong>in</strong>g <strong>and</strong><br />

production activities, subdivision of areas on offshore <strong>in</strong>stallations, arrangement of workplaces,<br />

common <strong>and</strong> treatment rooms on offshore <strong>in</strong>stallations, access routes as well as arrangement <strong>and</strong><br />

use of equipment.<br />

43 a. The M<strong>in</strong>ister for Climate <strong>and</strong> Energy can lay down rules specify<strong>in</strong>g that more specific<br />

<strong>in</strong>ternational decisions <strong>and</strong> technical specifications concern<strong>in</strong>g requirements <strong>to</strong> enterprises,<br />

<strong>in</strong>stallations, plants, products, etc, which are referred <strong>to</strong> <strong>in</strong> regulations issued pursuant <strong>to</strong> this act,<br />

are not published <strong>in</strong> the Danish Law Gazette.<br />

(2) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy shall lay down rules on how <strong>in</strong>formation about the<br />

<strong>in</strong>ternational decisions <strong>and</strong> technical specifications that are not published <strong>in</strong> ’the Danish Law<br />

Gazette, cf. subsection 1, can be acquired.<br />

44. The M<strong>in</strong>ister for Transport <strong>and</strong> Energy can lay down more specific rules on the fact that<br />

<strong>in</strong>ternational adoptions with<strong>in</strong> the scope of this Act <strong>and</strong> regulations laid down by recognised<br />

classification agencies, etc. shall apply irrespective of whether they are <strong>in</strong> Danish.<br />

Emergency Response<br />

45. For all offshore <strong>in</strong>stallations an emergency response shall be established <strong>to</strong> meet the<br />

consequences of accidents.<br />

(2) Before an offshore <strong>in</strong>stallation is put <strong>in</strong><strong>to</strong> use, a plan for the emergency response mentioned <strong>in</strong><br />

subsection (1) shall be made. The plan shall be co-ord<strong>in</strong>ated with the authorities’ rescue <strong>and</strong>


combat<strong>in</strong>g measures, cf. section 59 below, <strong>and</strong> <strong>to</strong> the greatest possible extent with emergency<br />

response plans prepared for other offshore <strong>in</strong>stallations.<br />

(3) With a view <strong>to</strong> ensur<strong>in</strong>g efficient rescue <strong>and</strong> combat<strong>in</strong>g efforts, the supervis<strong>in</strong>g authorities can<br />

order changes <strong>to</strong> the plan mentioned <strong>in</strong> subsection (2).<br />

(4) Operat<strong>in</strong>g companies produc<strong>in</strong>g hydrocarbons, <strong>and</strong> operat<strong>in</strong>g companies <strong>and</strong> other companies<br />

carry<strong>in</strong>g on transport of oil or natural gas through pipel<strong>in</strong>es between two or more offshore<br />

<strong>in</strong>stallations <strong>and</strong> l<strong>and</strong>-based <strong>in</strong>stallations shall make the necessary plann<strong>in</strong>g <strong>and</strong> take the necessary<br />

measures <strong>to</strong> secure own offshore <strong>in</strong>stallations, pipel<strong>in</strong>es, etc. as well as the natural gas <strong>and</strong> oil<br />

supply, respectively, <strong>in</strong> emergency situations <strong>and</strong> other extraord<strong>in</strong>ary situations.<br />

(5) The M<strong>in</strong>ister for Transport <strong>and</strong> Energy may lay down more specific rules on the emergency<br />

response measures mentioned <strong>in</strong> subsection (1), (2) <strong>and</strong> (4), <strong>in</strong>clud<strong>in</strong>g rules on co-ord<strong>in</strong>ation of the<br />

emergency response of the <strong>in</strong>dividual offshore <strong>in</strong>stallations with the authorities’ rescue <strong>and</strong><br />

combat<strong>in</strong>g measures <strong>and</strong> with the national cont<strong>in</strong>gency <strong>to</strong> safeguard the country’s energy supply.<br />

Health <strong>and</strong> Safety Activities<br />

46. The operat<strong>in</strong>g company shall ensure that the health <strong>and</strong> safety activities are organised <strong>in</strong><br />

collaboration with the employees.<br />

(2) The employees or their representatives shall be <strong>in</strong>volved <strong>in</strong> the plann<strong>in</strong>g of the performance of<br />

the work <strong>and</strong> plann<strong>in</strong>g of changes <strong>to</strong> the offshore <strong>in</strong>stallations as regards health <strong>and</strong> safety matters,<br />

<strong>in</strong>clud<strong>in</strong>g the related update of the health <strong>and</strong> safety case, cf. section 25(1) <strong>and</strong> (2) above.<br />

(3) The operat<strong>in</strong>g company shall defray the expenses connected with tasks performed by the<br />

employees <strong>in</strong> connection with the collaboration pursuant <strong>to</strong> subsection (1), <strong>in</strong>clud<strong>in</strong>g expenses<br />

connected with the related tra<strong>in</strong><strong>in</strong>g.<br />

47. On any permanently manned offshore <strong>in</strong>stallation the operat<strong>in</strong>g company shall ensure that<br />

personnel with the necessary health tra<strong>in</strong><strong>in</strong>g <strong>and</strong> competence form part of the mann<strong>in</strong>g with a view<br />

<strong>to</strong> attend<strong>in</strong>g <strong>to</strong> preventive <strong>and</strong> therapeutic health tasks.<br />

48. If the operat<strong>in</strong>g company does not have the necessary expert knowledge available <strong>to</strong> attend <strong>to</strong><br />

the health <strong>and</strong> safety work, the operat<strong>in</strong>g company shall procure external expert assistance with a<br />

view <strong>to</strong> ensur<strong>in</strong>g that the health <strong>and</strong> safety risks have been identified, assessed <strong>and</strong> reduced as much<br />

as reasonably practicable.<br />

49. The M<strong>in</strong>ister for Transport <strong>and</strong> Energy can lay down rules on the collaboration mentioned <strong>in</strong><br />

section 46(1), <strong>in</strong>clud<strong>in</strong>g rules on protection of employees attend<strong>in</strong>g <strong>to</strong> tasks <strong>in</strong> connection with this<br />

collaboration aga<strong>in</strong>st dismissal or other reduction of their employment conditions, on the conditions<br />

mentioned <strong>in</strong> section 47, <strong>in</strong>clud<strong>in</strong>g tra<strong>in</strong><strong>in</strong>g, <strong>and</strong> on expert assistance pursuant <strong>to</strong> section 48.<br />

Tra<strong>in</strong><strong>in</strong>g <strong>and</strong> Competence<br />

50. The operat<strong>in</strong>g company shall ensure that the employees, before the work is commenced, are<br />

sufficiently tra<strong>in</strong>ed <strong>to</strong> attend <strong>to</strong> the tasks accord<strong>in</strong>g <strong>to</strong> the emergency response plan of the<br />

<strong>in</strong>stallation, cf. section 45(2), <strong>and</strong> <strong>to</strong> attend <strong>to</strong> own safety <strong>in</strong> an emergency situation.<br />

(2) The employer shall ensure that the employees are adequately <strong>in</strong>structed, <strong>and</strong> that they have the<br />

competence ensur<strong>in</strong>g that their duties on the offshore <strong>in</strong>stallation can be performed fully justifiably<br />

<strong>in</strong> terms of health <strong>and</strong> safety, <strong>and</strong> that there is documentation available for this competence.<br />

(3) Persons under the age of 18 shall not be allowed <strong>to</strong> carry out work on offshore <strong>in</strong>stallations.


(4) The M<strong>in</strong>ister for Transport <strong>and</strong> Energy can lay down rules on tra<strong>in</strong><strong>in</strong>g pursuant <strong>to</strong> subsection<br />

(1) <strong>and</strong> on the necessary competence pursuant <strong>to</strong> subsection (2).<br />

Work<strong>in</strong>g Hours, Rest <strong>and</strong> Off-duty Periods<br />

51. The employer shall arrange the work so as <strong>to</strong> ensure that the average weekly work<strong>in</strong>g hours of<br />

the employee do not exceed 48 hours <strong>in</strong>clud<strong>in</strong>g overtime, calculated over a period of reference of<br />

12 months. Annual paid holidays <strong>and</strong> sick leave are not <strong>in</strong>cluded <strong>in</strong> the calculation.<br />

(2) The employer shall arrange the work so as <strong>to</strong> ensure that the employees have a rest period of at<br />

least 11 consecutive hours with<strong>in</strong> each 24-hour period.<br />

(3) In connection with the arrangement of the work the employer shall otherwise ensure,<br />

consider<strong>in</strong>g the duration of the work period, that the employee is given reasonable possibilities of<br />

rest <strong>and</strong> off-duty periods which are adjusted <strong>to</strong> the special conditions of the employees <strong>and</strong> the<br />

workplace with a view <strong>to</strong> reduc<strong>in</strong>g the health <strong>and</strong> safety risks connected with the work as much as<br />

reasonably practicable.<br />

(4) The M<strong>in</strong>ister for Transport <strong>and</strong> Energy shall lay down rules on deviation from the provisions<br />

<strong>in</strong> subsections (1) <strong>and</strong> (2), <strong>in</strong>clud<strong>in</strong>g agreements, rules on breaks dur<strong>in</strong>g the work<strong>in</strong>g day, rest <strong>and</strong><br />

off-duty periods, on-call work <strong>and</strong> night work.<br />

Registration <strong>and</strong> Report<strong>in</strong>g, etc.<br />

52. The M<strong>in</strong>ister for Transport <strong>and</strong> Energy can lay down rules specify<strong>in</strong>g that the operat<strong>in</strong>g<br />

company <strong>and</strong> the <strong>in</strong>dividual employer shall report accidents <strong>and</strong> other conditions that are important<br />

<strong>in</strong> terms of health <strong>and</strong> safety <strong>to</strong> the supervis<strong>in</strong>g authority <strong>and</strong> register conditions that are important<br />

<strong>in</strong> terms of health <strong>and</strong> safety.<br />

(2) The M<strong>in</strong>ister for Transport <strong>and</strong> Energy can lay down rules specify<strong>in</strong>g that doc<strong>to</strong>rs who notes<br />

or suspects that a person has been exposed <strong>to</strong> harmful effects <strong>in</strong> connection with their work shall<br />

<strong>in</strong>form the supervis<strong>in</strong>g authority or another authority with the consent of the person <strong>in</strong> question.<br />

Performance of the Work <strong>and</strong> Medical Exam<strong>in</strong>ations, etc.<br />

53. The employer shall ensure that health <strong>and</strong> safety risks connected with the performance of the<br />

work are identified, assessed <strong>and</strong> reduced as much as reasonably practicable <strong>and</strong> that threshold limit<br />

values established <strong>in</strong> rules laid down pursuant <strong>to</strong> this Act are complied with.<br />

54. Recognised norms <strong>and</strong> st<strong>and</strong>ards which are important <strong>in</strong> terms of health <strong>and</strong> safety <strong>to</strong> the<br />

performance of the work shall be observed.<br />

(2) Norms <strong>and</strong> st<strong>and</strong>ards accord<strong>in</strong>g <strong>to</strong> subsection (1) may be deviated from <strong>in</strong> cases where it is<br />

convenient for obta<strong>in</strong><strong>in</strong>g a higher level of health <strong>and</strong> safety or <strong>to</strong> be <strong>in</strong> keep<strong>in</strong>g with the technical<br />

development. It is presumed by the deviation that health <strong>and</strong> safety risks are reduced as much as<br />

reasonably practicable.<br />

55. The M<strong>in</strong>ister for Transport <strong>and</strong> Energy can lay down more specific rules on the performance<br />

of the work <strong>and</strong> on medical exam<strong>in</strong>ation of the employees before <strong>and</strong> dur<strong>in</strong>g the employment <strong>and</strong><br />

on exam<strong>in</strong>ations of occupational health, occupational hygiene or other health conditions.<br />

(2) The employer must ensure that medical exam<strong>in</strong>ations of the employees before <strong>and</strong> dur<strong>in</strong>g the<br />

employment <strong>and</strong> on exam<strong>in</strong>ations of occupational health, occupational hygiene or other health<br />

conditions can be carried out without any loss of <strong>in</strong>come of the employees <strong>and</strong> as far as possible<br />

dur<strong>in</strong>g work<strong>in</strong>g time. The expenses connected with the exam<strong>in</strong>ations cannot be imposed on the


employees. The M<strong>in</strong>ister for Transport <strong>and</strong> Energy can lay down more specific rules on the<br />

distribution of these expenses between the operat<strong>in</strong>g company <strong>and</strong> the contrac<strong>to</strong>r.<br />

Dismantl<strong>in</strong>g of Offshore Installations<br />

56. Dismantl<strong>in</strong>g of a fixed offshore <strong>in</strong>stallation shall be planned <strong>and</strong> carried out so as <strong>to</strong> ensure<br />

that the health <strong>and</strong> safety risks connected with the work are identified, assessed <strong>and</strong> reduced as<br />

much as reasonably practicable.<br />

57. The M<strong>in</strong>ister for Transport <strong>and</strong> Energy can lay down more specific rules on dismantl<strong>in</strong>g of<br />

fixed offshore <strong>in</strong>stallations.<br />

Part V<br />

Committees, etc.<br />

Offshore Safety Council<br />

58. The M<strong>in</strong>ister for Transport <strong>and</strong> Energy shall appo<strong>in</strong>t an Offshore Safety Council that is <strong>to</strong><br />

assist <strong>in</strong> lay<strong>in</strong>g down rules pursuant <strong>to</strong> this Act, follow the technical <strong>and</strong> social development<br />

concern<strong>in</strong>g offshore <strong>in</strong>stallations <strong>and</strong> discuss other conditions covered by this Act.<br />

(2) Before rules are laid down pursuant <strong>to</strong> this Act, a statement from the Offshore Safety Council<br />

shall be obta<strong>in</strong>ed.<br />

(3) The Offshore Safety Council shall consist of representatives from the two sides of <strong>in</strong>dustry,<br />

the Danish Energy Authority <strong>and</strong> other relevant authorities, <strong>in</strong>clud<strong>in</strong>g the Danish Maritime<br />

Authority, the Danish Work<strong>in</strong>g Environment Authority, the Danish Environmental Protection<br />

Agency <strong>and</strong> the Civil Aviation Adm<strong>in</strong>istration.<br />

(4) The M<strong>in</strong>ister for Transport <strong>and</strong> Energy shall decide which organisations <strong>and</strong> authorities, apart<br />

from the organisations <strong>and</strong> authorities mentioned <strong>in</strong> subsection (3) above, are <strong>to</strong> be represented <strong>in</strong><br />

the Offshore Safety Council <strong>and</strong> shall lay down the order of bus<strong>in</strong>ess for the council.<br />

The Authorities’ Emergency Response Committee<br />

59. The M<strong>in</strong>ister for Transport <strong>and</strong> Energy shall appo<strong>in</strong>t an Emergency Response Committee<br />

whose duty is <strong>to</strong> co-ord<strong>in</strong>ate the efforts of the authorities <strong>in</strong> accident situations on offshore<br />

<strong>in</strong>stallations. The members of the Emergency Response Committee shall moni<strong>to</strong>r the measures<br />

taken by those responsible for the offshore <strong>in</strong>stallations <strong>and</strong> co-ord<strong>in</strong>ate the rescue <strong>and</strong> combat<strong>in</strong>g<br />

measures taken by the authorities, cf. section 45(2).<br />

( 2) The M<strong>in</strong>ister for Transport <strong>and</strong> Energy shall lay down procedures for the Emergency<br />

Response Committee.<br />

Accident Investigation Board<br />

60. The M<strong>in</strong>ister for Transport <strong>and</strong> Energy shall appo<strong>in</strong>t an Accident Investigation Board whose<br />

task is <strong>to</strong> <strong>in</strong>vestigate major <strong>in</strong>cidents on offshore <strong>in</strong>stallations that have caused serious personal<br />

<strong>in</strong>jury or damage <strong>to</strong> facilities.<br />

( 2) The M<strong>in</strong>ister for Transport <strong>and</strong> Energy can order the Accident Investigation Board <strong>to</strong><br />

<strong>in</strong>vestigate <strong>in</strong>cidents that are assumed <strong>to</strong> be of a health <strong>and</strong> safety <strong>in</strong>terest <strong>in</strong> connection with the use<br />

of an offshore <strong>in</strong>stallation, <strong>and</strong> can lay down more specific rules for the activities of the Accident


Investigation Board, <strong>in</strong>clud<strong>in</strong>g which rights <strong>and</strong> duties the Accident Investigation Board has <strong>in</strong><br />

connection with <strong>in</strong>vestigations of the <strong>in</strong>cidents covered by subsection (1).<br />

Part VI<br />

Supervision, etc.<br />

61. The M<strong>in</strong>ister for Transport <strong>and</strong> Energy shall supervise that this Act <strong>and</strong> the rules laid down<br />

pursuant <strong>to</strong> this Act are observed.<br />

(2) The M<strong>in</strong>ister for Transport <strong>and</strong> Energy shall not supervise conditions covered by section<br />

13(3)-(5) <strong>and</strong> sections 14 <strong>and</strong> 15.<br />

(3) The M<strong>in</strong>ister for Transport <strong>and</strong> Energy can authorise the Danish Energy Authority <strong>and</strong> other<br />

government authorities, designated the supervis<strong>in</strong>g authority, <strong>to</strong> exercise powers attributed by law<br />

<strong>to</strong> the M<strong>in</strong>ister for Transport <strong>and</strong> Energy.<br />

(4) The M<strong>in</strong>ister for Transport <strong>and</strong> Energy can decide that the tasks of the supervis<strong>in</strong>g authority<br />

mentioned <strong>in</strong> subsection (3) <strong>to</strong> a more specific extent are transferred <strong>to</strong> private entities. The<br />

supervis<strong>in</strong>g authority shall supervise such tasks.<br />

62. Anybody on whom duties have been imposed pursuant <strong>to</strong> this Act shall, as requested, give the<br />

supervis<strong>in</strong>g authority, the Emergency Response Committee <strong>and</strong> the Accident Investigation Board<br />

the <strong>in</strong>formation that is necessary for performance of their activities. This also applies <strong>to</strong> persons<br />

who act on behalf of those on whom duties have been imposed as prescribed by law.<br />

(2) Anybody on whom duties have been imposed pursuant <strong>to</strong> this Act shall render the supervis<strong>in</strong>g<br />

authority, Emergency Response Committee <strong>and</strong> the Accident Investigation Board all necessary<br />

assistance <strong>in</strong> connection with their <strong>in</strong>quiries.<br />

(3) The supervis<strong>in</strong>g authority, the Emergency Response Committee <strong>and</strong> the Accident<br />

Investigation Board shall at any time without a Court order on proof of identity, <strong>to</strong> the extent<br />

necessary, have access <strong>to</strong> all parts of the company except for private parts of the company’s<br />

build<strong>in</strong>gs.<br />

63. The M<strong>in</strong>ister for Transport <strong>and</strong> Energy can lay down rules specify<strong>in</strong>g that the duty of the<br />

supervis<strong>in</strong>g authority is not <strong>to</strong> ensure observance of rules laid down pursuant <strong>to</strong> this Act when a<br />

similar duty falls under a documented collective agreement where the parties <strong>to</strong> the agreement is a<br />

national employers’ association or a s<strong>in</strong>gle company with<strong>in</strong> the offshore <strong>in</strong>dustry on the one side<br />

<strong>and</strong> a national trade union on the other side.<br />

(2) Notwithst<strong>and</strong><strong>in</strong>g subsection (1) above the duty of the supervis<strong>in</strong>g authority is <strong>to</strong> ensure<br />

observance of rules if the <strong>in</strong>dustrial party <strong>to</strong> the agreement does not <strong>in</strong>tend <strong>to</strong> <strong>in</strong>itiate an <strong>in</strong>dustrial<br />

procedure for <strong>in</strong>fr<strong>in</strong>gement of obligations that are subject <strong>to</strong> a collective agreement.<br />

(3) Notwithst<strong>and</strong><strong>in</strong>g subsection (1) the duty of the supervis<strong>in</strong>g authority is <strong>to</strong> ensure observance of<br />

rules <strong>to</strong>wards employees who are not subject <strong>to</strong> a collective agreement.<br />

(4) Subsections (1)-(3) do not apply <strong>to</strong> agreements on the right <strong>to</strong> leave the workplace <strong>and</strong> <strong>to</strong><br />

agreements on arrangement of work<strong>in</strong>g hours.<br />

64. The supervis<strong>in</strong>g authority can, possibly on specified terms, order that conditions that are<br />

contrary <strong>to</strong> this Act or rules or decisions pursuant <strong>to</strong> this Act are put <strong>in</strong> order immediately or with<strong>in</strong><br />

a specified time-limit.<br />

(2) If the supervis<strong>in</strong>g authority deems it necessary <strong>to</strong> avert an imm<strong>in</strong>ent, considerable danger of<br />

the health <strong>and</strong> safety of employees or others, it may order that such danger is immediately<br />

countered, <strong>in</strong>clud<strong>in</strong>g s<strong>to</strong>ppage of work


65. The licensee, opera<strong>to</strong>r, operat<strong>in</strong>g company <strong>and</strong> other companies shall pay the expenses of the<br />

authorities connected with the tasks of the authorities pursuant <strong>to</strong> this Act.<br />

(2) The M<strong>in</strong>ister for Transport <strong>and</strong> Energy shall lay down rules on payment of the expenses of the<br />

authorities pursuant <strong>to</strong> subsection (1).<br />

66. By electronic correspondence provided with a digital signature <strong>to</strong> the supervis<strong>in</strong>g authority,<br />

such digital signature shall comply with OCES st<strong>and</strong>ard (public certificates for electronic service)<br />

or with another st<strong>and</strong>ard accepted by the supervis<strong>in</strong>g authority.<br />

66 a. The M<strong>in</strong>ister for Transport <strong>and</strong> Energy conducts—as part of his supervisory activities after<br />

this act—supervision with the compliance of the Act on Smokeless Environments. The M<strong>in</strong>ister for<br />

Transport <strong>and</strong> Energy can, possibly on specified terms, order that conditions that are contrary <strong>to</strong> the<br />

act are put <strong>in</strong> order immediately or with<strong>in</strong> a specified time-limit.<br />

(2). Section 61(3) <strong>and</strong> Sections 62 <strong>and</strong> 65 <strong>and</strong> regulations that are issued pursuant <strong>to</strong> them are<br />

applied <strong>in</strong> the same way.<br />

(3). The M<strong>in</strong>ister for Transport <strong>and</strong> Energy may—upon negotiation with the M<strong>in</strong>ister for<br />

Domestic Affairs <strong>and</strong> Health—lay down rules on conduct<strong>in</strong>g the supervision.<br />

(4). Compla<strong>in</strong>ts about decisions made by the M<strong>in</strong>ister for Transport <strong>and</strong> Energy or by whom that<br />

is empowered here<strong>to</strong> <strong>and</strong> related <strong>to</strong> subsection 1 may be brought before the Energy Board of<br />

Appeal. Section 67(2) <strong>and</strong> (3), subsection (4-ii) <strong>and</strong> subsection (6) <strong>and</strong> Section 68 are applied<br />

likewise.<br />

Part VII<br />

Compla<strong>in</strong>ts Procedure<br />

67. The Energy Board of Appeal shall consider compla<strong>in</strong>ts about decisions made by the M<strong>in</strong>ister<br />

for Transport <strong>and</strong> Energy pursuant <strong>to</strong> this Act or rules laid down pursuant <strong>to</strong> this Act.<br />

(2) Decisions made by an <strong>in</strong>stitution under the M<strong>in</strong>istry of Transport <strong>and</strong> Energy, another<br />

authority or private persons, <strong>to</strong> whom the M<strong>in</strong>ister accord<strong>in</strong>g <strong>to</strong> section 61 above has transferred its<br />

powers pursuant <strong>to</strong> this Act, cannot be brought before an adm<strong>in</strong>istrative authority other than the<br />

Energy Board of Appeal mentioned <strong>in</strong> subsection (1) above.<br />

(3) The compla<strong>in</strong>t shall be lodged <strong>in</strong> writ<strong>in</strong>g <strong>to</strong> the Energy Board of Appeal with<strong>in</strong> four weeks<br />

from the time when the decision has been communicated <strong>to</strong> the person <strong>in</strong> question.<br />

(4) The M<strong>in</strong>ister for Transport <strong>and</strong> Energy can lay down rules on<br />

i) the access <strong>to</strong> compla<strong>in</strong> about decisions that, pursuant <strong>to</strong> this Act or rules issued pursuant <strong>to</strong> this<br />

Act, are made by the M<strong>in</strong>ister for Transport <strong>and</strong> Energy, <strong>and</strong><br />

ii) payment of fees for lodg<strong>in</strong>g a compla<strong>in</strong>t with the Energy Board of Appeal.<br />

(5) The authority mentioned <strong>in</strong> subsection (4)(i) shall not <strong>in</strong>clude rules on prevention of a<br />

compla<strong>in</strong>t about decisions made by private persons, cf. section 61(4).<br />

(6) In connection with decisions made pursuant <strong>to</strong> this Act or rules laid down pursuant <strong>to</strong> this Act<br />

representatives of the Energy Board of Appeal, who are appo<strong>in</strong>ted upon recommendation from the<br />

Confederation of Danish Industries <strong>and</strong> the Agricultural Council of <strong>Denmark</strong>, are replaced by one<br />

member represent<strong>in</strong>g the trade unions <strong>in</strong> the Offshore Safety Council, <strong>and</strong> one member represent<strong>in</strong>g<br />

the employers’ organisations <strong>in</strong> the Offshore Safety Council. The M<strong>in</strong>ister for Transport <strong>and</strong> Energy<br />

shall appo<strong>in</strong>t the members <strong>in</strong> question. Appo<strong>in</strong>tment of the two members represent<strong>in</strong>g the<br />

employers’ organisations <strong>and</strong> trade unions respectively <strong>in</strong> the Offshore Safety Council shall take<br />

place upon recommendation from the respective organisations.


68. Actions for review of decisions made by the Energy Board of Appeal pursuant <strong>to</strong> this Act or<br />

rules issued pursuant <strong>to</strong> this Act shall be brought six month after the decision has been<br />

communicated <strong>to</strong> the company or person <strong>in</strong> question at the latest. If the decision has been published,<br />

the time-limit always counts from the date of publication.<br />

Part VIII<br />

Civil Law Rules for Offshore Installations<br />

69. By apply<strong>in</strong>g the rules <strong>in</strong> Part 9 of the Merchant Shipp<strong>in</strong>g Act on mobile offshore <strong>in</strong>stallations<br />

dur<strong>in</strong>g exploration or extraction activities, the shipowner shall be liable when the liability is limited,<br />

regardless of the size of the <strong>in</strong>stallation by up <strong>to</strong> 50 million special draw<strong>in</strong>g rights (SDR). For <strong>in</strong>jury<br />

<strong>to</strong> a person this amount is <strong>in</strong>creased by 30 million SDRs.<br />

(2) Compensation for pollution damage as a result of exploration or extraction activities is not<br />

secured by maritime lien pursuant <strong>to</strong> Part 3 of the Merchant Shipp<strong>in</strong>g Act.<br />

Part IX<br />

Penalties<br />

70. The licensee, owner of offshore <strong>in</strong>stallations under section 2(1)(i)(c), operat<strong>in</strong>g company,<br />

contrac<strong>to</strong>r, employer, company manager <strong>and</strong> offshore <strong>in</strong>stallation manager who do not take care <strong>to</strong><br />

i) identify <strong>and</strong> assess the risks pursuant <strong>to</strong> section 5(1), (3) <strong>and</strong> (4), section 8(4), section 10(1),<br />

section 11(2), section 33(1) <strong>and</strong> (3), section 34(1), sections 35-36 or section 53,<br />

ii) supervise pursuant <strong>to</strong> section 6(1), section 7 second sentence, section 8(2) second sentence,<br />

section 10(2), section 19(3) or section 20(3), or<br />

iii) give <strong>in</strong>structions or tra<strong>in</strong><strong>in</strong>g pursuant <strong>to</strong> section 7 first sentence, section 8(2) first sentence,<br />

section 9, first sentence, or section 10(3), second sentence,<br />

shall be f<strong>in</strong>ed or punished with imprisonment for up <strong>to</strong> one year.<br />

(2) The supervisor or employees who do not assist <strong>in</strong> identify<strong>in</strong>g <strong>and</strong> assess<strong>in</strong>g the health <strong>and</strong><br />

safety risks pursuant <strong>to</strong> section 12 or 13 shall be f<strong>in</strong>ed or punished with imprisonment for up <strong>to</strong> one<br />

year.<br />

(3) Anyone who<br />

i) <strong>in</strong>fr<strong>in</strong>ges section 5(2) <strong>and</strong> (5), section 8(1), (3) <strong>and</strong> (5), section 10(3) first sentence, <strong>and</strong> (5),<br />

section 11(1), (3) <strong>and</strong> (4), section 12(1) second sentence, <strong>and</strong> (2) <strong>and</strong> (3), section 13(1) <strong>and</strong> (2),<br />

section 16, section 18(1)-(5), section 19(1) <strong>and</strong> (2), section 20(1) <strong>and</strong> (2), sections 23-25,<br />

sections 27-31, section 33(2), section 45(4), section 46(1) <strong>and</strong> (3), section 47 or section 50(1),<br />

ii) has work carried out contrary <strong>to</strong> section 50(3), or section 51(1)-(3), is <strong>in</strong> charge of or supervises<br />

such work or<br />

iii) does not comply with orders pursuant <strong>to</strong> section 45(3), or section 64.<br />

shall be f<strong>in</strong>ed or punished with imprisonment for up <strong>to</strong> one year.<br />

(4) The maximum imprisonment is two years if the <strong>in</strong>fr<strong>in</strong>gement has been made <strong>in</strong>tentionally or<br />

by gross negligence.<br />

(5) In connection with met<strong>in</strong>g out the penalty pursuant <strong>to</strong> subsection (3)(i), it shall, <strong>to</strong> the extent<br />

that the employer <strong>and</strong> the operat<strong>in</strong>g company have fulfilled their obligations pursuant <strong>to</strong> chapter 2<br />

<strong>and</strong> 4, be regarded as aggravat<strong>in</strong>g circumstances for employees, if these <strong>in</strong>tentionally or by gross<br />

negligence <strong>in</strong>fr<strong>in</strong>ge legislation requirements on<br />

i) the use of personal protective equipment,<br />

ii) the use of extraction facilities,<br />

iii) the use of protection equipment or safety precautions,


iv) the use of justifiable work<strong>in</strong>g methods or<br />

v) crane <strong>and</strong> forklift certificates.<br />

(6) In connection with met<strong>in</strong>g out the penalty pursuant <strong>to</strong> subsections (1)-(4)—outside the cases<br />

mentioned <strong>in</strong> subsection (5)—the follow<strong>in</strong>g shall be regarded as aggravat<strong>in</strong>g circumstances:<br />

i) that the <strong>in</strong>fr<strong>in</strong>gement has resulted <strong>in</strong> <strong>in</strong>jury <strong>to</strong> life <strong>and</strong> health or caused danger of this,<br />

ii) that an order pursuant <strong>to</strong> section 64 has been previously made for the same th<strong>in</strong>g or similar<br />

conditions, or<br />

iii) that <strong>in</strong> connection with the <strong>in</strong>fr<strong>in</strong>gement a f<strong>in</strong>ancial advantage has been obta<strong>in</strong>ed or <strong>in</strong>tended <strong>to</strong><br />

be obta<strong>in</strong>ed for the person himself or others.<br />

(7) It shall be regarded as a special aggravat<strong>in</strong>g circumstances if, for persons under the age of 18,<br />

there has been <strong>in</strong>jury <strong>to</strong> life <strong>and</strong> health or if danger of this has been evoked, cf. subsection (6)(i).<br />

(8) If no profits are seized, which have been obta<strong>in</strong>ed by <strong>in</strong>fr<strong>in</strong>gement, the met<strong>in</strong>g out of the f<strong>in</strong>e,<br />

<strong>in</strong>clud<strong>in</strong>g additional f<strong>in</strong>e, shall take <strong>in</strong><strong>to</strong> special consideration the size of a f<strong>in</strong>ancial advantage<br />

obta<strong>in</strong>ed or <strong>in</strong>tended <strong>to</strong> be obta<strong>in</strong>ed.<br />

(9) The limitation period for crim<strong>in</strong>al liability is five years for <strong>in</strong>fr<strong>in</strong>gement of section 18(1)-(5)<br />

<strong>and</strong> rules issued pursuant <strong>to</strong> section 18(6).<br />

(10) Unless a higher penalty is applicable pursuant <strong>to</strong> other legislation, any person shall be f<strong>in</strong>ed<br />

who violates the provisions <strong>in</strong> Regulation (EC) No 336/2006 of the European Parliament <strong>and</strong> of the<br />

Council of 15 February 2006 on the Implementation of the International Safety Management Code<br />

with<strong>in</strong> the Community <strong>and</strong> repeal<strong>in</strong>g Council Regulation (EC) No 3051/95.<br />

71. The <strong>in</strong>dividual employer shall be punishable by a f<strong>in</strong>e, even though the <strong>in</strong>fr<strong>in</strong>gement cannot<br />

be considered <strong>in</strong>tentional or grossly negligent, cf. however subsection (3), if the employer<br />

i) does not take care <strong>to</strong> identify <strong>and</strong> assess risks pursuant <strong>to</strong> section 10(1) or section 35,<br />

ii) does not take care <strong>to</strong> supervise pursuant <strong>to</strong> section 10(2),<br />

iii) has work carried out contrary <strong>to</strong> section 50(3) or section 51(1), or<br />

iv) does not comply with orders made pursuant <strong>to</strong> section 45(3) or section 64.<br />

(2) A condition for the <strong>in</strong>dividual employer be<strong>in</strong>g punishable by a f<strong>in</strong>e pursuant <strong>to</strong> subsection (1)<br />

above is that one or more persons attached <strong>to</strong> the company or the company as such can be blamed<br />

for the <strong>in</strong>fr<strong>in</strong>gement. No imprisonment shall be determ<strong>in</strong>ed <strong>in</strong> lieu of a f<strong>in</strong>e.<br />

(3) To the extent that the employer has fulfilled his obligations pursuant <strong>to</strong> sections 10 <strong>and</strong> 35, the<br />

employer cannot be punishable by a f<strong>in</strong>e if employees <strong>in</strong>fr<strong>in</strong>ge legislation requirements on<br />

i) the use of personal protective equipment,<br />

ii) the use of extraction facilities,<br />

iii) the use of protection equipment or safety precautions,<br />

iv) the use of justifiable work<strong>in</strong>g methods or<br />

v) crane <strong>and</strong> forklift certificates.<br />

72. In rules laid down pursuant <strong>to</strong> this Act, a penalty can be fixed <strong>in</strong> the form of a f<strong>in</strong>e for<br />

<strong>in</strong>fr<strong>in</strong>gement of the rules <strong>and</strong> for lack of non-compliance of orders or prohibitions pursuant <strong>to</strong> the<br />

rules. Infr<strong>in</strong>gement of rules that put regulations <strong>in</strong><strong>to</strong> force, which are not written <strong>in</strong> Danish, cf.<br />

section 44, shall not be punishable. Furthermore, it can be determ<strong>in</strong>ed that the <strong>in</strong>dividual employer,<br />

who <strong>in</strong>fr<strong>in</strong>ges provisions, orders or prohibitions as stated, shall be punishable by a f<strong>in</strong>e, even though<br />

he cannot be blamed for the <strong>in</strong>fr<strong>in</strong>gement as <strong>in</strong>tentional or grossly negligent. Punishment by f<strong>in</strong>e is<br />

conditional on the <strong>in</strong>fr<strong>in</strong>gement be<strong>in</strong>g blamed one or more persons attached <strong>to</strong> the company or the<br />

company as such. No imprisonment shall be determ<strong>in</strong>ed <strong>in</strong> lieu of a f<strong>in</strong>e


(2) Punishment by f<strong>in</strong>e pursuant <strong>to</strong> subsection (1), second sentence, <strong>and</strong> section 71, cannot be<br />

imposed on company managers, cf. section 10(6).<br />

73. Crim<strong>in</strong>al liability may be imposed on limited liability companies, etc. (legal persons) pursuant<br />

<strong>to</strong> the rules set out <strong>in</strong> Part V of the Danish Crim<strong>in</strong>al Code. Section 71(3) is similarly applicable.<br />

Part X<br />

Com<strong>in</strong>g <strong>in</strong><strong>to</strong> Force, etc.<br />

74. This Act shall come <strong>in</strong><strong>to</strong> force on 1 July <strong>in</strong> 2006 1 . At the same time Act No. 292 of 10 June<br />

1981 on Certa<strong>in</strong> Offshore Installation is repealed, except for section 8(1)-(3), section 9(2), (4) <strong>and</strong><br />

(5), sections 12 <strong>and</strong> 13 <strong>and</strong> section 21(1)(iv) as regards risk of pollution of the mar<strong>in</strong>e environment.<br />

(2) The Work<strong>in</strong>g Environment Act shall not apply <strong>to</strong> <strong>in</strong>stallations covered by this Act.<br />

(3) The M<strong>in</strong>ister for Transport <strong>and</strong> Energy can decide that rules laid down pursuant <strong>to</strong> Act No.<br />

292 of 10 June 1981 on Certa<strong>in</strong> Offshore Installations <strong>and</strong> The Work<strong>in</strong>g Environment Act, which<br />

concern conditions covered by this Act, shall rema<strong>in</strong> <strong>in</strong> force with certa<strong>in</strong> amendments, until they<br />

are replaced by provisions laid down pursuant <strong>to</strong> this or another Act <strong>and</strong> that compla<strong>in</strong>ts about<br />

decisions made pursuant <strong>to</strong> these acts shall be brought before the Energy Board of Appeal.<br />

75. Permits <strong>and</strong> approvals covered by this Act, <strong>and</strong> which are granted before the com<strong>in</strong>g <strong>in</strong><strong>to</strong> force<br />

of this Act, shall rema<strong>in</strong> valid until they must be renewed, are annulled or expire. Renewed permits<br />

<strong>and</strong> approval shall then be granted pursuant <strong>to</strong> this Act.<br />

(2) When approval of mann<strong>in</strong>g <strong>and</strong> organisation plans as well as emergency response plans<br />

granted before the com<strong>in</strong>g <strong>in</strong><strong>to</strong> force of this Act are <strong>to</strong> be renewed, the conditions that appear from<br />

the plan shall be <strong>in</strong>corporated <strong>in</strong> the health <strong>and</strong> safety cases, cf. sections 23 <strong>and</strong> 24.<br />

76. Safety cases <strong>and</strong> other evaluations of health <strong>and</strong> safety matters prepared before the com<strong>in</strong>g<br />

<strong>in</strong><strong>to</strong> force of this Act shall have fulfilled, wholly or partly, the requirements for health <strong>and</strong> safety<br />

cases laid down <strong>in</strong> this Act or <strong>in</strong> rules issued pursuant <strong>to</strong> this Act by the time of renewal of permits<br />

<strong>and</strong> approvals, cf. section 75(1) or with<strong>in</strong> a specified time-limit fixed after the com<strong>in</strong>g <strong>in</strong><strong>to</strong> force of<br />

this Act.<br />

(2) Management systems established before the com<strong>in</strong>g <strong>in</strong><strong>to</strong> force of this Act shall have fulfilled,<br />

wholly or partly, the requirements for health <strong>and</strong> safety <strong>and</strong> management systems <strong>in</strong> this Act or <strong>in</strong><br />

rules laid down pursuant <strong>to</strong> this Act by the time of renewal of permits <strong>and</strong> approvals or with<strong>in</strong> a<br />

specified time-limit fixed after the com<strong>in</strong>g <strong>in</strong><strong>to</strong> force of this Act.<br />

(3) The M<strong>in</strong>ister for Transport <strong>and</strong> Energy shall lay down more specific rules on the conditions<br />

mentioned <strong>in</strong> subsections (1) <strong>and</strong> (2) above.<br />

77. This Act shall not apply <strong>to</strong> the Faroe Isl<strong>and</strong>s <strong>and</strong> Greenl<strong>and</strong>.<br />

1 Act no 107 came <strong>in</strong><strong>to</strong> force on 9 February 2007.<br />

2 Act No 107 was given on 7 February 2007.<br />

Given at Christiansborg Castle, 21 December 2005 2<br />

Under Our Royal H<strong>and</strong> <strong>and</strong> Seal<br />

Margrethe R.<br />

/Flemm<strong>in</strong>g Hansen


i The Act conta<strong>in</strong>s provisions implement<strong>in</strong>g parts of Council Directive 89/391/EEC of 12 June 1989 on the Introduction of Measures <strong>to</strong> encourage<br />

Improvements <strong>in</strong> the Safety <strong>and</strong> Health of Workers at Work (OJ 1989 No. L 183, p. 1), parts of Council Directive 92/91/EEC of 3 November 1992<br />

concern<strong>in</strong>g M<strong>in</strong>imum Requirements for Improv<strong>in</strong>g the Safety <strong>and</strong> Health Protection of Workers <strong>in</strong> the M<strong>in</strong>eral-extract<strong>in</strong>g Industries dur<strong>in</strong>g Drill<strong>in</strong>g<br />

(eleventh special directive pursuant <strong>to</strong> Article 16(1), <strong>in</strong> Directive 89/391/EEC) (OJ 1992 No. L 348, p. 9) <strong>and</strong> parts of European Parliament <strong>and</strong><br />

Council Directive 2003/88/EC of 4 November 2003 concern<strong>in</strong>g Certa<strong>in</strong> Aspects of the Organisation of Work<strong>in</strong>g Time (OJ 2003 No. L 299, p. 9).<br />

Directive 1989/391/EEC Celex no. 31989L0391<br />

Directive 1992/91/EEC Celex no. 31992L0091<br />

Directive 2003/88/EC Celex no. 32003L0088


Unofficial translation of Consolidated Act No. 957 of 9 September 2011. In case of discrepancy, the orig<strong>in</strong>al Danish<br />

text shall prevail.<br />

Consolidated Act on the Establishment <strong>and</strong> Use of a Pipel<strong>in</strong>e for Transport<br />

of Crude Oil <strong>and</strong> Condensate<br />

The Act on the Establishment <strong>and</strong> Use of a Pipel<strong>in</strong>e for Transport of Crude Oil <strong>and</strong> Condensate,<br />

see Consolidated Act No. 1157 of 6 Oc<strong>to</strong>ber 2010, as amended by section 52 of Act No. 718 of 25<br />

June 2010, is hereby promulgated.<br />

1.-(1) DONG Oil Pipe A/S, a subsidiary of DONG Energy A/S, is responsible for the operation<br />

of the pipel<strong>in</strong>e, complete with pump<strong>in</strong>g <strong>and</strong> term<strong>in</strong>al facilities, for the transport of crude oil <strong>and</strong><br />

condensate <strong>and</strong> <strong>in</strong>stalled between the Danish cont<strong>in</strong>ental shelf area <strong>in</strong> the North Sea <strong>and</strong> Fredericia.<br />

(2) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may permit DONG Oil Pipe A/S, <strong>in</strong> conjunction with the<br />

activities referred <strong>to</strong> <strong>in</strong> subsection (1) above, <strong>to</strong> establish <strong>and</strong> operate facilities <strong>to</strong> separate the crude<br />

oil <strong>and</strong> condensate transported through the pipel<strong>in</strong>e. The grant<strong>in</strong>g of a permit assumes that one or<br />

more of the exist<strong>in</strong>g or future users of the pipel<strong>in</strong>e wish <strong>to</strong> have their crude oil <strong>and</strong> condensate<br />

separated. A permit will be granted on the basis of an application, <strong>to</strong> be submitted <strong>in</strong> accordance<br />

with section 2a below.<br />

(3) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may lay down rules <strong>and</strong> regulations regard<strong>in</strong>g the<br />

operation of the pipel<strong>in</strong>e <strong>and</strong> separation facilities, etc., <strong>and</strong> shall supervise the activities through the<br />

Danish Energy Agency.<br />

(4) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may order applicants under this Act, owners <strong>and</strong> users of<br />

the pipel<strong>in</strong>e or separation facilities <strong>and</strong> any party with a licence share that has been granted an<br />

exemption from the connection obligation pursuant <strong>to</strong> section 2(3) <strong>to</strong> pay the expenses associated<br />

with public authority case h<strong>and</strong>l<strong>in</strong>g pursuant <strong>to</strong> this Act, <strong>and</strong> the M<strong>in</strong>ister may lay down rules <strong>and</strong><br />

regulations <strong>in</strong> this respect.<br />

2.-(1) Any party produc<strong>in</strong>g liquid hydrocarbons <strong>in</strong> the Danish cont<strong>in</strong>ental shelf area of the North<br />

Sea shall connect its production facilities <strong>to</strong> the ma<strong>in</strong> pipel<strong>in</strong>e or <strong>to</strong> a branch pipel<strong>in</strong>e <strong>in</strong>stalled by<br />

DONG Oil Pipe A/S, <strong>and</strong> shall establish such <strong>in</strong>stallations <strong>and</strong> pipel<strong>in</strong>es as are required for<br />

connection <strong>to</strong> a connection po<strong>in</strong>t specified by DONG Oil Pipe A/S. Any crude oil <strong>and</strong> condensate<br />

produced from the Danish cont<strong>in</strong>ental shelf <strong>in</strong> the North Sea <strong>and</strong> <strong>in</strong>tended for ref<strong>in</strong><strong>in</strong>g or sale <strong>in</strong><br />

<strong>Denmark</strong> shall be transported through the pipel<strong>in</strong>e.<br />

(2) Subject <strong>to</strong> such limitations as are a consequence of the capacity of the pipel<strong>in</strong>e, DONG Oil<br />

Pipe A/S shall transport any crude oil <strong>and</strong> condensate produced <strong>in</strong> the Danish cont<strong>in</strong>ental shelf area<br />

of the North Sea through the pipel<strong>in</strong>e. DONG Oil Pipe A/S shall ma<strong>in</strong>ta<strong>in</strong> <strong>and</strong> operate such<br />

facilities <strong>and</strong> <strong>in</strong>stall such branch pipes as are necessitated by this obligation.<br />

(3) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may grant exemptions from the obligations set out <strong>in</strong><br />

subsections (1) <strong>and</strong> (2) above <strong>in</strong> cases where the M<strong>in</strong>ister deems transport through the pipel<strong>in</strong>e <strong>to</strong> be<br />

uneconomic or <strong>in</strong>expedient.<br />

(4) An exemption from the obligations set out <strong>in</strong> subsection (1) above is subject <strong>to</strong> the condition<br />

that a fee be paid <strong>to</strong> the Danish state amount<strong>in</strong>g <strong>to</strong> 5 per cent of the value of any crude oil <strong>and</strong><br />

condensate comprised by the exemption. The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may lay down more<br />

detailed rules <strong>and</strong> regulations regard<strong>in</strong>g the calculation <strong>and</strong> payment of the fee.<br />

(5) DONG Oil Pipe A/S shall agree with the users on the terms <strong>and</strong> conditions regard<strong>in</strong>g<br />

connection, transport <strong>and</strong> possible separation. If the quality of the <strong>in</strong>dividual users’ crude oil <strong>and</strong><br />

condensate changes dur<strong>in</strong>g transport <strong>and</strong> any process<strong>in</strong>g <strong>in</strong> separation facilities associated with<br />

1


transport through the pipel<strong>in</strong>e, DONG Oil Pipe A/S <strong>and</strong> the users may agree on terms <strong>and</strong><br />

conditions regard<strong>in</strong>g volume or monetary adjustments among the users. In case of any<br />

disagreement, the terms <strong>and</strong> conditions shall be laid down by the M<strong>in</strong>ister for Climate <strong>and</strong> Energy.<br />

(6) Agreements made <strong>in</strong> pursuance of subclause (5) above shall be subject <strong>to</strong> approval by the<br />

M<strong>in</strong>ister for Climate <strong>and</strong> Energy. The M<strong>in</strong>ister may lay down terms <strong>and</strong> conditions for the approval.<br />

2a.-(1) An application for a permit pursuant <strong>to</strong> section 1(2) above shall be accompanied by a plan<br />

for the separation facilities <strong>and</strong> their operation. The permit shall be granted by the M<strong>in</strong>ister for<br />

Climate <strong>and</strong> Energy, see section 1(2) above, before DONG Oil Pipe A/S <strong>in</strong>vites tenders for the<br />

establishment <strong>and</strong> operation of the facilities. The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may lay down<br />

terms <strong>and</strong> conditions for the permit.<br />

(2) Contrac<strong>to</strong>rs for establish<strong>in</strong>g <strong>and</strong> operat<strong>in</strong>g the facilities shall be selected on the basis of a<br />

tender procedure accord<strong>in</strong>g <strong>to</strong> the same rules as those laid down <strong>in</strong> the EU Utilities Procurement<br />

Directive.<br />

(3) A permit pursuant <strong>to</strong> section 1(2) above may only be granted if DONG Oil Pipe A/S is<br />

deemed <strong>to</strong> have the necessary technical expertise <strong>and</strong> f<strong>in</strong>ancial capacity <strong>to</strong> operate the separation<br />

facilities. DONG Oil Pipe A/S shall be able <strong>to</strong> document at any time that it has the necessary<br />

technical expertise.<br />

(4) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may withdraw a permit granted pursuant <strong>to</strong> section 1(2)<br />

if DONG Oil Pipe A/S is subjected <strong>to</strong> restructur<strong>in</strong>g, files a petition <strong>to</strong> commence <strong>in</strong>solvency<br />

proceed<strong>in</strong>gs or is declared <strong>in</strong>solvent.<br />

2b.-(1) DONG Oil Pipe A/S is obliged <strong>to</strong> separate crude oil <strong>and</strong> condensate products for users of<br />

the pipel<strong>in</strong>e. Payment for separation will be dem<strong>and</strong>ed from users of the separation facilities <strong>in</strong><br />

accordance with section 3c(3) below.<br />

(2) DONG Oil Pipe A/S may dem<strong>and</strong> that users <strong>and</strong> future users of the separation facilities provide<br />

security for the refund<strong>in</strong>g of DONG Oil Pipe A/S’ expenditures; see the first, third <strong>and</strong> fourth<br />

sentences of section 3c(1). Such refund shall fall due for payment if the user or future users decide<br />

not <strong>to</strong> use the facilities or discont<strong>in</strong>ue or curtail the use without others users wish<strong>in</strong>g <strong>to</strong> cont<strong>in</strong>ue<br />

such use. In case of any disagreement between DONG Oil Pipe A/S <strong>and</strong> a user or future user about<br />

the amount <strong>and</strong> nature of security, the M<strong>in</strong>ister for Climate <strong>and</strong> Energy shall make a decision <strong>in</strong> this<br />

respect.<br />

3.-(1) Any party that is under an obligation <strong>to</strong> connect its production facilities <strong>to</strong> the pipel<strong>in</strong>e<br />

pursuant <strong>to</strong> section 2 or uses it <strong>to</strong> transport crude oil or condensate shall pay <strong>to</strong> DONG Oil Pipe<br />

A/S:<br />

(i) an amount <strong>to</strong> cover the capital costs relat<strong>in</strong>g <strong>to</strong> f<strong>in</strong>anc<strong>in</strong>g the establishment of the oil pipel<strong>in</strong>e<br />

with appurtenant pump<strong>in</strong>g <strong>and</strong> term<strong>in</strong>al facilities, <strong>and</strong> any branch pipel<strong>in</strong>es; <strong>and</strong><br />

(ii) an amount <strong>to</strong> cover other expenditures for the operation of the pipel<strong>in</strong>e, as calculated per<br />

unit of transported crude oil <strong>and</strong> condensate.<br />

(2) In addition <strong>to</strong> the amounts referred <strong>to</strong> <strong>in</strong> subsection (1) above, any party that is under an<br />

obligation <strong>to</strong> connect its production facilities <strong>to</strong> the pipel<strong>in</strong>e shall pay 5 per cent of the value of<br />

crude oil <strong>and</strong> condensate produced from the fields subject <strong>to</strong> the connection obligation.<br />

(3) The capital costs referred <strong>to</strong> <strong>in</strong> section 3(1)(i) <strong>in</strong>clude <strong>in</strong>terest <strong>and</strong> other f<strong>in</strong>anc<strong>in</strong>g costs <strong>in</strong><br />

respect of the loans raised, as well as repayments of pr<strong>in</strong>cipal based on repayment of the loans over<br />

a period of 15 years. But the repayment period for any facilities cannot exceed the technical or<br />

economic life of such facilities.<br />

2


(4) The amounts referred <strong>to</strong> <strong>in</strong> subsections (1) <strong>and</strong> (2) above shall be subject <strong>to</strong> approval by the<br />

M<strong>in</strong>ister for Climate <strong>and</strong> Energy, <strong>and</strong> follow<strong>in</strong>g negotiation with DONG Oil Pipe A/S <strong>and</strong> the users,<br />

the M<strong>in</strong>ister for Climate <strong>and</strong> Energy shall lay down more specific rules <strong>and</strong> regulations regard<strong>in</strong>g<br />

the calculation, distribution <strong>and</strong> payment of such amounts.<br />

(5) Subject <strong>to</strong> six months’ prior notice, the M<strong>in</strong>ister for Climate <strong>and</strong> Energy may determ<strong>in</strong>e that<br />

the payment provided for <strong>in</strong> subsection (2) above shall be effected <strong>in</strong> the form of crude oil <strong>and</strong><br />

condensate.<br />

3a.-(1) DONG Oil Pipe A/S shall pay a tariff <strong>to</strong> the Danish state of 95 per cent of the amount<br />

referred <strong>to</strong> <strong>in</strong> section 3(2) above.<br />

(2) The tariff shall be calculated <strong>and</strong> paid monthly. The tariff shall be paid no later than at the end<br />

of the month follow<strong>in</strong>g the month <strong>in</strong> which the transport of crude oil <strong>and</strong> condensate <strong>to</strong>ok place.<br />

(3) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy shall lay down more detailed rules <strong>and</strong> regulations<br />

regard<strong>in</strong>g the calculation <strong>and</strong> payment of the tariff.<br />

3b.-(1) Follow<strong>in</strong>g negotiation with the users of the pipel<strong>in</strong>e <strong>and</strong> separation facilities, etc., DONG<br />

Oil Pipe A/S shall lay down the criteria for determ<strong>in</strong><strong>in</strong>g which compositions of crude oil <strong>and</strong><br />

condensate require separation. These criteria shall be determ<strong>in</strong>ed on the basis that a user’s crude oil<br />

<strong>and</strong> condensate require separation if the crude oil <strong>and</strong> condensate cannot be transported by a regular<br />

tanker designed for transport<strong>in</strong>g crude oil. The criteria shall be subject <strong>to</strong> approval by the M<strong>in</strong>ister<br />

for Climate <strong>and</strong> Energy <strong>and</strong> shall be published by DONG Oil Pipe A/S. The M<strong>in</strong>ister for Climate<br />

<strong>and</strong> Energy may lay down terms <strong>and</strong> conditions for the approval. In case of any disagreement<br />

between a user or a future user <strong>and</strong> DONG Oil Pipe A/S regard<strong>in</strong>g whether the user’s or future<br />

user’s crude oil <strong>and</strong> condensate require separation, the M<strong>in</strong>ister shall make a decision <strong>in</strong> this<br />

respect.<br />

(2) Users or future users of the pipel<strong>in</strong>e, etc. whose crude oil <strong>and</strong> condensate require separation<br />

shall agree with DONG Oil Pipe A/S on the payment <strong>and</strong> other terms <strong>and</strong> conditions for separation<br />

of their oil <strong>and</strong> condensate. In case of any disagreement, the terms <strong>and</strong> conditions shall be laid down<br />

by the M<strong>in</strong>ister for Climate <strong>and</strong> Energy. The agreements made shall be subject <strong>to</strong> approval by the<br />

M<strong>in</strong>ister for Climate <strong>and</strong> Energy. The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may lay down terms <strong>and</strong><br />

conditions for the approval.<br />

3c.-(1) Users of the separation facilities are obliged <strong>to</strong> pay DONG Oil Pipe A/S’ expenditures for<br />

the facilities. The users’ payment for use of the separation facilities <strong>in</strong> any f<strong>in</strong>ancial year shall cover<br />

the expenditures relat<strong>in</strong>g <strong>to</strong> the facilities <strong>in</strong> the same f<strong>in</strong>ancial year. The expenditures <strong>in</strong>clude all<br />

costs related <strong>to</strong> the operation of the separation facilities less any <strong>in</strong>come. Moreover, the<br />

expenditures shall <strong>in</strong>clude the costs actually <strong>in</strong>curred for repayments of pr<strong>in</strong>cipal <strong>and</strong> <strong>in</strong>terest on<br />

loans (loan capital) <strong>to</strong> f<strong>in</strong>ance the separation facilities, <strong>in</strong>terest on the equity that is tied up due <strong>to</strong><br />

the <strong>in</strong>vestment <strong>in</strong> the separation facilities, see subsection (2) below, <strong>and</strong> provisions for the costs of<br />

remov<strong>in</strong>g the separation facilities.<br />

(2) Interest on the equity tied up by DONG Oil Pipe A/S <strong>to</strong> f<strong>in</strong>ance the separation facilities shall<br />

be paid at the effective <strong>in</strong>terest rate charged on the current loans <strong>to</strong> f<strong>in</strong>ance the separation facilities<br />

<strong>in</strong> the same f<strong>in</strong>ancial year, plus 3 percentage po<strong>in</strong>ts. Regardless of the actual equity of DONG Oil<br />

Pipe A/S, the tied-up equity <strong>in</strong> DONG Oil Pipe A/S shall, for the purpose of calculat<strong>in</strong>g the cost of<br />

capital, be fixed at an amount equal <strong>to</strong> 30 per cent of the average, <strong>to</strong>tal capital tied up <strong>in</strong> the<br />

separation facilities <strong>in</strong> the relevant year.<br />

(3) Users whose crude oil <strong>and</strong> condensate require separation, <strong>and</strong> users whose crude oil <strong>and</strong><br />

condensate do not require separation, but who wish <strong>to</strong> have their products separated, shall pay an<br />

3


amount for separation that is equal <strong>to</strong> the average expenditures, see subsection (1) above, for the<br />

f<strong>in</strong>ancial year per <strong>to</strong>n of condensate that has been segregated <strong>in</strong> the same f<strong>in</strong>ancial year.<br />

(4) DONG Oil Pipe A/S may dem<strong>and</strong> payment on account for use of the separation facilities.<br />

(5) The amount from time <strong>to</strong> time payable for use of the separation facilities shall be published by<br />

DONG Oil Pipe A/S.<br />

(6) DONG Oil Pipe A/S shall present separate f<strong>in</strong>ancial statements for the activities referred <strong>to</strong> <strong>in</strong><br />

section 1(2) above. The f<strong>in</strong>ancial statements shall be audited <strong>in</strong> accordance with the rules from time<br />

<strong>to</strong> time applicable <strong>to</strong> the overall activities of DONG Oil Pipe A/S. The f<strong>in</strong>ancial year shall co<strong>in</strong>cide<br />

with the calendar year. The f<strong>in</strong>ancial statements, with attached comments from the users, shall be<br />

submitted <strong>to</strong> the M<strong>in</strong>ister for Climate <strong>and</strong> Energy. The f<strong>in</strong>ancial statements shall be published by<br />

DONG Oil Pipe A/S. In case of any disagreement between a user <strong>and</strong> DONG Oil Pipe A/S about<br />

the f<strong>in</strong>ancial statements, the M<strong>in</strong>ister for Climate <strong>and</strong> Energy shall make a decision <strong>in</strong> this respect.<br />

3d.-(1) Any party produc<strong>in</strong>g liquid hydrocarbons from fields straddl<strong>in</strong>g the borders between<br />

<strong>Denmark</strong> <strong>and</strong> another country shall pay 5 per cent of the value of the share of crude oil <strong>and</strong><br />

condensate that has been produced from the Danish cont<strong>in</strong>ental shelf area of the North Sea. If the<br />

crude oil <strong>and</strong> condensate produced are transported through the pipel<strong>in</strong>e, see section 2 above, the<br />

payment referred <strong>to</strong> <strong>in</strong> the first sentence hereof shall be made <strong>to</strong> DONG Oil Pipe A/S. In all other<br />

cases, payment shall be made <strong>to</strong> the Danish state.<br />

(2) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may lay down more detailed rules <strong>and</strong> regulations<br />

regard<strong>in</strong>g the calculation <strong>and</strong> payment of the fee <strong>to</strong> the Danish state referred <strong>to</strong> <strong>in</strong> subsection (1)<br />

above.<br />

4.-(1) To the extent necessary, the M<strong>in</strong>ister for Climate <strong>and</strong> Energy may permit that steps be taken<br />

for the compulsory acquisition of real property for the purpose of establish<strong>in</strong>g the pipel<strong>in</strong>e, etc.<br />

(2) Compulsory acquisition of real property <strong>in</strong> accordance with subsection (1) above shall take<br />

place subject <strong>to</strong> the provisions of the Act on the Procedure for the Compulsory Acquisition of Real<br />

Property.<br />

5.-(1) DONG Oil Pipe A/S shall pay compensation for any loss, damage or <strong>in</strong>jury caused through<br />

the <strong>in</strong>stallation or operation of the pipel<strong>in</strong>e <strong>and</strong> separation facilities, etc., regardless of whether such<br />

loss, damage or <strong>in</strong>jury is caused accidentally or not.<br />

(2) In the event that the <strong>in</strong>jured party contributed <strong>to</strong> the loss, damage or <strong>in</strong>jury, either <strong>in</strong>tentionally<br />

or through gross negligence, the compensation payable may be reduced or lapse.<br />

6.-(1) This Act shall come <strong>in</strong><strong>to</strong> force on 1 July 1981.<br />

(2) The provisions of the second sentence of section 2(1) <strong>and</strong> section 3(5) shall not apply <strong>to</strong><br />

activities carried out <strong>in</strong> pursuance of the Sole Concession of 8 July 1962 <strong>to</strong> Explore for <strong>and</strong> Recover<br />

<strong>Hydrocarbon</strong>s from the Danish Subsoil complete with pro<strong>to</strong>cols <strong>and</strong> agreements. Any decisions<br />

made by the M<strong>in</strong>ister for Climate <strong>and</strong> Energy under the provisions of section 2(3) <strong>and</strong> (5) of this<br />

Act regard<strong>in</strong>g terms <strong>and</strong> conditions for connection <strong>to</strong> <strong>and</strong> transport through the pipel<strong>in</strong>e as laid<br />

down <strong>in</strong> agreements between DONG Oil Pipe A/S <strong>and</strong> the users may be referred <strong>to</strong> arbitration by<br />

the Concessionaires <strong>and</strong> brought before the arbitration tribunal mentioned <strong>in</strong> Section 14(2) of the<br />

Concession; see Executive Order No. 372 of 7 November 1963, as subsequently amended.<br />

(3) With effect from 9 July 2012, the provisions of section 2(4) <strong>and</strong> section 3(2) shall not apply <strong>to</strong><br />

licensees comprised by the provisions of the <strong>Hydrocarbon</strong> Tax Act regard<strong>in</strong>g taxation of <strong>in</strong>come<br />

from the Sole Concession, etc., nor <strong>to</strong> licences granted with effect from 1 January 2004 or later.<br />

4


_______________________<br />

Act No. 254 of 8 June 1983 on Dansk Olie og Naturgas A/S, etc., which relates <strong>to</strong> section 3a,<br />

conta<strong>in</strong>s the follow<strong>in</strong>g commencement provision:<br />

Section 8<br />

(1) This Act shall come <strong>in</strong><strong>to</strong> force on the day follow<strong>in</strong>g its promulgation <strong>in</strong> the Danish Law<br />

Gazette. 1)<br />

(2) (Omitted)<br />

_______________________<br />

Act No. 432 of 10 June 1997 <strong>to</strong> amend the Act on the Establishment <strong>and</strong> Use of a Pipel<strong>in</strong>e for<br />

Transport of Crude Oil <strong>and</strong> Condensate, which relates <strong>to</strong> section 2(4), conta<strong>in</strong>s the follow<strong>in</strong>g<br />

commencement provision:<br />

Section 2<br />

This Act shall come <strong>in</strong><strong>to</strong> force on the day follow<strong>in</strong>g its promulgation <strong>in</strong> the Danish Law Gazette<br />

<strong>and</strong> shall have effect <strong>in</strong> all cases where no exemption has been granted by the M<strong>in</strong>ister for<br />

Transport <strong>and</strong> Energy from the obligations set out <strong>in</strong> section 2(1) prior <strong>to</strong> the commencement of this<br />

Act. 2)<br />

_______________________<br />

Act No. 74 of 12 February 2002 <strong>to</strong> amend the Act on the Use of the Danish Subsoil, the Act on<br />

the Establishment <strong>and</strong> Use of a Pipel<strong>in</strong>e for Transport of Crude Oil <strong>and</strong> Condensate <strong>and</strong> the Act on<br />

Certa<strong>in</strong> Offshore Installations, which relates <strong>to</strong> section 1(5), the second sentence of section 2(1),<br />

section 3 <strong>and</strong> the second sentence of section 6(2), conta<strong>in</strong>s the follow<strong>in</strong>g commencement provision:<br />

Section 4<br />

This Act shall come <strong>in</strong><strong>to</strong> force on 15 March 2002.<br />

_______________________<br />

Act No. 206 of 29 March 2004 <strong>to</strong> amend the Act on the Establishment <strong>and</strong> Use of a Pipel<strong>in</strong>e for<br />

Transport of Crude Oil <strong>and</strong> Condensate, which relates <strong>to</strong> section 6(3), conta<strong>in</strong>s the follow<strong>in</strong>g<br />

commencement provision:<br />

Section 2<br />

This Act shall come <strong>in</strong><strong>to</strong> force on the day follow<strong>in</strong>g its promulgation <strong>in</strong> the Danish Law Gazette.<br />

3))<br />

5


_______________________<br />

Act No. 1427 of 22 December 2004 <strong>to</strong> repeal the Act on Dansk Olie og Naturgas A/S, etc. <strong>and</strong> the<br />

Act on the Establishment of a Natural Gas Supply System <strong>and</strong> <strong>to</strong> amend the Act on the<br />

Establishment <strong>and</strong> Use of a Pipel<strong>in</strong>e for Transport of Crude Oil <strong>and</strong> Condensate, which relates <strong>to</strong><br />

section 3a, conta<strong>in</strong>s the follow<strong>in</strong>g commencement provision:<br />

Section 4<br />

This Act shall come <strong>in</strong><strong>to</strong> force on 1 January 2005.<br />

_______________________<br />

Act No. 542 of 26 May 2010 <strong>to</strong> amend the Act on the Establishment <strong>and</strong> Use of a Pipel<strong>in</strong>e for<br />

Transport of Crude Oil <strong>and</strong> Condensate, which relates <strong>to</strong> section 1, the second sentence of section<br />

2(4), section 2(5), section 2a, section 2b, section 3(3)-(6), section 3a(1), section 3b, section 3c,<br />

section 3d, section 5(1) <strong>and</strong> section 6(2), conta<strong>in</strong>s the follow<strong>in</strong>g commencement provision:<br />

Section 2<br />

This Act shall come <strong>in</strong><strong>to</strong> force on 1 July 2010.<br />

_______________________<br />

Act No. 718 of 25 June 2010 <strong>to</strong> amend the Insolvency Act <strong>and</strong> various other Acts, of which<br />

section 52 relates <strong>to</strong> section 2a(4), conta<strong>in</strong>s the follow<strong>in</strong>g commencement provision:<br />

Section 55<br />

(1) The M<strong>in</strong>ister of Justice shall determ<strong>in</strong>e when the Act shall come <strong>in</strong><strong>to</strong> force. 4)<br />

(2)-(10) (Omitted)<br />

_______________________<br />

The Danish Energy Agency, 9 September 2011<br />

Ib Larsen<br />

/ Jens Skov-Spill<strong>in</strong>g<br />

6


1) Act No. 254 of 8 June 1983 on Dansk Olie og Naturgas A/S, etc. came <strong>in</strong><strong>to</strong> force on 15 June 1983.<br />

2) Act No. 432 of 10 June 1997 <strong>to</strong> amend the Act on the Establishment <strong>and</strong> Use of a Pipel<strong>in</strong>e for Transport of Crude Oil<br />

<strong>and</strong> Condensate came <strong>in</strong><strong>to</strong> force on 12 June 1997.<br />

3) Act No. 206 of 29 March 2004 <strong>to</strong> amend the Act on the Establishment <strong>and</strong> Use of a Pipel<strong>in</strong>e for Transport of Crude<br />

Oil <strong>and</strong> Condensate came <strong>in</strong><strong>to</strong> force on 1 April 2004.<br />

4) Section 52 of Act No. 718 of 25 June 2010 <strong>to</strong> amend the Insolvency Act <strong>and</strong> Various Other Acts came <strong>in</strong><strong>to</strong> force on 1<br />

April, see Executive Order No. 208 of 15 March 2011 on the Commencement of the Amendment of the Insolvency Act<br />

<strong>and</strong> Various Other Acts (Restructur<strong>in</strong>g, etc.)<br />

7


Unofficial translation of Danish Executive Order No. 1032 of August 23, 2007. In case of discrepancy, the orig<strong>in</strong>al<br />

Danish text shall prevail.<br />

Executive Order on Reimbursement of Expenses related <strong>to</strong> the Authorities’<br />

Adm<strong>in</strong>istration <strong>in</strong> connection with <strong>Hydrocarbon</strong> Activities, etc.<br />

Pursuant <strong>to</strong> section 25(3) of Act on the Use of the Danish Subsoil, see Consolidated Act No. 889 of<br />

4 July 2007, section 65(2) of Act No. 1424 of 21 December 2005 on Safety, etc. for Offshore<br />

Installations for <strong>Exploration</strong>, Extraction <strong>and</strong> Transport of <strong>Hydrocarbon</strong>s (Offshore Safety Act),<br />

section 4d(3) of Act on the Cont<strong>in</strong>ental Shelf, see Consolidated Act No. 1101 of 18 November<br />

2005, as amended by Act No. 548 of 6 June 2007, <strong>and</strong> section 1(5) of Act on the Establishment <strong>and</strong><br />

Use of a Pipel<strong>in</strong>e for Transport of Crude Oil <strong>and</strong> Condensate, see Consolidated Act No. 1100 of 18<br />

November 2005, the follow<strong>in</strong>g provisions are hereby laid down, by virtue of authority granted:<br />

1. The authorities’ expenses related <strong>to</strong> adm<strong>in</strong>istration, <strong>in</strong>clud<strong>in</strong>g supervision, <strong>in</strong> connection with<br />

hydrocarbon activities, etc. pursuant <strong>to</strong> the Subsoil Act, the Offshore Safety Act, the Cont<strong>in</strong>ental<br />

Shelf Act <strong>and</strong> the Pipel<strong>in</strong>e Act shall be reimbursed by the parties liable <strong>to</strong> pay pursuant <strong>to</strong> section 2.<br />

2. For the purposes of this Executive Order, the parties liable <strong>to</strong> pay are:<br />

(i) licensees <strong>and</strong> concessionaires covered by the Subsoil Act,<br />

(ii) licensees, opera<strong>to</strong>rs, the operat<strong>in</strong>g companies <strong>and</strong> other companies covered by the Offshore<br />

Safety Act,<br />

(iii) owners <strong>and</strong> users of the pipel<strong>in</strong>e covered by the Pipel<strong>in</strong>e Act <strong>and</strong> any other party with a share <strong>in</strong><br />

a field that has been granted an exemption pursuant <strong>to</strong> section 2(3) of the Pipel<strong>in</strong>e Act, <strong>and</strong><br />

(iv) applicants <strong>and</strong> holders of permits pursuant <strong>to</strong> the Subsoil Act, Offshore Safety Act, Cont<strong>in</strong>ental<br />

Shelf Act or the Pipel<strong>in</strong>e Act who are not covered by paras. (i)-(iii) above.<br />

3.-(1) The authorities’ expenses related <strong>to</strong> adm<strong>in</strong>istration, <strong>in</strong>clud<strong>in</strong>g supervision, shall be<br />

calculated on the basis of a statement of the number of hours registered as spent <strong>in</strong> connection with<br />

performance of the <strong>in</strong>dividual tasks, but see subsection (3) below.<br />

(2) The hourly rate shall be fixed on the basis of the average payroll costs for the employees who<br />

take part <strong>in</strong> the adm<strong>in</strong>istrative procedure, plus a proportionate share of the other adm<strong>in</strong>istrative costs<br />

connected with adm<strong>in</strong>istration <strong>in</strong> the account<strong>in</strong>g year <strong>in</strong> question.<br />

(3) The authorities’ expenses related <strong>to</strong> surveys, consultancy services, <strong>in</strong>clud<strong>in</strong>g services from<br />

other authorities, publication pursuant <strong>to</strong> section 28a(1) of the Subsoil Act, publication pursuant <strong>to</strong><br />

section 4a(1) of the Cont<strong>in</strong>ental Shelf Act <strong>and</strong> official trips, etc. which, accord<strong>in</strong>g <strong>to</strong> vouchers<br />

submitted, can be attributed <strong>to</strong> the <strong>in</strong>dividual task, shall be paid on the basis of a statement of such<br />

expenses prepared by the authorities.<br />

4.-(1) Before the end of every year, the authorities shall <strong>in</strong>form the parties liable <strong>to</strong> pay pursuant<br />

<strong>to</strong> section 2, paras. (i)-(iii), if the authorities expect that the extent of adm<strong>in</strong>istration <strong>in</strong> the follow<strong>in</strong>g<br />

year will considerably exceed the amount of work usually result<strong>in</strong>g from the planned activities.<br />

(2) If, dur<strong>in</strong>g the year, substantial changes occur compared <strong>to</strong> the <strong>in</strong>formation given pursuant <strong>to</strong><br />

subsection (1), or if the extent of adm<strong>in</strong>istration considerably exceeds the amount of work usually<br />

result<strong>in</strong>g from the planned activities, the parties liable <strong>to</strong> pay shall be <strong>in</strong>formed hereof as soon as<br />

possible.


5.-(1) In order that the parties liable <strong>to</strong> pay can fulfil the payment obligations calculated pursuant<br />

<strong>to</strong> section 3, the authorities shall send out provisional dem<strong>and</strong> notes after the end of every quarter<br />

for the expenses related <strong>to</strong> adm<strong>in</strong>istration.<br />

(2) In connection with the dem<strong>and</strong> note for the first quarter <strong>in</strong> the payment year, the authorities<br />

shall state the hourly rate <strong>to</strong> be used <strong>in</strong> the year <strong>in</strong> question for provisional payments. The<br />

provisional hourly rate shall be fixed on the basis of the hourly rate calculated for the closed<br />

account<strong>in</strong>g year, adjusted <strong>to</strong> <strong>in</strong>clude budgeted changes <strong>in</strong> costs.<br />

6. After the expiry of an account<strong>in</strong>g year, the authorities shall prepare a statement of the amounts<br />

<strong>to</strong> be paid for the relevant year, on the basis of the f<strong>in</strong>al hourly rate; see section 3(2). These amounts<br />

shall be adjusted by the amounts paid provisionally pursuant <strong>to</strong> section 5 above. The f<strong>in</strong>al statement<br />

shall be sent <strong>to</strong> the parties liable <strong>to</strong> pay no later than four months after the expiry of the account<strong>in</strong>g<br />

year.<br />

7. The expenses payable pursuant <strong>to</strong> this Executive Order shall be paid no later than 30 days after<br />

a dem<strong>and</strong> note has been submitted.<br />

8.-(1) This Executive Order shall come <strong>in</strong><strong>to</strong> force on 1 September 2007 with retroactive effect <strong>to</strong> 8<br />

June 2007.<br />

(2) Executive Order No. 689 of 22 June 2006 on Reimbursement of Expenses related <strong>to</strong> the<br />

Authorities’ Adm<strong>in</strong>istration <strong>in</strong> connection with <strong>Hydrocarbon</strong> Activities, etc. shall be repealed.<br />

The Danish Energy Authority, 23 August 2007<br />

IB LARSEN<br />

/Søren Enevoldsen


Unofficial translation of Danish Executive Order No. 56 of February 4, 2002. In case of discrepancy, the orig<strong>in</strong>al<br />

Danish text shall prevail.<br />

Executive Order on Submission of Samples <strong>and</strong> Other Information about the<br />

Danish Subsoil<br />

Under section 34(1) <strong>and</strong> section 38(2) of the Act on the Use of the Danish Subsoil, cf. Consolidated<br />

Act No. 552 of 29 June 1995, the follow<strong>in</strong>g is laid down:<br />

General provisions<br />

1. In this Executive Order, the term licensee shall mean any party carry<strong>in</strong>g on activities under a<br />

licence granted pursuant <strong>to</strong> Act on the Use of the Danish Subsoil (the Subsoil Act) as well as a<br />

concession or a licence granted under Act No. 181 of 8 May 1950 on <strong>Exploration</strong> for <strong>and</strong> Recovery<br />

of Raw Materials <strong>in</strong> the Subsoil of the K<strong>in</strong>gdom of <strong>Denmark</strong>, cf. section 40 of the Subsoil Act.<br />

2.- (1) Under the provisions of this Executive Order, the licensee shall, free of charge, submit<br />

samples <strong>and</strong> other <strong>in</strong>formation acquired dur<strong>in</strong>g the performance of the activities comprised by the<br />

Subsoil Act.<br />

(2) The obligation referred <strong>to</strong> <strong>in</strong> subsection (1) above shall extend <strong>to</strong> any activity comprised by the<br />

Subsoil Act, <strong>in</strong>clud<strong>in</strong>g activities <strong>to</strong> be carried out on the authorities’ order, e.g. under the terms of a<br />

licence, as well as any additional activities.<br />

Submission of samples <strong>and</strong> <strong>in</strong>formation<br />

3.- (1) The licensee shall submit the samples <strong>and</strong> <strong>in</strong>formation referred <strong>to</strong> <strong>in</strong> subsections (2)-(5)<br />

below as soon as they are available.<br />

(2) For geophysical surveys the follow<strong>in</strong>g are <strong>to</strong> be submitted:<br />

(i) Information about l<strong>in</strong>es collected, number of km per l<strong>in</strong>e <strong>and</strong> the <strong>to</strong>tal number of km collected<br />

<strong>in</strong> the previous week. For threedimensional surveys the same <strong>in</strong>formations shall be submitted<br />

with <strong>in</strong>formations on number of km 2 . The <strong>in</strong>formation shall be submitted by fax or <strong>in</strong> electronic<br />

form accord<strong>in</strong>g <strong>to</strong> more specific agreement with the Danish Energy Authority <strong>and</strong> the Geological<br />

Survey of <strong>Denmark</strong> <strong>and</strong> Greenl<strong>and</strong> while the surveys are conducted.<br />

(ii) Information about seismic measurements as stated <strong>in</strong> schedule 1, paragraph I, No. 1.<br />

(iii) Information about gravity <strong>and</strong> magnetic measurements as stated <strong>in</strong> schedule 1, paragraph I,<br />

No. 2.<br />

(3) For geochemical surveys, the reports, maps, data <strong>and</strong> samples referred <strong>to</strong> <strong>in</strong> schedule 1,<br />

paragraph II, shall be submitted. The amount of sample material <strong>and</strong> their packag<strong>in</strong>g shall be agreed<br />

with the Geological Survey of <strong>Denmark</strong> <strong>and</strong> Greenl<strong>and</strong>. The samples taken shall be provided with<br />

the necessary identification, <strong>in</strong>clud<strong>in</strong>g <strong>in</strong>dication of location.


(4) For wellsite, subsoil <strong>and</strong> soil surveys, the reports, maps, data <strong>and</strong> samples referred <strong>to</strong> <strong>in</strong> schedule<br />

1, paragraph III, shall be submitted. The number of samples <strong>and</strong> their packag<strong>in</strong>g shall be agreed<br />

with the Geological Survey of <strong>Denmark</strong> <strong>and</strong> Greenl<strong>and</strong>. The samples taken shall be provided with<br />

the necessary identification, <strong>in</strong>clud<strong>in</strong>g <strong>in</strong>dication of location.<br />

(5) For drill<strong>in</strong>g operations the follow<strong>in</strong>g are <strong>to</strong> be submitted:<br />

(i) Report on the previous day’s operations <strong>and</strong> results, cf. Schedule 1, paragraph IV, No. 1. The<br />

report shall from the time the drill<strong>in</strong>g equipment is positioned at the wellsite <strong>and</strong> until the<br />

wellsite is ab<strong>and</strong>oned be submitted daily before 11.00 a.m. by telefax or <strong>in</strong> electronic form<br />

accord<strong>in</strong>g <strong>to</strong> more specific agreement with the Danish Energy Authority <strong>and</strong> the Geological<br />

Survey of <strong>Denmark</strong> <strong>and</strong> Greenl<strong>and</strong>.<br />

(ii) Moni<strong>to</strong>r<strong>in</strong>g <strong>and</strong> survey<strong>in</strong>g data from the well as stated <strong>in</strong> schedule 1, paragraph IV, No. 2.<br />

(iii) In case of sampl<strong>in</strong>g (cutt<strong>in</strong>gs, drill<strong>in</strong>g fluid, sidewall cores, cores <strong>and</strong> formation fluids),<br />

sampled material as stated <strong>in</strong> schedule 1, paragraph IV, No. 3. The samples shall be provided<br />

with a durable mark<strong>in</strong>g <strong>in</strong>dicat<strong>in</strong>g the well designation <strong>and</strong> sample depth, so that the samples can<br />

be identified at all times. The samples shall be delivered <strong>in</strong> packag<strong>in</strong>g which provides for longterm<br />

identification <strong>and</strong> s<strong>to</strong>rage.<br />

(iv) Reports on analyses of samples from the well as stated <strong>in</strong> schedule 1, paragraph IV, No. 4.<br />

(v) Reports on raw data <strong>and</strong> process<strong>in</strong>g results for test production as stated <strong>in</strong> schedule 1,<br />

paragraph IV, No. 5.<br />

(vi) For test production conclud<strong>in</strong>g report as stated <strong>in</strong> schedule 1, paragraph IV, No.6.The report<br />

shall be submitted no later than six months after term<strong>in</strong>ation of the drill<strong>in</strong>g operation.<br />

(vii) F<strong>in</strong>al report<strong>in</strong>g as stated <strong>in</strong> schedule 1, paragraph IV, No. 7. The report shall be submitted<br />

no later than six months after term<strong>in</strong>ation of the drill<strong>in</strong>g operation.<br />

(6) The core material, <strong>in</strong>clud<strong>in</strong>g sidewall cores, shall be deposited with the Geological Survey of<br />

<strong>Denmark</strong> <strong>and</strong> Greenl<strong>and</strong> with<strong>in</strong> one year after term<strong>in</strong>ation of the drill<strong>in</strong>g operation. The Danish<br />

Energy Authority may on request postpone the deadl<strong>in</strong>e for such deposit<strong>in</strong>g <strong>and</strong> may <strong>in</strong> special<br />

circumstances grant exemptions from the requirement for samples <strong>to</strong> be deposited with the<br />

Geological Survey of <strong>Denmark</strong> <strong>and</strong> Greenl<strong>and</strong>, provided that they can be deposited satisfac<strong>to</strong>rily<br />

elsewhere.<br />

(7) In addition <strong>to</strong> the samples <strong>and</strong> <strong>in</strong>formation mentioned <strong>in</strong> subsections (2) <strong>to</strong> (6), The Danish<br />

Energy Authority <strong>and</strong> the Geological Survey of <strong>Denmark</strong> <strong>and</strong> Greenl<strong>and</strong> may dem<strong>and</strong> the<br />

submission of other significant samples <strong>and</strong> <strong>in</strong>formation.<br />

Exemptions<br />

4. The Danish Energy Authority may <strong>in</strong> special cases grant exemptions from the provisions <strong>in</strong><br />

section (3) of this Executive Order.


Penalties, etc.<br />

5.- (1) Any <strong>in</strong>fr<strong>in</strong>gement of sections 2-4 of this Executive Order shall be punishable by a f<strong>in</strong>e unless<br />

higher penalty are provided for under section (38) of the Subsoil Act.<br />

(2). Where <strong>in</strong>fr<strong>in</strong>gements are committed by a public or private company or cooperative society<br />

(body corporate), f<strong>in</strong>es may be imposed on the company or society as such pursuant <strong>to</strong> chapter 5 of<br />

the Crim<strong>in</strong>al Act.<br />

Commencement<br />

6.- (1) This Executive Order shall come <strong>in</strong><strong>to</strong> force on 1 March 2002.<br />

(2). As from that date, Executive Order No. 13 of 7 January 1991 on the Submission of Samples<br />

<strong>and</strong> Other Information about the Danish Subsoil shall be repealed.<br />

(3). For samples <strong>and</strong> other <strong>in</strong>formation acquired before the com<strong>in</strong>g <strong>in</strong><strong>to</strong> force of this Executive<br />

Order but not submitted <strong>to</strong> the Danish Energy Authority <strong>and</strong> the Geological Survey of <strong>Denmark</strong> <strong>and</strong><br />

Greenl<strong>and</strong>, the licensee may submit those samples <strong>and</strong> other <strong>in</strong>formation <strong>in</strong> accordance with<br />

Executive Order No. 13 of 7 January 1991.<br />

M<strong>in</strong>istry of Economic <strong>and</strong> Bus<strong>in</strong>ess Affairs, the 4 February 2002<br />

BENDT BENDTSEN<br />

/Peter Helmer Steen


Schedule<br />

Samples <strong>and</strong> other <strong>in</strong>formation <strong>to</strong> be submitted under the provisions of the Executive Order<br />

Unless otherwise provided, the samples <strong>and</strong> other <strong>in</strong>formation mentioned below shall be<br />

submitted <strong>to</strong> both the Danish Energy Authority <strong>and</strong> the Geological Survey of <strong>Denmark</strong> <strong>and</strong><br />

Greenl<strong>and</strong> (“GEUS”).<br />

I. Geophysical surveys<br />

1. Seismic measurements:<br />

a) Digital seismic field data <strong>in</strong> SEGY or another st<strong>and</strong>ard format shall be sent <strong>to</strong> GEUS on<br />

IBM3590 tapes or another medium agreed with GEUS. Unless GEUS requests the field<br />

data <strong>to</strong> be submitted at another time the data shall be submitted at the time of expiry of the<br />

confidentiality period for the data <strong>in</strong> question, cf. the provisions <strong>in</strong> the permit accord<strong>in</strong>g <strong>to</strong><br />

which the data has been acquired, however data acquired accord<strong>in</strong>g <strong>to</strong> an exclusive licence<br />

shall be submitted not later than at the time of expiry of the licence.<br />

b) Processed digital navigation data <strong>in</strong> UKOOA format with exact format specifications <strong>and</strong><br />

<strong>in</strong>dication of the central meridian shall be submitted <strong>to</strong> GEUS on IBM3590 or Exabyte<br />

tapes or another medium agreed with GEUS.<br />

c) A hard copy shotpo<strong>in</strong>t map show<strong>in</strong>g the location of the acquired data shall be submitted <strong>to</strong><br />

GEUS.<br />

d) Acquisition report conta<strong>in</strong><strong>in</strong>g the necessary <strong>in</strong>formation for reprocess<strong>in</strong>g purposes.<br />

Observers log as digital data <strong>in</strong> tif format on CDrom or another media agreed with GEUS.<br />

e) Processed <strong>and</strong> stacked seismic data with raw stack, stack <strong>and</strong> f<strong>in</strong>al migration shall if<br />

produced be submitted <strong>to</strong> GEUS <strong>in</strong> SEGY format on IBM3590 or Exabyte tapes or another<br />

medium agreed with GEUS.<br />

If data is scaled <strong>to</strong> a L<strong>and</strong>mark workstation such data shall be submitted on Exabyte tapes<br />

<strong>to</strong> the Danish Energy Authority <strong>and</strong> on IBM3590 or Exabyte tapes <strong>to</strong> GEUS. Data scaled<br />

<strong>to</strong> other seismic workstations shall be submitted <strong>to</strong> GEUS.<br />

If the licensee produces hard-copy versions of stacked <strong>and</strong> migrated seismic l<strong>in</strong>es,<br />

correspond<strong>in</strong>g versions shall be submitted <strong>to</strong> GEUS. If the licensee produces hard-copy<br />

versions of migrated seismic l<strong>in</strong>es, a folded copy shall likewise be submitted <strong>to</strong> DEA.<br />

f) Stack<strong>in</strong>g <strong>and</strong> migration velocities <strong>in</strong> Esso V2 format shall be submitted <strong>to</strong> GEUS on<br />

IBM3480, IBM3590 or Exabyte tapes or another medium agreed with GEUS.<br />

g) Process<strong>in</strong>g reports shall be submitted <strong>to</strong> GEUS.<br />

h) If other special process<strong>in</strong>g or reprocess<strong>in</strong>g is carried out, such data shall be submitted <strong>in</strong><br />

accordance with the provisions conta<strong>in</strong>ed <strong>in</strong> paragraph I, 1, e-g, above.<br />

i) Interpretation reports.<br />

2. Gravity <strong>and</strong> magnetic measurements:<br />

a) Report document<strong>in</strong>g method of measurement <strong>and</strong> calibration shall be submitted <strong>to</strong> GEUS.<br />

b) Free-air <strong>and</strong> Bouguer gravity maps as well as a <strong>to</strong>tal magnetic field map.<br />

c) Measurements <strong>and</strong> any processed data <strong>in</strong> digital form shall be submitted <strong>to</strong> GEUS <strong>in</strong> a<br />

well-documented st<strong>and</strong>ard format immediately readable by GEUS, either on IBM3590<br />

tapes or another medium agreed with GEUS.<br />

d) Interpretation reports.


II. Geochemical surveys<br />

1. Reports:<br />

Results from geochemical surveys with <strong>in</strong>formation about exact locations <strong>and</strong> analytical<br />

methods <strong>and</strong> st<strong>and</strong>ards applied, <strong>in</strong>clud<strong>in</strong>g reference st<strong>and</strong>ards. Furthermore, a systematic<br />

presentation of the results specify<strong>in</strong>g all tested substances, <strong>in</strong>clud<strong>in</strong>g light <strong>and</strong> heavy<br />

hydrocarbons.<br />

2. Maps, data <strong>and</strong> samples:<br />

a) Maps <strong>in</strong> a commonly used scale.<br />

b) Data shall be submitted <strong>to</strong> GEUS on an electronic medium <strong>in</strong> a well-documented format<br />

immediately readable by GEUS, accompanied by a hard-copy version, provided that this is<br />

a suitable mode of representation for the data concerned<br />

c) Sets of all samples collected shall be submitted <strong>to</strong> GEUS, cf. section 3(3) of the Executive<br />

Order.<br />

III. Wellsite, bot<strong>to</strong>m <strong>and</strong> soil surveys<br />

1. Report<strong>in</strong>g:<br />

Reports conta<strong>in</strong><strong>in</strong>g survey data <strong>and</strong> results, methods of analysis, <strong>in</strong>terpretations <strong>and</strong> evaluations.<br />

2. Maps, data <strong>and</strong> samples:<br />

a) Maps, <strong>in</strong>clud<strong>in</strong>g shotpo<strong>in</strong>t <strong>and</strong> navigation maps, <strong>in</strong> a commonly used scale shall be<br />

submitted <strong>to</strong> GEUS.<br />

b) Processed data <strong>and</strong> navigation data shall be submitted <strong>to</strong> GEUS on an electronic medium <strong>in</strong><br />

a well-documented format immediately readable by GEUS, accompanied by a hard-copy<br />

version, provided that this is a suitable mode of representation for the data concerned.<br />

c) A folded paper copy of all seismic l<strong>in</strong>es <strong>and</strong> a folded paper copy of any other types of<br />

survey shall be submitted <strong>to</strong> GEUS.<br />

d) In connection with sampl<strong>in</strong>g a set of samples collected shall be submitted <strong>to</strong> GEUS, cf.<br />

section 3(4) of the Executive Order.<br />

IV. Drill<strong>in</strong>g operations<br />

1. Daily report<strong>in</strong>g dur<strong>in</strong>g drill<strong>in</strong>g operations. Daily reports shall <strong>in</strong>clude all ma<strong>in</strong> data about the<br />

work carried out <strong>in</strong> the preced<strong>in</strong>g 24-hour period, <strong>in</strong>clud<strong>in</strong>g a geological description of the<br />

layers penetrated <strong>and</strong> descriptions of any cores extracted <strong>and</strong> any results obta<strong>in</strong>ed from<br />

geophysical measurements made <strong>in</strong> the well dur<strong>in</strong>g drill<strong>in</strong>g<br />

2. Daily moni<strong>to</strong>r<strong>in</strong>g <strong>and</strong> survey<strong>in</strong>g data from the well, <strong>in</strong>clud<strong>in</strong>g <strong>in</strong>formation concern<strong>in</strong>g<br />

<strong>in</strong>vestigations made <strong>in</strong> wells used for the production <strong>and</strong>/or <strong>in</strong>jection of oil, gas or water.<br />

a) Measurements <strong>in</strong> the well:<br />

Results of measurements <strong>and</strong> <strong>in</strong>terpretations carried out shall be submitted as paper copies<br />

of each pr<strong>in</strong>ted scale from every log run. Raw data recorded on an electronic medium shall<br />

be submitted <strong>to</strong> GEUS <strong>in</strong> a well-documented st<strong>and</strong>ard format (usually LIS/DLIS)<br />

immediately readable by GEUS on CDrom, Exabyte tape or another medium agreed with<br />

GEUS. If data is scaled <strong>to</strong> a L<strong>and</strong>mark workstation such data shall be submitted <strong>to</strong> the<br />

Danish Energy Authority on Exabyte tapes or another agreed medium. Basic <strong>in</strong>formation<br />

relat<strong>in</strong>g <strong>to</strong> the collection of data shall be presented <strong>in</strong> such a way that all measurements are


easily identifiable. In case of image logs, processed data shall be submitted <strong>in</strong> a welldocumented<br />

format immediately readable by GEUS.<br />

b) Directional measurements:<br />

A directional measurements report shall be submitted as soon as it is available. Data shall<br />

also be submitted on an electronic medium <strong>in</strong> a well-documented <strong>and</strong> immediately<br />

readable st<strong>and</strong>ard format.<br />

c) For seismic measurements <strong>in</strong> the well (Vertical seismic profile or walk-away seismic<br />

measurements) a set of raw data <strong>and</strong> of st<strong>and</strong>ard-processed data shall be submitted. Data <strong>in</strong><br />

digital form shall be submitted <strong>to</strong> GEUS <strong>in</strong> a well-documented st<strong>and</strong>ard format<br />

immediately readable by GEUS (normally SEGY, however for time-depth tables ASCII).<br />

3. Sampl<strong>in</strong>g: The follow<strong>in</strong>g types of geological samples shall be submitted <strong>to</strong> GEUS, cf. section<br />

3(5) (iii) <strong>in</strong> the Executive Order:<br />

a) Cutt<strong>in</strong>gs. A set of washed <strong>and</strong> dried samples as well as a set of wet samples. These samples<br />

shall be taken at the same <strong>in</strong>tervals as the samples collected for the licensee’s own use.<br />

b) Drill<strong>in</strong>g fluid. For exploration wells samples shall be taken from the <strong>in</strong>let side after any<br />

qualitative change <strong>in</strong> additives <strong>and</strong> prior <strong>to</strong> test production, however for at least every 300 m<br />

drilled. Sample volumes <strong>and</strong> packag<strong>in</strong>g shall be agreed upon with GEUS.<br />

c) Sidewall cores. Where such cores are extracted, the rema<strong>in</strong><strong>in</strong>g core material shall be<br />

deposited with GEUS with<strong>in</strong> one year of term<strong>in</strong>ation of the drill<strong>in</strong>g operation. It shall be<br />

ensured that the amount of rema<strong>in</strong><strong>in</strong>g core material submitted <strong>to</strong> GEUS is sufficient <strong>to</strong> allow<br />

a lithological evaluation <strong>and</strong> petrographical, clay-m<strong>in</strong>eralogical, micropaleon<strong>to</strong>logical <strong>and</strong><br />

palynological analysis. If specimens of extracted sidewall core material are prepared for<br />

paleoanalysis, a set of paleon<strong>to</strong>logical <strong>and</strong> palynological slides (an orig<strong>in</strong>al or extra set)<br />

shall be submitted <strong>to</strong> GEUS immediately upon completion of the analysis.<br />

d) Cores, cf. section 3(5) (iii) of the Executive Order. Furthermore, the provision laid down <strong>in</strong><br />

section 3(6) <strong>in</strong> the Executive Order shall be applicable.<br />

e) Formation fluid. Where possible, samples under pressure shall be taken of all fluids <strong>and</strong><br />

gases produced <strong>in</strong> all well sections subjected <strong>to</strong> production tests, as well as from sections<br />

sampled by other methods. Sample volumes <strong>and</strong> packag<strong>in</strong>g shall be agreed upon with<br />

GEUS.<br />

4. Reports on analyses from the well samples. Any reports available <strong>in</strong> electronic form shall also<br />

be submitted.<br />

a) Report on any stratigraphical, sedimen<strong>to</strong>logical <strong>and</strong> paleon<strong>to</strong>logical surveys.<br />

b) Core descriptions as well as pho<strong>to</strong>graphs under white <strong>and</strong> ultraviolet light of core material<br />

from all cores.<br />

c) Results from measurements <strong>and</strong> analyses of core material.<br />

d) Qualitative <strong>and</strong> quantitative analysis of any formation water produced.<br />

e) Report on pressure, volume <strong>and</strong> temperature relations for any hydrocarbons produced<br />

(PVT report).<br />

f) Reports on any source rock analyses.<br />

5. Reports on raw data <strong>and</strong> <strong>in</strong>terpreted results relat<strong>in</strong>g <strong>to</strong> production tests. Any reports available <strong>in</strong><br />

electronic form shall also be submitted.<br />

a) Reports on raw data, <strong>in</strong>clud<strong>in</strong>g pressure <strong>and</strong> temperature measurements, both <strong>in</strong> the well<br />

<strong>and</strong> at the surface, as well as separa<strong>to</strong>r conditions, size of orifice, course of operation,<br />

production rates <strong>and</strong> cumulative production.


6. For all production tests carried out, a summarized report with the ma<strong>in</strong> conclusions shall be<br />

submitted with<strong>in</strong> six months of term<strong>in</strong>ation of the drill<strong>in</strong>g operation. The report shall <strong>in</strong>clude the<br />

follow<strong>in</strong>g:<br />

a) An account of the course of the <strong>in</strong>dividual production tests, <strong>in</strong>clud<strong>in</strong>g perforation pattern <strong>and</strong><br />

<strong>in</strong>terval, a description of any well stimulation <strong>and</strong> clean-up.<br />

b) An outl<strong>in</strong>e of the measurement data used <strong>in</strong> test production analyses.<br />

c) An outl<strong>in</strong>e of any parameters used <strong>in</strong> test production analyses that did not derive from direct<br />

measurement, as well as a documented account of the reasons for choos<strong>in</strong>g such parameters.<br />

d) An outl<strong>in</strong>e of the computed values obta<strong>in</strong>ed <strong>in</strong> production tests, <strong>in</strong>clud<strong>in</strong>g permeability,<br />

radius of <strong>in</strong>fluence <strong>and</strong> flow efficiency.<br />

e) All master curves <strong>and</strong> plots used <strong>in</strong> the analysis of production tests with <strong>in</strong>dication of match<br />

po<strong>in</strong>ts.<br />

f) Detailed evaluation <strong>and</strong> conclusion as regards the results obta<strong>in</strong>ed <strong>and</strong> the basis for their<br />

<strong>in</strong>terpretation.<br />

If available the report shall also be submitted <strong>in</strong> digital form.<br />

7. F<strong>in</strong>al report<strong>in</strong>g. Any reports available <strong>in</strong> electronic form shall also be submitted. Summarized<br />

technical/geological report, cf. section 3(5) (vi) of the Executive Order, <strong>in</strong>clud<strong>in</strong>g:<br />

a) Outl<strong>in</strong>e of ma<strong>in</strong> well data, name of the well, its location accord<strong>in</strong>g <strong>to</strong> geographical <strong>and</strong><br />

UTM coord<strong>in</strong>ates, drill<strong>in</strong>g rig, water depth/ground level, reference level, opera<strong>to</strong>r,<br />

contrac<strong>to</strong>r, date <strong>and</strong> time of the operation, <strong>to</strong>tal number of hours spent <strong>and</strong> <strong>to</strong>tal depth with<br />

<strong>in</strong>dication of the geological age.<br />

b) Summary of the course of drill<strong>in</strong>g operations, <strong>in</strong>dicat<strong>in</strong>g any technical problems <strong>and</strong><br />

assess<strong>in</strong>g their possible causes.<br />

c) Summary of geological <strong>in</strong>formation obta<strong>in</strong>ed dur<strong>in</strong>g the drill<strong>in</strong>g operations.<br />

d) General <strong>in</strong>formation about cas<strong>in</strong>g used <strong>and</strong> results of cement<strong>in</strong>g.<br />

e) Description of drill<strong>in</strong>g mud used.<br />

f) Detailed description, <strong>in</strong>clud<strong>in</strong>g a chart show<strong>in</strong>g the well status upon completion of the<br />

work.<br />

g) A composite log of the measurements made <strong>in</strong> the well, <strong>in</strong>dicat<strong>in</strong>g core <strong>and</strong> test production<br />

<strong>in</strong>tervals, cas<strong>in</strong>g <strong>and</strong> cas<strong>in</strong>g cementation, plugs, lithology <strong>and</strong> selected logs.<br />

h) A composite log of the results of drill<strong>in</strong>g fluid analyses made dur<strong>in</strong>g drill<strong>in</strong>g operations.


Unofficial translation of Danish Executive Order No. 419 of June 2, 2002. In case of discrepancy, the orig<strong>in</strong>al Danish<br />

text shall prevail.<br />

Executive Order on the Payment of Fees connected with Certa<strong>in</strong> <strong>Licences</strong> Issued<br />

pursuant <strong>to</strong> the Act on the Use of the Danish Subsoil<br />

Pursuant <strong>to</strong> sections 4(2) <strong>and</strong> 5(4) of the Act on the Use of the Danish Subsoil, see Consolidated<br />

Act No. 526 of 11 June 2002, the follow<strong>in</strong>g is hereby laid down:<br />

1.-(1) Upon the issuance of a licence for perform<strong>in</strong>g a prelim<strong>in</strong>ary <strong>in</strong>vestigation pursuant <strong>to</strong> section<br />

3 of the Act on the Use of the Danish Subsoil, a fee of DKK 50,000 shall be payable for a one-year<br />

period.<br />

(2) In special <strong>in</strong>stances, the fee mentioned <strong>in</strong> subsection (1) above may be reduced <strong>to</strong> DKK 25,000<br />

if the Danish Energy Authority considers the prelim<strong>in</strong>ary survey <strong>to</strong> be limited <strong>in</strong> scope <strong>and</strong> duration.<br />

(3) The Danish Energy Authority may dispense with the fee fixed <strong>in</strong> subsection (1) above if the<br />

Authority considers the prelim<strong>in</strong>ary <strong>in</strong>vestigation <strong>to</strong> be a necessary extension of a survey conducted<br />

under an exclusive licence granted pursuant <strong>to</strong> section 5 of the Act on the Use of the Danish<br />

Subsoil.<br />

(4) An issued licence will not become valid until the fee has been paid.<br />

2.-(1) Upon submitt<strong>in</strong>g an application for a licence conferr<strong>in</strong>g an exclusive right on the holder <strong>to</strong><br />

carry out exploration <strong>and</strong> production pursuant <strong>to</strong> section 5 of the Act on the Use of the Danish<br />

Subsoil, the applicant shall pay a fee of DKK 25,000.<br />

(2) The application will be rejected if it is not accompanied by proof of payment of the fee.<br />

(3) If the Danish Energy Authority decides not <strong>to</strong> process the application, the fee will be repaid <strong>to</strong><br />

the applicant.<br />

3. The fees mentioned <strong>in</strong> sections 1 <strong>and</strong> 2 above shall be paid <strong>to</strong> the Danish Energy Authority.<br />

4. This Executive Order shall come <strong>in</strong><strong>to</strong> force on 15 June 2005.<br />

The M<strong>in</strong>istry of Transport <strong>and</strong> Energy, 2 June 2005<br />

FLEMMING HANSEN<br />

/Peter Helmer Steen


Executive Order No. 684 of 23 June 2011 on EIA, consequence assessment<br />

concern<strong>in</strong>g <strong>in</strong>ternational nature conservation areas <strong>and</strong> protection of certa<strong>in</strong><br />

species <strong>in</strong> connection with projects about offshore exploration for <strong>and</strong> production<br />

of hydrocarbons, s<strong>to</strong>rage <strong>in</strong> the subsoil, pipel<strong>in</strong>es etc.<br />

The unofficial translation of this executive order is not available yet.<br />

The official Danish text is available at rets<strong>in</strong>formation.dk via this l<strong>in</strong>k:<br />

https://www.rets<strong>in</strong>formation.dk/Forms/R0710.aspx?id=137928


Unofficial translation of Danish Executive Order No. 657 of December 30, 1985. In case of discrepancy, the<br />

orig<strong>in</strong>al Danish text shall prevail.<br />

Executive Order on Safety Zones <strong>and</strong> Zones for the Observance of Order<br />

<strong>and</strong> the Prevention of Danger<br />

Pursuant <strong>to</strong> sections 4 (2, 3) <strong>and</strong> 5 (3) of Act on the Cont<strong>in</strong>ental Shelf, cf. promulgation<br />

Order No. 182 of May 1, 1979, <strong>and</strong> section 5 of the Merchant Shipp<strong>in</strong>g Safety of<br />

Navigation Act, cf. promulgation Order No. 309 of August 3, 1965, <strong>and</strong> the M<strong>in</strong>ister for<br />

Industry hav<strong>in</strong>g been consulted, the follow<strong>in</strong>g shall be established:<br />

1.- (1) Fixed <strong>in</strong>stallations, drill<strong>in</strong>g rigs, drill ships <strong>and</strong> other <strong>in</strong>stallations which are used for<br />

or <strong>in</strong> connection with exploration for <strong>and</strong> recovery of raw materials <strong>in</strong> the subsoil below the<br />

sea floor <strong>in</strong> Danish cont<strong>in</strong>ental shelf area shall be surrounded by safety zones unless the<br />

<strong>in</strong>stallation is be<strong>in</strong>g transported or <strong>to</strong>wed.<br />

(2) Correspond<strong>in</strong>g <strong>in</strong>stallations <strong>in</strong> Danish terri<strong>to</strong>rial waters shall be surrounded by zones for<br />

the observance of order <strong>and</strong> prevention of danger.<br />

2.- (1) An <strong>in</strong>stallation which is not immediately visible at the surface of the sea shall be<br />

marked with a buoy or some other easily visible marker approved by the Royal Danish<br />

Adm<strong>in</strong>istration of Navigation <strong>and</strong> Hydrography.<br />

3.- (1) The extent of the zones mentioned <strong>in</strong> section 1 (1, 2) shall be 500 metres around the<br />

<strong>in</strong>stallation, measured from any po<strong>in</strong>t of the outer edge of such an <strong>in</strong>stallation or from the<br />

marker mentioned <strong>in</strong> section 2.<br />

(2) After hav<strong>in</strong>g obta<strong>in</strong>ed a statement from the M<strong>in</strong>ister for Fisheries, the Danish Energy<br />

Agency may lay down deviations from the extent fixed <strong>in</strong> (1) of the zones mentioned <strong>in</strong><br />

section 1 (1, 2). Information about this shall be published by the Danish Energy Agency <strong>in</strong><br />

‘Notice <strong>to</strong> Mar<strong>in</strong>ers’.<br />

4.- (1) It shall be prohibited for ships <strong>and</strong> other crafts without bus<strong>in</strong>ess at the <strong>in</strong>stallation <strong>to</strong><br />

move <strong>in</strong><strong>to</strong> the zones mentioned <strong>in</strong> section 1 (1, 2). The prohibition shall also apply <strong>to</strong><br />

fish<strong>in</strong>g tackle <strong>and</strong> the like.<br />

(2)The provisions <strong>in</strong> (1) shall also apply when Danish ships unlawfully sail through, stay or<br />

fish <strong>in</strong> a safety zone established <strong>in</strong> the cont<strong>in</strong>ental shelf area of a foreign state.<br />

(3) The Danish Energy Agency may <strong>in</strong> special cases make exemptions from the provisions<br />

<strong>in</strong> (1).<br />

(4) Permission accord<strong>in</strong>g <strong>to</strong> (3) <strong>to</strong> fish or carry out fish<strong>in</strong>g <strong>and</strong> mar<strong>in</strong>e research <strong>in</strong> the zones<br />

mentioned <strong>in</strong> section 1 (1, 2) shall be given after a statement has been obta<strong>in</strong>ed from the<br />

M<strong>in</strong>ister for Fisheries.


5.- (1) After hav<strong>in</strong>g consulted the Royal Danish Adm<strong>in</strong>istration of Navigation <strong>and</strong><br />

Hydrography, the Danish Energy Agency shall give <strong>in</strong>formation <strong>in</strong> ‘Notice <strong>to</strong> Mar<strong>in</strong>ers’<br />

regard<strong>in</strong>g the positions of the <strong>in</strong>stallations mentioned <strong>in</strong> section 1 (1, 2).<br />

6.- (1) Infr<strong>in</strong>gement of section 4 shall be f<strong>in</strong>ed.<br />

7.- (1) This Order shall come <strong>in</strong><strong>to</strong> force at its publication <strong>in</strong> the Danish law report<br />

‘Lovtidende’.<br />

(2) This Order shall not apply <strong>to</strong> pipel<strong>in</strong>es comprised by order No. 327 of Oc<strong>to</strong>ber 29,<br />

1962, on Protection of Mar<strong>in</strong>e Cables <strong>and</strong> Submar<strong>in</strong>e Pipel<strong>in</strong>es.<br />

(3) Order No. 421 of August 24, 1976, on a Safety Zone by the Dan Field Oil Production<br />

System on the Cont<strong>in</strong>ental Shelf <strong>in</strong> the North Sea <strong>and</strong> Order No. 29 of January 27, 1978, on<br />

Prohibition aga<strong>in</strong>st the Sail<strong>in</strong>g through or Stay<strong>in</strong>g <strong>in</strong> Safety Zones shall hereby be<br />

abolished<br />

The M<strong>in</strong>istry of Energy, December 30, 1985.<br />

KNUD ENGGAARD<br />

/Jørgen Staffeldt


Opera<strong>to</strong>r's Declaration of Insurance<br />

Concern<strong>in</strong>g Licence _________Cover<strong>in</strong>g the year 20__<br />

The opera<strong>to</strong>r hereby declares <strong>to</strong> have received <strong>in</strong>surance certificates or declarations of self <strong>in</strong>surance<br />

from all co-licensees (<strong>in</strong>clud<strong>in</strong>g the opera<strong>to</strong>r's own certificate or declaration) for the year mentioned above.<br />

Furthermore, the opera<strong>to</strong>r declares that the <strong>in</strong>surances programmes for all<br />

co-licensees fulfill the follow<strong>in</strong>g conditions:<br />

Opera<strong>to</strong>r's additional expenses<br />

Offshore activities<br />

Control of Well (COW) - <strong>in</strong>clud<strong>in</strong>g seepage <strong>and</strong> pollution<br />

Coverage: normal coverage <strong>in</strong> the Danish sec<strong>to</strong>r is a m<strong>in</strong>imum of DKK 1,000,000,000 (100% <strong>in</strong>terest) per<br />

occurence - <strong>in</strong>clud<strong>in</strong>g underground blow out. If three times all cost relat<strong>in</strong>g <strong>to</strong> drill<strong>in</strong>g <strong>and</strong> test<strong>in</strong>g any well <strong>in</strong><br />

the covered year exceeds DKK 1,000,000,000 the coverage should as a m<strong>in</strong>imum be <strong>in</strong>creased <strong>to</strong> this<br />

amount for that well. Cost relat<strong>in</strong>g <strong>to</strong> drill<strong>in</strong>g <strong>and</strong> test<strong>in</strong>g this well shall be as stated <strong>in</strong> the budget for the<br />

licence, approved <strong>in</strong> accordance with the JOA.<br />

Onshore Activities<br />

Control of Well (COW) - <strong>in</strong>clud<strong>in</strong>g seepage <strong>and</strong> pollution<br />

Coverage: normal coverage <strong>in</strong> <strong>Denmark</strong> is a m<strong>in</strong>imum of DKK 300,000,000 (100% <strong>in</strong>terest) per occurence -<br />

<strong>in</strong>clud<strong>in</strong>g underground blow out. If three times all cost relat<strong>in</strong>g <strong>to</strong> drill<strong>in</strong>g <strong>and</strong> test<strong>in</strong>g any well <strong>in</strong> the covered<br />

year exceeds DKK 300,000,000 the coverage should as a m<strong>in</strong>imum be <strong>in</strong>creased <strong>to</strong> this amount for that<br />

well. Cost relat<strong>in</strong>g <strong>to</strong> drill<strong>in</strong>g <strong>and</strong> test<strong>in</strong>g the most expensive well shall be as stated <strong>in</strong> the budget for the<br />

licence, approved <strong>in</strong> accordance with the JOA.<br />

Third Party Liability (TPL) regard<strong>in</strong>g exploration, development <strong>and</strong> production both onshore <strong>and</strong> offshore<br />

Coverage:<br />

- when drill<strong>in</strong>g: DKK 1,000,000,000 (100% <strong>in</strong>terest) per occurence<br />

- when not drill<strong>in</strong>g: DKK 100,000,000 (100% <strong>in</strong>terest) per occurence<br />

Other activities than drill<strong>in</strong>g<br />

By sign<strong>in</strong>g this form the opera<strong>to</strong>r declares that the companies carry<strong>in</strong>g out other activities than drill<strong>in</strong>g carry<br />

<strong>in</strong>surance coverage which is normal for the specific activity performed under the Knock-for-Knock<br />

pr<strong>in</strong>ciple.<br />

Date, stamp <strong>and</strong> signature<br />

To be submitted <strong>to</strong> the Danish Energy Agency by no later than 1 March <strong>in</strong> the covered year.


Unofficial translation. In case of discrepancy, the orig<strong>in</strong>al Danish text shall prevail.<br />

THE DANISH ENERGY AGENCY<br />

August 2011<br />

Account<strong>in</strong>g <strong>in</strong>structions for activities under exploration <strong>and</strong> production licences<br />

Pursuant <strong>to</strong> section 21 of the Model Licence for <strong>Exploration</strong> for <strong>and</strong> Production of <strong>Hydrocarbon</strong>s<br />

<strong>in</strong> <strong>Denmark</strong> <strong>and</strong> section 3 of Executive Order no. 1672 of 22 December 2010 on the<br />

tasks <strong>and</strong> authority of the Danish Energy Agency (the DEA), the follow<strong>in</strong>g <strong>in</strong>structions regard<strong>in</strong>g<br />

the disclosure of f<strong>in</strong>ancial <strong>in</strong>formation <strong>and</strong> expected activities shall be laid down:<br />

Contents:<br />

1 Time-limit <strong>and</strong> calendar year .............................................................................................. 2<br />

2 Opera<strong>to</strong>r's f<strong>in</strong>ancial statements for the Jo<strong>in</strong>t Account ........................................................ 2<br />

3 F<strong>in</strong>ancial statements for activities covered by the licence .................................................. 2<br />

4 F<strong>in</strong>ancial statements when a company with a share <strong>in</strong> one or several licences carries out<br />

other activities than those covered by the licence ............................................................... 3<br />

5 Parent company f<strong>in</strong>ancial statements <strong>and</strong> consolidated f<strong>in</strong>ancial statements ..................... 3<br />

6 Report<strong>in</strong>g on change of ownership ..................................................................................... 3<br />

7 Report<strong>in</strong>g <strong>in</strong>come, expenses <strong>and</strong> budgets ........................................................................... 4


1 Time-limit <strong>and</strong> calendar year<br />

Licensees shall, annually <strong>and</strong> by no later than 15 August the follow<strong>in</strong>g year, submit <strong>in</strong>formation<br />

<strong>to</strong> the DEA accord<strong>in</strong>g <strong>to</strong> the guidel<strong>in</strong>es set out below. The <strong>in</strong>formation shall follow the<br />

calendar year.<br />

No later than by the end of each year, <strong>in</strong>formation about planned <strong>and</strong> expected activities, cf.<br />

po<strong>in</strong>t 7, shall similarly be notified.<br />

The <strong>in</strong>formation may be submitted electronically or by post.<br />

2 Opera<strong>to</strong>r's f<strong>in</strong>ancial statements for the Jo<strong>in</strong>t Account<br />

The opera<strong>to</strong>r shall keep <strong>and</strong> present jo<strong>in</strong>t f<strong>in</strong>ancial statements for the group's jo<strong>in</strong>t <strong>in</strong>come, expenses,<br />

assets <strong>and</strong> liabilities relat<strong>in</strong>g <strong>to</strong> activities covered by the licence (the Jo<strong>in</strong>t Account accord<strong>in</strong>g<br />

<strong>to</strong> the JOA).<br />

The f<strong>in</strong>ancial statements for the Jo<strong>in</strong>t Account shall be received by the DEA no later than 15<br />

August the follow<strong>in</strong>g year.<br />

Such f<strong>in</strong>ancial statements shall be presented pursuant <strong>to</strong> the guidel<strong>in</strong>es <strong>in</strong> the Danish Act on<br />

F<strong>in</strong>ancial Statements, ref. Consolidated Act No. 323 of 11 April 2011 with later amendments.<br />

Note that there is no requirement for the opera<strong>to</strong>r’s f<strong>in</strong>ancial statements <strong>to</strong> be audited.<br />

3 F<strong>in</strong>ancial statements for activities covered by the licence<br />

A company with a share <strong>in</strong> one or several licences shall disclose <strong>to</strong> the DEA whether it has <strong>in</strong>curred<br />

other expenses than those disclosed <strong>in</strong> the opera<strong>to</strong>r’s f<strong>in</strong>ancial statements for the Jo<strong>in</strong>t<br />

Account.<br />

This <strong>in</strong>formation shall be received by the DEA no later than 15 August the follow<strong>in</strong>g year.<br />

The format is given <strong>in</strong> po<strong>in</strong>t 7 below.<br />

Bookkeep<strong>in</strong>g relat<strong>in</strong>g <strong>to</strong> activities covered by the licence shall be <strong>in</strong> accordance with the<br />

guidel<strong>in</strong>es <strong>in</strong> the Danish Bookkeep<strong>in</strong>g Act, ref. Consolidated Act No. 648 of 15 June 2006<br />

with later amendments, <strong>and</strong> shall be organised so that the requirements for account<strong>in</strong>g <strong>and</strong> f<strong>in</strong>ancial<br />

<strong>in</strong>formation are met. For each licence <strong>in</strong> which the company has a share, a separate<br />

account shall be established for:<br />

- the opera<strong>to</strong>r’s activities (the Jo<strong>in</strong>t Account), cf. po<strong>in</strong>t 2,<br />

- expenses for exploration activities which are not a part of the opera<strong>to</strong>r’s activities<br />

(the Jo<strong>in</strong>t Account),<br />

- expenses for development activities which are not a part of the opera<strong>to</strong>r’s activities<br />

(the Jo<strong>in</strong>t Account),<br />

- expenses for production activities which are not a part of the opera<strong>to</strong>r’s activities<br />

(the Jo<strong>in</strong>t Account).<br />

2/5


4 F<strong>in</strong>ancial statements when a company with a share <strong>in</strong> one or several licences carries<br />

out other activities than those covered by the licence<br />

A company with a share <strong>in</strong> one or several licences shall also submit annual f<strong>in</strong>ancial statements<br />

for the company. If the company has other activities than those relat<strong>in</strong>g <strong>to</strong> the licence, it<br />

will suffice <strong>to</strong> submit f<strong>in</strong>ancial statements for all the company’s activities.<br />

The DEA shall therefore receive a copy of the annual f<strong>in</strong>ancial statements which the licensee<br />

submits <strong>to</strong> the Danish Commerce <strong>and</strong> Companies Agency.<br />

Such f<strong>in</strong>ancial statements will generally have been prepared for other purposes, <strong>and</strong> companies<br />

merely have a duty <strong>to</strong> submit a copy of f<strong>in</strong>ancial statements already prepared.<br />

The f<strong>in</strong>ancial statements shall be received by the DEA no later than 15 August the follow<strong>in</strong>g<br />

year. If the country <strong>in</strong> which the company is registered provides for a later submission timelimit,<br />

the company may request dispensation from the DEA <strong>to</strong> exceed the Danish time-limit.<br />

5 Parent company f<strong>in</strong>ancial statements <strong>and</strong> consolidated f<strong>in</strong>ancial statements<br />

If a company with a share <strong>in</strong> one or several licences is a branch or a subsidiary of another<br />

company, said company shall submit annual f<strong>in</strong>ancial statements (or an <strong>in</strong>ternet l<strong>in</strong>k <strong>to</strong> these<br />

statements) for its parent company as well as consolidated f<strong>in</strong>ancial statements.<br />

Such f<strong>in</strong>ancial statements will generally have been prepared for other purposes <strong>and</strong> companies<br />

merely have a duty <strong>to</strong> submit a copy of f<strong>in</strong>ancial statements already prepared.<br />

6 Report<strong>in</strong>g on change of ownership<br />

A company with a share <strong>in</strong> one or several licences shall notify the DEA promptly of any of the<br />

follow<strong>in</strong>g changes <strong>in</strong> its capital position:<br />

- changes <strong>in</strong> ownership of 10 per cent or more of the share capital or contributed<br />

capital, or<br />

- changes <strong>in</strong> the controll<strong>in</strong>g <strong>in</strong>terest caused by agreements with the same effect.<br />

Furthermore, such changes shall be subject <strong>to</strong> approval pursuant <strong>to</strong> section 29 of the Danish<br />

Subsoil Act.<br />

Report<strong>in</strong>g on change of capital position<br />

A company with a share <strong>in</strong> one or several licenses shall notify the DEA promptly, if, <strong>in</strong> its<br />

half-year balance sheet, the relationship between its equity <strong>and</strong> loan capital has changed by 20<br />

per cent or more relative <strong>to</strong> the balance at the end of the previous calendar year, or if its equity<br />

at the end of a calendar year is less than<br />

- DKK 25 million for companies that exclusively have a share <strong>in</strong> licences <strong>in</strong><br />

the exploration phase <strong>and</strong><br />

- DKK 200 million for companies with a share <strong>in</strong> a licence for which an extension<br />

has been requested <strong>in</strong> accordance with section 5(3) of the licence.<br />

3/5


Instead of comply<strong>in</strong>g with the requirement above regard<strong>in</strong>g changes <strong>in</strong> equity, a company<br />

which <strong>in</strong> its application for a licence has notified an equity that is lower than the one stated<br />

above shall promptly notify the DEA if its equity at the end of a calendar year has been reduced<br />

by 10 per cent or more.<br />

If a bank guarantee has been issued for the company’s commitments <strong>in</strong> connection with licences,<br />

notification is not a requirement.<br />

7 Report<strong>in</strong>g <strong>in</strong>come, expenses <strong>and</strong> budgets<br />

These report<strong>in</strong>g procedures apply <strong>to</strong> <strong>in</strong>come <strong>and</strong> expenses paid, <strong>and</strong> planned <strong>and</strong> expected activities.<br />

7.1 Income <strong>and</strong> expenses paid<br />

The opera<strong>to</strong>r:<br />

The opera<strong>to</strong>r shall, no later than 15 august, submit f<strong>in</strong>ancial statements for the Jo<strong>in</strong>t Account<br />

for the preced<strong>in</strong>g year. If there is an audi<strong>to</strong>r’s report on the f<strong>in</strong>ancial statements, said report<br />

shall be enclosed.<br />

The f<strong>in</strong>ancial statements shall be identical <strong>to</strong> the f<strong>in</strong>ancial statements which are submitted <strong>to</strong><br />

the other companies with shares <strong>in</strong> the licence. The f<strong>in</strong>ancial statements shall make it possible<br />

<strong>to</strong> dist<strong>in</strong>guish between expenses for exploration, development <strong>and</strong> production, respectively.<br />

The f<strong>in</strong>ancial statements shall be presented <strong>in</strong> accordance with po<strong>in</strong>ts 2 <strong>and</strong> 3.<br />

All companies:<br />

All companies with a share <strong>in</strong> one or several licences shall submit <strong>in</strong>formation about any <strong>in</strong>come<br />

<strong>and</strong> expenses paid which are not covered by the Jo<strong>in</strong>t Account, broken down by exploration,<br />

development <strong>and</strong> production, no later than 15 August.<br />

This <strong>in</strong>formation may be submitted <strong>in</strong> the “co-licensees’ disclosure form” (www.ens.dk/en-<br />

US/OilAndGas/<strong>Licences</strong>/<strong>Guide</strong>/Sider/Forside.aspx) for the preced<strong>in</strong>g year.<br />

A form (co-licensees’ disclosure form) is available for each activity <strong>and</strong> shall be completed <strong>in</strong><br />

accordance with these account<strong>in</strong>g <strong>in</strong>structions.<br />

The form perta<strong>in</strong><strong>in</strong>g <strong>to</strong> production also conta<strong>in</strong>s a box for stat<strong>in</strong>g the licensee’s <strong>in</strong>come.<br />

The licensee may, if desired, submit <strong>in</strong>formation <strong>in</strong> another format. However the <strong>in</strong>formation<br />

<strong>in</strong> the form shall be stated clearly per licence <strong>and</strong>, <strong>in</strong> general, follow the guidel<strong>in</strong>es described<br />

above.<br />

7.2 Budgets <strong>and</strong> budget estimates<br />

The opera<strong>to</strong>r shall, no later than 31 December, submit a budget for the Jo<strong>in</strong>t Account for the<br />

next four years. The budget for the com<strong>in</strong>g year shall be identical <strong>to</strong> the budget that has been<br />

approved by the Operational Committee for the subsequent three budget years, the budget<br />

4/5


submitted shall be identical <strong>to</strong> the budget presented <strong>to</strong> the Operat<strong>in</strong>g Committee <strong>in</strong> connection<br />

with the budget for the com<strong>in</strong>g year with agreed changes if any.<br />

The budget shall make it possible <strong>to</strong> dist<strong>in</strong>guish between expenses for exploration, development<br />

<strong>and</strong> production, respectively. The budget shall be presented <strong>in</strong> accordance with these account<strong>in</strong>g<br />

<strong>in</strong>structions.<br />

5/5


Co-licensee disclosure form for exploration <strong>and</strong> appraisal activities for 20__<br />

This form concerns licence no. <strong>and</strong> co-licensee (name)_________________________<br />

Please <strong>in</strong>dicate the co-licensee's own <strong>to</strong>tal expenses for exploration <strong>and</strong> appraisal activities (<strong>in</strong> DKK '000)<br />

not covered by the contribution <strong>to</strong> the Jo<strong>in</strong>t Accounts for the above-mentioned year:<br />

_________ <strong>in</strong> DKK '000<br />

<strong>Guide</strong>l<strong>in</strong>es<br />

The follow<strong>in</strong>g is covered by exploration <strong>and</strong> appraisal activities:<br />

a) Geology & geophysics (general & <strong>in</strong>terpretation, seismic acquisition/process<strong>in</strong>g, <strong>and</strong> other expenses <strong>in</strong> this category)<br />

b) Drill<strong>in</strong>g (site survey/location, preparation, mobilization/demobilization, drilll<strong>in</strong>g rig hire, materials & supplies, rentals & services,<br />

<strong>and</strong> other expenses <strong>in</strong> this category)<br />

c) Indirect costs (adm<strong>in</strong>istration & overheads, concession fees, <strong>in</strong>surance, <strong>in</strong>terest, currency ga<strong>in</strong>s/losses, <strong>and</strong> other expenses <strong>in</strong><br />

this category)<br />

To be submitted <strong>to</strong> the Danish Energy Authority by 15 August <strong>in</strong> the year follow<strong>in</strong>g the above-mentioned year.


Co-licensee disclosure form for development activities for 20__<br />

This form concerns licence no. <strong>and</strong> co-licensee (name)_________________________<br />

Please <strong>in</strong>dicate the co-licensee's own <strong>to</strong>tal expenses for development activities (<strong>in</strong> DKK '000)<br />

not covered by the contribution <strong>to</strong> the Jo<strong>in</strong>t Accounts for the above-mentioned year:<br />

_________ <strong>in</strong> DKK '000<br />

<strong>Guide</strong>l<strong>in</strong>es<br />

The follow<strong>in</strong>g is covered by development activities:<br />

a) Project plann<strong>in</strong>g (eng<strong>in</strong>eer<strong>in</strong>g, surveys, <strong>and</strong> other expenses <strong>in</strong> this category)<br />

b) Construction (management, certification, eng<strong>in</strong>eer<strong>in</strong>g, fabrication structure, fabrication <strong>to</strong>pside/wellhead, fabrication<br />

<strong>to</strong>pside/process, fabrication <strong>to</strong>pside/accommodation, <strong>in</strong>stallation, hook-up & commission<strong>in</strong>g, pre-production costs, pipel<strong>in</strong>es,<br />

<strong>and</strong> other expenses <strong>in</strong> this category)<br />

c) Drill<strong>in</strong>g (site survey/location, preparation, mobilization/demobilization, drill<strong>in</strong>g rig hire, materials & supplies, rentals &<br />

services, <strong>and</strong> other expenses <strong>in</strong> this category)<br />

d) Indirect costs (adm<strong>in</strong>istration & overheads, <strong>in</strong>surance, <strong>in</strong>terest, currency ga<strong>in</strong>s/losses, <strong>and</strong> other expenses <strong>in</strong> this<br />

category)<br />

To be submitted <strong>to</strong> the Danish Energy Authority by 15 August <strong>in</strong> the year follow<strong>in</strong>g the above-mentioned year.


Co-licensee disclosure form for production activities for 20__<br />

This form concerns licence no. <strong>and</strong> co-licensee (name)_________________________<br />

Please <strong>in</strong>dicate the co-licensee's own <strong>to</strong>tal expenses for production activities (<strong>in</strong> DKK '000)<br />

not covered by the contribution <strong>to</strong> the Jo<strong>in</strong>t Accounts for the above-mentioned year:<br />

_________ <strong>in</strong> DKK '000<br />

<strong>Guide</strong>l<strong>in</strong>es<br />

The follow<strong>in</strong>g is covered by poduction activities:<br />

a) Operat<strong>in</strong>g expenses (employee costs, materials, supplies & equipment, services & rentals,<br />

haul<strong>in</strong>g & transport services, <strong>and</strong> other expenses <strong>in</strong> this category)<br />

b )Transportation of oil & gas (capital costs (DONG Olierør), operat<strong>in</strong>g costs (DONG Olierør), 5%<br />

profit element (DONG Olierør), own expenses)<br />

c) Repair & ma<strong>in</strong>tenance (employee costs, construction & oper. materials, construction & oper.<br />

services, <strong>and</strong> other expenses <strong>in</strong> this category)<br />

d) Additions & improvements (design & supervision, materials & supplies, services, <strong>and</strong> other<br />

expenses <strong>in</strong> this category)<br />

e) Indirect costs (adm<strong>in</strong>istration & overheads, <strong>in</strong>surance, <strong>in</strong>terest, currency ga<strong>in</strong>s/losses, <strong>and</strong> other<br />

expenses <strong>in</strong> this category)<br />

Please <strong>in</strong>dicate the co-licensee's own <strong>in</strong>come from the above-mentioned licence (<strong>in</strong> DKK '000)<br />

Average Cubric In DKK<br />

price metre '000<br />

Total <strong>in</strong>come<br />

Sale of crude oil<br />

" gas<br />

Other <strong>in</strong>come (e.g. condensate)*<br />

Total<br />

* Other <strong>in</strong>come derives from:<br />

Do the company books record activities other than those relat<strong>in</strong>g <strong>to</strong> the licences issued<br />

by the M<strong>in</strong>istry of Transport <strong>and</strong> Energy?<br />

No Yes<br />

Comments:<br />

(delete the uncorrect answer)<br />

(if yes, please expla<strong>in</strong> <strong>in</strong> the comments section)<br />

To be submitted <strong>to</strong> the Danish Energy Authority by 15 August <strong>in</strong> the year follow<strong>in</strong>g the above-mentioned year.


UNOFFICIAL TRANSLATION<br />

L I C E N C E<br />

NO. X/YY<br />

F O R E X P L O R A T I O N F O R<br />

A N D P R O D U C T I O N O F<br />

H Y D R O C A R B O N S<br />

This translation is provided for convenience only, <strong>and</strong> <strong>in</strong> the event of any conflict between the<br />

word<strong>in</strong>g of the Danish <strong>and</strong> English versions, the word<strong>in</strong>g of the Danish version shall prevail <strong>in</strong><br />

all respects.<br />

200X


CONTENTS<br />

Page<br />

Licensee ...........................................................................................................................4<br />

Sect. 1 Def<strong>in</strong>itions .........................................................................................................5<br />

Sect. 2 Licence area.......................................................................................................5<br />

Sect. 3 Scope of licence ................................................................................................6<br />

Sect. 4 Work programme <strong>and</strong> evaluation programme..................................................7<br />

Sect. 5 Term of the licence <strong>and</strong> extension for the<br />

purpose of production .......................................................................................7<br />

Sect. 6 Production .........................................................................................................8<br />

Sect. 7 One-time fee......................................................................................................9<br />

Sect. 8-12 (not used)...........................................................................................................9<br />

Sect. 13 State participation .............................................................................................9<br />

Sect. 14 (not used)...........................................................................................................9<br />

Sect. 15 Use of goods <strong>and</strong> services...............................................................................10<br />

Sect. 16 (not used).........................................................................................................10<br />

Sect. 17 Location of activities.......................................................................................10<br />

Sect. 18 Jo<strong>in</strong>t operat<strong>in</strong>g agreement ...............................................................................11<br />

Sect. 19 Observers.........................................................................................................11<br />

Sect. 20 Transport <strong>and</strong> accommodation<br />

for supervisors, etc ..........................................................................................11<br />

Sect. 21 Report<strong>in</strong>g .........................................................................................................12<br />

Sect. 22 Confidentiality.................................................................................................13<br />

Sect. 23 Licensee's communications <strong>to</strong> <strong>in</strong>dividuals<br />

or <strong>to</strong> the public.................................................................................................14<br />

Sect. 24 Measurement ...................................................................................................15<br />

Sect. 25 Drill<strong>in</strong>g regulations .........................................................................................15<br />

Sect. 26 Rules <strong>and</strong> regulations for mark<strong>in</strong>g<br />

of equipment, etc.............................................................................................15<br />

2


Page<br />

Sect. 27 Connection <strong>to</strong> pipel<strong>in</strong>e facilities .....................................................................15<br />

Sect. 28-29 (not used).........................................................................................................16<br />

Sect. 30 Insurance..........................................................................................................16<br />

Sect. 31 Liability for damages ......................................................................................17<br />

Sect. 32 Form of security ..............................................................................................17<br />

Sect. 33 Assignment......................................................................................................17<br />

Sect. 34 Rel<strong>in</strong>quishment................................................................................................18<br />

Sect. 35 Revocation <strong>and</strong> laps<strong>in</strong>g of licence ......................................................... ........18<br />

Sect. 36 Consequences of term<strong>in</strong>ation of licence.........................................................19<br />

Sect. 37 Transfer <strong>and</strong> removal of facilities, etc. ...........................................................19<br />

Sect. 38 Indemnity.........................................................................................................21<br />

Sect. 39 Relationship <strong>to</strong> other legal requirements........................................................21<br />

Sect. 40 Jurisdiction <strong>and</strong> venue.....................................................................................22<br />

ANNEX 1: Area covered by the licence<br />

ANNEX 2: Work programme<br />

3


Pursuant <strong>to</strong> sections 5 <strong>and</strong> 13 of Act No. 293 of 10 June 1981 on the Use of the Danish Subsoil<br />

(the Subsoil Act), see Consolidated Act No. 526 of 11 June 2002, as amended by Act No. 1230<br />

of 27 December 2003, by section 12 of Act No. 442 of 9 June 2004, <strong>and</strong> on the basis of the<br />

<strong>in</strong>formation stated <strong>in</strong> the application dated XX.YY.2005 <strong>and</strong> otherwise obta<strong>in</strong>ed, the M<strong>in</strong>ister<br />

for Transport <strong>and</strong> Energy hereby grants a licence for the exploration for <strong>and</strong> production of<br />

hydrocarbons (referred <strong>to</strong> below as the “Licence”) with<strong>in</strong> the area specified <strong>in</strong> section 2 hereof<br />

<strong>to</strong> the follow<strong>in</strong>g companies, who shall hold the Licence jo<strong>in</strong>tly (referred <strong>to</strong> below as “the<br />

Licensee”):<br />

which company shall hold a share of :<br />

……………………………………………………………….XX %<br />

which company shall hold a share of :<br />

………………………………………………………………. YY %<br />

The Foundation responsible for State-participation,<br />

which shall hold a share of ……………………………………20 %<br />

The Licence thus granted shall be subject <strong>to</strong> the terms <strong>and</strong> conditions provided here<strong>in</strong>.<br />

4


Section 1<br />

(1) For the purpose of this Licence the follow<strong>in</strong>g terms shall have the mean<strong>in</strong>gs set forth<br />

respectively below, unless otherwise apparent from the context.<br />

<strong>Hydrocarbon</strong>s:<br />

<strong>Hydrocarbon</strong>s <strong>in</strong> the liquid, gaseous or solid state, found <strong>in</strong> a natural condition <strong>in</strong> the subsoil.<br />

Liquid hydrocarbons:<br />

Crude oil <strong>and</strong> condensate.<br />

<strong>Hydrocarbon</strong> deposit or deposit:<br />

A cont<strong>in</strong>uous accumulation of hydrocarbons <strong>in</strong> the subsoil. In case of doubt, the Danish Energy<br />

Authority shall determ<strong>in</strong>e what constitutes a hydrocarbon deposit.<br />

(2) The M<strong>in</strong>ister for Transport <strong>and</strong> Energy may authorize other public authorities <strong>to</strong> exercise<br />

rights granted <strong>in</strong> this Licence <strong>to</strong> the Danish Energy Authority.<br />

Section 2<br />

(1) The Licence shall apply <strong>to</strong> the area <strong>in</strong>dicated on the attached map, with the attendant corner<br />

coord<strong>in</strong>ates <strong>and</strong> blocks shown <strong>in</strong> Annex 1.<br />

(2) The coord<strong>in</strong>ate <strong>and</strong> block system used is <strong>in</strong>dicated on a map, dated 30 April 1984, deposited<br />

with the Danish Energy Authority.<br />

(3) Where the area covered by this Licence, or any part of it, is not with<strong>in</strong>, or is withdrawn from,<br />

Danish sovereignty under rules of <strong>in</strong>ternational law, <strong>in</strong>clud<strong>in</strong>g any <strong>in</strong>ternational treaties, the<br />

Licensee shall be bound by any result<strong>in</strong>g restriction of the area, <strong>and</strong> shall not on this account<br />

have any claim whatsoever aga<strong>in</strong>st the Danish Energy Authority or otherwise aga<strong>in</strong>st the Danish<br />

State.<br />

5


Section 3<br />

(1) This Licence confers upon the Licensee the exclusive right <strong>to</strong> explore for <strong>and</strong> <strong>to</strong> produce<br />

hydrocarbons, as def<strong>in</strong>ed <strong>in</strong> section 1, with<strong>in</strong> the area referred <strong>to</strong> under section 2. Excepted are<br />

such hydrocarbons as are obta<strong>in</strong>ed by subject<strong>in</strong>g coal, bitum<strong>in</strong>ous shale or other underground<br />

deposits <strong>to</strong> decompos<strong>in</strong>g distillation processes or other similar treatment, <strong>and</strong> methane<br />

accumulations <strong>in</strong> quaternary strata that are subject <strong>to</strong> private ownership.<br />

(2) This Licence shall not prevent permission from be<strong>in</strong>g granted, with<strong>in</strong> the area covered by<br />

this Licence, <strong>to</strong> any parties other than the Licensee <strong>to</strong> undertake prelim<strong>in</strong>ary <strong>in</strong>vestigations of<br />

the subsoil with a view <strong>to</strong> exploration for hydrocarbons, <strong>to</strong> explore for <strong>and</strong> <strong>to</strong> produce raw<br />

materials other than those covered by this Licence, <strong>to</strong> establish <strong>and</strong> operate pipel<strong>in</strong>e facilities<br />

<strong>in</strong>tended for activities fall<strong>in</strong>g with<strong>in</strong> the scope of the Subsoil Act, <strong>to</strong> use the subsoil for s<strong>to</strong>rage<br />

or for purposes other than production <strong>and</strong> <strong>to</strong> carry out scientific <strong>in</strong>vestigations. The Licensee<br />

shall ensure that the activities referred <strong>to</strong> <strong>in</strong> the previous sentence <strong>and</strong> the hydrocarbon<br />

exploration <strong>and</strong> production activities carried on under any other licences are not unnecessarily<br />

impeded.<br />

(3) Where both hydrocarbons <strong>and</strong> other natural deposits are discovered with<strong>in</strong> an area, <strong>and</strong><br />

where such resources cannot be produced at the same time, the Danish Energy Authority shall<br />

decide which of the activities shall have priority.<br />

(4) Where the Licensee discovers any raw materials other than those fall<strong>in</strong>g with<strong>in</strong> the scope of<br />

the Licence, the Licensee shall be obligated <strong>to</strong> give notice thereof <strong>to</strong> the Danish Energy<br />

Authority.<br />

(5) Where, as a necessary element of the production of hydrocarbons, other raw materials fall<strong>in</strong>g<br />

with<strong>in</strong> the scope of the Subsoil Act are produced at the same time, the Licensee shall be entitled<br />

<strong>to</strong> such raw materials. The Danish Energy Authority reserves the right <strong>to</strong> impose upon the<br />

Licensee specific terms <strong>and</strong> conditions with respect there<strong>to</strong>, <strong>in</strong>clud<strong>in</strong>g payment of a special fee<br />

<strong>in</strong> case the production is economically significant.<br />

6


Section 4<br />

(1) The Licensee shall carry out any such exploration works as are specified <strong>in</strong> the work<br />

programme attached here<strong>to</strong> as Annex 2.<br />

(2) Where the Licensee discovers any hydrocarbons, notice thereof shall promptly be given <strong>to</strong><br />

the Danish Energy Authority. Not later than six months after the completion of the drill<strong>in</strong>g<br />

activity dur<strong>in</strong>g which the discovery is made, the Licensee shall produce a report on the<br />

discovery <strong>and</strong> a programme for such further works as are necessary, <strong>in</strong> accordance with good<br />

practice with<strong>in</strong> the oil <strong>in</strong>dustry <strong>in</strong> the North Sea countries, <strong>to</strong> ascerta<strong>in</strong> whether a hydrocarbon<br />

deposit has been demonstrated under conditions such that production is technically feasible <strong>and</strong><br />

must be considered economically profitable (an evaluation programme). The evaluation<br />

programme shall <strong>in</strong>clude a time schedule for the execution of the works. If the discovery is<br />

made <strong>in</strong> the exploration period, the time schedule shall aim at establish<strong>in</strong>g the necessary basis,<br />

before the date of expiry of the exploration period fixed <strong>in</strong> the first sentence of section 5(1), or<br />

with<strong>in</strong> any extension of the exploration period granted by the Danish Energy Authority pursuant<br />

<strong>to</strong> the second sentence of section 5(1), for the issuance of a declaration as provided <strong>in</strong> section<br />

5(3) hereof. The evaluation programme shall be subject <strong>to</strong> approval by the Danish Energy<br />

Authority.<br />

Section 5<br />

(1) The Licence shall be valid for a term of six years from the date of issuance. The Danish<br />

Energy Authority may extend the term of the Licence for the purpose of exploration by up <strong>to</strong><br />

two years at a time, provided that special circumstances exist. The cumulative exploration<br />

period, however, may only exceed ten years <strong>in</strong> exceptional cases.<br />

(2) Any extension of the Licence under section 13(2) of the Subsoil Act for the purpose of<br />

production is <strong>to</strong> be granted by the Danish Energy Authority for the area delimited under subs.<br />

(4) for a period of 30 years from the grant<strong>in</strong>g of the extension; however, see section 35(4)<br />

below. Extensions may be granted separately for one or more areas.<br />

7


(3) The right <strong>to</strong> an extension referred <strong>to</strong> <strong>in</strong> subs. (2) shall be conditional upon the Licensee<br />

hav<strong>in</strong>g satisfied its obligations, <strong>in</strong>clud<strong>in</strong>g performance of the evaluation programme approved<br />

under section 4(2), <strong>and</strong> upon the submission, not later than four months before the expiry of the<br />

period specified <strong>in</strong> subs. (1), of a request for an extension of the term of the Licence. The<br />

request shall conta<strong>in</strong> a declaration <strong>to</strong> the effect that a hydrocarbon deposit has been<br />

demonstrated under conditions such that production is technically feasible <strong>and</strong> must be<br />

considered economically profitable, <strong>and</strong> that the Licensee <strong>in</strong>tends <strong>to</strong> undertake such production.<br />

The request shall be accompanied by a report on the evaluations of the deposit that supports the<br />

declaration. The report shall conta<strong>in</strong> a description <strong>and</strong> an evaluation of the deposit <strong>in</strong> terms of its<br />

geology <strong>and</strong> the technical aspects of the reservoir, as well as a statement of the assumptions<br />

concern<strong>in</strong>g production techniques <strong>and</strong> the economic fac<strong>to</strong>rs on which the Licensee's declaration<br />

is based.<br />

(4) The Danish Energy Authority shall undertake the delimitation of the area or areas with<br />

respect <strong>to</strong> which the Licence is extended for the purpose of production. The delimitation shall be<br />

<strong>in</strong>dicated by geographical coord<strong>in</strong>ates <strong>and</strong> by depths. The area thus delimited shall <strong>in</strong>clude the<br />

deposit such as its extent, <strong>in</strong> terms of coord<strong>in</strong>ates <strong>and</strong> depths, has been substantiated by the<br />

Licensee <strong>in</strong> the op<strong>in</strong>ion of the Danish Energy Authority <strong>in</strong> connection with the Licensee’s<br />

request for an extension of the term of the Licence. Where conditions so require, a delimited<br />

area may <strong>in</strong>clude more than one deposit. If the delimitation of the deposit cannot be established<br />

with substantial accuracy, the Danish Energy Authority shall take this <strong>in</strong><strong>to</strong> account <strong>in</strong><br />

establish<strong>in</strong>g the supplementary area <strong>and</strong> depths.<br />

Section 6<br />

(1) Any extension of the term of the Licence pursuant <strong>to</strong> section 5 for the purpose of production<br />

is conditional upon the Licensee submitt<strong>in</strong>g, prior <strong>to</strong> a deadl<strong>in</strong>e set by the Danish Energy<br />

Authority <strong>in</strong> grant<strong>in</strong>g the extension, a plan for the activities, <strong>in</strong>clud<strong>in</strong>g preparations for<br />

production <strong>and</strong> the facilities therefor (production arrangements, etc.) meet<strong>in</strong>g the approval of the<br />

Danish Energy Authority pursuant <strong>to</strong> section 10 of the Subsoil Act, <strong>and</strong> upon the Licensee<br />

commenc<strong>in</strong>g production by the date fixed <strong>in</strong> the approval.<br />

8


(2) The Danish Energy Authority may lay down detailed rules on the content <strong>and</strong> form of an<br />

application pursuant <strong>to</strong> section 10 of the Subsoil Act as well as on the <strong>in</strong>formation <strong>to</strong> be<br />

submitted <strong>to</strong>gether with or subsequent <strong>to</strong> the application.<br />

Section 7<br />

The Licensee shall pay a fee of DKK 100,000. The fee shall be paid <strong>to</strong> the Danish Energy<br />

Authority not later than 30 days after the grant<strong>in</strong>g of the Licence.<br />

(not used)<br />

Sections 8-12<br />

Section 13<br />

(1) ´The Foundation responsible for State-participation (referred <strong>to</strong> below as the “State<br />

Participant”) shall exercise for the Danish State the rights under this Licence <strong>in</strong> proportion <strong>to</strong> the<br />

size of the share held by it. The more specific rules concern<strong>in</strong>g the State Participant’s rights <strong>and</strong><br />

obligations as a co-holder of the Licence appear from section 8 of the Subsoil Act <strong>and</strong> are<br />

otherwise set forth <strong>in</strong> the jo<strong>in</strong>t operat<strong>in</strong>g agreement which, under section 18 of the Licence, is<br />

subject <strong>to</strong> the approval of the Danish Energy Authority.<br />

(Not used)<br />

Section 14<br />

9


Section 15<br />

(1) To comply with Article 3 of Directive 93/38/EEC, the Danish Energy Authority may decide<br />

that the Licensee:<br />

(a) shall observe the pr<strong>in</strong>ciples of non-discrim<strong>in</strong>ation <strong>and</strong> competitive procurement <strong>in</strong><br />

respect of the award of supplies, works <strong>and</strong> service contracts;<br />

(b) shall be obliged <strong>to</strong> communicate <strong>in</strong>formation <strong>to</strong> the European Commission relat<strong>in</strong>g <strong>to</strong><br />

the award of contracts, subject <strong>to</strong> conditions <strong>to</strong> be def<strong>in</strong>ed by the Commission <strong>in</strong><br />

accordance with Article 40 of the above-mentioned Directive.<br />

(2) The Danish Energy Authority may issue detailed rules on the procedures <strong>to</strong> be followed by<br />

the Licensee <strong>in</strong> order <strong>to</strong> fulfil an obligation stipulated <strong>in</strong> accordance with subs. (1)(a).<br />

(not used)<br />

Section 16<br />

Section 17<br />

With<strong>in</strong> a period of three months after the grant<strong>in</strong>g of this Licence, the Licensee shall submit a<br />

plan, <strong>to</strong> be approved by the Danish Energy Authority, concern<strong>in</strong>g the organization of the<br />

bus<strong>in</strong>ess <strong>and</strong> its location dur<strong>in</strong>g the exploration period. The Licensee shall submit a<br />

correspond<strong>in</strong>g plan for the production period <strong>to</strong> the Danish Energy Authority for approval, at the<br />

same time as submitt<strong>in</strong>g a request for approval of a plan for production arrangements, etc.<br />

10


Section 18<br />

(1) The Licence is granted subject <strong>to</strong> the condition that a jo<strong>in</strong>t operat<strong>in</strong>g agreement concern<strong>in</strong>g<br />

the performance of the activities covered by the Licence is executed not later than 90 days after<br />

the Licence has been granted, such agreement be<strong>in</strong>g subject <strong>to</strong> the approval of the Danish<br />

Energy Authority.<br />

(2) Any amendment of, deviation from or supplement <strong>to</strong> such agreement, <strong>in</strong>clud<strong>in</strong>g the<br />

appo<strong>in</strong>tment of a new opera<strong>to</strong>r, shall be subject <strong>to</strong> the approval of the Danish Energy Authority.<br />

Section 19<br />

(1) Representatives of the Danish Energy Authority shall be entitled <strong>to</strong> attend as observers any<br />

meet<strong>in</strong>gs of committees or groups established <strong>in</strong> connection with the activities comprised by the<br />

Licence.<br />

(2) The Danish Energy Authority shall receive the same notice <strong>and</strong> be given the same material,<br />

<strong>in</strong>clud<strong>in</strong>g m<strong>in</strong>utes of meet<strong>in</strong>gs, as the Licensee.<br />

Section 20<br />

At the Danish Energy Authority’s request, the Licensee shall arrange for the transportation of<br />

public authority representatives from their places of work <strong>to</strong> <strong>and</strong> from the places where the<br />

activities are be<strong>in</strong>g performed, <strong>and</strong> shall also provide accommodation. The associated<br />

expenditure shall be borne by the Licensee.<br />

11


Section 21<br />

(1) In order <strong>to</strong> ensure <strong>in</strong>sight <strong>in</strong><strong>to</strong> <strong>and</strong> allow supervision of the Licensee's activities under this<br />

Licence, the Licensee shall:<br />

(a) Submit all required f<strong>in</strong>ancial <strong>in</strong>formation about its activities. In this connection, the<br />

Licensee shall submit annual f<strong>in</strong>ancial statements consist<strong>in</strong>g of a balance sheet, <strong>in</strong>come<br />

statement <strong>and</strong> annual report, <strong>and</strong> shall submit <strong>in</strong>formation about shareholders<br />

represent<strong>in</strong>g at least one-tenth of the share capital. In addition, the Licensee shall<br />

promptly furnish <strong>in</strong>formation about any material changes <strong>in</strong> the company’s capital<br />

structure. Where the f<strong>in</strong>ancial statements cover activities other than those encompassed<br />

by the Licence, the Licensee shall also submit separate f<strong>in</strong>ancial statements for the<br />

activities covered by the Licence. Where the Licence is held by several parties, such<br />

<strong>in</strong>formation shall be furnished <strong>in</strong> respect of each of the holders, <strong>and</strong> <strong>in</strong> such case<br />

f<strong>in</strong>ancial statements shall be prepared show<strong>in</strong>g all common <strong>in</strong>come <strong>and</strong> expenditure.<br />

All of the f<strong>in</strong>ancial statements referred <strong>to</strong> shall be <strong>in</strong> Danish <strong>and</strong> shall be audited by a<br />

state-authorized public accountant <strong>in</strong> accordance with recognized Danish audit<strong>in</strong>g<br />

st<strong>and</strong>ards. Except as otherwise permitted by the Danish Energy Authority, the f<strong>in</strong>ancial<br />

year shall correspond <strong>to</strong> the calendar year. If the Licensee is a subsidiary of another<br />

company, the Licensee shall submit the f<strong>in</strong>ancial statements of its parent company <strong>and</strong><br />

consolidated f<strong>in</strong>ancial statements if so requested.<br />

(b) Submit any required <strong>in</strong>formation about the Licensee's activities <strong>in</strong> regard <strong>to</strong> prelim<strong>in</strong>ary<br />

<strong>in</strong>vestigations, exploration <strong>and</strong> production. In connection with the performance of<br />

geophysical, geological, geochemical <strong>and</strong> other <strong>in</strong>vestigations as well as drill<strong>in</strong>g<br />

activities, the Licensee shall thus submit, on a current or periodic basis, reports,<br />

samples, raw data, processed results, <strong>in</strong>terpretations <strong>and</strong> evaluations, <strong>to</strong>gether with<br />

summary reports conta<strong>in</strong><strong>in</strong>g an <strong>in</strong>terpretation <strong>and</strong> evaluation of the results obta<strong>in</strong>ed.<br />

With respect <strong>to</strong> the establishment <strong>and</strong> operation of production <strong>in</strong>stallations, the<br />

Licensee shall, on a current or periodic basis, submit <strong>in</strong>formation <strong>and</strong> reports on any<br />

present <strong>and</strong> future activities.<br />

12


c) Each year submit a summary of the Licensee's anticipated activities dur<strong>in</strong>g the<br />

follow<strong>in</strong>g four calendar years. The summary shall specify the <strong>in</strong>dividual activities <strong>and</strong><br />

the anticipated expenditures on prelim<strong>in</strong>ary <strong>in</strong>vestigations <strong>and</strong> exploration <strong>and</strong> the<br />

commencement <strong>and</strong> operation of production activity, as well as the anticipated <strong>in</strong>come<br />

<strong>and</strong> taxation <strong>in</strong> each year of the said period.<br />

(2) The Danish Energy Authority shall issue detailed rules concern<strong>in</strong>g the time of submission of<br />

the <strong>in</strong>formation referred <strong>to</strong> <strong>in</strong> subs. (1), <strong>in</strong>clud<strong>in</strong>g the form <strong>and</strong> degree of specification of such<br />

<strong>in</strong>formation, as well as rules concern<strong>in</strong>g the book-keep<strong>in</strong>g of the Licensees. The Danish Energy<br />

Authority may also issue rules concern<strong>in</strong>g <strong>in</strong>formation that the Licensee may be required <strong>to</strong><br />

submit <strong>in</strong> addition <strong>to</strong> that stipulated <strong>in</strong> subs. (1) <strong>and</strong> <strong>in</strong> the rules laid down pursuant <strong>to</strong> the<br />

provisions of section 34(1) of the Subsoil Act, <strong>and</strong> may dem<strong>and</strong> that further <strong>in</strong>formation be<br />

furnished <strong>in</strong> <strong>in</strong>dividual cases, if considered necessary.<br />

(3) The Danish Energy Authority may issue rules concern<strong>in</strong>g the Licensee's s<strong>to</strong>rage <strong>and</strong> use of<br />

samples, data, etc.<br />

Section 22<br />

(1) Any authorities <strong>and</strong> persons perform<strong>in</strong>g duties pursuant <strong>to</strong> the Subsoil Act, <strong>and</strong> any persons<br />

assist<strong>in</strong>g therewith, shall be subject <strong>to</strong> the confidentiality obligations under the provisions of<br />

sections 152 <strong>to</strong> 152f of 'Straffeloven' (the Penal Code) <strong>in</strong> respect of such <strong>in</strong>formation <strong>and</strong><br />

samples, etc., as may be received by the authorities from the Licensee under this Licence <strong>and</strong><br />

under sections 26 <strong>and</strong> 34 of the Subsoil Act.<br />

(2) Such <strong>in</strong>formation <strong>and</strong> samples, etc., as are covered by section 34(1) of the Subsoil Act may<br />

be disclosed <strong>to</strong> parties other than public authorities after five years, reckoned from the time<br />

when the <strong>in</strong>formation, etc., has been produced <strong>and</strong> made available <strong>to</strong> the Licensee. Should the<br />

Licence expire, lapse or be rel<strong>in</strong>quished or revoked, whether <strong>in</strong> whole or <strong>in</strong> part, such period<br />

shall be reduced <strong>to</strong> two years with respect <strong>to</strong> <strong>in</strong>formation concern<strong>in</strong>g the area no longer covered<br />

by the Licence.<br />

13


(3) The provisions <strong>in</strong> subs. (1) <strong>and</strong> (2) shall not prevent the disclosure of such <strong>in</strong>formation if:<br />

(a) No legitimate <strong>in</strong>terest of the Licensee requires the <strong>in</strong>formation <strong>to</strong> be kept confidential;<br />

(b) it is determ<strong>in</strong>ed that the Licensee's <strong>in</strong>terest <strong>in</strong> ma<strong>in</strong>ta<strong>in</strong><strong>in</strong>g confidentiality must yield <strong>to</strong><br />

considerations of essential public <strong>in</strong>terest;<br />

(c) <strong>in</strong>formation of a general nature is furnished <strong>in</strong> connection with the issuance of public<br />

statements, annual reports, etc., concern<strong>in</strong>g matters relat<strong>in</strong>g <strong>to</strong> exploration <strong>and</strong><br />

production, or<br />

(d) <strong>in</strong>formation is disclosed as part of the cooperation with other countries’ authorities <strong>and</strong><br />

subject <strong>to</strong> the condition that similar provisions for ensur<strong>in</strong>g secrecy of such <strong>in</strong>formation<br />

apply <strong>in</strong> the country <strong>in</strong> question. Information received from other countries’ authorities<br />

that is classified as secret or confidential, or where this is implied by the nature of the<br />

<strong>in</strong>formation, shall be subject <strong>to</strong> the provisions of subs. (1) above.<br />

Section 23<br />

In communications <strong>to</strong> <strong>in</strong>dividual persons or <strong>to</strong> the public, the Licensee shall not, without the<br />

prior consent of the Danish Energy Authority, directly or <strong>in</strong>directly quote or refer <strong>to</strong> statements<br />

or communications from the Danish Energy Authority, any other public authority or any person<br />

employed by or perform<strong>in</strong>g duties for them, concern<strong>in</strong>g the probability of mak<strong>in</strong>g discoveries or<br />

concern<strong>in</strong>g the size of hydrocarbon deposits.<br />

14


Section 24<br />

(1) Any equipment, procedures <strong>and</strong> units of measurement for the qualitative <strong>and</strong> quantitative<br />

measurement of hydrocarbons produced are subject <strong>to</strong> approval by the Danish Energy<br />

Authority. Measurements shall be performed accord<strong>in</strong>g <strong>to</strong> a recognized <strong>and</strong> cus<strong>to</strong>mary<br />

procedure, <strong>and</strong> the Danish Energy Authority shall be able <strong>to</strong> check them.<br />

(2) If it is found that the methods or apparatus used have resulted <strong>in</strong> <strong>to</strong>o low a measurement<br />

result, this situation shall be deemed <strong>to</strong> have existed s<strong>in</strong>ce the last previous check <strong>to</strong>ok place,<br />

unless it is established that such situation has existed for a shorter or a longer period of time.<br />

Section 25<br />

The Licensee shall be obligated <strong>to</strong> comply with such rules <strong>and</strong> regulations on the performance<br />

of drill<strong>in</strong>g activity <strong>and</strong> other works as may be prescribed from time <strong>to</strong> time as a condition for<br />

approval under section 28 of the Subsoil Act.<br />

Section 26<br />

The Licensee shall be obligated <strong>to</strong> comply with such rules <strong>and</strong> regulations as the Danish Energy<br />

Authority may issue concern<strong>in</strong>g the mark<strong>in</strong>g of equipment, etc., transported <strong>to</strong> or from offshore<br />

facilities with<strong>in</strong> the licence area.<br />

Section 27<br />

(1) Where the Licence <strong>in</strong>cludes areas not comprised by Act No. 291 of 10 June 1981 on the<br />

Establishment <strong>and</strong> Utilization of a Pipel<strong>in</strong>e for Transportation of Crude Oil <strong>and</strong> Condensate, as<br />

amended by Act No. 74 of 12 February 2002, Act No. 206 of 29 March 2004 <strong>and</strong> Act No. 1427<br />

of 22 December 2004, the Licensee shall be obligated, when carry<strong>in</strong>g on production <strong>in</strong> such<br />

areas, <strong>to</strong> connect its production facilities <strong>to</strong> pipel<strong>in</strong>e systems for transport<strong>in</strong>g liquid<br />

hydrocarbons from their place of production. The Danish Energy Authority may grant<br />

exceptions <strong>to</strong> the obligations <strong>in</strong> the preced<strong>in</strong>g sentence <strong>in</strong> circumstances where transportation<br />

15


through the pipel<strong>in</strong>e system would be uneconomical or <strong>in</strong>expedient <strong>in</strong> the op<strong>in</strong>ion of the<br />

Authority. After the Licensee has had an opportunity <strong>to</strong> submit comments, the Danish Energy<br />

Authority shall lay down more specific provisions on the connection <strong>and</strong> use of the system,<br />

<strong>in</strong>clud<strong>in</strong>g rules for payment therefor, dues <strong>to</strong> the State, etc.<br />

(2) With respect <strong>to</strong> natural gas, the Licensee shall be obligated <strong>to</strong> connect its production<br />

facilities <strong>to</strong> the pipel<strong>in</strong>e systems for transport<strong>in</strong>g natural gas that have been constructed or<br />

designated by the State <strong>and</strong> shall use such systems for transport<strong>in</strong>g the produced natural gas<br />

from its place of production. The provisions of the second <strong>and</strong> third sentences of subs. (1) shall<br />

apply mutatis mut<strong>and</strong>is.<br />

(3) If production facilities are connected <strong>to</strong> pipel<strong>in</strong>e systems pursuant <strong>to</strong> subs. (1) <strong>and</strong>/or subs.<br />

(2) after production has commenced, the Danish Energy Authority, when issu<strong>in</strong>g the specific<br />

rules concern<strong>in</strong>g payment for connection <strong>and</strong> use, shall take <strong>in</strong><strong>to</strong> account the <strong>in</strong>vestments made<br />

by the Licensee for the purpose of transport<strong>in</strong>g produced hydrocarbons from their place of<br />

production.<br />

(4) The connection obligation under subs. (1) <strong>and</strong>/or subs. (2) shall <strong>in</strong>clude the obligation <strong>to</strong><br />

construct <strong>in</strong>stallations <strong>and</strong> pipel<strong>in</strong>es that may be required for connection at the tie-<strong>in</strong> po<strong>in</strong>t<br />

designated by the Danish Energy Authority.<br />

(not used)<br />

Sections 28-29<br />

Section 30<br />

(1) The Licensee's liability for damages under the Subsoil Act shall be covered by <strong>in</strong>surance <strong>in</strong><br />

accordance with the rules <strong>in</strong> subs. (2) through (4).<br />

(2) The <strong>in</strong>surance shall provide reasonable coverage, <strong>in</strong> light of the risks <strong>in</strong>volved <strong>in</strong> the<br />

operation of the bus<strong>in</strong>ess <strong>and</strong> the premiums <strong>to</strong> be paid.<br />

16


(3) At the end of each calendar year, the Danish Energy Authority shall be <strong>in</strong>formed of the<br />

<strong>in</strong>surance then <strong>in</strong> force <strong>and</strong> of the pr<strong>in</strong>cipal terms thereof. The Danish Energy Authority may<br />

require additional <strong>in</strong>surance <strong>to</strong> be taken out.<br />

(4) The Licensee also shall be obligated <strong>to</strong> comply with any rules concern<strong>in</strong>g <strong>in</strong>surance that may<br />

be issued by the Danish Energy Authority.<br />

Section 31<br />

If the Licence is granted <strong>to</strong> several parties jo<strong>in</strong>tly, they shall be jo<strong>in</strong>tly <strong>and</strong> severally liable for<br />

any damages claimed pursuant <strong>to</strong> section 35 of the Subsoil Act <strong>and</strong> for the satisfaction of any<br />

obligations <strong>to</strong> the State under this Licence.<br />

Section 32<br />

In order <strong>to</strong> ensure performance by the Licensee of all its obligations under this Licence, the<br />

Licensee shall, with<strong>in</strong> a period of 30 days from the grant<strong>in</strong>g hereof, provide security, possibly <strong>in</strong><br />

the form of a parent company guaranty, <strong>in</strong> an amount <strong>and</strong> of a nature that is acceptable <strong>to</strong> the<br />

Danish Energy Authority. Upon 30 days' notice, the Danish Energy Authority may subsequently<br />

require that such security be changed or supplemented.<br />

Section 33<br />

Neither this Licence nor any <strong>in</strong>terest there<strong>in</strong> may be assigned or otherwise transferred, either<br />

directly or <strong>in</strong>directly, <strong>in</strong> whole or <strong>in</strong> part, <strong>to</strong> any third party or between several co-Licensees,<br />

without the approval of the Danish Energy Authority. Correspond<strong>in</strong>g restrictions shall also<br />

apply <strong>to</strong> the transfer of sharehold<strong>in</strong>gs <strong>and</strong> <strong>in</strong>terests <strong>in</strong> companies <strong>in</strong> such amounts as may result<br />

<strong>in</strong> the transfer of a controll<strong>in</strong>g <strong>in</strong>terest <strong>in</strong> a company that is a co-Licensee, <strong>and</strong> <strong>to</strong> the conclusion<br />

of agreements hav<strong>in</strong>g the same effect. A fee may be charged for an approval given pursuant <strong>to</strong><br />

the first <strong>and</strong> second sentences of this section.<br />

17


Section 34<br />

(1) Where the rights under this Licence are rel<strong>in</strong>quished dur<strong>in</strong>g the exploration period, such<br />

rel<strong>in</strong>quishment shall apply <strong>to</strong> the entire licence area.<br />

(2) Where the Licence has been extended <strong>in</strong> respect of one or more areas for the purpose of<br />

production, the Licensee may rel<strong>in</strong>quish the right <strong>to</strong> any such area upon one year's notice.<br />

(3) In the event of any rel<strong>in</strong>quishment pursuant <strong>to</strong> subs. (1) or subs. (2), the provisions <strong>in</strong><br />

sections 36 <strong>and</strong> 37 shall apply.<br />

Section 35<br />

(1) The Danish Energy Authority may revoke this Licence:<br />

1) if any provisions, conditions or stipulations conta<strong>in</strong>ed <strong>in</strong> the Subsoil Act <strong>and</strong><br />

<strong>in</strong> this Licence or issued pursuant there<strong>to</strong> are not complied with,<br />

2) if <strong>in</strong>correct or mislead<strong>in</strong>g <strong>in</strong>formation is given <strong>in</strong> an application for a Licence,<br />

3) if one or more holders of the Licence suspend their payments, file a petition<br />

for a compulsory composition with credi<strong>to</strong>rs, are declared bankrupt, go <strong>in</strong><strong>to</strong><br />

liquidation or experience any comparable circumstances.<br />

(2) If the default can be remedied by the Licensee, the Licence may not be revoked pursuant <strong>to</strong><br />

para. 1) of subs. (1) until the Danish Energy Authority has ordered that the default be remedied<br />

with<strong>in</strong> a specified period, <strong>and</strong> such order has not been complied with.<br />

(3) In the case of revocation pursuant <strong>to</strong> subs. (1) <strong>and</strong> laps<strong>in</strong>g of the Licence pursuant <strong>to</strong> subs.<br />

(4), the provisions of sections 36 <strong>and</strong> 37 shall apply.<br />

18


(4) If production has been <strong>in</strong>itiated <strong>and</strong> is then suspended for a period of more than two<br />

consecutive years, <strong>and</strong> such suspension is not part of an approved plan, the Licence shall lapse<br />

for the area concerned, unless the Licensee can substantiate that cont<strong>in</strong>u<strong>in</strong>g production is<br />

temporarily non-viable commercially. In such event, the Licensee may reta<strong>in</strong> the Licence for a<br />

period fixed by the Danish Energy Authority of up <strong>to</strong> five consecutive years, even though<br />

production is suspended dur<strong>in</strong>g such period.<br />

Section 36<br />

(1) The expiry, rel<strong>in</strong>quishment, laps<strong>in</strong>g or revocation of the Licence shall not relieve the<br />

Licensee of its obligations pursuant <strong>to</strong> legislation, this Licence or any other applicable rules,<br />

conditions or orders.<br />

(2) Where any part of the work programme laid down <strong>in</strong> Annex 2 is not performed, the<br />

Licensee, unless exempted by the Danish Energy Authority, shall pay <strong>to</strong> the Treasury an amount<br />

equal <strong>to</strong> the cost of performance of the obligations. In establish<strong>in</strong>g such amount, account shall<br />

be taken of the costs that would have been <strong>in</strong>curred by hav<strong>in</strong>g other parties perform the work for<br />

the State at the time of term<strong>in</strong>ation of the Licence.<br />

(3) Payment of the amount referred <strong>to</strong> <strong>in</strong> subs. (2) shall not be subject <strong>to</strong> the Danish Energy<br />

Authority hav<strong>in</strong>g the rema<strong>in</strong><strong>in</strong>g work performed.<br />

(4) Payment shall be made not later than 30 days after the Danish Energy Authority has<br />

submitted a request <strong>in</strong> this respect.<br />

(5) In the event of del<strong>in</strong>quent payments, the Licensee shall pay <strong>in</strong>terest at an annual rate equal <strong>to</strong><br />

the official deposit rate set by Danmarks Nationalbank from time <strong>to</strong> time, plus 7 %.<br />

Section 37<br />

(1) If the Licence term<strong>in</strong>ates due <strong>to</strong> its expiry, rel<strong>in</strong>quishment, laps<strong>in</strong>g or revocation, <strong>in</strong> respect<br />

of either the entire area or part thereof, the State shall be entitled <strong>to</strong> take over, without<br />

19


consideration, all or part of any facilities, equipment <strong>and</strong> <strong>in</strong>stallations <strong>in</strong>tended for long-term use<br />

with<strong>in</strong> the area concerned, as well as any required accessories <strong>and</strong> materials, <strong>in</strong>clud<strong>in</strong>g journals<br />

<strong>and</strong> manuals, etc.<br />

(2) If the Licence term<strong>in</strong>ates, cf. subs. (1), the Licensee shall be obligated <strong>to</strong> ensure that the<br />

facilities, etc., referred <strong>to</strong> <strong>in</strong> subs. (1) are located with<strong>in</strong> the area <strong>and</strong> can be assigned <strong>to</strong> the State<br />

without consideration, <strong>in</strong> a condition consistent with satisfac<strong>to</strong>ry ma<strong>in</strong>tenance <strong>and</strong> repair.<br />

Correspond<strong>in</strong>g rules shall apply <strong>to</strong> the facilities, etc., referred <strong>to</strong> <strong>in</strong> subs. (1) that are <strong>in</strong> the<br />

course of construction for the purpose of production activities, provided, however, that the<br />

Licensee shall not be obligated <strong>to</strong> take any further measures <strong>to</strong>wards the completion thereof.<br />

(3) At the time the Licence term<strong>in</strong>ates, cf. subs. (1), the Licensee shall be obligated <strong>to</strong> ensure<br />

that the facilities, etc. referred <strong>to</strong> <strong>in</strong> subs. (1) <strong>and</strong> (2) that do not belong <strong>to</strong> the Licensee or that<br />

are encumbered with other rights <strong>in</strong> favour of third parties, are released from any third party<br />

rights, such that they can be assigned <strong>to</strong> the State without consideration <strong>and</strong> free of<br />

encumbrances.<br />

(4) In the event of fail<strong>in</strong>g <strong>to</strong> comply with its obligations under subs. (1), (2) <strong>and</strong> (3), whether or<br />

not negligence is shown, the Licensee shall be obligated <strong>to</strong> compensate for any <strong>and</strong> all losses<br />

caused thereby, <strong>in</strong>clud<strong>in</strong>g any loss of profits <strong>and</strong> all expenses which the State is required <strong>to</strong> bear<br />

<strong>in</strong> order <strong>to</strong> be placed <strong>in</strong> the same position as if such obligations had been satisfied <strong>in</strong> accordance<br />

with their terms.<br />

(5) The provisions of subs. (1) <strong>to</strong> (4) shall apply mutatis mut<strong>and</strong>is <strong>to</strong> <strong>in</strong>stallations, etc. that are<br />

ab<strong>and</strong>oned or disused prior <strong>to</strong> the term<strong>in</strong>ation of the Licence, <strong>in</strong> step with the use of such<br />

<strong>in</strong>stallations be<strong>in</strong>g discont<strong>in</strong>ued.<br />

(6) Not later than two years before the term<strong>in</strong>ation of the Licence, cf. subs. (1), or two years<br />

before the time when one or more <strong>in</strong>stallations, etc. are expected <strong>to</strong> be ab<strong>and</strong>oned or disused, the<br />

Licensee shall submit a plan for discont<strong>in</strong>u<strong>in</strong>g the use of all <strong>in</strong>stallations, etc. (w<strong>in</strong>d<strong>in</strong>g-up plan)<br />

for the approval of the Danish Energy Authority. Not later than three months after the Licence<br />

has lapsed, been revoked or the use of an <strong>in</strong>stallation or the like has been discont<strong>in</strong>ued, without<br />

20


the submission of a w<strong>in</strong>d<strong>in</strong>g-up plan, a w<strong>in</strong>d<strong>in</strong>g-up plan shall be submitted for the Danish<br />

Energy Authority’s approval. The w<strong>in</strong>d<strong>in</strong>g-up plan shall set out the procedure for remov<strong>in</strong>g the<br />

<strong>in</strong>stallations, etc. that the State does not wish <strong>to</strong> take over, <strong>in</strong> whole or <strong>in</strong> part, <strong>in</strong> accordance<br />

with subs. (1) <strong>to</strong> (5) above. The w<strong>in</strong>d<strong>in</strong>g-up plan shall moreover <strong>in</strong>clude <strong>in</strong>formation about <strong>and</strong><br />

an assessment of the environmental impact <strong>and</strong> safety aspects of the plan, as well as a time<br />

schedule for its implementation. The Danish Energy Authority may lay down detailed<br />

guidel<strong>in</strong>es for the content of the plan. Accord<strong>in</strong>g <strong>to</strong> a time schedule fixed by the Danish Energy<br />

Authority, the Authority may require the Licensee <strong>to</strong> remove all or part of any <strong>in</strong>stallations, etc.,<br />

whether they belong <strong>to</strong> the Licensee or <strong>to</strong> any other party, which the State does not choose <strong>to</strong><br />

take over under subs. (1) <strong>to</strong> (5).<br />

(7) The Danish Energy Authority may at any time require the Licensee <strong>to</strong> take any other<br />

necessary measures <strong>in</strong> order <strong>to</strong> prevent the <strong>in</strong>stallations, etc., from pos<strong>in</strong>g any risk or<br />

<strong>in</strong>convenience. If the Licensee fails <strong>to</strong> comply with any such requirement made by the Danish<br />

Energy Authority, the Danish Energy Authority shall be entitled, without further notice, <strong>to</strong> have<br />

the necessary measures taken for the Licensee's account <strong>and</strong> risk <strong>in</strong> every respect. The Licensee<br />

shall <strong>in</strong>demnify the State aga<strong>in</strong>st any third-party claims for damages from the State result<strong>in</strong>g<br />

from such removal or tak<strong>in</strong>g of preventive measures.<br />

Section 38<br />

The Licensee shall <strong>in</strong>demnify the State aga<strong>in</strong>st all claims whatsoever which may be made by<br />

any third party aga<strong>in</strong>st the State as a consequence of the Licensee's activities.<br />

Section 39<br />

(1) This Licence shall be subject <strong>to</strong> the laws of <strong>Denmark</strong> <strong>in</strong> force from time <strong>to</strong> time, <strong>in</strong>clud<strong>in</strong>g<br />

future amendments, if any, <strong>to</strong> the Act on the Use of the Danish Subsoil, executive orders,<br />

decrees, <strong>and</strong> the obligations <strong>in</strong> force from time <strong>to</strong> time that arise from <strong>Denmark</strong>'s membership of<br />

the European Union. Accord<strong>in</strong>gly, this Licence shall not restrict the State's general right <strong>to</strong> levy<br />

taxes or its authority <strong>to</strong> issue general provisions concern<strong>in</strong>g more specific aspects of exploration<br />

<strong>and</strong> production activities.<br />

21


(2) This Licence shall not exempt the Licensee from obta<strong>in</strong><strong>in</strong>g any other licences <strong>and</strong> approvals<br />

required pursuant <strong>to</strong> the Act on the Use of the Danish Subsoil <strong>and</strong> legislation <strong>in</strong> general.<br />

Section 40<br />

(1) Any disputes aris<strong>in</strong>g <strong>in</strong> connection with this Licence or with the Licensee's performance of<br />

activities under this Licence shall be resolved pursuant <strong>to</strong> the laws <strong>in</strong> force <strong>in</strong> <strong>Denmark</strong> <strong>and</strong> by<br />

the Danish courts.<br />

(2) The venue shall be Copenhagen.<br />

(3) Subs. (1) <strong>and</strong> (2) shall not prejudice the right of the Danish Energy Authority <strong>and</strong> the<br />

Licensee <strong>to</strong> agree, <strong>in</strong> any particular case, that a dispute as referred <strong>to</strong> <strong>in</strong> subs. (1) shall be<br />

resolved by arbitration.<br />

Copenhagen, 200X<br />

22


Annex 1<br />

<strong>to</strong> Licence No. x/xx<br />

for <strong>Exploration</strong> for <strong>and</strong> Production of <strong>Hydrocarbon</strong>s<br />

Area covered by the Licence, cf. section 2(1).<br />

The Licence covers the areas <strong>in</strong> blocks ..... shown on the attached map with the corner<br />

coord<strong>in</strong>ates:<br />

(Geographical network ED 50)<br />

Latitude Longitude<br />

Po<strong>in</strong>t Degrees M<strong>in</strong>utes Seconds Degrees M<strong>in</strong>utes Seconds<br />

1 - - - - - -<br />

2 - - - - - -<br />

3 - - - - - -<br />

4 - - - - - -<br />

- - - - - - -<br />

- - - - - - -<br />

1 - - - - - -<br />

Where possible, the licence area will be del<strong>in</strong>eated by connect<strong>in</strong>g the corner coord<strong>in</strong>ates <strong>in</strong><br />

the above order by longitudes <strong>and</strong> latitudes. If not, geodetic l<strong>in</strong>es will be used.


Annex 2<br />

<strong>to</strong> Licence No. x/xx<br />

for <strong>Exploration</strong> for <strong>and</strong> Production of <strong>Hydrocarbon</strong>s<br />

Work programme for the Licence, cf. section 4(1).<br />

The follow<strong>in</strong>g work programme covers the explora<strong>to</strong>ry activities that the Licensee shall carry<br />

out, as a m<strong>in</strong>imum, pursuant <strong>to</strong> section 4(1) of Licence No. x/x for <strong>Exploration</strong> for <strong>and</strong><br />

Production of <strong>Hydrocarbon</strong>s, with regard <strong>to</strong> the area comprised by the Licence; see Annex 1.<br />

1) Not later than xx months after the issuance of the Licence, the Licensee shall have<br />

provided xx km/km 2 of new 2D/3D seismics.<br />

2) The Licensee shall drill one (1) exploration well <strong>and</strong> shall commence drill<strong>in</strong>g the well not<br />

later than xx months after the issuance of the Licence. The well shall be carried <strong>to</strong> a depth<br />

that makes it possible <strong>to</strong> carry out logg<strong>in</strong>g of the entire XX Formation.<br />

3)<br />

4)<br />

When the Licence for an area term<strong>in</strong>ates, the Licensee shall submit a f<strong>in</strong>al report <strong>to</strong> the Danish<br />

Energy Authority on the hydrocarbon potential <strong>in</strong> the relevant area.<br />

The wells shall be drilled so as <strong>to</strong> ensure safe <strong>and</strong> appropriate exploration, which shall <strong>in</strong>clude<br />

core drill<strong>in</strong>g, extraction of samples <strong>and</strong> test production, <strong>and</strong> otherwise <strong>in</strong> conformity with any<br />

guidel<strong>in</strong>es laid down by the Danish Energy Authority <strong>in</strong> connection with the approval of each<br />

<strong>in</strong>dividual drill<strong>in</strong>g programme. Moreover, wells shall be drilled <strong>in</strong> compliance with good<br />

exploration practice.<br />

Satisfac<strong>to</strong>ry analyses <strong>and</strong> <strong>in</strong>terpretations of acquired data shall be prepared. The Licensee<br />

shall comply with any <strong>in</strong>structions issued by the Danish Energy Authority <strong>in</strong> this respect.<br />

Prior <strong>to</strong> the commencement of the work, the Licensee may obta<strong>in</strong> the Danish Energy<br />

Authority's op<strong>in</strong>ion as <strong>to</strong> whether the work planned will count <strong>to</strong>wards fulfilment of the work<br />

programme.


UNOFFICIAL TRANSLATION<br />

L I C E N C E<br />

NO. X/XX<br />

F O R E X P L O R A T I O N F O R<br />

A N D P R O D U C T I O N O F<br />

H Y D R O C A R B O N S<br />

O P E N D O O R P R O C E D U R E<br />

M<strong>in</strong>istry of Climate <strong>and</strong> Energy<br />

This translation is provided for convenience only, <strong>and</strong> <strong>in</strong> the event of any conflict between<br />

the word<strong>in</strong>g of the Danish <strong>and</strong> English versions, the word<strong>in</strong>g of the Danish version shall<br />

prevail <strong>in</strong> all respects.<br />

2011


CONTENTS<br />

Page<br />

Licensee ................................................................................................................... 4<br />

Sect. 1 Def<strong>in</strong>itions ................................................................................................... 5<br />

Sect. 2 Licence area ............................................................................................... 5<br />

Sect. 3 Scope of licence ......................................................................................... 6<br />

Sect. 4 Work programme <strong>and</strong> evaluation programme ............................................ 6<br />

Sect. 5 Term of the licence <strong>and</strong> extension for the purpose of production ............... 7<br />

Sect. 6 Production .................................................................................................. 8<br />

Sect. 7 One-time fee ............................................................................................... 8<br />

Sect. 8-12 (not used) ................................................................................................... 9<br />

Sect. 13 State participation ....................................................................................... 9<br />

Sect. 14-16 (not used) ................................................................................................... 9<br />

Sect. 17 Location of activities ................................................................................... 9<br />

Sect. 18 Jo<strong>in</strong>t operat<strong>in</strong>g agreement .......................................................................... 9<br />

Sect. 19 Observers ................................................................................................. 10<br />

Sect. 20 Transport <strong>and</strong> documentation for supervisors, etc .................................... 10<br />

Sect. 21 Report<strong>in</strong>g .................................................................................................. 10<br />

Sect. 22 Confidentiality ........................................................................................... 12<br />

Sect. 23 Licensee's communications <strong>to</strong> <strong>in</strong>dividuals or <strong>to</strong> the public ........................ 12<br />

Sect. 24 Measurement ............................................................................................ 13<br />

Sect. 25 Drill<strong>in</strong>g regulations .................................................................................... 13<br />

Sect. 26 Rules <strong>and</strong> regulations for mark<strong>in</strong>g of equipment, etc ............................... 13<br />

Sect. 27 Connection <strong>to</strong> pipel<strong>in</strong>e facilities ................................................................ 13<br />

Sect. 28-29 (not used) ................................................................................................. 14<br />

Sect. 30 Insurance .................................................................................................. 14<br />

2


Sect. 31 Liability for damages ................................................................................. 15<br />

Sect. 32 Form of security ........................................................................................ 15<br />

Sect. 33 Assignment ............................................................................................... 15<br />

Sect. 34 Rel<strong>in</strong>quishment ......................................................................................... 16<br />

Sect. 35 Revocation <strong>and</strong> laps<strong>in</strong>g of licence ............................................................ 16<br />

Sect. 36 Consequences of term<strong>in</strong>ation of licence ................................................... 17<br />

Sect. 37 Transfer <strong>and</strong> removal of facilities, etc ....................................................... 17<br />

Sect. 38 Indemnity .................................................................................................. 19<br />

Sect. 39 Relationship <strong>to</strong> other legal requirements .................................................. 19<br />

Sect. 40 Jurisdiction <strong>and</strong> venue .............................................................................. 20<br />

ANNEX 1:<br />

Area covered by the licence<br />

ANNEX 2: Work programme<br />

3


Pursuant <strong>to</strong> sections 5 <strong>and</strong> 13 of Act No. 293 of 10 June 1981 on the Use of the Danish Subsoil<br />

(the Subsoil Act), see Consolidated Act No. 960 of 13 September 2011, <strong>and</strong> on the basis of the<br />

<strong>in</strong>formation stated <strong>in</strong> the application from xxx <strong>and</strong> otherwise obta<strong>in</strong>ed, the M<strong>in</strong>ister for Climate <strong>and</strong><br />

Energy hereby grants a licence for the exploration for <strong>and</strong> production of hydrocarbons (referred <strong>to</strong><br />

below as the “Licence”) with<strong>in</strong> the area specified <strong>in</strong> section 2 hereof <strong>to</strong> the follow<strong>in</strong>g companies,<br />

who shall hold the Licence jo<strong>in</strong>tly (referred <strong>to</strong> below as “the Licensee”):<br />

Company 1,<br />

registered <strong>in</strong> [Country] with registration no. ,<br />

with a share of ................................................................................................... XX %<br />

Company 2,<br />

registered <strong>in</strong> [Country] with registration no. ,<br />

with a share of ................................................................................................... XX %<br />

……………..<br />

The Danish North Sea Fund,<br />

registered <strong>in</strong> <strong>Denmark</strong> with registration no. Cvr-nr. 29435065,<br />

with a share of .................................................................................................... 20 %<br />

The Licence thus granted shall be subject <strong>to</strong> the terms <strong>and</strong> conditions provided here<strong>in</strong>.<br />

4


Section 1<br />

(1) For the purpose of this Licence the follow<strong>in</strong>g terms shall have the mean<strong>in</strong>gs set forth<br />

respectively below, unless otherwise apparent from the context.<br />

<strong>Hydrocarbon</strong>s:<br />

<strong>Hydrocarbon</strong>s <strong>in</strong> the liquid, gaseous or solid state, found <strong>in</strong> a natural condition <strong>in</strong> the subsoil.<br />

Liquid hydrocarbons:<br />

Crude oil <strong>and</strong> condensate.<br />

<strong>Hydrocarbon</strong> deposit or deposit:<br />

A cont<strong>in</strong>uous accumulation of hydrocarbons <strong>in</strong> the subsoil. In case of doubt, the Danish Energy<br />

Agency shall determ<strong>in</strong>e what constitutes a hydrocarbon deposit.<br />

(2) The M<strong>in</strong>ister for Climate <strong>and</strong> Energy may authorize other public authorities <strong>to</strong> exercise rights<br />

granted <strong>in</strong> this Licence <strong>to</strong> the Danish Energy Agency.<br />

Section 2<br />

(1) The Licence shall apply <strong>to</strong> the area <strong>in</strong>dicated on the attached map, with the attendant corner<br />

coord<strong>in</strong>ates <strong>and</strong> blocks shown <strong>in</strong> Annex 1.<br />

(2) The coord<strong>in</strong>ate <strong>and</strong> block system used is <strong>in</strong>dicated on a map, dated 30 April 1984, deposited<br />

with the Danish Energy Agency.<br />

(3) Where the area covered by this Licence, or any part of it, is not with<strong>in</strong>, or is withdrawn from,<br />

Danish sovereignty under rules of <strong>in</strong>ternational law, <strong>in</strong>clud<strong>in</strong>g any <strong>in</strong>ternational treaties, the<br />

Licensee shall be bound by any result<strong>in</strong>g restriction of the area, <strong>and</strong> shall not on this account<br />

have any claim whatsoever aga<strong>in</strong>st the Danish Energy Agency or otherwise aga<strong>in</strong>st the Danish<br />

State.<br />

5


Section 3<br />

(1) This Licence confers upon the Licensee the exclusive right <strong>to</strong> explore for <strong>and</strong> <strong>to</strong> produce<br />

hydrocarbons, as def<strong>in</strong>ed <strong>in</strong> section 1, with<strong>in</strong> the area referred <strong>to</strong> under section 2. Excepted are<br />

such hydrocarbons as are obta<strong>in</strong>ed by subject<strong>in</strong>g coal, bitum<strong>in</strong>ous shale or other underground<br />

deposits <strong>to</strong> decompos<strong>in</strong>g distillation processes or other similar treatment, <strong>and</strong> methane<br />

accumulations <strong>in</strong> quaternary strata that are subject <strong>to</strong> private ownership.<br />

(2) This Licence shall not prevent permission from be<strong>in</strong>g granted, with<strong>in</strong> the area covered by this<br />

Licence, <strong>to</strong> any parties other than the Licensee <strong>to</strong> undertake prelim<strong>in</strong>ary <strong>in</strong>vestigations of the<br />

subsoil with a view <strong>to</strong> exploration for hydrocarbons, <strong>to</strong> explore for <strong>and</strong> <strong>to</strong> produce raw materials<br />

other than those covered by this Licence, <strong>to</strong> establish <strong>and</strong> operate pipel<strong>in</strong>e facilities <strong>in</strong>tended for<br />

activities fall<strong>in</strong>g with<strong>in</strong> the scope of the Subsoil Act, <strong>to</strong> use the subsoil for s<strong>to</strong>rage or for purposes<br />

other than production <strong>and</strong> <strong>to</strong> carry out scientific <strong>in</strong>vestigations. The Licensee shall ensure that the<br />

activities referred <strong>to</strong> <strong>in</strong> the previous sentence <strong>and</strong> the hydrocarbon exploration <strong>and</strong> production<br />

activities carried on under any other licences are not unnecessarily impeded.<br />

(3) Where both hydrocarbons <strong>and</strong> other natural deposits are discovered with<strong>in</strong> an area, <strong>and</strong><br />

where such resources cannot be produced at the same time, the Danish Energy Agency shall<br />

decide which of the activities shall have priority.<br />

(4) Where the Licensee discovers any raw materials other than those fall<strong>in</strong>g with<strong>in</strong> the scope of<br />

the Licence, the Licensee shall be obligated <strong>to</strong> give notice thereof <strong>to</strong> the Danish Energy Agency.<br />

(5) Where, as a necessary element of the production of hydrocarbons, other raw materials fall<strong>in</strong>g<br />

with<strong>in</strong> the scope of the Subsoil Act are produced at the same time, the Licensee shall be entitled<br />

<strong>to</strong> such raw materials. The Danish Energy Agency reserves the right <strong>to</strong> impose upon the Licensee<br />

specific terms <strong>and</strong> conditions with respect there<strong>to</strong>, <strong>in</strong>clud<strong>in</strong>g payment of a special fee <strong>in</strong> case the<br />

production is economically significant.<br />

Section 4<br />

(1) The Licensee shall carry out any such exploration works as are specified <strong>in</strong> the work<br />

programme attached here<strong>to</strong> as Annex 2.<br />

6


(2) Where the Licensee discovers any hydrocarbons, notice thereof shall promptly be given <strong>to</strong> the<br />

Danish Energy Agency. Not later than six months after the completion of the drill<strong>in</strong>g activity dur<strong>in</strong>g<br />

which the discovery is made, the Licensee shall produce a report on the discovery <strong>and</strong> a<br />

programme for such further works as are necessary, <strong>in</strong> accordance with good practice with<strong>in</strong> the<br />

oil <strong>in</strong>dustry <strong>in</strong> the North Sea countries, <strong>to</strong> ascerta<strong>in</strong> whether a hydrocarbon deposit has been<br />

demonstrated under conditions such that production is technically feasible <strong>and</strong> must be<br />

considered economically profitable (an evaluation programme). The evaluation programme shall<br />

<strong>in</strong>clude a time schedule for the execution of the works. If the discovery is made <strong>in</strong> the exploration<br />

period, the time schedule shall aim at establish<strong>in</strong>g the necessary basis, before the date of expiry<br />

of the exploration period fixed <strong>in</strong> the first sentence of section 5(1), or with<strong>in</strong> any extension of the<br />

exploration period granted by the Danish Energy Agency pursuant <strong>to</strong> the second sentence of<br />

section 5(1), for the issuance of a declaration as provided <strong>in</strong> section 5(3) hereof. The evaluation<br />

programme shall be subject <strong>to</strong> approval by the Danish Energy Agency.<br />

Section 5<br />

(1) The Licence shall be valid for a term of six years from the date of issuance. The Danish<br />

Energy Agency may extend the term of the Licence for the purpose of exploration by up <strong>to</strong> two<br />

years at a time, provided that special circumstances exist. The cumulative exploration period,<br />

however, may only exceed ten years <strong>in</strong> exceptional cases.<br />

(2) Any extension of the Licence under section 13(2) of the Subsoil Act for the purpose of<br />

production is <strong>to</strong> be granted by the Danish Energy Agency for the area delimited under subs. (4)<br />

for a period of 30 years from the grant<strong>in</strong>g of the extension; however, see section 35(4) below.<br />

Extensions may be granted separately for one or more areas.<br />

(3) The right <strong>to</strong> an extension referred <strong>to</strong> <strong>in</strong> subs. (2) shall be conditional upon the Licensee hav<strong>in</strong>g<br />

satisfied its obligations, <strong>in</strong>clud<strong>in</strong>g performance of the evaluation programme approved under<br />

section 4(2), <strong>and</strong> upon the submission, not later than four months before the expiry of the period<br />

specified <strong>in</strong> subs. (1), of a request for an extension of the term of the Licence. The request shall<br />

conta<strong>in</strong> a declaration <strong>to</strong> the effect that a hydrocarbon deposit has been demonstrated under<br />

conditions such that production is technically feasible <strong>and</strong> must be considered economically<br />

profitable, <strong>and</strong> that the Licensee <strong>in</strong>tends <strong>to</strong> undertake such production. The request shall be<br />

7


accompanied by a report on the evaluations of the deposit that supports the declaration. The<br />

report shall conta<strong>in</strong> a description <strong>and</strong> an evaluation of the deposit <strong>in</strong> terms of its geology <strong>and</strong> the<br />

technical aspects of the reservoir, as well as a statement of the assumptions concern<strong>in</strong>g<br />

production techniques <strong>and</strong> the economic fac<strong>to</strong>rs on which the Licensee's declaration is based.<br />

(4) The Danish Energy Agency shall undertake the delimitation of the area or areas with respect<br />

<strong>to</strong> which the Licence is extended for the purpose of production. The delimitation shall be <strong>in</strong>dicated<br />

by geographical coord<strong>in</strong>ates <strong>and</strong> by depths. The area thus delimited shall <strong>in</strong>clude the deposit<br />

such as its extent, <strong>in</strong> terms of coord<strong>in</strong>ates <strong>and</strong> depths, has been substantiated by the Licensee <strong>in</strong><br />

the op<strong>in</strong>ion of the Danish Energy Agency <strong>in</strong> connection with the Licensee’s request for an<br />

extension of the term of the Licence. Where conditions so require, a delimited area may <strong>in</strong>clude<br />

more than one deposit. If the delimitation of the deposit cannot be established with substantial<br />

accuracy, the Danish Energy Agency shall take this <strong>in</strong><strong>to</strong> account <strong>in</strong> establish<strong>in</strong>g the<br />

supplementary area <strong>and</strong> depths.<br />

Section 6<br />

(1) Any extension of the term of the Licence pursuant <strong>to</strong> section 5 for the purpose of production is<br />

conditional upon the Licensee submitt<strong>in</strong>g, prior <strong>to</strong> a deadl<strong>in</strong>e set by the Danish Energy Agency <strong>in</strong><br />

grant<strong>in</strong>g the extension, a plan for the activities, <strong>in</strong>clud<strong>in</strong>g preparations for production <strong>and</strong> the<br />

facilities therefore (production arrangements, etc.) meet<strong>in</strong>g the approval of the Danish Energy<br />

Agency pursuant <strong>to</strong> section 10 of the Subsoil Act, <strong>and</strong> upon the Licensee commenc<strong>in</strong>g production<br />

by the date fixed <strong>in</strong> the approval.<br />

(2) The Danish Energy Agency may lay down detailed rules on the content <strong>and</strong> form of an<br />

application pursuant <strong>to</strong> section 10 of the Subsoil Act as well as on the <strong>in</strong>formation <strong>to</strong> be submitted<br />

<strong>to</strong>gether with or subsequent <strong>to</strong> the application.<br />

Section 7<br />

The Licensee shall pay a fee of DKK 100,000. The fee shall be paid <strong>to</strong> the Danish Energy<br />

Agency not later than 30 days after the grant<strong>in</strong>g of the Licence.<br />

8


(Not used)<br />

Section 8-12<br />

Section 13<br />

(1) The Danish North Sea Fund shall exercise for the Danish State the rights under this Licence <strong>in</strong><br />

proportion <strong>to</strong> the size of the share held by it. The more specific rules concern<strong>in</strong>g the State<br />

Participant’s rights <strong>and</strong> obligations as a co-holder of the Licence appear from section 8 of the<br />

Subsoil Act <strong>and</strong> are otherwise set forth <strong>in</strong> the jo<strong>in</strong>t operat<strong>in</strong>g agreement which, under section 18<br />

of the Licence, is subject <strong>to</strong> the approval of the Danish Energy Agency.<br />

(Not used)<br />

Section 14-16<br />

Section 17<br />

With<strong>in</strong> a period of three months after the grant<strong>in</strong>g of this Licence, the Licensee shall submit a<br />

plan, <strong>to</strong> be approved by the Danish Energy Agency, concern<strong>in</strong>g the organization of the bus<strong>in</strong>ess<br />

<strong>and</strong> its location dur<strong>in</strong>g the exploration period. The Licensee shall submit a correspond<strong>in</strong>g plan for<br />

the production period <strong>to</strong> the Danish Energy Agency for approval, at the same time as submitt<strong>in</strong>g a<br />

request for approval of a plan for production arrangements, etc.<br />

Section 18<br />

(1) The Licence is granted subject <strong>to</strong> the condition that a jo<strong>in</strong>t operat<strong>in</strong>g agreement concern<strong>in</strong>g<br />

the performance of the activities covered by the Licence is executed not later than 90 days after<br />

the Licence has been granted, such agreement be<strong>in</strong>g subject <strong>to</strong> the approval of the Danish<br />

Energy Agency.<br />

(2) Any amendment of, deviation from or supplement <strong>to</strong> such agreement, <strong>in</strong>clud<strong>in</strong>g the<br />

appo<strong>in</strong>tment of a new opera<strong>to</strong>r, shall be subject <strong>to</strong> the approval of the Danish Energy Agency.<br />

9


Section 19<br />

(1) Representatives of the Danish Energy Agency shall be entitled <strong>to</strong> attend as observers any<br />

meet<strong>in</strong>gs of committees or groups established <strong>in</strong> connection with the activities comprised by the<br />

Licence.<br />

(2) The Danish Energy Agency shall receive the same notice <strong>and</strong> be given the same material,<br />

<strong>in</strong>clud<strong>in</strong>g m<strong>in</strong>utes of meet<strong>in</strong>gs, as the Licensee.<br />

Section 20<br />

At the Danish Energy Agency’s request, the Licensee shall arrange for the transportation of<br />

public authority representatives from their places of work <strong>to</strong> <strong>and</strong> from the places where the<br />

activities are be<strong>in</strong>g performed, <strong>and</strong> shall also provide accommodation. The associated<br />

expenditure shall be borne by the Licensee.<br />

Section 21<br />

(1) In order <strong>to</strong> ensure <strong>in</strong>sight <strong>in</strong><strong>to</strong> <strong>and</strong> allow supervision of the Licensee's activities under this<br />

Licence, the Licensee shall:<br />

(a) Submit all required f<strong>in</strong>ancial <strong>in</strong>formation about its activities. In this connection, the<br />

Licensee shall submit annual f<strong>in</strong>ancial statements consist<strong>in</strong>g of a balance sheet, <strong>in</strong>come<br />

statement <strong>and</strong> annual report, <strong>and</strong> shall submit <strong>in</strong>formation about shareholders<br />

represent<strong>in</strong>g at least one-tenth of the share capital. In addition, the Licensee shall<br />

promptly furnish <strong>in</strong>formation about any material changes <strong>in</strong> the company’s capital<br />

structure. Where the f<strong>in</strong>ancial statements cover activities other than those encompassed<br />

by the Licence, the Licensee shall also submit separate f<strong>in</strong>ancial statements for the<br />

activities covered by the Licence. Where the Licence is held by several parties, such<br />

<strong>in</strong>formation shall be furnished <strong>in</strong> respect of each of the holders, <strong>and</strong> <strong>in</strong> such case<br />

f<strong>in</strong>ancial statements shall be prepared show<strong>in</strong>g all common <strong>in</strong>come <strong>and</strong> expenditure. All<br />

of the f<strong>in</strong>ancial statements referred <strong>to</strong> shall be <strong>in</strong> Danish <strong>and</strong> shall be audited by a<br />

state-authorized public accountant <strong>in</strong> accordance with recognized Danish audit<strong>in</strong>g<br />

st<strong>and</strong>ards. Except as otherwise permitted by the Danish Energy Agency, the f<strong>in</strong>ancial<br />

10


year shall correspond <strong>to</strong> the calendar year. If the Licensee is a subsidiary of another<br />

company, the Licensee shall submit the f<strong>in</strong>ancial statements of its parent company <strong>and</strong><br />

consolidated f<strong>in</strong>ancial statements if so requested.<br />

(b) Submit any required <strong>in</strong>formation about the Licensee's activities <strong>in</strong> regard <strong>to</strong> prelim<strong>in</strong>ary<br />

<strong>in</strong>vestigations, exploration <strong>and</strong> production. In connection with the performance of<br />

geophysical, geological, geochemical <strong>and</strong> other <strong>in</strong>vestigations as well as drill<strong>in</strong>g<br />

activities, the Licensee shall thus submit, on a current or periodic basis, reports, samples,<br />

raw data, processed results, <strong>in</strong>terpretations <strong>and</strong> evaluations, <strong>to</strong>gether with summary<br />

reports conta<strong>in</strong><strong>in</strong>g an <strong>in</strong>terpretation <strong>and</strong> evaluation of the results obta<strong>in</strong>ed. With respect<br />

<strong>to</strong> the establishment <strong>and</strong> operation of production <strong>in</strong>stallations, the Licensee shall, on a<br />

current or periodic basis, submit <strong>in</strong>formation <strong>and</strong> reports on any present <strong>and</strong> future<br />

activities.<br />

c) Each year submit a summary of the Licensee's anticipated activities dur<strong>in</strong>g the follow<strong>in</strong>g<br />

four calendar years. The summary shall specify the <strong>in</strong>dividual activities <strong>and</strong> the<br />

anticipated expenditures on prelim<strong>in</strong>ary <strong>in</strong>vestigations <strong>and</strong> exploration <strong>and</strong> the<br />

commencement <strong>and</strong> operation of production activity, as well as the anticipated <strong>in</strong>come<br />

<strong>and</strong> taxation <strong>in</strong> each year of the said period.<br />

(2) The Danish Energy Agency shall issue detailed rules concern<strong>in</strong>g the time of submission of the<br />

<strong>in</strong>formation referred <strong>to</strong> <strong>in</strong> subs. (1), <strong>in</strong>clud<strong>in</strong>g the form <strong>and</strong> degree of specification of such<br />

<strong>in</strong>formation, as well as rules concern<strong>in</strong>g the book-keep<strong>in</strong>g of the Licensees. The Danish Energy<br />

Agency may also issue rules concern<strong>in</strong>g <strong>in</strong>formation that the Licensee may be required <strong>to</strong> submit<br />

<strong>in</strong> addition <strong>to</strong> that stipulated <strong>in</strong> subs. (1) <strong>and</strong> <strong>in</strong> the rules laid down pursuant <strong>to</strong> the provisions of<br />

section 34(1) of the Subsoil Act, <strong>and</strong> may dem<strong>and</strong> that further <strong>in</strong>formation be furnished <strong>in</strong><br />

<strong>in</strong>dividual cases, if considered necessary.<br />

(3) The Danish Energy Agency may issue rules concern<strong>in</strong>g the Licensee's s<strong>to</strong>rage <strong>and</strong> use of<br />

samples, data, etc.<br />

11


Section 22<br />

(1) Any authorities <strong>and</strong> persons perform<strong>in</strong>g duties pursuant <strong>to</strong> the Subsoil Act, <strong>and</strong> any persons<br />

assist<strong>in</strong>g therewith, shall be subject <strong>to</strong> the confidentiality obligations under the provisions of<br />

sections 152 <strong>to</strong> 152f of 'Straffeloven' (the Penal Code) <strong>in</strong> respect of such <strong>in</strong>formation <strong>and</strong><br />

samples, etc., as may be received by the authorities from the Licensee under this Licence <strong>and</strong><br />

under sections 26 <strong>and</strong> 34 of the Subsoil Act.<br />

(2) Such <strong>in</strong>formation <strong>and</strong> samples, etc., as are covered by section 34(1) of the Subsoil Act may<br />

be disclosed <strong>to</strong> parties other than public authorities after five years, reckoned from the time when<br />

the <strong>in</strong>formation, etc., has been produced <strong>and</strong> made available <strong>to</strong> the Licensee. Should the Licence<br />

expire, lapse or be rel<strong>in</strong>quished or revoked, whether <strong>in</strong> whole or <strong>in</strong> part, such period shall be<br />

reduced <strong>to</strong> two years with respect <strong>to</strong> <strong>in</strong>formation concern<strong>in</strong>g the area no longer covered by the<br />

Licence.<br />

(3) The provisions <strong>in</strong> subs. (1) <strong>and</strong> (2) shall not prevent the disclosure of such <strong>in</strong>formation if:<br />

(a) No legitimate <strong>in</strong>terest of the Licensee requires the <strong>in</strong>formation <strong>to</strong> be kept confidential;<br />

(b) it is determ<strong>in</strong>ed that the Licensee's <strong>in</strong>terest <strong>in</strong> ma<strong>in</strong>ta<strong>in</strong><strong>in</strong>g confidentiality must yield <strong>to</strong><br />

considerations of essential public <strong>in</strong>terest;<br />

(c) <strong>in</strong>formation of a general nature is furnished <strong>in</strong> connection with the issuance of public<br />

statements, annual reports, etc., concern<strong>in</strong>g matters relat<strong>in</strong>g <strong>to</strong> exploration <strong>and</strong><br />

production, or<br />

(d) <strong>in</strong>formation is disclosed as part of the cooperation with other countries’ authorities <strong>and</strong><br />

subject <strong>to</strong> the condition that similar provisions for ensur<strong>in</strong>g secrecy of such <strong>in</strong>formation<br />

apply <strong>in</strong> the country <strong>in</strong> question. Information received from other countries’ authorities<br />

that is classified as secret or confidential, or where this is implied by the nature of the<br />

<strong>in</strong>formation, shall be subject <strong>to</strong> the provisions of subs. (1) above.<br />

Section 23<br />

In communications <strong>to</strong> <strong>in</strong>dividual persons or <strong>to</strong> the public, the Licensee shall not, without the prior<br />

consent of the Danish Energy Agency, directly or <strong>in</strong>directly quote or refer <strong>to</strong> statements or<br />

communications from the Danish Energy Agency, any other public authority or any person<br />

12


employed by or perform<strong>in</strong>g duties for them, concern<strong>in</strong>g the probability of mak<strong>in</strong>g discoveries or<br />

concern<strong>in</strong>g the size of hydrocarbon deposits.<br />

Section 24<br />

(1) Any equipment, procedures <strong>and</strong> units of measurement for the qualitative <strong>and</strong> quantitative<br />

measurement of hydrocarbons produced are subject <strong>to</strong> approval by the Danish Energy Agency.<br />

Measurements shall be performed accord<strong>in</strong>g <strong>to</strong> a recognized <strong>and</strong> cus<strong>to</strong>mary procedure, <strong>and</strong> the<br />

Danish Energy Agency shall be able <strong>to</strong> check them.<br />

(2) If it is found that the methods or apparatus used have resulted <strong>in</strong> <strong>to</strong>o low a measurement<br />

result, this situation shall be deemed <strong>to</strong> have existed s<strong>in</strong>ce the last previous check <strong>to</strong>ok place,<br />

unless it is established that such situation has existed for a shorter or a longer period of time.<br />

Section 25<br />

The Licensee shall be obligated <strong>to</strong> comply with such rules <strong>and</strong> regulations on the performance of<br />

drill<strong>in</strong>g activity <strong>and</strong> other works as may be prescribed from time <strong>to</strong> time as a condition for approval<br />

under section 28 of the Subsoil Act.<br />

Section 26<br />

The Licensee shall be obligated <strong>to</strong> comply with such rules <strong>and</strong> regulations as the Danish Energy<br />

Agency may issue concern<strong>in</strong>g the mark<strong>in</strong>g of equipment, etc., transported <strong>to</strong> or from offshore<br />

facilities with<strong>in</strong> the licence area.<br />

Section 27<br />

(1) Where the Licence <strong>in</strong>cludes areas not comprised by Act No. 291 of 10 June 1981 on the<br />

Establishment <strong>and</strong> Utilization of a Pipel<strong>in</strong>e for Transportation of Crude Oil <strong>and</strong> Condensate, cf.<br />

Consolidated Act No. 957 of 9 September 2011, the Licensee shall be obligated, when carry<strong>in</strong>g<br />

on production <strong>in</strong> such areas, <strong>to</strong> connect its production facilities <strong>to</strong> pipel<strong>in</strong>e systems for<br />

transport<strong>in</strong>g liquid hydrocarbons from their place of production. The Danish Energy Agency may<br />

grant exceptions <strong>to</strong> the obligations <strong>in</strong> the preced<strong>in</strong>g sentence <strong>in</strong> circumstances where<br />

13


transportation through the pipel<strong>in</strong>e system would be uneconomical or <strong>in</strong>expedient <strong>in</strong> the op<strong>in</strong>ion<br />

of the Agency. After the Licensee has had an opportunity <strong>to</strong> submit comments, the Danish<br />

Energy Agency shall lay down more specific provisions on the connection <strong>and</strong> use of the system,<br />

<strong>in</strong>clud<strong>in</strong>g rules for payment therefore, dues <strong>to</strong> the State, etc.<br />

(2) With respect <strong>to</strong> natural gas, the Licensee shall be obligated <strong>to</strong> connect its production facilities<br />

<strong>to</strong> the pipel<strong>in</strong>e systems for transport<strong>in</strong>g natural gas that have been constructed or designated by<br />

the State <strong>and</strong> shall use such systems for transport<strong>in</strong>g the produced natural gas from its place of<br />

production. The provisions of the second <strong>and</strong> third sentences of subs. (1) shall apply mutatis<br />

mut<strong>and</strong>is.<br />

(3) If production facilities are connected <strong>to</strong> pipel<strong>in</strong>e systems pursuant <strong>to</strong> subs. (1) <strong>and</strong>/or subs. (2)<br />

after production has commenced, the Danish Energy Agency, when issu<strong>in</strong>g the specific rules<br />

concern<strong>in</strong>g payment for connection <strong>and</strong> use, shall take <strong>in</strong><strong>to</strong> account the <strong>in</strong>vestments made by the<br />

Licensee for the purpose of transport<strong>in</strong>g produced hydrocarbons from their place of production.<br />

(4) The connection obligation under subs. (1) <strong>and</strong>/or subs. (2) shall <strong>in</strong>clude the obligation <strong>to</strong><br />

construct <strong>in</strong>stallations <strong>and</strong> pipel<strong>in</strong>es that may be required for connection at the tie-<strong>in</strong> po<strong>in</strong>t<br />

designated by the Danish Energy Agency.<br />

(Not used)<br />

Sections 28-29<br />

Section 30<br />

(1) The Licensee's liability for damages under the Subsoil Act shall be covered by <strong>in</strong>surance <strong>in</strong><br />

accordance with the rules <strong>in</strong> subs. (2) through (4).<br />

(2) The <strong>in</strong>surance shall provide reasonable coverage, <strong>in</strong> light of the risks <strong>in</strong>volved <strong>in</strong> the operation<br />

of the bus<strong>in</strong>ess <strong>and</strong> the premiums <strong>to</strong> be paid.<br />

14


(3) At the end of each calendar year, the Danish Energy Agency shall be <strong>in</strong>formed of the<br />

<strong>in</strong>surance then <strong>in</strong> force <strong>and</strong> of the pr<strong>in</strong>cipal terms thereof. The Danish Energy Agency may<br />

require additional <strong>in</strong>surance <strong>to</strong> be taken out.<br />

(4) The Licensee also shall be obligated <strong>to</strong> comply with any rules concern<strong>in</strong>g <strong>in</strong>surance that may<br />

be issued by the Danish Energy Agency.<br />

Section 31<br />

If the Licence is granted <strong>to</strong> several parties jo<strong>in</strong>tly, they shall be jo<strong>in</strong>tly <strong>and</strong> severally liable for any<br />

damages claimed pursuant <strong>to</strong> section 35 of the Subsoil Act <strong>and</strong> for the satisfaction of any<br />

obligations <strong>to</strong> the State under this Licence.<br />

Section 32<br />

In order <strong>to</strong> ensure performance by the Licensee of all its obligations under this Licence, the<br />

Licensee shall, with<strong>in</strong> a period of 30 days from the grant<strong>in</strong>g hereof, provide security, possibly <strong>in</strong><br />

the form of a parent company guaranty, <strong>in</strong> an amount <strong>and</strong> of a nature that is acceptable <strong>to</strong> the<br />

Danish Energy Agency. Upon 30 days' notice, the Danish Energy Agency may subsequently<br />

require that such security be changed or supplemented.<br />

Section 33<br />

Neither this Licence nor any <strong>in</strong>terest there<strong>in</strong> may be assigned or otherwise transferred, either<br />

directly or <strong>in</strong>directly, <strong>in</strong> whole or <strong>in</strong> part, <strong>to</strong> any third party or between several co-Licensees,<br />

without the approval of the Danish Energy Agency. Correspond<strong>in</strong>g restrictions shall also apply <strong>to</strong><br />

the transfer of sharehold<strong>in</strong>gs <strong>and</strong> <strong>in</strong>terests <strong>in</strong> companies <strong>in</strong> such amounts as may result <strong>in</strong> the<br />

transfer of a controll<strong>in</strong>g <strong>in</strong>terest <strong>in</strong> a company that is a co-Licensee, <strong>and</strong> <strong>to</strong> the conclusion of<br />

agreements hav<strong>in</strong>g the same effect. A fee may be charged for an approval given pursuant <strong>to</strong> the<br />

first <strong>and</strong> second sentences of this section.<br />

15


Section 34<br />

(1) Where the rights under this Licence are rel<strong>in</strong>quished dur<strong>in</strong>g the exploration period, such<br />

rel<strong>in</strong>quishment shall apply <strong>to</strong> the entire licence area.<br />

(2) Where the Licence has been extended <strong>in</strong> respect of one or more areas for the purpose of<br />

production, the Licensee may rel<strong>in</strong>quish the right <strong>to</strong> any such area upon one year's notice.<br />

(3) In the event of any rel<strong>in</strong>quishment pursuant <strong>to</strong> subs. (1) or subs. (2), the provisions <strong>in</strong> sections<br />

36 <strong>and</strong> 37 shall apply.<br />

Section 35<br />

(1) The Danish Energy Agency may revoke this Licence:<br />

1) if any provisions, conditions or stipulations conta<strong>in</strong>ed <strong>in</strong> the Subsoil Act <strong>and</strong> <strong>in</strong><br />

this Licence or issued pursuant there<strong>to</strong> are not complied with,<br />

2) if <strong>in</strong>correct or mislead<strong>in</strong>g <strong>in</strong>formation is given <strong>in</strong> an application for a Licence,<br />

3) if one or more holders of the Licence is subjected <strong>to</strong> restructur<strong>in</strong>g, file a petition<br />

for a compulsory composition with credi<strong>to</strong>rs, are declared bankrupt, go <strong>in</strong><strong>to</strong><br />

liquidation or experience any comparable circumstances.<br />

(2) If the default can be remedied by the Licensee, the Licence may not be revoked pursuant <strong>to</strong><br />

para. 1) of subs. (1) until the Danish Energy Agency has ordered that the default be remedied<br />

with<strong>in</strong> a specified period, <strong>and</strong> such order has not been complied with.<br />

(3) In the case of revocation pursuant <strong>to</strong> subs. (1) <strong>and</strong> laps<strong>in</strong>g of the Licence pursuant <strong>to</strong> subs.<br />

(4), the provisions of sections 36 <strong>and</strong> 37 shall apply.<br />

(4) If production has been <strong>in</strong>itiated <strong>and</strong> is then suspended for a period of more than two<br />

consecutive years, <strong>and</strong> such suspension is not part of an approved plan, the Licence shall lapse<br />

for the area concerned, unless the Licensee can substantiate that cont<strong>in</strong>u<strong>in</strong>g production is<br />

16


temporarily non-viable commercially. In such event, the Licensee may reta<strong>in</strong> the Licence for a<br />

period fixed by the Danish Energy Agency of up <strong>to</strong> five consecutive years, even though<br />

production is suspended dur<strong>in</strong>g such period.<br />

Section 36<br />

(1) The expiry, rel<strong>in</strong>quishment, laps<strong>in</strong>g or revocation of the Licence shall not relieve the Licensee<br />

of its obligations pursuant <strong>to</strong> legislation, this Licence or any other applicable rules, conditions or<br />

orders.<br />

(2) Where any part of the work programme laid down <strong>in</strong> Annex 2 or <strong>in</strong> prolongations <strong>to</strong> the<br />

Licence is not performed, the Licensee, unless exempted by the Danish Energy Agency, shall<br />

pay <strong>to</strong> the Treasury an amount equal <strong>to</strong> the cost of performance of the obligations. In establish<strong>in</strong>g<br />

such amount, account shall be taken of the costs that would have been <strong>in</strong>curred by hav<strong>in</strong>g other<br />

parties perform the work for the State at the time of term<strong>in</strong>ation of the Licence.<br />

(3) Payment of the amount referred <strong>to</strong> <strong>in</strong> subs. (2) shall not be subject <strong>to</strong> the Danish Energy<br />

Agency hav<strong>in</strong>g the rema<strong>in</strong><strong>in</strong>g work performed.<br />

(4) Payment shall be made not later than 30 days after the Danish Energy Agency has submitted<br />

a request <strong>in</strong> this respect.<br />

(5) In the event of del<strong>in</strong>quent payments, the Licensee shall pay <strong>in</strong>terest at an annual rate equal <strong>to</strong><br />

the official deposit rate set by Danmarks Nationalbank from time <strong>to</strong> time, plus 7 %.<br />

Section 37<br />

(1) If the Licence term<strong>in</strong>ates due <strong>to</strong> its expiry, rel<strong>in</strong>quishment, laps<strong>in</strong>g or revocation, <strong>in</strong> respect of<br />

either the entire area or part thereof, the State shall be entitled <strong>to</strong> take over, without<br />

consideration, all or part of any facilities, equipment <strong>and</strong> <strong>in</strong>stallations <strong>in</strong>tended for long-term use<br />

with<strong>in</strong> the area concerned, as well as any required accessories <strong>and</strong> materials, <strong>in</strong>clud<strong>in</strong>g journals<br />

<strong>and</strong> manuals, etc.<br />

17


(2) If the Licence term<strong>in</strong>ates, cf. subs. (1), the Licensee shall be obligated <strong>to</strong> ensure that the<br />

facilities, etc., referred <strong>to</strong> <strong>in</strong> subs. (1) are located with<strong>in</strong> the area <strong>and</strong> can be assigned <strong>to</strong> the State<br />

without consideration, <strong>in</strong> a condition consistent with satisfac<strong>to</strong>ry ma<strong>in</strong>tenance <strong>and</strong> repair.<br />

Correspond<strong>in</strong>g rules shall apply <strong>to</strong> the facilities, etc., referred <strong>to</strong> <strong>in</strong> subs. (1) that are<br />

<strong>in</strong> the course of construction for the purpose of production activities, provided, however, that the<br />

Licensee shall not be obligated <strong>to</strong> take any further measures <strong>to</strong>wards the completion thereof.<br />

(3) At the time the Licence term<strong>in</strong>ates, cf. subs. (1), the Licensee shall be obligated <strong>to</strong> ensure that<br />

the facilities, etc. referred <strong>to</strong> <strong>in</strong> subs. (1) <strong>and</strong> (2) that do not belong <strong>to</strong> the Licensee or that are<br />

encumbered with other rights <strong>in</strong> favour of third parties, are released from any third party rights,<br />

such that they can be assigned <strong>to</strong> the State without consideration <strong>and</strong> free of encumbrances.<br />

(4) In the event of fail<strong>in</strong>g <strong>to</strong> comply with its obligations under subs. (1), (2) <strong>and</strong> (3), whether or not<br />

negligence is shown, the Licensee shall be obligated <strong>to</strong> compensate for any <strong>and</strong> all losses<br />

caused thereby, <strong>in</strong>clud<strong>in</strong>g any loss of profits <strong>and</strong> all expenses which the State is required <strong>to</strong> bear<br />

<strong>in</strong> order <strong>to</strong> be placed <strong>in</strong> the same position as if such obligations had been satisfied <strong>in</strong> accordance<br />

with their terms.<br />

(5) The provisions of subs. (1) <strong>to</strong> (4) shall apply mutatis mut<strong>and</strong>is <strong>to</strong> <strong>in</strong>stallations, etc. that are<br />

ab<strong>and</strong>oned or disused prior <strong>to</strong> the term<strong>in</strong>ation of the Licence, <strong>in</strong> step with the use of such<br />

<strong>in</strong>stallations be<strong>in</strong>g discont<strong>in</strong>ued.<br />

(6) Not later than two years before the term<strong>in</strong>ation of the Licence, cf. subs. (1), or two years<br />

before the time when one or more <strong>in</strong>stallations, etc. are expected <strong>to</strong> be ab<strong>and</strong>oned or disused,<br />

the Licensee shall submit a plan for discont<strong>in</strong>u<strong>in</strong>g the use of all <strong>in</strong>stallations, etc. (w<strong>in</strong>d<strong>in</strong>g-up<br />

plan) for the approval of the Danish Energy Agency. Not later than three months after the Licence<br />

has lapsed, been revoked or the use of an <strong>in</strong>stallation or the like has been discont<strong>in</strong>ued, without<br />

the submission of a w<strong>in</strong>d<strong>in</strong>g-up plan, a w<strong>in</strong>d<strong>in</strong>g-up plan shall be submitted for the Danish Energy<br />

Agency’s approval. The w<strong>in</strong>d<strong>in</strong>g-up plan shall set out the procedure for remov<strong>in</strong>g the <strong>in</strong>stallations,<br />

etc. that the State does not wish <strong>to</strong> take over, <strong>in</strong> whole or <strong>in</strong> part, <strong>in</strong> accordance with subs. (1) <strong>to</strong><br />

(5) above. The w<strong>in</strong>d<strong>in</strong>g-up plan shall moreover <strong>in</strong>clude <strong>in</strong>formation about <strong>and</strong> an assessment of<br />

the environmental impact <strong>and</strong> safety aspects of the plan, as well as a time schedule for its<br />

implementation. The Danish Energy Agency may lay down detailed guidel<strong>in</strong>es for the content of<br />

the plan. Accord<strong>in</strong>g <strong>to</strong> a time schedule fixed by the Danish Energy Agency, the Agency may<br />

18


equire the Licensee <strong>to</strong> remove all or part of any <strong>in</strong>stallations, etc., whether they belong <strong>to</strong> the<br />

Licensee or <strong>to</strong> any other party, which the State does not choose <strong>to</strong> take over under subs. (1) <strong>to</strong><br />

(5).<br />

(7) The Danish Energy Agency may at any time require the Licensee <strong>to</strong> take any other necessary<br />

measures <strong>in</strong> order <strong>to</strong> prevent the <strong>in</strong>stallations, etc., from pos<strong>in</strong>g any risk or <strong>in</strong>convenience. If the<br />

Licensee fails <strong>to</strong> comply with any such requirement made by the Danish Energy Agency, the<br />

Danish Energy Agency shall be entitled, without further notice, <strong>to</strong> have the necessary measures<br />

taken for the Licensee's account <strong>and</strong> risk <strong>in</strong> every respect. The Licensee shall <strong>in</strong>demnify the State<br />

aga<strong>in</strong>st any third-party claims for damages from the State result<strong>in</strong>g from such removal or tak<strong>in</strong>g of<br />

preventive measures.<br />

Section 38<br />

The Licensee shall <strong>in</strong>demnify the State aga<strong>in</strong>st all claims whatsoever which may be made by any<br />

third party aga<strong>in</strong>st the State as a consequence of the Licensee's activities.<br />

Section 39<br />

(1) This Licence shall be subject <strong>to</strong> the laws of <strong>Denmark</strong> <strong>in</strong> force from time <strong>to</strong> time, <strong>in</strong>clud<strong>in</strong>g<br />

future amendments, if any, <strong>to</strong> the Act on the Use of the Danish Subsoil, executive orders,<br />

decrees, <strong>and</strong> the obligations <strong>in</strong> force from time <strong>to</strong> time that arise from <strong>Denmark</strong>'s membership of<br />

the European Union. Accord<strong>in</strong>gly, this Licence shall not restrict the State's general right <strong>to</strong> levy<br />

taxes or its authority <strong>to</strong> issue general provisions concern<strong>in</strong>g more specific aspects of exploration<br />

<strong>and</strong> production activities.<br />

(2) This Licence shall not exempt the Licensee from obta<strong>in</strong><strong>in</strong>g any other licences <strong>and</strong> approvals<br />

required pursuant <strong>to</strong> the Act on the Use of the Danish Subsoil <strong>and</strong> legislation <strong>in</strong> general.<br />

19


Section 40<br />

(1) Any disputes aris<strong>in</strong>g <strong>in</strong> connection with this Licence or with the Licensee's performance of<br />

activities under this Licence shall be resolved pursuant <strong>to</strong> the laws <strong>in</strong> force <strong>in</strong> <strong>Denmark</strong> <strong>and</strong> by the<br />

Danish courts.<br />

(2) The venue shall be Copenhagen.<br />

(3) Subs. (1) <strong>and</strong> (2) shall not prejudice the right of the Danish Energy Agency <strong>and</strong> the Licensee<br />

<strong>to</strong> agree, <strong>in</strong> any particular case, that a dispute as referred <strong>to</strong> <strong>in</strong> subs. (1) shall be resolved by<br />

arbitration.<br />

Copenhagen, x of xxx 20XX<br />

Lykke Friis<br />

/<br />

Birgitta Jacobsen<br />

20


Annex 1<br />

<strong>to</strong> Licence No. x/xx<br />

for <strong>Exploration</strong> for <strong>and</strong> Production of <strong>Hydrocarbon</strong>s<br />

Area covered by the Licence, cf. Section 2(1)<br />

The Licence covers the area <strong>in</strong> the blocks …………….., shown on the attached map, with the<br />

corner co-ord<strong>in</strong>ates:<br />

(Geographic coord<strong>in</strong>ate system European Datum 1950)<br />

Latitude Longitude<br />

Po<strong>in</strong>t no. Degrees M<strong>in</strong>utes Seconds Degrees M<strong>in</strong>utes Seconds<br />

1 - - - - - -<br />

2 - - - - - -<br />

3 - - - - - -<br />

- - - - - - -<br />

- - - - - - -<br />

1 - - - - - -<br />

If possible, the Licence area is del<strong>in</strong>eated by connect<strong>in</strong>g the corner co-ord<strong>in</strong>ates <strong>in</strong> the above<br />

mentioned order by latitudes or longitudes. Otherwise the po<strong>in</strong>ts are connected by geodetic l<strong>in</strong>es.


Annex 2<br />

<strong>to</strong> Licence No. x/xx<br />

for <strong>Exploration</strong> for <strong>and</strong> Production of <strong>Hydrocarbon</strong>s<br />

Work programme for the Licence, cf. Section 4(1).<br />

The follow<strong>in</strong>g work program covers the exploration activities that the Licensee as a m<strong>in</strong>imum shall<br />

carry out pursuant <strong>to</strong> subsection 1 of Section 4 of Licence No. x/xx for <strong>Exploration</strong> for <strong>and</strong><br />

Production of <strong>Hydrocarbon</strong>s relat<strong>in</strong>g <strong>to</strong> the licence area cf. Annex 1:<br />

1) The Licensee shall, not later than 21 months after the issuance of the Licence, have<br />

carried out the follow<strong>in</strong>g work: ..................................................................<br />

2) Not later than 24 months after the issuance of the Licence, the Licensee shall either<br />

rel<strong>in</strong>quish the Licence or undertake <strong>to</strong> carry out such additional exploration as is<br />

necessary <strong>to</strong> select a suitable well site with<strong>in</strong> the licence area, <strong>and</strong> <strong>to</strong> decide whether a<br />

well should be drilled. Such work shall be carried out with<strong>in</strong> 48 months of the issuance of<br />

the Licence.<br />

3) Not later than 48 months after the issuance of the Licence, the Licensee shall either<br />

rel<strong>in</strong>quish the Licence or undertake <strong>to</strong> drill an exploration well with<strong>in</strong> the licence area. This<br />

well shall have been drilled at least six months prior <strong>to</strong> the term<strong>in</strong>ation of the Licence.<br />

When the licence <strong>to</strong> an area term<strong>in</strong>ates, the Licensee shall submit a f<strong>in</strong>al report <strong>to</strong> the Danish<br />

Energy Agency on the hydrocarbon potential <strong>in</strong> the area <strong>in</strong> question.<br />

The wells shall be drilled so as <strong>to</strong> ensure safe <strong>and</strong> appropriate exploration, which shall <strong>in</strong>clude<br />

core drill<strong>in</strong>g, extraction of samples <strong>and</strong> test production, <strong>and</strong> otherwise <strong>in</strong> conformity with any<br />

guidel<strong>in</strong>es laid down by the Danish Energy Agency <strong>in</strong> connection with the approval of each<br />

<strong>in</strong>dividual drill<strong>in</strong>g programme. Moreover, wells shall be drilled <strong>in</strong> compliance with good exploration<br />

practice.<br />

Satisfac<strong>to</strong>ry analyses <strong>and</strong> <strong>in</strong>terpretations of acquired data shall be prepared. The Licensee shall<br />

comply with any <strong>in</strong>structions issued by the Danish Energy Agency <strong>in</strong> this respect.<br />

Prior <strong>to</strong> the commencement of the work, the Licensee may obta<strong>in</strong> the op<strong>in</strong>ion of the Danish<br />

Energy Agency as <strong>to</strong> whether the work planned will constitute fulfilment of the work programme.


• DRAFT MODEL<br />

Danish Energy Agency<br />

February 2009<br />

Licence xx/XX<br />

Xxxx Group<br />

JOINT OPERATING AGREEMENT<br />

(see section 2.1 <strong>in</strong> the guide)


i<br />

Table of Contents<br />

1. SCOPE AND DURATION .....................................................................................2<br />

1.1 Scope ........................................................................................................................2<br />

1.2 Duration....................................................................................................................2<br />

2. INTERESTS OF THE PARTIES ...........................................................................3<br />

2.1 Percentage Interests ..................................................................................................3<br />

2.2 Obligations <strong>and</strong> Rights ..............................................................................................3<br />

3. OPERATOR ...........................................................................................................4<br />

3.1 Designation ...............................................................................................................4<br />

3.2 Rights .......................................................................................................................4<br />

3.3 Responsibility ...........................................................................................................4<br />

3.3.1 Responsibilities ...........................................................................................4<br />

3.3.2 Methods <strong>and</strong> Practices .................................................................................5<br />

3.3.3 Opera<strong>to</strong>r's Liability .....................................................................................5<br />

3.4 Liens <strong>and</strong> Encumbrances...........................................................................................5<br />

3.5 Employees ................................................................................................................6<br />

3.6 Contrac<strong>to</strong>rs <strong>and</strong> Contracts .........................................................................................6<br />

3.6.1 General Pr<strong>in</strong>ciples .......................................................................................6<br />

3.6.2 Information <strong>and</strong> Consultation of the Non-Opera<strong>to</strong>rs ....................................6<br />

3.6.3 Liability under Contracts .............................................................................7<br />

3.6.4 Amendment of Amounts .............................................................................7<br />

3.7 Representation of the Parties .....................................................................................7<br />

3.8 Records .....................................................................................................................8<br />

3.9 Reports, Data etc. ......................................................................................................8<br />

3.9.1 Common Data Base.....................................................................................8<br />

3.9.2 Report<strong>in</strong>g ....................................................................................................8<br />

3.10 Consultation <strong>and</strong> Information ....................................................................................9<br />

3.11 Expenditures <strong>and</strong> Actions........................................................................................ 10<br />

3.12 Insurance ................................................................................................................ 10<br />

3.12.1 Jo<strong>in</strong>t <strong>and</strong> Individual Insurance .................................................................. 10<br />

3.12.2 Cost, Information, Co-<strong>in</strong>surance, Report<strong>in</strong>g <strong>and</strong> Fil<strong>in</strong>g of Claims .............. 10<br />

3.12.3 Evidence of Insurance ............................................................................... 11<br />

3.12.4 Contrac<strong>to</strong>rs' Insurance ............................................................................... 11<br />

3.13 Litigation ................................................................................................................ 11<br />

3.13.1 Notification ............................................................................................... 11<br />

3.13.2 Opera<strong>to</strong>r's Authority .................................................................................. 12<br />

3.13.3 Claims aga<strong>in</strong>st Non-Opera<strong>to</strong>rs ................................................................... 12<br />

3.13.4 Right <strong>to</strong> Participate .................................................................................... 12


ii<br />

3.14 Rentals, Taxes, Fees <strong>and</strong> Charges............................................................................ 13<br />

3.15 Rights of the Parties ................................................................................................ 13<br />

3.15.1 Rights under the Licence ........................................................................... 13<br />

3.15.2 Inspection of Books, Records <strong>and</strong> Inven<strong>to</strong>ries ........................................... 13<br />

3.15.3 Access <strong>to</strong> the Licence Area ....................................................................... 13<br />

3.16 (Deleted) ................................................................................................................. 13<br />

3.17 Resignation <strong>and</strong> Removal........................................................................................ 14<br />

3.17.1 Resignation ............................................................................................... 14<br />

3.17.2 Removal .................................................................................................... 14<br />

3.17.3 Selection of a New Opera<strong>to</strong>r...................................................................... 15<br />

3.17.4 Transfer of Opera<strong>to</strong>r's Rights <strong>and</strong> Responsibilities .................................... 15<br />

3.18 Disposal <strong>and</strong> Ab<strong>and</strong>onment..................................................................................... 16<br />

3.18.1 Disposal .................................................................................................... 16<br />

3.18.2 Ab<strong>and</strong>onment ............................................................................................ 16<br />

3.18.3 Ab<strong>and</strong>onment Agreement .......................................................................... 16<br />

4. OPERATING COMMITTEE .............................................................................. 18<br />

4.1 Establishment <strong>and</strong> Powers ....................................................................................... 18<br />

4.2 Representation ........................................................................................................ 18<br />

4.3 Meet<strong>in</strong>gs ................................................................................................................. 18<br />

4.3.1 Venue, Summons ...................................................................................... 18<br />

4.3.2 Special Meet<strong>in</strong>gs ....................................................................................... 19<br />

4.3.3 Waiver of Notice ....................................................................................... 19<br />

4.3.4 Proxy, Prior Vot<strong>in</strong>g ................................................................................... 19<br />

4.4 M<strong>in</strong>utes ................................................................................................................... 19<br />

4.5 Action without a Meet<strong>in</strong>g ........................................................................................ 19<br />

4.6 Sub-Committees ..................................................................................................... 20<br />

4.7 Vot<strong>in</strong>g Procedure .................................................................................................... 21<br />

4.7.1 Vot<strong>in</strong>g Interest .......................................................................................... 21<br />

4.7.2 Pass-mark.................................................................................................. 21<br />

4.7.3 B<strong>in</strong>d<strong>in</strong>g Decision....................................................................................... 21<br />

4.7.4 Decision on Work Obligations .................................................................. 21<br />

5. PROGRAMMES, BUDGETS AND AFES .......................................................... 22<br />

5.1 <strong>Exploration</strong> Programmes <strong>and</strong> Budgets ..................................................................... 22<br />

5.2 Appraisal Programmes <strong>and</strong> Budgets ........................................................................ 22<br />

5.3 Extension of the Licence ......................................................................................... 22<br />

5.3.1 Extension of the Licence for Production .................................................... 22<br />

5.3.2 Extension of the Licence for the Purpose of Further <strong>Exploration</strong> ............... 23<br />

5.3.3 Extension of the Licence for the Purpose of a Sole Risk Operation ............ 24<br />

5.3.4 Percentage Interests of the Participants <strong>in</strong> an Extension ............................. 24<br />

5.4 Development Programmes <strong>and</strong> Budgets .................................................................. 24<br />

5.4.1 Preparation <strong>and</strong> Decision ........................................................................... 24<br />

5.4.2 All Parties Participate ................................................................................ 25


iii<br />

5.5 Production Programmes <strong>and</strong> Budgets ...................................................................... 25<br />

5.6 Ab<strong>and</strong>onment Programmes <strong>and</strong> Budgets ................................................................. 26<br />

5.7 Information <strong>in</strong> Programmes <strong>and</strong> Budgets ................................................................ 26<br />

5.8 Status Reports ......................................................................................................... 26<br />

5.9 Authorisation <strong>to</strong> Proceed ......................................................................................... 27<br />

5.10 AFEs ...................................................................................................................... 27<br />

5.11 Amendments ........................................................................................................... 27<br />

[5.12 Drill-or-Drop .......................................................................................................... 27<br />

6. ACCOUNTING PROCEDURE AND COSTS AND EXPENSES ...................... 28<br />

6.1 Adoption <strong>and</strong> Conflict ............................................................................................. 28<br />

6.2 Payment of Costs <strong>and</strong> Expenses .............................................................................. 28<br />

7. SOLE RISK OPERATIONS AND DEVELOPMENT BY LESS THAN ALL<br />

PARTIES............................................................................................................... 29<br />

7.1 Rights <strong>to</strong> Propose .................................................................................................... 29<br />

7.2 Types ...................................................................................................................... 29<br />

7.3 Restrictions <strong>and</strong> Conditions..................................................................................... 29<br />

7.4 General Provisions .................................................................................................. 30<br />

7.4.1 Indemnification ......................................................................................... 30<br />

7.4.2 Use of Jo<strong>in</strong>t Risk Property ......................................................................... 31<br />

7.4.3 Sole Risk Opera<strong>to</strong>r .................................................................................... 31<br />

7.4.4 Data <strong>and</strong> Information ................................................................................ 31<br />

7.4.5 Sole Risk Percentage Interest .................................................................... 31<br />

7.4.6 Sole Risk Adm<strong>in</strong>istration .......................................................................... 32<br />

7.5 Consequences ......................................................................................................... 33<br />

7.5.1 Access <strong>to</strong> Data <strong>and</strong> Information ................................................................. 33<br />

7.5.2 Jo<strong>in</strong>t Drill<strong>in</strong>g as a Result of Sole Risk Geophysical Survey ....................... 33<br />

7.5.3 Additional Activities as a Result of Sole Risk Drill<strong>in</strong>g .............................. 33<br />

7.6 Sole Risk Development <strong>and</strong> Development by Less than All Parties ......................... 34<br />

7.6.1 Sole Risk Preparation of a Development Programme ................................. 34<br />

7.6.2 Sole Risk Proposal of a Development Programme ..................................... 34<br />

7.6.3 Development by Less than All Parties ....................................................... 35<br />

7.6.4 Less than All Parties Proceed .................................................................... 35<br />

7.6.5 Percentage Interest <strong>in</strong> Sole Risk Development ........................................... 35<br />

7.6.6 Rights <strong>in</strong> the Sole Risk Development ........................................................ 36<br />

7.6.7 Sub-Area ................................................................................................... 36<br />

8. DISPOSAL OF HYDROCARBONS .................................................................... 38<br />

8.1 Right <strong>and</strong> Obligation ............................................................................................... 38<br />

8.2 Lift<strong>in</strong>g/Off-take Procedures for <strong>Hydrocarbon</strong>s ........................................................ 38<br />

8.3 Failure <strong>to</strong> Lift Liquid <strong>Hydrocarbon</strong>s ........................................................................ 38<br />

8.4 (Deleted) ................................................................................................................. 38


iv<br />

9. ASSIGNMENTS AND ENCUMBRANCES ........................................................ 39<br />

9.1 Assignments ........................................................................................................... 39<br />

9.2 Option <strong>to</strong> Purchase .................................................................................................. 41<br />

9.2.1 Bona Fide Offer <strong>and</strong> Exercise of the Option .............................................. 41<br />

9.2.2 No Parties Exercise the Option .................................................................. 41<br />

9.2.3 Exceptions ................................................................................................ 42<br />

9.3 Encumbrances ......................................................................................................... 42<br />

10. WITHDRAWAL ................................................................................................... 43<br />

10.1 Rights ..................................................................................................................... 43<br />

10.1.1 Notice of Withdrawal ................................................................................ 43<br />

10.1.2 Work Obligations <strong>to</strong> be Fulfilled ............................................................... 43<br />

10.1.3 Withdrawal from a Development Programme ............................................ 43<br />

10.1.4 Approval by the Danish Energy Agency .................................................... 43<br />

10.2 Conditions .............................................................................................................. 43<br />

10.2.1 Allocation of Percentage Interests ............................................................. 43<br />

10.2.2 Execution of Documents ........................................................................... 44<br />

10.2.3 Ma<strong>in</strong>tenance of the Licence ....................................................................... 44<br />

10.2.4 Costs <strong>and</strong> Expenses ................................................................................... 44<br />

10.2.5 No Encumbrances, Liens <strong>and</strong> Charges ....................................................... 44<br />

10.2.6 Liability for Approved Programme <strong>and</strong> Budget ......................................... 44<br />

10.2.7 Liability for Ab<strong>and</strong>onment ........................................................................ 44<br />

11. DEFAULT IN PAYMENT ................................................................................... 46<br />

11.1 Failure <strong>to</strong> Pay .......................................................................................................... 46<br />

11.2 Remedy of Default .................................................................................................. 47<br />

11.3 Cont<strong>in</strong>uation of Default .......................................................................................... 47<br />

11.3.1 No Right <strong>to</strong> <strong>Hydrocarbon</strong>s ......................................................................... 47<br />

11.3.2 No Right <strong>to</strong> Representation or Vot<strong>in</strong>g........................................................ 47<br />

11.3.3 Forfeiture .................................................................................................. 47<br />

11.3.4 Acquisition ................................................................................................ 48<br />

12. MISCELLANEOUS ............................................................................................. 50<br />

12.1 Covenant ................................................................................................................ 50<br />

12.2 Relationship ............................................................................................................ 50<br />

12.2.1 Relationship under the Agreement ............................................................. 50<br />

12.2.2 Third Party Claims .................................................................................... 50<br />

12.2.3 Reimbursement of the Opera<strong>to</strong>r ................................................................. 50<br />

12.2.4 Interest ...................................................................................................... 50<br />

12.2.5 Mutual Indemnification ............................................................................. 51<br />

12.3 Confidentiality ........................................................................................................ 51<br />

12.3.1 Ma<strong>in</strong> Rule <strong>and</strong> Exceptions ......................................................................... 51<br />

12.3.2 Exchange of Data <strong>and</strong> Information ............................................................ 52<br />

12.4 Public Announcements ........................................................................................... 52<br />

12.5 Force Majeure ......................................................................................................... 53<br />

12.6 Arbitration .............................................................................................................. 53


v<br />

12.7 Applicable Law <strong>and</strong> Jurisdiction ............................................................................. 54<br />

12.8 Notices ................................................................................................................... 54<br />

12.9 Danish Government ................................................................................................ 54<br />

13. DEFINITIONS AND INTERPRETATIONS ...................................................... 55<br />

13.1 Def<strong>in</strong>itions .............................................................................................................. 55<br />

13.2 Interpretations ......................................................................................................... 57<br />

APPENDIX A: ACCOUNTING PROCEDURE


This Agreement is made as of the day of 200X between:<br />

...............<br />

...............<br />

............... <strong>and</strong><br />

Nordsøfonden<br />

WHEREAS, the Parties are the holders of the Licence <strong>and</strong> wish <strong>to</strong> def<strong>in</strong>e their respective rights,<br />

<strong>in</strong>terests, duties <strong>and</strong> obligations with respect <strong>to</strong> operations <strong>in</strong> connection with the Licence.<br />

NOW, THEREFORE the Parties hereby agree as follows:<br />

1


1. SCOPE AND DURATION<br />

1.1 Scope<br />

The scope of this Agreement shall extend <strong>to</strong> the exploration for <strong>and</strong> the development<br />

<strong>and</strong> production of <strong>Hydrocarbon</strong>s under the Licence <strong>and</strong> <strong>to</strong> the consideration of treatment,<br />

s<strong>to</strong>rage <strong>and</strong> transportation of the same. This Agreement shall not extend <strong>to</strong> any<br />

jo<strong>in</strong>t f<strong>in</strong>anc<strong>in</strong>g arrangements or any jo<strong>in</strong>t market<strong>in</strong>g or sale of <strong>Hydrocarbon</strong>s.<br />

1.2 Duration<br />

This Agreement shall be considered effective as of the …th of …, xxxx (the date upon<br />

which the Licence commenced) <strong>and</strong> shall, subject <strong>to</strong> Section 12.3, cont<strong>in</strong>ue for so long<br />

as the Licence rema<strong>in</strong>s <strong>in</strong> force <strong>and</strong> until all licence obligations have been fulfilled <strong>and</strong><br />

all Jo<strong>in</strong>t Property has been disposed of <strong>and</strong> f<strong>in</strong>al settlement has been made between the<br />

Parties <strong>in</strong> accordance with their respective rights <strong>and</strong> obligations hereunder <strong>in</strong>clud<strong>in</strong>g<br />

the satisfaction of all ab<strong>and</strong>onment obligations.<br />

2


2. INTERESTS OF THE PARTIES<br />

2.1 Percentage Interests<br />

As of the effective date of this Agreement, the respective Percentage Interests of the<br />

Parties <strong>to</strong> the jo<strong>in</strong>t venture established by this Agreement are as follows:<br />

________________________________ ..........%<br />

________________________________ ..........%<br />

________________________________ ..........%<br />

Nordsøfonden 20 %<br />

Except as provided <strong>in</strong> Article 7, the Parties' Percentage Interests under this Agreement<br />

shall always be equal <strong>to</strong> the Parties' Percentage Interests under the Licence.<br />

2.2 Obligations <strong>and</strong> Rights<br />

Except as otherwise provided <strong>in</strong> this Agreement or <strong>in</strong> the Licence:<br />

(a) all obligations, costs, expenses <strong>and</strong> liabilities accru<strong>in</strong>g, result<strong>in</strong>g from or accrued<br />

<strong>in</strong> connection with the Jo<strong>in</strong>t Operations shall be the responsibility of the<br />

Parties <strong>in</strong> accordance with their respective Percentage Interests; <strong>and</strong><br />

(b) all the rights with respect <strong>to</strong> <strong>and</strong> <strong>in</strong>terests <strong>in</strong> <strong>and</strong> under the Licence, all Jo<strong>in</strong>t<br />

Property, all Jo<strong>in</strong>t <strong>Hydrocarbon</strong>s, all technology, all rights <strong>and</strong> claims aga<strong>in</strong>st<br />

third Parties <strong>and</strong> all other property produced or developed under the Jo<strong>in</strong>t Operations<br />

shall be owned by (<strong>and</strong> the title <strong>to</strong> the same shall au<strong>to</strong>matically pass<br />

<strong>to</strong>) the Parties <strong>in</strong> accordance with their respective Percentage Interests.<br />

3


3. OPERATOR<br />

3.1 Designation<br />

3.2 Rights<br />

_____ is hereby designated <strong>and</strong> agrees <strong>to</strong> act as the Opera<strong>to</strong>r under this Agreement.<br />

Subject <strong>to</strong> the other provisions of this Agreement, the Opera<strong>to</strong>r has the right <strong>and</strong> is<br />

obliged <strong>to</strong> conduct the Jo<strong>in</strong>t Operations by itself, or through its Affiliates, its agents or<br />

its contrac<strong>to</strong>rs, under the overall supervision <strong>and</strong> control of the Operat<strong>in</strong>g Committee. If<br />

the Opera<strong>to</strong>r does not conduct all or any of the Jo<strong>in</strong>t Operations itself, it shall nevertheless<br />

rema<strong>in</strong> responsible for such operations as Opera<strong>to</strong>r. The Opera<strong>to</strong>r's right shall<br />

not be assignable without the written consent of the Non-Opera<strong>to</strong>rs <strong>and</strong> the consent of<br />

the Danish Energy Agency.<br />

Subject <strong>to</strong> Article 3.3.3 it is the <strong>in</strong>tention of the Parties that the Party designated as Opera<strong>to</strong>r<br />

shal neigther ga<strong>in</strong> nor lose as a result of conduct<strong>in</strong>g Jo<strong>in</strong>t Operations under this<br />

Agreement.<br />

3.3 Responsibility<br />

3.3.1 Responsibilities<br />

Subject <strong>to</strong> the overall supervision of the Operat<strong>in</strong>g Committee, the responsibilities of<br />

the Opera<strong>to</strong>r shall <strong>in</strong>clude but not be limited <strong>to</strong>:<br />

(a) the preparation of Programmes, Budgets <strong>and</strong> AFEs pursuant <strong>to</strong> the provisions<br />

of this Agreement;<br />

(b) the obta<strong>in</strong><strong>in</strong>g <strong>and</strong> ma<strong>in</strong>tenance of all necessary permissions from the Danish<br />

Energy Agency <strong>and</strong> other governmental <strong>and</strong> municipal authorities <strong>to</strong> implement<br />

the Programmes;<br />

(c) the implementation of such Programmes <strong>and</strong> Budgets as shall, <strong>to</strong>gether with<br />

the relevant AFEs, have been approved by the Operat<strong>in</strong>g Committee;<br />

(d) the submission <strong>to</strong> each of the Parties of reports, data <strong>and</strong> <strong>in</strong>formation concern<strong>in</strong>g<br />

the Jo<strong>in</strong>t Operations pursuant <strong>to</strong> the provisions of this Agreement;<br />

(e) the timely provision <strong>to</strong> the Danish Energy Agency or other governmental authorities<br />

of reports, data, samples, <strong>and</strong> <strong>in</strong>formation concern<strong>in</strong>g the Jo<strong>in</strong>t Operations<br />

pursuant <strong>to</strong> the Licence <strong>and</strong> any applicable laws or regulations;<br />

(f) the plann<strong>in</strong>g for <strong>and</strong> obta<strong>in</strong><strong>in</strong>g of all requisite services <strong>and</strong> Material;<br />

4


(g) the direction <strong>and</strong> control of account<strong>in</strong>g services;<br />

(h) the provision of all technical <strong>and</strong> advisory services required for the efficient<br />

performance of the Jo<strong>in</strong>t Operations;<br />

(i) the conduct of such other activities as the Operat<strong>in</strong>g Committee shall decide<br />

shall be appropriate for the proper <strong>and</strong> efficient carry<strong>in</strong>g out of the Jo<strong>in</strong>t Operations;<br />

<strong>and</strong><br />

(j) the adm<strong>in</strong>istration of the Licence.<br />

3.3.2 Methods <strong>and</strong> Practices<br />

The Opera<strong>to</strong>r shall conduct the Jo<strong>in</strong>t Operations <strong>in</strong> a proper <strong>and</strong> workmanlike manner <strong>in</strong><br />

accordance with methods <strong>and</strong> practices cus<strong>to</strong>marily used <strong>in</strong> good <strong>and</strong> prudent oil <strong>and</strong><br />

gas field practice <strong>and</strong> with that degree of diligence <strong>and</strong> prudence ord<strong>in</strong>arily exercised by<br />

experienced opera<strong>to</strong>rs under similar circumstances <strong>and</strong> conditions. The Opera<strong>to</strong>r shall<br />

further do or cause <strong>to</strong> be done, with due diligence, all such acts <strong>and</strong> th<strong>in</strong>gs with<strong>in</strong> its<br />

control as may be necessary <strong>to</strong> keep <strong>and</strong> ma<strong>in</strong>ta<strong>in</strong> the Licence <strong>in</strong> force <strong>and</strong> effect <strong>and</strong><br />

shall conduct the Jo<strong>in</strong>t Operations <strong>in</strong> compliance with the Licence <strong>and</strong> any applicable<br />

laws or regulations.<br />

3.3.3 Opera<strong>to</strong>r's Liability<br />

The Opera<strong>to</strong>r shall not <strong>in</strong> its role as Opera<strong>to</strong>r be liable for any loss or damage <strong>in</strong> connection<br />

with its responsibilities <strong>and</strong> functions as Opera<strong>to</strong>r unless such loss or damage results<br />

from:<br />

(a) the gross negligence, wilful misconduct or wilful failure <strong>to</strong> act of the Managerial<br />

or Supervisory Personnel of the Opera<strong>to</strong>r or any of its Affiliates (<strong>to</strong> the extent<br />

such personnel perform functions as Opera<strong>to</strong>r); or<br />

(b) its failure <strong>to</strong> obta<strong>in</strong> or ma<strong>in</strong>ta<strong>in</strong> any <strong>in</strong>surance which it is required <strong>to</strong> obta<strong>in</strong> or<br />

ma<strong>in</strong>ta<strong>in</strong> under Section 3.12, except where it has used all reasonable endeavours<br />

<strong>to</strong> obta<strong>in</strong> or ma<strong>in</strong>ta<strong>in</strong> such <strong>in</strong>surance but has been unable <strong>to</strong> do so <strong>and</strong> has<br />

promptly notified the Parties of such fact;<br />

provided that <strong>in</strong> neither case shall the Opera<strong>to</strong>r be liable for any consequential loss or<br />

damage. For the purposes of this Section consequential loss or damage shall <strong>in</strong>clude but<br />

not be limited <strong>to</strong> <strong>in</strong>ability <strong>to</strong> produce <strong>Hydrocarbon</strong>s, environmental damage caused by a<br />

discharge of <strong>Hydrocarbon</strong>s, lost production or loss of profits.<br />

3.4 Liens <strong>and</strong> Encumbrances<br />

The Opera<strong>to</strong>r shall, <strong>in</strong> so far as it may be with<strong>in</strong> its control, keep all Jo<strong>in</strong>t Property <strong>and</strong><br />

all Jo<strong>in</strong>t <strong>Hydrocarbon</strong>s free from all liens, charges <strong>and</strong> encumbrances, which might arise<br />

by reason of the conduct of the Jo<strong>in</strong>t Operations.<br />

5


3.5 Employees<br />

Subject <strong>to</strong> the provisions of any approved Programme <strong>and</strong> Budget, the number of employees<br />

of the Opera<strong>to</strong>r employed <strong>in</strong> connection with its activities hereunder shall be<br />

determ<strong>in</strong>ed by the Opera<strong>to</strong>r. The Opera<strong>to</strong>r shall also determ<strong>in</strong>e their selection, hours of<br />

work <strong>and</strong> remuneration.<br />

3.6 Contrac<strong>to</strong>rs <strong>and</strong> Contracts<br />

3.6.1 General Pr<strong>in</strong>ciples<br />

Subject <strong>to</strong> Section 3.6.2 hereof <strong>and</strong> <strong>to</strong> the provisions of any approved Programme <strong>and</strong><br />

Budget the Opera<strong>to</strong>r shall have the right <strong>to</strong> determ<strong>in</strong>e the contrac<strong>to</strong>rs, vendors <strong>and</strong> others<br />

<strong>to</strong> provide goods <strong>and</strong> services <strong>in</strong> connection with the Jo<strong>in</strong>t Operations, provided that<br />

the Opera<strong>to</strong>r shall utilise all reasonable efforts <strong>to</strong> ensure that each contract is entered<br />

<strong>in</strong><strong>to</strong> under the best commercial practice <strong>and</strong> provides the most beneficial terms <strong>and</strong> rates<br />

for the goods <strong>and</strong> services based on various criteria depend<strong>in</strong>g on the contract <strong>in</strong> question<br />

such as e.g. price, quality, availability <strong>and</strong> reputation. Thus, under normal circumstances<br />

bids from several suppliers should be obta<strong>in</strong>ed. Subject <strong>to</strong> Section 13, Subsection<br />

1, of the Licence <strong>and</strong> Section 8.2 of the Subsoil Act the Opera<strong>to</strong>r shall at the request<br />

of any Party <strong>in</strong>form the Operat<strong>in</strong>g Committee fully about the adm<strong>in</strong>istration of the<br />

provisions of this Section 3.6.<br />

3.6.2 Information <strong>and</strong> Consultation of the Non-Opera<strong>to</strong>rs<br />

In the case of any proposed contract for the Jo<strong>in</strong>t Operations where the cost thereof will<br />

or is likely <strong>to</strong> exceed ………….(DKK …………..) <strong>and</strong> subject <strong>to</strong> Section 13, Subsection<br />

1, of the Licence <strong>and</strong> Section 8.2 of the Subsoil Act, the Opera<strong>to</strong>r shall:<br />

(a) <strong>in</strong> each case obta<strong>in</strong> competitive sealed bid tenders;<br />

(b) consult with the Parties regard<strong>in</strong>g the contrac<strong>to</strong>rs <strong>to</strong> be <strong>in</strong>vited <strong>to</strong> tender on a<br />

timely enough basis <strong>to</strong> allow the Non-Opera<strong>to</strong>rs <strong>to</strong> make recommendations, by<br />

forward<strong>in</strong>g <strong>to</strong> the Non-Opera<strong>to</strong>rs the proposed list of such contrac<strong>to</strong>rs (<strong>in</strong>clud<strong>in</strong>g<br />

any known subcontrac<strong>to</strong>rs);<br />

(c) forward the tender documents if requested <strong>to</strong> do so by the Non-Opera<strong>to</strong>rs;<br />

(d) after the expiry of the period allowed for tender <strong>and</strong> the open<strong>in</strong>g of the bids,<br />

upon request promptly submit <strong>to</strong> the Non-Opera<strong>to</strong>rs evaluations <strong>and</strong> recommendations<br />

<strong>and</strong> upon request, report details of all bids received, <strong>and</strong> any rebids,<br />

amendments <strong>to</strong> bids <strong>and</strong> subsequent negotiations, <strong>to</strong> the Non-Opera<strong>to</strong>rs;<br />

(e) use its reasonable endeavours <strong>to</strong> ensure that any such contract can be fully assigned<br />

<strong>to</strong> any of the Non-Opera<strong>to</strong>rs <strong>in</strong> the event of any change of the Opera<strong>to</strong>r;<br />

6


(f) promptly notify the Non-Opera<strong>to</strong>rs when a commitment is entered <strong>in</strong><strong>to</strong> <strong>and</strong><br />

upon request promptly supply the Non-Opera<strong>to</strong>rs with confirmed copies of<br />

each such contract <strong>and</strong> any subsequent revisions there<strong>to</strong>;<br />

(g) when an agreement for the delivery of goods or services with an anticipated<br />

contract value of ………….Kroner (DKK …………… or more or such higher<br />

amount as may be agreed by all Parties dur<strong>in</strong>g the development <strong>and</strong> production<br />

phase is <strong>to</strong> be concluded, furnish <strong>to</strong> the contracts committee established accord<strong>in</strong>g<br />

<strong>to</strong> Section 4.6 (or <strong>in</strong> case no contracts committee has been established furnish<br />

<strong>to</strong> the Operat<strong>in</strong>g Committee act<strong>in</strong>g as ad hoc contracts committee) the material<br />

referred <strong>to</strong> <strong>in</strong> Sections 3.6.2 (b), (c) <strong>and</strong> (d) <strong>and</strong> refra<strong>in</strong> from enter<strong>in</strong>g <strong>in</strong><strong>to</strong><br />

such agreement until the contracts committee (or the Operat<strong>in</strong>g Committee as<br />

the case may be) has submitted <strong>to</strong> the Opera<strong>to</strong>r a recommendation on which of<br />

the bids received should be accepted; <strong>and</strong><br />

(h) when an agreement for the delivery of goods or services with an anticipated<br />

contract value of ………………..Kroner (DKK…………….) or more is <strong>to</strong> be<br />

concluded, <strong>and</strong> the recommendation of the contracts committee established accord<strong>in</strong>g<br />

<strong>to</strong> Section 4.6 (if any) has been received, obta<strong>in</strong> the Operat<strong>in</strong>g Committee's<br />

approval of the bid <strong>and</strong> the applicable terms <strong>and</strong> conditions prior <strong>to</strong> the<br />

conclusion of the agreement.<br />

3.6.3 Liability under Contracts<br />

Unless otherwise decided by the Operat<strong>in</strong>g Committee, agreements with third Parties<br />

shall be such that no party other than the Opera<strong>to</strong>r shall be directly liable thereunder <strong>to</strong><br />

such third party <strong>in</strong> connection with Jo<strong>in</strong>t Operations. The assumption of jo<strong>in</strong>t liability <strong>to</strong><br />

a third party shall always require the unanimous vote of the Operat<strong>in</strong>g Committee. It<br />

shall be the responsibility of the Opera<strong>to</strong>r <strong>in</strong> conclud<strong>in</strong>g agreements <strong>to</strong> ensure that they<br />

are drafted so as <strong>to</strong> <strong>in</strong>corporate the legal position required by this Section 3.6.3.<br />

3.6.4 Amendment of Amounts<br />

The Operat<strong>in</strong>g Committee may unanimously amend amounts shown <strong>in</strong> this Section 3.6<br />

from time <strong>to</strong> time <strong>to</strong> take account of the general level of <strong>in</strong>flation <strong>and</strong> prevail<strong>in</strong>g costs of<br />

relevant goods <strong>and</strong> services.<br />

3.7 Representation of the Parties<br />

The Opera<strong>to</strong>r will represent the Parties regard<strong>in</strong>g any matters or deal<strong>in</strong>gs with the Danish<br />

Energy Agency, any other governmental or municipal authorities or third parties <strong>in</strong><br />

so far as the same relate <strong>to</strong> the Jo<strong>in</strong>t Operations <strong>and</strong> <strong>in</strong> accordance with any directions<br />

given by the Operat<strong>in</strong>g Committee. In reasonable time prior <strong>to</strong> any representation which<br />

concerns matters of a non-rout<strong>in</strong>e character the Opera<strong>to</strong>r shall consult with <strong>and</strong> obta<strong>in</strong><br />

7


from the Operat<strong>in</strong>g Committee such directions, if any, as the Operat<strong>in</strong>g Committee sees<br />

fit. The Parties shall always have the right <strong>to</strong> be present as observers at meet<strong>in</strong>gs with<br />

the Danish Energy Agency, <strong>and</strong> any other governmental or municipal authorities where<br />

the Opera<strong>to</strong>r represents the Parties. There is reserved <strong>to</strong> each Party the unfettered right<br />

<strong>to</strong> deal with the Danish Energy Agency, any other governmental or municipal authorities<br />

<strong>in</strong> respect of matters relat<strong>in</strong>g <strong>to</strong> its own Percentage Interest.<br />

3.8 Records<br />

The Opera<strong>to</strong>r shall prepare <strong>and</strong> ma<strong>in</strong>ta<strong>in</strong> proper books, records <strong>and</strong> <strong>in</strong>ven<strong>to</strong>ries <strong>in</strong> respect<br />

of the Jo<strong>in</strong>t Operations which shall be kept <strong>in</strong> compliance with the Account<strong>in</strong>g<br />

Procedure <strong>and</strong> with due regard <strong>to</strong> the requirements of the Licence <strong>and</strong> any applicable<br />

laws or regulations. The books, records, <strong>and</strong> <strong>in</strong>ven<strong>to</strong>ries shall be preserved for a period<br />

of fifteen (15) years from the date of record<strong>in</strong>g or, if arbitration proceed<strong>in</strong>gs have been<br />

<strong>in</strong>stituted, until the term<strong>in</strong>ation of such proceed<strong>in</strong>gs, whichever is the longer.<br />

3.9 Reports, Data etc.<br />

3.9.1 Common Data Base<br />

With a view <strong>to</strong> br<strong>in</strong>g<strong>in</strong>g all the Parties who are technically active <strong>to</strong> as equal a foot<strong>in</strong>g as<br />

reasonably possible from the start of the Jo<strong>in</strong>t Operations the Opera<strong>to</strong>r shall propose a<br />

common database <strong>to</strong> be def<strong>in</strong>ed by unanimous decision of the Parties <strong>in</strong> the Operat<strong>in</strong>g<br />

Committee with<strong>in</strong> six (6) months after the issuance of the Licence. As a m<strong>in</strong>imum any<br />

Party shall be able at such Party's request <strong>to</strong> acquire the technical part of the application<br />

for the Licence <strong>in</strong>clud<strong>in</strong>g pert<strong>in</strong>ent data coverage of the Licence Area. The costs (<strong>in</strong>clud<strong>in</strong>g<br />

reproduction costs) related <strong>to</strong> acquir<strong>in</strong>g the necessary data <strong>and</strong> <strong>in</strong>formation<br />

(with the deduction of any group rebate) shall be for the account of the receiv<strong>in</strong>g Party.<br />

3.9.2 Report<strong>in</strong>g<br />

The Opera<strong>to</strong>r shall, <strong>in</strong> respect of Jo<strong>in</strong>t Operations:<br />

(a) provide each Party with<br />

(i) monthly progress reports on all exploration, appraisal <strong>and</strong> development<br />

activities or quarterly reports <strong>in</strong> periods of low activity;<br />

(ii) dur<strong>in</strong>g drill<strong>in</strong>g: daily geological <strong>and</strong> drill<strong>in</strong>g reports, <strong>and</strong> promptly<br />

when available with all types of field logs, f<strong>in</strong>al logs <strong>and</strong> well reports<br />

<strong>in</strong>clud<strong>in</strong>g composite log;<br />

(iii) dur<strong>in</strong>g production: daily <strong>and</strong> monthly production reports of Jo<strong>in</strong>t <strong>Hydrocarbon</strong>s;<br />

8


(iv) copies of evaluations <strong>and</strong> reports on technical, economical, health, environmental<br />

<strong>and</strong> safety as well as other issues (monthly or quarterly);<br />

(v) copies of all reports submitted by the Opera<strong>to</strong>r <strong>to</strong> the Danish authorities<br />

immediately upon submittal;<br />

(vi) m<strong>in</strong>utes of the Opera<strong>to</strong>r's meet<strong>in</strong>gs with the Danish authorities with<strong>in</strong><br />

fourteen (14) days of the meet<strong>in</strong>g <strong>and</strong> copies of any correspondence<br />

sent <strong>to</strong> or received from the Danish authorities regard<strong>in</strong>g the Jo<strong>in</strong>t Operations<br />

immediately upon submittal/receipt;<br />

(vii) such other reports as the Operat<strong>in</strong>g Committee may decide; <strong>and</strong><br />

(viii) at the sole cost of the Party request<strong>in</strong>g the same, such additional reports,<br />

data, analyses <strong>and</strong> such other <strong>in</strong>formation as such Party may<br />

reasonably request; <strong>and</strong><br />

(b) timely submit <strong>to</strong> the appropriate governmental authorities all reports concern<strong>in</strong>g<br />

the Jo<strong>in</strong>t Operations required under the Licence <strong>and</strong> any applicable laws or<br />

regulations after review by the Parties (unless the Operat<strong>in</strong>g Committee decides<br />

that such review is not required) <strong>and</strong>, concurrently therewith, furnish copies<br />

of all such reports <strong>to</strong> all the Parties.<br />

3.10 Consultation <strong>and</strong> Information<br />

The Opera<strong>to</strong>r shall freely consult with the Parties <strong>and</strong> keep them <strong>in</strong>formed of matters<br />

concern<strong>in</strong>g the Jo<strong>in</strong>t Operations. Without prejudice <strong>to</strong> the generality of the forego<strong>in</strong>g,<br />

the Opera<strong>to</strong>r shall:<br />

(a) advise all Parties of circumstances that may warrant the tak<strong>in</strong>g out of <strong>in</strong>surance<br />

either for the Jo<strong>in</strong>t Account or for the Parties <strong>in</strong>dividually;<br />

(b) <strong>in</strong>form each Party of all logg<strong>in</strong>g, cor<strong>in</strong>g <strong>and</strong> test<strong>in</strong>g operations with such advance<br />

notice as shall allow each Party subject <strong>to</strong> section 3.15.3(b) <strong>to</strong> have one<br />

(1) or more representatives present on location dur<strong>in</strong>g the conduct of such operations;<br />

(c) provide each Party with copies of all seismic data, well logs <strong>and</strong> core analyses<br />

<strong>and</strong> with such eng<strong>in</strong>eer<strong>in</strong>g, geological, geophysical, technical <strong>and</strong> other data<br />

<strong>and</strong> <strong>in</strong>formation relat<strong>in</strong>g <strong>to</strong> the Jo<strong>in</strong>t Operations as each Party may reasonably<br />

request;<br />

(d) give each Party full access <strong>to</strong> exam<strong>in</strong>e all cores, <strong>in</strong>clud<strong>in</strong>g sidewall cores, cutt<strong>in</strong>gs<br />

<strong>and</strong> well-samples - such Material after analysis <strong>to</strong> be s<strong>to</strong>red <strong>in</strong> <strong>Denmark</strong>;<br />

(e) s<strong>to</strong>re materials as mentioned under (d) as well as other samples <strong>and</strong> data for a<br />

period <strong>to</strong> be decided by the Operat<strong>in</strong>g Committee, <strong>and</strong> before dispos<strong>in</strong>g<br />

9


thereof, offer The Geological Survey of <strong>Denmark</strong> <strong>and</strong> Greenl<strong>and</strong> the right <strong>to</strong><br />

acquire the same free of charge; <strong>and</strong><br />

(f) consult on such other matters <strong>and</strong> provide the Parties with such other <strong>in</strong>formation<br />

relat<strong>in</strong>g <strong>to</strong> the Jo<strong>in</strong>t Operations as the Operat<strong>in</strong>g Committee may decide.<br />

3.11 Expenditures <strong>and</strong> Actions<br />

The Opera<strong>to</strong>r is authorised <strong>to</strong> make such expenditures, <strong>in</strong>cur such commitments for expenditures<br />

<strong>and</strong> take such actions as may be authorised by the Operat<strong>in</strong>g Committee <strong>in</strong><br />

accordance with this Agreement. The Opera<strong>to</strong>r is also authorised <strong>in</strong> circumstances constitut<strong>in</strong>g<br />

an emergency <strong>to</strong> make any expenditure for the Jo<strong>in</strong>t Account or <strong>in</strong>cur any<br />

commitments for such expenditures or take any actions it deems necessary <strong>to</strong> safeguard<br />

lives or property or prevent or mitigate pollution or other damage <strong>to</strong> the environment.<br />

The Opera<strong>to</strong>r shall promptly notify all the Parties of any such emergency circumstances<br />

<strong>and</strong> the amount of expenditures <strong>and</strong> commitments for expenditures so made <strong>and</strong> <strong>in</strong>curred<br />

<strong>and</strong> the action so taken.<br />

3.12 Insurance<br />

3.12.1 Jo<strong>in</strong>t <strong>and</strong> Individual Insurance<br />

The Opera<strong>to</strong>r shall obta<strong>in</strong> <strong>and</strong> ma<strong>in</strong>ta<strong>in</strong>, <strong>in</strong> respect of the Jo<strong>in</strong>t Operations <strong>and</strong> the Jo<strong>in</strong>t<br />

Property, all <strong>in</strong>surance required under the Licence or any applicable laws <strong>and</strong> regulations<br />

<strong>and</strong> any additional <strong>in</strong>surance determ<strong>in</strong>ed by the Operat<strong>in</strong>g Committee. A Party<br />

shall, however, have the right not <strong>to</strong> participate if such Party 1) gives notice <strong>to</strong> that effect<br />

<strong>to</strong> the Opera<strong>to</strong>r, 2) establishes that the other Parties have reasonable opportunity <strong>to</strong><br />

obta<strong>in</strong> such <strong>in</strong>surance at a premium which is not substantially higher than said Parties'<br />

shares of the premium for said <strong>in</strong>surance if obta<strong>in</strong>ed jo<strong>in</strong>tly by all Parties, 3) does noth<strong>in</strong>g<br />

which may <strong>in</strong>terfere with the Opera<strong>to</strong>r <strong>in</strong> negotiat<strong>in</strong>g for such <strong>in</strong>surance for the<br />

other Parties <strong>and</strong> 4) obta<strong>in</strong>s <strong>and</strong> ma<strong>in</strong>ta<strong>in</strong>s <strong>in</strong> respect of its Percentage Interest share of<br />

all the risks covered by the determ<strong>in</strong>ed <strong>in</strong>surance such <strong>in</strong>surance - with waiver of subrogation<br />

<strong>in</strong> favour of all the Parties - or other evidence of f<strong>in</strong>ancial responsibility as may<br />

reasonably be determ<strong>in</strong>ed by the Operat<strong>in</strong>g Committee. If a Party - <strong>in</strong>stead of <strong>in</strong>surance<br />

- provides such other evidence of f<strong>in</strong>ancial responsibility, a waiver of subrogation <strong>in</strong> favour<br />

of all the Parties shall likewise apply.<br />

3.12.2 Cost, Information, Co-<strong>in</strong>surance, Report<strong>in</strong>g <strong>and</strong> Fil<strong>in</strong>g of Claims<br />

The cost of <strong>in</strong>surance <strong>in</strong> which all the Parties are participat<strong>in</strong>g shall be for the Jo<strong>in</strong>t Account<br />

<strong>and</strong> the cost of <strong>in</strong>surance <strong>in</strong> which less than all the Parties are participat<strong>in</strong>g shall<br />

be charged <strong>to</strong> the Parties so participat<strong>in</strong>g <strong>in</strong> proportion <strong>to</strong> their respective <strong>in</strong>terests <strong>in</strong> the<br />

10


<strong>in</strong>surance. The Opera<strong>to</strong>r shall, <strong>in</strong> respect of all <strong>in</strong>surance obta<strong>in</strong>ed pursuant <strong>to</strong> this<br />

Agreement:<br />

(a) promptly <strong>in</strong>form the Parties participat<strong>in</strong>g there<strong>in</strong> of the <strong>in</strong>surance it has taken<br />

out <strong>and</strong> supply them with copies of the relevant policies when the same are issued;<br />

(b) arrange for the Parties participat<strong>in</strong>g there<strong>in</strong>, accord<strong>in</strong>g <strong>to</strong> their respective <strong>in</strong>terests<br />

<strong>in</strong> the <strong>in</strong>surance <strong>to</strong> be named as co-<strong>in</strong>sured on the relevant policies with<br />

waivers of subrogation <strong>in</strong> favour of the Parties;<br />

(c) provide the Parties with copies of any statement of <strong>in</strong>surance submitted <strong>to</strong> the<br />

Danish Energy Agency <strong>in</strong> accordance with Section 30 of the Licence, cf. Section<br />

3.3.1 (e);<br />

(d) duly file all claims <strong>and</strong> take all necessary <strong>and</strong> proper steps <strong>to</strong> collect any proceeds<br />

with respect <strong>to</strong> <strong>in</strong>surance taken out by it <strong>and</strong>, if all the Parties are participat<strong>in</strong>g<br />

there<strong>in</strong>, credit them <strong>to</strong> the Jo<strong>in</strong>t Account or, if less than all the Parties<br />

are participat<strong>in</strong>g there<strong>in</strong>, credit them <strong>to</strong> the participat<strong>in</strong>g Parties.<br />

3.12.3 Evidence of Insurance<br />

Each of the Parties shall, as <strong>and</strong> when required by the Opera<strong>to</strong>r or any other Party, produce<br />

such evidence as may reasonably be required <strong>to</strong> establish that the <strong>in</strong>surance required<br />

under this Section 3.12 is be<strong>in</strong>g ma<strong>in</strong>ta<strong>in</strong>ed.<br />

3.12.4 Contrac<strong>to</strong>rs' Insurance<br />

The Opera<strong>to</strong>r shall take all reasonable steps <strong>to</strong> ensure that all contrac<strong>to</strong>rs (<strong>in</strong>clud<strong>in</strong>g<br />

subcontrac<strong>to</strong>rs) perform<strong>in</strong>g work <strong>in</strong> respect of the Jo<strong>in</strong>t Operations <strong>and</strong> the Jo<strong>in</strong>t Property<br />

obta<strong>in</strong> <strong>and</strong> ma<strong>in</strong>ta<strong>in</strong> all <strong>in</strong>surance required under the Licence or any applicable laws<br />

or regulations <strong>and</strong> such additional <strong>in</strong>surance as the Operat<strong>in</strong>g Committee may determ<strong>in</strong>e.<br />

The Opera<strong>to</strong>r shall <strong>in</strong> respect of all such <strong>in</strong>surance take reasonable steps <strong>to</strong> arrange<br />

for such contrac<strong>to</strong>rs (<strong>in</strong>clud<strong>in</strong>g subcontrac<strong>to</strong>rs) <strong>to</strong> obta<strong>in</strong> from their <strong>in</strong>surers a<br />

waiver of subrogation <strong>in</strong> favour of the Parties.<br />

3.13 Litigation<br />

3.13.1 Notification<br />

The Opera<strong>to</strong>r shall promptly notify the Parties of:<br />

(i) any <strong>in</strong>cidents, accidents or circumstance caus<strong>in</strong>g damage <strong>to</strong> Jo<strong>in</strong>t Property, the<br />

cost of which may exceed ……………..Kroner (DKK………………..); <strong>and</strong><br />

11


(ii) any claim relat<strong>in</strong>g <strong>to</strong> the Jo<strong>in</strong>t Operations where the <strong>to</strong>tal amount <strong>in</strong> dispute<br />

<strong>and</strong>/or the <strong>to</strong>tal amount of damages <strong>to</strong>gether with any costs are estimated <strong>to</strong> exceed<br />

………………..Kroner (DKK ……………);<br />

or such other amounts as may from time <strong>to</strong> time be determ<strong>in</strong>ed by the Operat<strong>in</strong>g<br />

Committee; <strong>and</strong><br />

(iii) any claim for <strong>in</strong>junction or analogous proceed<strong>in</strong>gs relat<strong>in</strong>g <strong>to</strong> the Jo<strong>in</strong>t Operations.<br />

3.13.2 Opera<strong>to</strong>r's Authority<br />

Unless otherwise limited by the Operat<strong>in</strong>g Committee the Opera<strong>to</strong>r shall have the authority<br />

<strong>to</strong> pursue, prosecute, defend or settle any claim relat<strong>in</strong>g <strong>to</strong> the Jo<strong>in</strong>t Operations<br />

(other than between the Parties) on behalf of the Parties provided that where the <strong>to</strong>tal<br />

amount <strong>in</strong> dispute <strong>and</strong>/or the <strong>to</strong>tal amount of damages <strong>to</strong>gether with any costs are estimated<br />

<strong>to</strong> exceed……………. Kroner (DKK …………..) or such other amount as may<br />

from time <strong>to</strong> time be determ<strong>in</strong>ed by the Operat<strong>in</strong>g Committee <strong>and</strong> where practicable <strong>in</strong><br />

the case of any claim for specific performance, <strong>in</strong>junction or analogous proceed<strong>in</strong>gs the<br />

Opera<strong>to</strong>r shall seek the advice of the Operat<strong>in</strong>g Committee <strong>and</strong> shall comply with any<br />

directions given by the Operat<strong>in</strong>g Committee <strong>in</strong> respect there<strong>to</strong>. In absence of such directions,<br />

the Opera<strong>to</strong>r shall act as it deems prudent <strong>in</strong> the <strong>in</strong>terest of the Parties <strong>to</strong> endeavour<br />

<strong>to</strong> prevent judgement be<strong>in</strong>g given aga<strong>in</strong>st any Party, or <strong>to</strong> challenge the jurisdiction<br />

of any court, whilst full authority from the Parties is be<strong>in</strong>g sought.<br />

3.13.3 Claims aga<strong>in</strong>st Non-Opera<strong>to</strong>rs<br />

Any Non-Opera<strong>to</strong>r shall promptly notify the other Parties of any claim relat<strong>in</strong>g <strong>to</strong> or<br />

which may affect the Jo<strong>in</strong>t Operations, <strong>and</strong> <strong>in</strong> so far as such claim relates <strong>to</strong> or affects<br />

the Jo<strong>in</strong>t Operations such Non-Opera<strong>to</strong>r shall defend or settle the same <strong>in</strong> accordance<br />

with any reasonable directions given by the Operat<strong>in</strong>g Committee, provided that prior <strong>to</strong><br />

giv<strong>in</strong>g any such directions the Operat<strong>in</strong>g Committee shall take <strong>in</strong><strong>to</strong> account any other<br />

relevant contractual obligations of such Non-Opera<strong>to</strong>r. Any costs, expenses <strong>and</strong> damages<br />

that are payable pursuant <strong>to</strong> such defence or settlement shall be for the Jo<strong>in</strong>t Account.<br />

3.13.4 Right <strong>to</strong> Participate<br />

Notwithst<strong>and</strong><strong>in</strong>g Sections 3.13.1, 3.13.2 <strong>and</strong> 3.13.3 each Party shall have the right <strong>to</strong><br />

participate <strong>in</strong> any such pursuit, prosecution, defence or settlement conducted <strong>in</strong> accordance<br />

with Sections 3.13.1, 3.13.2 or 3.13.3 at its sole cost <strong>and</strong> expense provided always<br />

that such participation does not unreasonably prejudice the conduct thereof by the<br />

Opera<strong>to</strong>r or the <strong>in</strong>terest of the Jo<strong>in</strong>t Operations.<br />

12


3.14 Rentals, Taxes, Fees <strong>and</strong> Charges<br />

The Opera<strong>to</strong>r shall pay for the Jo<strong>in</strong>t Account all rentals, taxes (except taxes based on <strong>in</strong>come<br />

<strong>and</strong> profits), fees <strong>and</strong> charges which may be levied or assessed by, or due or payable<br />

<strong>to</strong> the Government of <strong>Denmark</strong>, any sub-division thereof or any Danish municipality<br />

on or with respect <strong>to</strong> the respective Percentage Interests of the Parties.<br />

3.15 Rights of the Parties<br />

3.15.1 Rights under the Licence<br />

Subject as otherwise provided <strong>in</strong> this Agreement, each Party reserves all its rights under<br />

the Licence.<br />

3.15.2 Inspection of Books, Records <strong>and</strong> Inven<strong>to</strong>ries<br />

Without prejudice <strong>to</strong> the provisions of Section 7.1 of the Account<strong>in</strong>g Procedure, each<br />

Party shall have the right <strong>to</strong> <strong>in</strong>spect at all reasonable times dur<strong>in</strong>g usual bus<strong>in</strong>ess hours,<br />

all books, records <strong>and</strong> <strong>in</strong>ven<strong>to</strong>ries of any k<strong>in</strong>d or nature ma<strong>in</strong>ta<strong>in</strong>ed by or on behalf of<br />

the Opera<strong>to</strong>r <strong>and</strong> relat<strong>in</strong>g <strong>to</strong> the Jo<strong>in</strong>t Operations other than those books, records <strong>and</strong> <strong>in</strong>ven<strong>to</strong>ries<br />

ma<strong>in</strong>ta<strong>in</strong>ed by the Opera<strong>to</strong>r as the owner of a Percentage Interest, provided<br />

that such Party gives the Opera<strong>to</strong>r not less than thirty (30) days prior notice of the date<br />

upon which it desires <strong>to</strong> make such <strong>in</strong>spection <strong>and</strong> identifies the person or persons <strong>to</strong><br />

conduct such <strong>in</strong>spection.<br />

3.15.3 Access <strong>to</strong> the Licence Area<br />

(a) Each Party shall have the right, at all reasonable times <strong>and</strong> at its sole risk <strong>and</strong><br />

expense, of access <strong>to</strong> the Licence Area <strong>and</strong>/or the Jo<strong>in</strong>t Operations provided<br />

such Party gives the Opera<strong>to</strong>r reasonable notice of the date such access is required<br />

<strong>and</strong> identifies the representative or representatives <strong>to</strong> whom such access<br />

is <strong>to</strong> be granted. If any Party wishes access <strong>to</strong> be given <strong>to</strong> more than one representative<br />

at a time the Opera<strong>to</strong>r shall not be required <strong>to</strong> grant such access for<br />

the additional representatives if, <strong>and</strong> <strong>to</strong> the extent that, the grant<strong>in</strong>g of such access<br />

will <strong>in</strong>terfere with the conduct of the Jo<strong>in</strong>t Operations.<br />

(b) In the case of offshore operations, the Opera<strong>to</strong>r shall, at the cost of the Jo<strong>in</strong>t<br />

Account, provide access <strong>to</strong> the means of transportation used <strong>in</strong> connection<br />

therewith from the nearest airport or heliport <strong>in</strong> <strong>Denmark</strong> <strong>to</strong> the place <strong>to</strong> which<br />

access is requested, <strong>and</strong> <strong>to</strong> accommodation offshore, provided that the provision<br />

of such access does not <strong>in</strong>terfere with the conduct of the Jo<strong>in</strong>t Operations.<br />

3.16 (Deleted)<br />

13


3.17 Resignation <strong>and</strong> Removal<br />

3.17.1 Resignation<br />

The Opera<strong>to</strong>r shall have the right <strong>to</strong> resign at the end of any Month follow<strong>in</strong>g completion<br />

of the Work Obligations by giv<strong>in</strong>g not less than one hundred <strong>and</strong> eighty (180) days'<br />

notice <strong>to</strong> the Parties or such shorter period of notice as all Parties may agree.<br />

3.17.2 Removal<br />

(a) The Opera<strong>to</strong>r may be removed for cause at the end of any Month by the Operat<strong>in</strong>g<br />

Committee giv<strong>in</strong>g not less than n<strong>in</strong>ety (90) days' notice <strong>to</strong> it stat<strong>in</strong>g such<br />

cause.<br />

(b) In addition, the Opera<strong>to</strong>r may be removed by notice given by the Operat<strong>in</strong>g<br />

Committee which notice shall have immediate effect if it materially defaults <strong>in</strong><br />

the performance of its obligations under this Agreement <strong>and</strong>, where such default<br />

is capable of remedy, it fails <strong>to</strong> remedy or commence actions which lead<br />

<strong>to</strong> such remedy with<strong>in</strong> a reasonable period specified by the Operat<strong>in</strong>g Committee.<br />

(c) Furthermore, the Opera<strong>to</strong>r may be removed immediately if the circumstances<br />

described <strong>in</strong> Section 35, Sub-section 1, item (3), of the Licence apply <strong>to</strong> the<br />

Opera<strong>to</strong>r or if circumstances occur which may <strong>in</strong> the reasonable op<strong>in</strong>ion of the<br />

Operat<strong>in</strong>g Committee materially adversely affect the ability of the Opera<strong>to</strong>r <strong>to</strong><br />

cont<strong>in</strong>ue <strong>to</strong> carry out its obligations hereunder.<br />

(d) If the Opera<strong>to</strong>r has been removed immediately, then until election of a new<br />

Opera<strong>to</strong>r has taken place the Non-Opera<strong>to</strong>r hav<strong>in</strong>g the largest Percentage Interest<br />

shall act as Opera<strong>to</strong>r unless the Operat<strong>in</strong>g Committee otherwise decides.<br />

(e) In respect of any vote of the Operat<strong>in</strong>g Committee on any removal of the Opera<strong>to</strong>r,<br />

on any notice <strong>to</strong> the Opera<strong>to</strong>r accord<strong>in</strong>g <strong>to</strong> Section 3.17.2 (a) <strong>and</strong> (b), on<br />

any determ<strong>in</strong>ation as <strong>to</strong> whether a default is capable of remedy, on any request<br />

<strong>to</strong> the Opera<strong>to</strong>r <strong>to</strong> remedy the default <strong>and</strong> on any determ<strong>in</strong>ation as <strong>to</strong> whether<br />

the default is satisfac<strong>to</strong>rily remedied, on the period <strong>to</strong> be specified for remedy<br />

<strong>and</strong> on the nom<strong>in</strong>ation of a temporary Opera<strong>to</strong>r, the votes of the Party which is<br />

the Opera<strong>to</strong>r <strong>and</strong> the votes of any Party which is an Affiliate of the Opera<strong>to</strong>r<br />

shall be ignored <strong>and</strong> the vote required for any such decision shall be __ per<br />

cent (..%) of the <strong>to</strong>tal Percentage Interests held by the other Parties. In the<br />

event of a change of any Party's Percentage Interest at the request of any Party,<br />

the Parties shall discuss whether the above percentage shall be revised. Any<br />

such revision shall be subject <strong>to</strong> the approval of the Danish Energy Agency.<br />

14


3.17.3 Selection of a New Opera<strong>to</strong>r<br />

As soon as practicable after the effective date of the resignation or removal of the Opera<strong>to</strong>r,<br />

the Non-Opera<strong>to</strong>r obta<strong>in</strong><strong>in</strong>g the largest number of votes <strong>in</strong> favour of it’s appo<strong>in</strong>tment<br />

shall, subject <strong>to</strong> its acceptance of the position <strong>and</strong> subject <strong>to</strong> the consent of<br />

the Danish Energy Agency, be selected by the Operat<strong>in</strong>g Committee <strong>to</strong> assume the position<br />

of Opera<strong>to</strong>r with effect from the effective date of the resignation or removal of the<br />

prior Opera<strong>to</strong>r. In the case of the removal of the Opera<strong>to</strong>r, if the Party, which is the Opera<strong>to</strong>r,<br />

or any Party which is an Affiliate of the Opera<strong>to</strong>r either fails <strong>to</strong> vote or votes for<br />

itself or any of its Affiliates as successor <strong>to</strong> the Opera<strong>to</strong>rship, those votes shall be ignored<br />

<strong>and</strong> the number of votes required for any such decision shall be ___ per cent (..%)<br />

of the <strong>to</strong>tal Percentage Interests held by the other Parties.<br />

3.17.4 Transfer of Opera<strong>to</strong>r's Rights <strong>and</strong> Responsibilities<br />

(a) The outgo<strong>in</strong>g Opera<strong>to</strong>r <strong>and</strong> any successor Opera<strong>to</strong>r shall co-operate fully <strong>to</strong> ensure<br />

a timely <strong>and</strong> appropriate assignment <strong>and</strong> transfer of all rights <strong>and</strong> responsibilities<br />

of the Opera<strong>to</strong>r <strong>and</strong> all records <strong>and</strong> material perta<strong>in</strong><strong>in</strong>g there<strong>to</strong>. This<br />

<strong>and</strong> the follow<strong>in</strong>g subsection shall apply mutatis mut<strong>and</strong>is <strong>in</strong> the event of the<br />

appo<strong>in</strong>tment of a temporary Opera<strong>to</strong>r <strong>to</strong> the extent necessary <strong>to</strong> ensure the cont<strong>in</strong>uation<br />

of the Jo<strong>in</strong>t Operations until the appo<strong>in</strong>tment of a successor Opera<strong>to</strong>r.<br />

(b) As soon as practicable but <strong>in</strong> any event no later than the effective date of resignation<br />

or removal of the Opera<strong>to</strong>r under Section 3.17, the outgo<strong>in</strong>g Opera<strong>to</strong>r<br />

shall h<strong>and</strong> or deliver <strong>to</strong>, or rel<strong>in</strong>quish cus<strong>to</strong>dy <strong>in</strong> favour of, the successor Opera<strong>to</strong>r<br />

which shall be the Non-Opera<strong>to</strong>r selected pursuant <strong>to</strong> Section 3.17.3<br />

above as the successor Opera<strong>to</strong>r or, if no such selection shall be made by such<br />

date, the Party with the largest rema<strong>in</strong><strong>in</strong>g Percentage Interest, all funds relat<strong>in</strong>g<br />

<strong>to</strong> the Jo<strong>in</strong>t Account, all Jo<strong>in</strong>t Property, all Jo<strong>in</strong>t <strong>Hydrocarbon</strong>s <strong>and</strong> all books,<br />

records <strong>and</strong> <strong>in</strong>ven<strong>to</strong>ries relat<strong>in</strong>g <strong>to</strong> the Jo<strong>in</strong>t Operations other than those books,<br />

records <strong>and</strong> <strong>in</strong>ven<strong>to</strong>ries ma<strong>in</strong>ta<strong>in</strong>ed by the outgo<strong>in</strong>g Opera<strong>to</strong>r as the owner of a<br />

Percentage Interest. Upon such delivery the outgo<strong>in</strong>g Opera<strong>to</strong>r shall be discharged<br />

from all rights <strong>and</strong> obligations as Opera<strong>to</strong>r but without prejudice <strong>to</strong><br />

any rights, obligations or liabilities which accrued or which subsequently accrue<br />

<strong>in</strong> respect of the period when it acted as Opera<strong>to</strong>r. The outgo<strong>in</strong>g Opera<strong>to</strong>r<br />

shall further use its reasonable endeavours <strong>to</strong> transfer <strong>to</strong> the successor Opera<strong>to</strong>r,<br />

effective as of the effective date of such resignation or removal, its rights<br />

as the Opera<strong>to</strong>r under all contracts exclusively relat<strong>in</strong>g <strong>to</strong> the Jo<strong>in</strong>t Operations<br />

<strong>and</strong> the successor Opera<strong>to</strong>r shall assume all obligations of the Opera<strong>to</strong>r thereunder.<br />

Pend<strong>in</strong>g such transfer <strong>and</strong> <strong>in</strong> relation <strong>to</strong> all other contracts relat<strong>in</strong>g <strong>to</strong> the<br />

Jo<strong>in</strong>t Operations (<strong>to</strong> the extent such so relate) the outgo<strong>in</strong>g Opera<strong>to</strong>r shall hold<br />

its rights <strong>and</strong> <strong>in</strong>terests as the Opera<strong>to</strong>r from such effective date for the account<br />

<strong>and</strong> <strong>to</strong> the order of the successor Opera<strong>to</strong>r <strong>and</strong> (without prejudice <strong>to</strong> any liabil-<br />

15


ity of the outgo<strong>in</strong>g Opera<strong>to</strong>r aris<strong>in</strong>g pursuant <strong>to</strong> Section 3.3.3) the Parties shall,<br />

from such effective date, <strong>in</strong>demnify <strong>and</strong> hold harmless the outgo<strong>in</strong>g Opera<strong>to</strong>r<br />

from all obligations thereunder.<br />

(c) As soon as practicable after the date on which the outgo<strong>in</strong>g Opera<strong>to</strong>r is required<br />

<strong>to</strong> transfer its responsibilities as provided <strong>in</strong> Section 3.17.4 (b), the Parties<br />

shall audit the Jo<strong>in</strong>t Account <strong>and</strong> conduct an <strong>in</strong>ven<strong>to</strong>ry of all Jo<strong>in</strong>t Property<br />

<strong>and</strong> Material charged <strong>to</strong> the Jo<strong>in</strong>t Account <strong>and</strong> all Jo<strong>in</strong>t <strong>Hydrocarbon</strong>s <strong>and</strong> such<br />

<strong>in</strong>ven<strong>to</strong>ry shall be used <strong>in</strong> the return of <strong>and</strong> the account<strong>in</strong>g for the said Jo<strong>in</strong>t<br />

Property, Material <strong>and</strong> Jo<strong>in</strong>t <strong>Hydrocarbon</strong>s by the outgo<strong>in</strong>g Opera<strong>to</strong>r for the<br />

purposes of the transfer of responsibilities under this Section 3.17.4. All costs<br />

<strong>and</strong> expenses <strong>in</strong>curred <strong>in</strong> connection with such audit <strong>and</strong> <strong>in</strong>ven<strong>to</strong>ry shall be for<br />

the Jo<strong>in</strong>t Account.<br />

3.18 Disposal <strong>and</strong> Ab<strong>and</strong>onment<br />

3.18.1 Disposal<br />

If the Opera<strong>to</strong>r shall consider that any item of the Jo<strong>in</strong>t Property is no longer needed or<br />

suitable for the Jo<strong>in</strong>t Operations the Opera<strong>to</strong>r shall, subject <strong>to</strong> the provisions of the Account<strong>in</strong>g<br />

Procedure <strong>and</strong> Section 37 of the Licence, dispose of the same.<br />

3.18.2 Ab<strong>and</strong>onment<br />

If the Parties shall decide <strong>to</strong> ab<strong>and</strong>on the Jo<strong>in</strong>t Operations, or any part thereof, the Opera<strong>to</strong>r<br />

shall recover <strong>and</strong> endeavour <strong>to</strong> dispose of as much of the Jo<strong>in</strong>t Property as the<br />

Operat<strong>in</strong>g Committee directs can economically <strong>and</strong> reasonably be recovered or as may<br />

be required <strong>to</strong> be recovered under the Licence or any applicable law, <strong>and</strong> the net costs or<br />

net proceeds therefrom shall be charged or credited <strong>to</strong> the Jo<strong>in</strong>t Account.<br />

3.18.3 Ab<strong>and</strong>onment Agreement<br />

The Parties participat<strong>in</strong>g <strong>in</strong> the development will before submission of a development<br />

plan <strong>to</strong> the Danish Energy Agency agree the terms of an Ab<strong>and</strong>onment Agreement.<br />

Such agreement shall state the terms for the security which each Party shall provide <strong>to</strong><br />

the other Parties for its Percentage Interest share of the costs of ab<strong>and</strong>onment (which<br />

expression shall <strong>in</strong>clude demolition <strong>and</strong> removal <strong>to</strong>gether with any necessary site re<strong>in</strong>statement)<br />

of all or part of any facilities, equipment, <strong>in</strong>stallations <strong>and</strong> pipel<strong>in</strong>es used <strong>in</strong><br />

connection with the Jo<strong>in</strong>t Operations ("Ab<strong>and</strong>onment").<br />

The Ab<strong>and</strong>onment Agreement shall state the date from which the security shall be provided,<br />

based on estimates of<br />

(i) the likely costs of Ab<strong>and</strong>onment; <strong>and</strong><br />

16


(ii) the net funds (<strong>to</strong> be def<strong>in</strong>ed <strong>in</strong> the Ab<strong>and</strong>onment Agreement, but <strong>in</strong> any case <strong>to</strong><br />

be net of expenses of production <strong>and</strong> costs of Ab<strong>and</strong>onment) available from<br />

production of <strong>Hydrocarbon</strong>s from a Discovery.<br />

The Ab<strong>and</strong>onment Agreement shall further state that - if a Party fails <strong>to</strong> provide <strong>and</strong><br />

ma<strong>in</strong>ta<strong>in</strong> the agreed security - such failure shall also constitute a default under this<br />

Agreement <strong>and</strong> the provisions of Section 11.3.1 shall apply <strong>to</strong> such default. The Ab<strong>and</strong>onment<br />

Agreement shall further provide for the provision of security <strong>in</strong> case of assignment.<br />

17


4. OPERATING COMMITTEE<br />

4.1 Establishment <strong>and</strong> Powers<br />

There is hereby established an Operat<strong>in</strong>g Committee which shall exercise overall supervision<br />

<strong>and</strong> control of all matters perta<strong>in</strong><strong>in</strong>g <strong>to</strong> the Jo<strong>in</strong>t Operations.<br />

4.2 Representation<br />

The Operat<strong>in</strong>g Committee shall consist of one (1) representative appo<strong>in</strong>ted by each of<br />

the Parties. Each Party shall as soon as possible after the date of this Agreement give<br />

notice <strong>to</strong> all of the other Parties of the name of its representative <strong>and</strong> of his alternate.<br />

Such representatives <strong>and</strong> alternates may be replaced from time <strong>to</strong> time by like notice.<br />

The representative of a Party, or <strong>in</strong> the absence of the representative his alternate, shall<br />

be deemed authorised <strong>to</strong> represent <strong>and</strong> b<strong>in</strong>d such Party with respect <strong>to</strong> any matter which<br />

is with<strong>in</strong> the powers of the Operat<strong>in</strong>g Committee. The representative of the Party which<br />

is the Opera<strong>to</strong>r shall be the chairman of the Operat<strong>in</strong>g Committee, but such representative<br />

shall have no special vot<strong>in</strong>g powers as a result of its position as chairman. The representative<br />

of a Party <strong>and</strong> its alternate may be assisted at all meet<strong>in</strong>gs by any advisers<br />

which may reasonably be required.<br />

4.3 Meet<strong>in</strong>gs<br />

4.3.1 Venue, Summons<br />

The Operat<strong>in</strong>g Committee shall hold meet<strong>in</strong>gs each Quarter or meet<strong>in</strong>gs at such other<br />

<strong>in</strong>tervals as may be determ<strong>in</strong>ed by the Operat<strong>in</strong>g Committee but <strong>in</strong> no event less than<br />

once a year. The meet<strong>in</strong>gs shall be held <strong>in</strong> <strong>Denmark</strong> or at such other place as may be<br />

unanimously agreed by the Operat<strong>in</strong>g Committee. The Opera<strong>to</strong>r shall call such meet<strong>in</strong>gs<br />

<strong>and</strong> shall unless the Parties otherwise unanimously agree give at least twenty (20) days'<br />

notice of the time <strong>and</strong> date of each meet<strong>in</strong>g, <strong>to</strong>gether with an agenda <strong>and</strong> all relevant<br />

data <strong>and</strong> <strong>in</strong>formation relat<strong>in</strong>g <strong>to</strong> the matters <strong>to</strong> be considered at that meet<strong>in</strong>g. By notice<br />

<strong>to</strong> all the other Parties, any Party may advise of an additional matter or matters which<br />

such Party desires <strong>to</strong> be considered at the meet<strong>in</strong>g, <strong>and</strong> shall provide all relevant data<br />

<strong>and</strong> <strong>in</strong>formation relat<strong>in</strong>g <strong>to</strong> the matters <strong>to</strong> be considered <strong>and</strong> provided such notice is<br />

given at least ten (10) days before the date of the meet<strong>in</strong>g such matter or matters shall<br />

be deemed added <strong>to</strong> the agenda proposed by the Opera<strong>to</strong>r <strong>and</strong> be considered at the meet<strong>in</strong>g.<br />

No decision shall be taken on items not <strong>in</strong>cluded <strong>in</strong> the agenda sent <strong>to</strong> all the Parties<br />

or <strong>in</strong> the above-mentioned notice of additional matters unless all Parties are present <strong>and</strong><br />

unanimously agree that such item shall be <strong>in</strong>cluded.<br />

18


4.3.2 Special Meet<strong>in</strong>gs<br />

The Operat<strong>in</strong>g Committee shall hold a special meet<strong>in</strong>g upon the request of any Party.<br />

Such request shall be made by notice <strong>to</strong> all the other Parties <strong>and</strong> state the matter <strong>to</strong> be<br />

considered at that meet<strong>in</strong>g. Upon receiv<strong>in</strong>g such request, the Opera<strong>to</strong>r shall call a special<br />

meet<strong>in</strong>g for a date not less than seven (7) nor more than fifteen (15) days after receipt<br />

of the request. By notice <strong>to</strong> all the other Parties, any Party may advise of an additional<br />

matter or matters which such Party desires <strong>to</strong> be considered at the meet<strong>in</strong>g, <strong>and</strong><br />

provided such notice is given at least five (5) days before the date of the meet<strong>in</strong>g such<br />

matter or matters shall be deemed added <strong>to</strong> the agenda proposed by the Opera<strong>to</strong>r <strong>and</strong> be<br />

considered at the meet<strong>in</strong>g.<br />

4.3.3 Waiver of Notice<br />

For any meet<strong>in</strong>g of the Operat<strong>in</strong>g Committee, the notice <strong>to</strong> be provided may be waived<br />

with the consent of all the Parties.<br />

4.3.4 Proxy, Prior Vot<strong>in</strong>g<br />

Any Party not represented at a meet<strong>in</strong>g may vote on any matter on the agenda for such<br />

meet<strong>in</strong>g by either appo<strong>in</strong>t<strong>in</strong>g a proxy <strong>in</strong> writ<strong>in</strong>g or giv<strong>in</strong>g notice <strong>in</strong> writ<strong>in</strong>g of such vote<br />

<strong>to</strong> the Opera<strong>to</strong>r prior <strong>to</strong> the submission of such matter for vote at such meet<strong>in</strong>g.<br />

4.4 M<strong>in</strong>utes<br />

The Opera<strong>to</strong>r shall prepare the m<strong>in</strong>utes of each meet<strong>in</strong>g <strong>in</strong>clud<strong>in</strong>g a record of its decisions<br />

<strong>and</strong> a list of the actions required <strong>to</strong> be taken by the Opera<strong>to</strong>r, the Parties or any of<br />

them <strong>and</strong> provide each Party with a copy thereof not more than fourteen (14) days after<br />

the meet<strong>in</strong>g. Each Party shall notify all other Parties of its approval or disapproval of<br />

the m<strong>in</strong>utes with<strong>in</strong> fourteen (14) days of receipt thereof. A Party who fails <strong>to</strong> do so will<br />

be deemed <strong>to</strong> have approved the m<strong>in</strong>utes. The approval or disapproval of m<strong>in</strong>utes as<br />

aforesaid shall not affect the validity of any action taken by the Opera<strong>to</strong>r <strong>in</strong> good faith<br />

prior <strong>to</strong> notice of disapproval <strong>in</strong> accordance with the reasonable underst<strong>and</strong><strong>in</strong>g of any<br />

decisions taken by the Operat<strong>in</strong>g Committee <strong>in</strong> the meet<strong>in</strong>g <strong>to</strong> which such m<strong>in</strong>utes relate.<br />

4.5 Action without a Meet<strong>in</strong>g<br />

The Parties may vote on <strong>and</strong> determ<strong>in</strong>e by notice <strong>to</strong> the Opera<strong>to</strong>r without hold<strong>in</strong>g a<br />

meet<strong>in</strong>g any proposal which is submitted <strong>to</strong> them by the Opera<strong>to</strong>r by notice <strong>and</strong> which<br />

they could validly determ<strong>in</strong>e at a meet<strong>in</strong>g of the Operat<strong>in</strong>g Committee. Each Party shall<br />

cast its vote with<strong>in</strong> fourteen (14) days after the proposal is received by it except that<br />

where the Parties are requested <strong>to</strong> vote on <strong>and</strong> determ<strong>in</strong>e any proposal relat<strong>in</strong>g <strong>to</strong> the<br />

deepen<strong>in</strong>g, plugg<strong>in</strong>g back, side-track<strong>in</strong>g, suspension, test<strong>in</strong>g or ab<strong>and</strong>onment of a well<br />

19


on which drill<strong>in</strong>g equipment is then located or where the matter presented for consideration<br />

by its nature requires determ<strong>in</strong>ation <strong>in</strong> less than fourteen (14) days <strong>and</strong> such fact<br />

<strong>and</strong> such lesser period (which shall not be less than forty-eight (48) hours) are so stated<br />

<strong>in</strong> the notice submitt<strong>in</strong>g the proposal, the Parties shall cast their votes with<strong>in</strong> such lesser<br />

period after receipt of the proposal provided always that <strong>in</strong> such circumstances each<br />

party shall cast its vote as soon as possible with<strong>in</strong> the relevant periods. Failure by a<br />

Party <strong>to</strong> cast its vote with<strong>in</strong> the relevant period shall be regarded as a vote by that Party<br />

aga<strong>in</strong>st the proposal. The Opera<strong>to</strong>r shall give prompt notice of the results of any such<br />

vot<strong>in</strong>g <strong>to</strong> the Parties <strong>and</strong> any decision so taken shall be b<strong>in</strong>d<strong>in</strong>g on the Parties. In respect<br />

of any action without a meet<strong>in</strong>g the Opera<strong>to</strong>r shall give notice <strong>to</strong> the Danish Energy<br />

Agency <strong>and</strong> furnish the Danish Energy Agency with the same <strong>in</strong>formation that is furnished<br />

<strong>to</strong> the Parties <strong>and</strong> at the same time <strong>in</strong> accordance with Section 19 of the Licence.<br />

4.6 Sub-Committees<br />

The Operat<strong>in</strong>g Committee may establish such sub-committees as it considers desirable<br />

from time <strong>to</strong> time, however<br />

(a) a technical committee shall be established <strong>in</strong> any case <strong>to</strong> discuss all technical,<br />

safety <strong>and</strong> environmental matters relat<strong>in</strong>g <strong>to</strong> the Jo<strong>in</strong>t Operations;<br />

(b) at the request of at least 2 (two) Parties <strong>and</strong> always dur<strong>in</strong>g the development<br />

phase the Operat<strong>in</strong>g Committee shall establish a contracts committee <strong>to</strong> consider<br />

<strong>and</strong> make recommendations <strong>to</strong> the Opera<strong>to</strong>r regard<strong>in</strong>g such contracts as<br />

are described <strong>in</strong> Section 3.6.2 (g) <strong>and</strong> (h); <strong>and</strong><br />

(c) at the request of any Party, an account<strong>in</strong>g committee shall be established <strong>to</strong><br />

discuss all account<strong>in</strong>g matters relat<strong>in</strong>g <strong>to</strong> the Jo<strong>in</strong>t Operations.<br />

Sub-committee meet<strong>in</strong>gs shall be held <strong>in</strong> <strong>Denmark</strong> or at such other place as may be<br />

unanimously agreed by the Operat<strong>in</strong>g Committee. Each Party shall have one (1) representative<br />

on any such technical or account<strong>in</strong>g committee, which shall meet each Quarter<br />

unless the Operat<strong>in</strong>g Committee shall otherwise decide. The provisions of Section 4.4<br />

are also applicable <strong>to</strong> this Section 4.6. Each sub-committee established shall be given<br />

terms of reference <strong>and</strong> shall be subject <strong>to</strong> such procedures as the Operat<strong>in</strong>g Committee<br />

may determ<strong>in</strong>e.<br />

The functions of the sub-committees shall be <strong>in</strong> an advisory capacity or as otherwise determ<strong>in</strong>ed<br />

unanimously by the Operat<strong>in</strong>g Committee.<br />

20


4.7 Vot<strong>in</strong>g Procedure<br />

4.7.1 Vot<strong>in</strong>g Interest<br />

Each Party shall have a vot<strong>in</strong>g <strong>in</strong>terest <strong>in</strong> the Operat<strong>in</strong>g Committee <strong>and</strong> (if applicable) <strong>in</strong><br />

any sub-committees equal <strong>to</strong> its Percentage Interest.<br />

4.7.2 Pass-mark<br />

Unless otherwise provided <strong>in</strong> this Agreement, all decisions of the Operat<strong>in</strong>g Committee<br />

shall be made by the affirmative vote of [the Party or Parties] [at least … Parties] who<br />

are not Affiliates hav<strong>in</strong>g <strong>in</strong>dividually or <strong>in</strong> aggregate Percentage Interests of not less<br />

than _____ per cent (..%) provided that the surrender of acreage with<strong>in</strong> the Licence<br />

Area or the surrender or ab<strong>and</strong>onment of the Licence shall require the unanimous<br />

agreement of all the Parties. In the event of a change of any Party's Percentage Interest<br />

at the request of any Party, the Parties shall meet <strong>to</strong> discuss whether a revision of the<br />

vot<strong>in</strong>g rules <strong>in</strong> Section 4.7.2 is required. Any such revision shall be subject <strong>to</strong> the approval<br />

of the Danish Energy Agency.<br />

4.7.3 B<strong>in</strong>d<strong>in</strong>g Decision<br />

All the Parties shall be bound by each decision of the Operat<strong>in</strong>g Committee duly made<br />

<strong>in</strong> accordance with the provisions of this Agreement.<br />

4.7.4 Decision on Work Obligations<br />

If the Operat<strong>in</strong>g Committee cannot decide on the manner of carry<strong>in</strong>g out the Work Obligations<br />

required under the Licence <strong>in</strong> sufficient time <strong>to</strong> fulfil those obligations with<strong>in</strong><br />

the Licence terms <strong>and</strong> <strong>in</strong> accordance with the Licence conditions, then such Work Obligations<br />

will be carried out or satisfied <strong>in</strong> such manner as shall be favoured by the Party<br />

or Parties hold<strong>in</strong>g <strong>in</strong>dividually or <strong>in</strong> the aggregate the greatest Percentage Interests, <strong>and</strong><br />

all Parties shall be bound by any such decision.<br />

21


5. PROGRAMMES, BUDGETS AND AFES<br />

5.1 <strong>Exploration</strong> Programmes <strong>and</strong> Budgets<br />

The Opera<strong>to</strong>r shall submit <strong>to</strong> each of the Parties not later than September 1st of each<br />

Year a proposed exploration Programme <strong>and</strong> Budget for the follow<strong>in</strong>g Year, <strong>and</strong> forecasts<br />

for the next follow<strong>in</strong>g three (3) Years <strong>and</strong> for plann<strong>in</strong>g purposes estimates for the<br />

rema<strong>in</strong><strong>in</strong>g exploration period if any. The Operat<strong>in</strong>g Committee shall meet <strong>to</strong> consider<br />

such exploration Programme <strong>and</strong> Budget <strong>and</strong> <strong>to</strong> make such revisions there<strong>to</strong> as may be<br />

agreed as soon as practicable but <strong>in</strong> any event not later than November 1st. Not later<br />

than December 1st the Operat<strong>in</strong>g Committee shall approve an exploration Programme<br />

<strong>and</strong> Budget for the follow<strong>in</strong>g Year <strong>and</strong> consider the forecasts for the next follow<strong>in</strong>g<br />

three (3) Years.<br />

5.2 Appraisal Programmes <strong>and</strong> Budgets<br />

In the event of a Discovery, the Opera<strong>to</strong>r shall, as soon as possible after such Discovery<br />

has been made, submit <strong>to</strong> the Parties a report on the Discovery, <strong>and</strong> - unless otherwise<br />

decided by the Operat<strong>in</strong>g Committee - a proposed appraisal Programme, (meet<strong>in</strong>g the<br />

requirements of Section 4, Sub-section 2, of the Licence) <strong>and</strong> Budget therefore. The report<br />

<strong>and</strong> the proposed Programme <strong>and</strong> Budget shall be subject <strong>to</strong> consideration, revision<br />

<strong>and</strong> approval by the Operat<strong>in</strong>g Committee, which shall be completed as soon as possible,<br />

<strong>and</strong> <strong>in</strong> any event such that the six-month time limit set forth <strong>in</strong> Section 4, Subsection<br />

2, of the Licence can be met. When the report <strong>and</strong> appraisal Programme have<br />

been approved, the Opera<strong>to</strong>r shall submit them <strong>to</strong> the Danish Energy Agency. In the<br />

event that the Danish Energy Agency requires that the appraisal Programme be amendes<br />

the Opera<strong>to</strong>r shall resubmit it <strong>to</strong> Operat<strong>in</strong>g Committee <strong>to</strong>gether with a correspond<strong>in</strong>gly<br />

amendes budget for further consideration <strong>and</strong> the above procedure shall apply duly adjusted<br />

for any new time limit set by the Danish Energy Agency.<br />

5.3 Extension of the Licence<br />

5.3.1 Extension of the Licence for Production<br />

In the event of a Discovery <strong>and</strong> unless otherwise decided by the Operat<strong>in</strong>g Committee,<br />

<strong>and</strong> with due regard for the need <strong>to</strong> obta<strong>in</strong> the approval of the Parties <strong>in</strong> sufficient time<br />

before the expiry of the exploration period (or any extension thereof), the Opera<strong>to</strong>r shall<br />

submit <strong>to</strong> the Operat<strong>in</strong>g Committee a proposed application for the extension of the Licence<br />

for the purpose of production. The proposal shall be accompanied by a report on<br />

the deposit concerned, which <strong>in</strong> accordance with the requirements of the Danish Energy<br />

Agency describes the geological, technical <strong>and</strong> economic characteristics upon which the<br />

appraisal of the deposit is based. As soon as possible after the approval by the Operat<strong>in</strong>g<br />

22


Committee of the application <strong>and</strong> the report, the Opera<strong>to</strong>r shall submit them <strong>to</strong> the Danish<br />

Energy Agency. If the Operat<strong>in</strong>g Committee decides that an application for extension<br />

shall not be submitted, the Opera<strong>to</strong>r shall submit <strong>to</strong> the Danish Energy Agency a<br />

report on the deposit which has been approved by the Operat<strong>in</strong>g Committee. If the necessary<br />

majority required by Section 4.7.2 for the submission of an application for extension<br />

cover<strong>in</strong>g one or more Deposits is not achieved, <strong>and</strong> the failure <strong>to</strong> submit an application<br />

at the time <strong>in</strong> question will result <strong>in</strong> the expiry of the Licence, the Parties wish<strong>in</strong>g<br />

<strong>to</strong> do so may submit an application for an extension of the Licence cover<strong>in</strong>g the Deposit,<br />

<strong>to</strong> be effective as of the expiry of the exploration period. The Parties not participat<strong>in</strong>g<br />

<strong>in</strong> such an application shall cease <strong>to</strong> be Parties <strong>to</strong> said extension of the Licence.<br />

The Parties not wish<strong>in</strong>g <strong>to</strong> jo<strong>in</strong> <strong>in</strong> such an application shall take no action which would<br />

unreasonably prejudice such an application.<br />

5.3.2 Extension of the Licence for the Purpose of Further <strong>Exploration</strong><br />

(a) Subject <strong>to</strong> Section 13, Subsection 1 of the Subsoil Act <strong>and</strong> Section 5.3.3 below<br />

<strong>and</strong> except <strong>to</strong> the extent not already <strong>in</strong>cluded <strong>in</strong> an application under Section<br />

5.3.1 the Opera<strong>to</strong>r <strong>and</strong> any other Party may propose by notice <strong>to</strong> the Operat<strong>in</strong>g<br />

Committee <strong>to</strong> submit an application for extension of the Licence for the purpose<br />

of further exploration <strong>and</strong> the terms <strong>and</strong> conditions suggested <strong>to</strong> apply. As<br />

soon as possible after the approval by the Operat<strong>in</strong>g Committee of the application,<br />

the Opera<strong>to</strong>r shall submit it <strong>to</strong> the Danish Energy Agency.<br />

(b) If the necessary majority required by Section 4.7.2 for the submission of an application<br />

for extension for the purpose of further exploration is not achieved,<br />

<strong>and</strong> the failure <strong>to</strong> submit an application at the time <strong>in</strong> question will result <strong>in</strong> the<br />

expiry of the Licence, the Parties wish<strong>in</strong>g <strong>to</strong> do so may submit an application<br />

for an extension of the Licence for the purpose of further exploration <strong>to</strong> be effective<br />

as of the expiry of the Licence. If Nordsøfonden wishes <strong>to</strong> participate it<br />

shall at the same time notify the other Parties wish<strong>in</strong>g <strong>to</strong> submit an application<br />

which Percentage Interest it will participate with <strong>in</strong> accordance with Section<br />

5.3.4. In the event that such Parties are unable <strong>to</strong> agree on the terms <strong>and</strong> conditions<br />

suggested <strong>to</strong> apply <strong>to</strong> the extension, the proposal attract<strong>in</strong>g the votes of<br />

the Party or Parties hav<strong>in</strong>g the largest Percentage Interest(s) shall form the basis<br />

for the application. The Parties not participat<strong>in</strong>g <strong>in</strong> such an application shall<br />

cease <strong>to</strong> be Parties <strong>to</strong> said extension of the Licence <strong>and</strong> shall take no action<br />

which would unreasonably prejudice such an application. In the event that the<br />

Danish Energy Agency rejects an application thus submitted, but, however, allows<br />

for the re-submission thereof subject <strong>to</strong> amendment of terms <strong>and</strong> conditions<br />

as may be advised by it, then also the Parties which did not participate <strong>in</strong><br />

23


the application first submitted shall be offered <strong>and</strong> be entitled <strong>to</strong> participate <strong>in</strong><br />

any amended application <strong>to</strong> be submitted.<br />

5.3.3 Extension of the Licence for the Purpose of a Sole Risk Operation<br />

If an extension of the Licence is submitted for the purpose of carry<strong>in</strong>g out or cont<strong>in</strong>u<strong>in</strong>g<br />

a sole risk operation accord<strong>in</strong>g <strong>to</strong> Section 7.2 the provision <strong>in</strong> Section 5.3.2 shall not<br />

prejudice the right of a Party not participat<strong>in</strong>g <strong>in</strong> such operation <strong>to</strong> cont<strong>in</strong>ue as a Non-<br />

Sole Risk Participant accord<strong>in</strong>g <strong>to</strong> the provisions <strong>in</strong> Article 7 <strong>and</strong> <strong>in</strong> such case the provision<br />

of Article 7 shall apply <strong>to</strong> the Opera<strong>to</strong>rs.<br />

5.3.4 Percentage Interests of the Participants <strong>in</strong> an Extension<br />

If less than all Parties participate <strong>in</strong> an application for an extension of the Licence <strong>in</strong> accordance<br />

with Section 5.3.2 <strong>and</strong> unless otherwise unanimously agreed by the participat<strong>in</strong>g<br />

Parties the percentage <strong>in</strong>terest of each participat<strong>in</strong>g Party shall be the proportion that<br />

its Percentage Interest bears <strong>to</strong> the <strong>to</strong>tal of the Percentage Interests of all participat<strong>in</strong>g<br />

Parties. However, <strong>in</strong> the event Nordsøfonden decides <strong>to</strong> participate <strong>in</strong> an application for<br />

an extension of the Licence <strong>in</strong> accordance with Section 5.3.2 Nordsøfonden may elect<br />

<strong>to</strong> participate either with a percentage <strong>in</strong>terest calculated as here<strong>in</strong> described or with its<br />

Orig<strong>in</strong>al State Participation Share.<br />

5.4 Development Programmes <strong>and</strong> Budgets<br />

5.4.1 Preparation <strong>and</strong> Decision<br />

At such time as the Operat<strong>in</strong>g Committee determ<strong>in</strong>es that a proposal for a development<br />

Programme <strong>and</strong> Budget for one or more deposits shall be prepared, it shall direct the<br />

Opera<strong>to</strong>r <strong>to</strong> carry out such preparations. The Operat<strong>in</strong>g Committee shall establish a subcommittee<br />

<strong>to</strong> supervise the preparations. The Opera<strong>to</strong>r shall keep this sub-committee<br />

fully <strong>in</strong>formed about the progress of the work <strong>and</strong> submit major decisions for the consideration<br />

of the sub-committee. The proposal shall <strong>in</strong>clude:<br />

(a) a description of the Deposit(s) <strong>to</strong> be produced with detailed analysis <strong>and</strong><br />

evaluations of geological conditions, technical aspects of the reservoir <strong>and</strong> production,<br />

<strong>and</strong> economic fac<strong>to</strong>rs;<br />

(b) a production plan with particulars concern<strong>in</strong>g the date for commencement of<br />

production <strong>and</strong> the anticipated magnitude of the annual production for each<br />

Year the deposit is planned <strong>to</strong> be <strong>in</strong> production. If the plan encompasses more<br />

than one Deposit, such particulars shall be given for each Deposit covered by<br />

the plan as well as for the cumulative production anticipated under the plan;<br />

(c) a general description of the facilities planned <strong>to</strong> be <strong>in</strong>stalled, <strong>in</strong>clud<strong>in</strong>g the<br />

number <strong>and</strong> type of wells, <strong>and</strong> equipment for production, re<strong>in</strong>jection, measure-<br />

24


ment, s<strong>to</strong>rage <strong>and</strong> process<strong>in</strong>g, <strong>and</strong> of pipel<strong>in</strong>es between <strong>in</strong>dividual parts of the<br />

facilities, as well as a more detailed description of the transportation system<br />

planned for the produced <strong>Hydrocarbon</strong>s;<br />

(d) a risk analysis for the planned facilities with a statement of measures <strong>to</strong> be<br />

taken <strong>to</strong> reduce identified risks;<br />

(e) a plan for the manner <strong>in</strong> which the development project is <strong>to</strong> be carried out, <strong>in</strong>clud<strong>in</strong>g<br />

a time schedule <strong>and</strong> organisational plan for the execution of the project;<br />

(f) a detailed description of any elements of uncerta<strong>in</strong>ty <strong>in</strong> the project with respect<br />

<strong>to</strong> reserves, the time schedule, economics etc., <strong>to</strong>gether with all other data,<br />

studies, <strong>in</strong>terpretations, map models etc., which may be necessary for an<br />

evaluation of the project.<br />

The proposed Programme <strong>and</strong> Budget shall be put before the Operat<strong>in</strong>g Committee as<br />

soon as possible after their preparation. If the proposed Programme <strong>and</strong> Budget are approved,<br />

each of the Parties shall, with<strong>in</strong> the next one hundred (100) days or such longer<br />

period as may be determ<strong>in</strong>ed by the Operat<strong>in</strong>g Committee (however, not exceed<strong>in</strong>g one<br />

hundred <strong>and</strong> eighty (180) days), declare <strong>in</strong> writ<strong>in</strong>g <strong>to</strong> the other Parties whether it will<br />

participate <strong>in</strong> the development <strong>and</strong> the expenses thereof <strong>to</strong> the extent of its Percentage<br />

Interest share. The Programme <strong>and</strong> Budget shall be renewed <strong>and</strong> updated annually until<br />

the Programme has been completed. If fewer than all the Parties decide <strong>to</strong> participate <strong>in</strong><br />

such development, the provisions of Section 7.6.3 shall apply. If the Operat<strong>in</strong>g Committee<br />

fails <strong>to</strong> approve the proposed Programme <strong>and</strong> Budget, the provisions of Section<br />

7.6.2 shall apply.<br />

5.4.2 All Parties Participate<br />

If all the Parties decide <strong>to</strong> participate <strong>in</strong> such development the Opera<strong>to</strong>r, under the direction<br />

of the Operat<strong>in</strong>g Committee, shall prepare <strong>and</strong> submit a development plan <strong>to</strong> the<br />

Danish Energy Agency. If the Danish Energy Agency, <strong>in</strong> approv<strong>in</strong>g the development<br />

plan, requires that it be amended, any of the Parties may, by notice <strong>to</strong> the other Parties<br />

given with<strong>in</strong> twenty-eight (28) days follow<strong>in</strong>g such approval, elect not <strong>to</strong> proceed with<br />

the development. If no Party gives such notice, the approved plan (with any amendments<br />

as aforesaid) shall be adopted for the development, the Parties shall be obligated<br />

<strong>to</strong> participate <strong>in</strong> carry<strong>in</strong>g it out, <strong>and</strong> the Opera<strong>to</strong>r shall be authorised <strong>and</strong> obligated <strong>to</strong><br />

proceed <strong>in</strong> accordance with it. If less than all the Parties elect <strong>to</strong> proceed with the development,<br />

the provisions of Section 7.6.4 shall apply.<br />

5.5 Production Programmes <strong>and</strong> Budgets<br />

The Opera<strong>to</strong>r shall not later than September 1 st of the Year prior <strong>to</strong> that <strong>in</strong> which production<br />

will commence, <strong>and</strong> <strong>in</strong> each subsequent Year, submit <strong>to</strong> the Parties a proposed<br />

25


production Programme <strong>and</strong> Budget for the next Year, <strong>and</strong> forecasts for the next follow<strong>in</strong>g<br />

three (3) Years. The proposed production Programme <strong>and</strong> Budget shall be subject <strong>to</strong><br />

consideration, revision <strong>and</strong> approval by the Operat<strong>in</strong>g Committee, <strong>and</strong> the Operat<strong>in</strong>g<br />

Committee shall meet <strong>to</strong> consider such production Programme <strong>and</strong> Budget <strong>and</strong> <strong>to</strong> make<br />

such revisions there<strong>to</strong> as may be agreed as soon as practicable <strong>and</strong> <strong>in</strong> any event not later<br />

than November 1st. Not later than December 1st the Operat<strong>in</strong>g Committee shall approve<br />

a production Programme <strong>and</strong> Budget.<br />

5.6 Ab<strong>and</strong>onment Programmes <strong>and</strong> Budgets<br />

At such time as the Operat<strong>in</strong>g Committee determ<strong>in</strong>es that a proposal for an ab<strong>and</strong>onment<br />

Programme <strong>and</strong> Budget shall be prepared, it shall direct the Opera<strong>to</strong>r <strong>to</strong> carry out<br />

such preparations. The proposed Programme <strong>and</strong> Budget shall be put before the Operat<strong>in</strong>g<br />

Committee as soon as possible after their preparation. When the proposed Programme<br />

<strong>and</strong> Budget are approved, the Opera<strong>to</strong>r shall be authorised <strong>and</strong> obligated <strong>to</strong><br />

proceed <strong>in</strong> accordance with it subject <strong>to</strong> the approval of the Danish Energy Agency. The<br />

Programme <strong>and</strong> Budget shall be renewed <strong>and</strong> updated annually until the Programme has<br />

been completed.<br />

5.7 Information <strong>in</strong> Programmes <strong>and</strong> Budgets<br />

Each Programme <strong>and</strong> Budget provided for <strong>in</strong> this Article 5 shall set out <strong>in</strong> reasonable<br />

detail the projects <strong>and</strong> work proposed <strong>to</strong> be carried out, the goods <strong>and</strong> services <strong>to</strong> be<br />

purchased, the <strong>in</strong>formation required under Article 2 of the Account<strong>in</strong>g Procedure <strong>and</strong><br />

such other <strong>in</strong>formation as shall be decided upon by the Operat<strong>in</strong>g Committee. The forecasts<br />

shall <strong>to</strong> a reasonable extent set out the same <strong>in</strong>formation. The Programmes <strong>and</strong><br />

Budgets shall also set forth an estimate of the expenditures required, broken down by<br />

Quarters.<br />

5.8 Status Reports<br />

The Opera<strong>to</strong>r shall as of June 30th of each Year provide <strong>to</strong> each of the Parties a status<br />

report regard<strong>in</strong>g all then current Programmes <strong>and</strong> Budgets <strong>and</strong> anticipated revisions <strong>to</strong><br />

be proposed dur<strong>in</strong>g the rema<strong>in</strong>der of the Year. If required by two (2) or more Parties the<br />

Opera<strong>to</strong>r shall provide Quarterly status reports.<br />

Furthermore, the Opera<strong>to</strong>r shall as of 31 January of each Year after a development plan<br />

has been approved provide <strong>to</strong> each of the Parties a status report of contracts entered <strong>in</strong><strong>to</strong><br />

show<strong>in</strong>g subject, date <strong>and</strong> amount of each contract.<br />

26


5.9 Authorisation <strong>to</strong> Proceed<br />

5.10 AFEs<br />

Subject <strong>to</strong> Section 5.10 <strong>and</strong> <strong>to</strong> obta<strong>in</strong><strong>in</strong>g any necessary consents of the Danish Energy<br />

Agency, the Opera<strong>to</strong>r shall be authorised <strong>and</strong> obligated <strong>to</strong> proceed with any approved<br />

Programme <strong>and</strong> Budget.<br />

Except for emergency expenditures as provided for <strong>in</strong> Section 3.11 <strong>and</strong> expenditures as<br />

mentioned <strong>in</strong> Section 2.3.2 of the Account<strong>in</strong>g Procedure, the Opera<strong>to</strong>r shall before enter<strong>in</strong>g<br />

<strong>in</strong><strong>to</strong> any commitment or <strong>in</strong>curr<strong>in</strong>g any expenditure under an approved Programme<br />

<strong>and</strong> Budget submit <strong>to</strong> the Parties an AFE therefor. An AFE shall <strong>in</strong>clude the <strong>in</strong>formation<br />

set out <strong>in</strong>, <strong>and</strong> be prepared <strong>in</strong> accordance with, Section 7.2 of the Account<strong>in</strong>g Procedure.<br />

To the extent that the Operat<strong>in</strong>g Committee approves an AFE, the Opera<strong>to</strong>r shall be<br />

authorised <strong>and</strong> obligated, subject <strong>to</strong> Section 5.11, <strong>to</strong> proceed with such commitment or<br />

expenditure.<br />

5.11 Amendments<br />

At any time the Opera<strong>to</strong>r <strong>and</strong> any other Party may, by notice <strong>to</strong> all the other Parties,<br />

propose that an approved Programme <strong>and</strong> Budget <strong>and</strong>/or approved AFE be amended.<br />

To the extent that an amendment is approved by the Operat<strong>in</strong>g Committee, the approved<br />

Programme <strong>and</strong> Budget <strong>and</strong>/or AFE shall be deemed amended accord<strong>in</strong>gly, <strong>and</strong> a revised<br />

AFE <strong>and</strong>/or Budget prepared, reflect<strong>in</strong>g the decision provided that such amendment<br />

shall not <strong>in</strong>validate any authorised commitment or expenditure made by the Opera<strong>to</strong>r<br />

prior there<strong>to</strong>.<br />

[5.12 Drill-or-Drop<br />

[If applicable. The exact word<strong>in</strong>g of this Section will depend on the License.]<br />

(a) if with<strong>in</strong> … (..) Months after the issuance of the Licence the Operat<strong>in</strong>g Committee<br />

decides <strong>to</strong> commit <strong>to</strong> the Danish Energy Agency <strong>to</strong> drill an explora<strong>to</strong>ry well<br />

accord<strong>in</strong>g <strong>to</strong> Section … of Annex 2 <strong>to</strong> the Licence then such explora<strong>to</strong>ry well<br />

shall be deemed <strong>to</strong> be part of the Work Obligations <strong>and</strong> no Party may withdraw<br />

until such Work Obligations have been fulfilled, ref. Section 10.1.2.<br />

(b) If with<strong>in</strong> … (..) Months after the issuance of the Licence the Operat<strong>in</strong>g Committee<br />

has not decided <strong>to</strong> commit <strong>to</strong> drill an explora<strong>to</strong>ry well accord<strong>in</strong>g <strong>to</strong> Section<br />

.. of Annex 2 <strong>to</strong> the Licence then any Party or Parties may propose <strong>to</strong><br />

carry out the drill<strong>in</strong>g <strong>in</strong> accordance with the provisions <strong>in</strong> Article 7.<br />

27


6. ACCOUNTING PROCEDURE AND COSTS AND EXPENSES<br />

6.1 Adoption <strong>and</strong> Conflict<br />

The Account<strong>in</strong>g Procedure attached here<strong>to</strong> as Appendix A is hereby made a part of this<br />

Agreement. In the event of any conflict between any provision <strong>in</strong> the ma<strong>in</strong> body of this<br />

Agreement <strong>and</strong> any provision <strong>in</strong> the Account<strong>in</strong>g Procedure, the provision <strong>in</strong> the ma<strong>in</strong><br />

body shall prevail.<br />

6.2 Payment of Costs <strong>and</strong> Expenses<br />

Each Party agrees <strong>to</strong> pay <strong>to</strong> the Opera<strong>to</strong>r its respective share of costs <strong>and</strong> expenses <strong>and</strong><br />

<strong>in</strong> accordance with the Account<strong>in</strong>g Procedure.<br />

28


7. SOLE RISK OPERATIONS AND DEVELOPMENT BY LESS THAN<br />

ALL PARTIES<br />

7.1 Rights <strong>to</strong> Propose<br />

7.2 Types<br />

At any time one or more Parties may propose by notice <strong>to</strong> the Operat<strong>in</strong>g Committee that<br />

operations be carried out which are not <strong>in</strong>cluded <strong>in</strong> a Programme approved by the Operat<strong>in</strong>g<br />

Committee. Any such notice shall <strong>in</strong>clude a description of the nature, method <strong>and</strong><br />

tim<strong>in</strong>g of the operations proposed <strong>and</strong> the estimated <strong>to</strong>tal expenditure <strong>to</strong> be made <strong>in</strong><br />

connection therewith <strong>to</strong>gether with such other relevant <strong>in</strong>formation as is necessary <strong>in</strong><br />

order <strong>to</strong> allow the Parties <strong>to</strong> consider the proposal <strong>and</strong> elect whether or not <strong>to</strong> participate.<br />

Subject <strong>to</strong> the follow<strong>in</strong>g provisions of this Article such operations may be carried<br />

out by the propos<strong>in</strong>g Party <strong>and</strong> any Parties choos<strong>in</strong>g <strong>to</strong> participate <strong>in</strong> such operations<br />

(the "Sole Risk Participants") on a sole risk basis.<br />

Subject <strong>to</strong> the other provisions hereof, the follow<strong>in</strong>g types of sole risk operations may<br />

be proposed <strong>and</strong> carried out:<br />

(a) geophysical surveys;<br />

(b) the drill<strong>in</strong>g of an explora<strong>to</strong>ry or appraisal well;<br />

(c) the deepen<strong>in</strong>g or side-track<strong>in</strong>g of a suspended well or well <strong>in</strong> the course of be<strong>in</strong>g<br />

drilled or the test<strong>in</strong>g of zones penetrated by a suspended well or a well <strong>in</strong><br />

the course of be<strong>in</strong>g drilled; or<br />

(d) the development of a Discovery.<br />

7.3 Restrictions <strong>and</strong> Conditions<br />

The follow<strong>in</strong>g restrictions <strong>and</strong> conditions shall be applicable with respect <strong>to</strong> any proposed<br />

sole risk operations:<br />

(a) no sole risk operations may be carried out unless the Operat<strong>in</strong>g Committee has<br />

decided that such operations shall not be carried out as part of the Jo<strong>in</strong>t Operations.<br />

Such decision of the Operat<strong>in</strong>g Committee shall be taken with<strong>in</strong> one<br />

Month after the Operat<strong>in</strong>g Committee has received a written notice by the propos<strong>in</strong>g<br />

Party giv<strong>in</strong>g the <strong>in</strong>formation required <strong>in</strong> Section 7.1. Each Party may<br />

choose <strong>to</strong> participate <strong>in</strong> any operation <strong>to</strong> be carried out on a sole risk basis provided<br />

that such Party with<strong>in</strong> one Month after the decision of the Operat<strong>in</strong>g<br />

Committee submits <strong>to</strong> the propos<strong>in</strong>g Party written notice thereof. When a sole<br />

risk operation of the type referred <strong>to</strong> <strong>in</strong> Section 7.2 (c) <strong>in</strong> relation <strong>to</strong> a well <strong>in</strong><br />

29


the course of be<strong>in</strong>g drilled is proposed the above mentioned time limits shall,<br />

however, be forty-eight (48) hours, respectively;<br />

(b) no sole risk operations can be carried out if such operations would conflict with<br />

or prejudice any part of any development or other Programme approved by or<br />

under active consideration by the Operat<strong>in</strong>g Committee;<br />

(c ) no drill<strong>in</strong>g of an appraisal well with respect <strong>to</strong> a Discovery can be carried out<br />

unless the Operat<strong>in</strong>g Committee shall have decided not <strong>to</strong> engage <strong>in</strong> any appraisal<br />

drill<strong>in</strong>g with respect <strong>to</strong> such Discovery as part of the Jo<strong>in</strong>t Operations or<br />

the Operat<strong>in</strong>g Committee has ab<strong>and</strong>oned or completed its appraisal Programme<br />

with respect <strong>to</strong> such Discovery <strong>and</strong> decided not <strong>to</strong> prepare a development Programme<br />

with respect there<strong>to</strong>;<br />

(d) any proposal <strong>to</strong> drill an explora<strong>to</strong>ry well or <strong>to</strong> deepen or side-track a suspended<br />

well <strong>in</strong> or through an exist<strong>in</strong>g Discovery shall require the approval of the Operat<strong>in</strong>g<br />

Committee <strong>to</strong> evidence that such proposal is not <strong>in</strong> breach of Section 7.3<br />

(b) above (such approval not <strong>to</strong> be unreasonable withheld) before such drill<strong>in</strong>g,<br />

deepen<strong>in</strong>g or side-track<strong>in</strong>g is carried out; <strong>and</strong><br />

(e) if the sole risk operations are not commenced with<strong>in</strong> twelve (12) months after<br />

the time limit <strong>in</strong> Section 7.3 (a) third paragraph above the Sole Risk Participants<br />

lose the right <strong>to</strong> carry out the sole risk operations <strong>and</strong> the relationship between<br />

the Parties shall be deemed <strong>to</strong> be as if the sole risk operations had never<br />

been proposed.<br />

7.4 General Provisions<br />

7.4.1 Indemnification<br />

Any sole risk operations will be carried out at the sole risk, cost <strong>and</strong> expense of the Sole<br />

Risk Participants. In addition, the Sole Risk Participants shall jo<strong>in</strong>tly <strong>and</strong> severally <strong>in</strong>demnify<br />

<strong>and</strong> hold harmless the other Parties ("Non-Sole Risk Participants") <strong>and</strong> Opera<strong>to</strong>r<br />

(if a Non- Opera<strong>to</strong>r is operat<strong>in</strong>g the sole risk operations under Section 7.4.4 <strong>and</strong> subject<br />

always <strong>to</strong> Section 3.3.3) aga<strong>in</strong>st all actions, claims, dem<strong>and</strong>s <strong>and</strong> proceed<strong>in</strong>gs whatever<br />

brought by any third party aris<strong>in</strong>g out of or <strong>in</strong> connection with the sole risk operations<br />

<strong>and</strong> shall further jo<strong>in</strong>tly <strong>and</strong> severally <strong>in</strong>demnify the Non-Sole Risk Participants<br />

<strong>and</strong> Opera<strong>to</strong>r (if a Non- Opera<strong>to</strong>r operat<strong>in</strong>g the sole risk operations under Section 7.4.4<br />

<strong>and</strong> subject always <strong>to</strong> Section 3.3.3) aga<strong>in</strong>st all damages, costs, losses <strong>and</strong> expenses<br />

whatsoever directly or <strong>in</strong>directly caused <strong>to</strong> or <strong>in</strong>curred by them as a result of anyth<strong>in</strong>g<br />

done or omitted <strong>to</strong> be done <strong>in</strong> connection with the carry<strong>in</strong>g out of the sole risk operations,<br />

except<strong>in</strong>g only damage <strong>in</strong>flicted <strong>to</strong> the subsurface <strong>in</strong>clud<strong>in</strong>g any reservoir. Any<br />

approval by the Non-Sole Risk Participants of the conduct of sole risk operations shall<br />

not constitute a waiver of these provisions.<br />

30


7.4.2 Use of Jo<strong>in</strong>t Risk Property<br />

Sole Risk Participants carry<strong>in</strong>g out sole risk operations shall be entitled <strong>to</strong> use Jo<strong>in</strong>t<br />

Property for such sole risk operations unless the Operat<strong>in</strong>g Committee otherwise decides.<br />

The Operat<strong>in</strong>g Committee shall also decide the terms <strong>and</strong> conditions upon which<br />

any Jo<strong>in</strong>t Property may be used, it be<strong>in</strong>g unders<strong>to</strong>od that the use of Jo<strong>in</strong>t Property shall<br />

not be unreasonably withheld <strong>and</strong> that the charges for such use shall be on a reasonable<br />

<strong>and</strong> equitable basis.<br />

7.4.3 Sole Risk Opera<strong>to</strong>r<br />

If the Opera<strong>to</strong>r is a Sole Risk Participant, or if the Opera<strong>to</strong>r <strong>and</strong> the Sole Risk Participants<br />

so agree, the Opera<strong>to</strong>r shall be opera<strong>to</strong>r for the sole risk operations. If the Opera<strong>to</strong>r<br />

is a Non- Sole Risk Participant it may only decl<strong>in</strong>e <strong>to</strong> carry out sole risk operations<br />

which are new work, such as a new well, but not operations which are a cont<strong>in</strong>uation of<br />

work started, such as the deepen<strong>in</strong>g or test<strong>in</strong>g of a well. If the Opera<strong>to</strong>r does not carry<br />

out the sole risk operations such work shall, subject <strong>to</strong> the prior consent of the Danish<br />

Energy Agency, be carried out by the Party designated by the Sole Risk Participants.<br />

7.4.4 Data <strong>and</strong> Information<br />

Sole Risk Participants shall be entitled for the purpose of sole risk operations <strong>to</strong> utilise<br />

any data <strong>and</strong> <strong>in</strong>formation owned jo<strong>in</strong>tly with the Non-Sole Risk Participants. Data <strong>and</strong><br />

<strong>in</strong>formation obta<strong>in</strong>ed pursuant <strong>to</strong> the carry<strong>in</strong>g out of sole risk operations under Section<br />

7.2 (b) or (c) shall not be made available <strong>to</strong> the Non-Sole Risk Participants unless the<br />

Sole Risk Participant(s), or any of them or any Non-Sole Risk Participant who has become<br />

an owner of such data <strong>and</strong> <strong>in</strong>formation makes a proposal <strong>to</strong> carry out further drill<strong>in</strong>g<br />

or <strong>to</strong> carry out extended test<strong>in</strong>g or development operations <strong>in</strong> respect of a Discovery,<br />

the subject of the operation under Section 7.2 (b) or (c). In this case a Non-Sole Risk<br />

Participant shall be entitled <strong>to</strong> have access at the Sole Risk Participant’s premises <strong>to</strong><br />

such data <strong>and</strong> <strong>in</strong>formation <strong>to</strong> the extent relevant <strong>and</strong> for the purposes only decid<strong>in</strong>g<br />

whether or not <strong>to</strong> participate <strong>in</strong> appraisal drill<strong>in</strong>g or a development Programme as provided<br />

<strong>in</strong> Section 7.5.3 but such data <strong>and</strong> <strong>in</strong>formation shall rema<strong>in</strong> the property of the<br />

Sole Risk Participants. In the event that one or more of the Non-Sole Risk Participants<br />

discharges <strong>in</strong> full its liability <strong>to</strong> Sole Risk Participants under Section 7.5.3 hereof, such<br />

data <strong>and</strong> <strong>in</strong>formation shall become the jo<strong>in</strong>t property of the participants discharg<strong>in</strong>g<br />

such liability <strong>and</strong> the Sole Risk Participants.<br />

7.4.5 Sole Risk Percentage Interest<br />

Unless the Sole Risk Participants otherwise unanimously agree the Percentage Interest<br />

of each participant <strong>in</strong> a sole risk operation shall be the proportion that its Percentage Interest<br />

bears <strong>to</strong> the <strong>to</strong>tal of the Percentage Interests of all Sole Risk Participants. In the<br />

event Nordsøfonden decides <strong>to</strong> participate <strong>in</strong> a sole risk operation Nordsøfonden may<br />

31


elect <strong>to</strong> participate either with a Percentage Interest calculated as here<strong>in</strong> described or<br />

with its Orig<strong>in</strong>al State Participation Share <strong>in</strong> the area <strong>in</strong> which the sole risk operation is<br />

carried out. Upon a Non-Sole Risk Participant elect<strong>in</strong>g <strong>to</strong> participate <strong>in</strong> further operations<br />

aris<strong>in</strong>g out of a sole risk operation <strong>and</strong> mak<strong>in</strong>g such payments as may be due <strong>in</strong><br />

accordance with section 7.5.1. – 7.5.2 <strong>in</strong>clusive (<strong>and</strong> without prejudice <strong>to</strong> any further<br />

payment which may become due pursuant <strong>to</strong> Section 7.5.4), such Sole Risk Participant<br />

shall (unless the Sole Risk Participants otherwise agree), assume its Jo<strong>in</strong>t Operations<br />

Percentage Interest share <strong>in</strong> such further operation <strong>and</strong> all rights <strong>and</strong> liabilities attributable<br />

there<strong>to</strong>.<br />

7.4.6 Sole Risk Adm<strong>in</strong>istration<br />

In connection with any sole risk operations:<br />

(a) the sole risk operation will be carried out under the overall supervision <strong>and</strong><br />

control of the Sole Risk Participant <strong>in</strong> lieu of the Operat<strong>in</strong>g Committee;<br />

(b) the computation of costs <strong>and</strong> expenses of the sole risk operation <strong>in</strong>curred by the<br />

Sole Risk Participant shall be made <strong>in</strong> accordance with the pr<strong>in</strong>ciples set out <strong>in</strong><br />

the Account<strong>in</strong>g Procedure;<br />

(c) the Opera<strong>to</strong>r or the Sole Risk participant carry<strong>in</strong>g out the sole risk operation<br />

shall ma<strong>in</strong>ta<strong>in</strong> separate books, records <strong>and</strong> accounts (<strong>in</strong>clud<strong>in</strong>g bank accounts)<br />

for the sole risk operations which shall be subject <strong>to</strong> the same right of exam<strong>in</strong>ation<br />

<strong>and</strong> audit by the Sole Risk Participants <strong>and</strong>, so long as they are entitled <strong>to</strong><br />

elect <strong>to</strong> participate <strong>in</strong> the sole risk operations, the Non-Sole Risk Participant, as<br />

those relat<strong>in</strong>g <strong>to</strong> the Jo<strong>in</strong>t Operations;<br />

(d) the costs <strong>and</strong> expenses of the sole risk operation shall not be reflected <strong>in</strong> the<br />

statements <strong>and</strong> bill<strong>in</strong>gs rendered by the Opera<strong>to</strong>r for the Jo<strong>in</strong>t Operations; <strong>and</strong><br />

(e) if the Opera<strong>to</strong>r is carry<strong>in</strong>g out a sole risk operation on behalf of a Sole Risk<br />

Participant, the Opera<strong>to</strong>r shall be entitled <strong>to</strong> make Cash Calls on the Sole Risk<br />

Participants <strong>in</strong> connection with the sole risk operation <strong>and</strong> shall not use Jo<strong>in</strong>t<br />

Account funds or be required <strong>to</strong> use its own funds for the purpose of pay<strong>in</strong>g the<br />

costs <strong>and</strong> expenses of the sole risk operations; furthermore the Opera<strong>to</strong>r shall<br />

not be obliged <strong>to</strong> commence or, hav<strong>in</strong>g commenced, <strong>to</strong> cont<strong>in</strong>ue the sole risk<br />

operations unless <strong>and</strong> until the relevant Advances have been received from the<br />

Sole Risk Participants.<br />

32


7.5 Consequences<br />

7.5.1 Access <strong>to</strong> Data <strong>and</strong> Information<br />

Any Party which does not participate <strong>in</strong> sole risk operations carried out under Section<br />

7.2 (a) shall not be entitled <strong>to</strong> have access <strong>to</strong> any data or <strong>in</strong>formation obta<strong>in</strong>ed <strong>in</strong> respect<br />

of such sole risk operations, provided that any Non-Sole Risk Participant may at any<br />

time become entitled <strong>to</strong> have access <strong>to</strong> <strong>and</strong> shall become a jo<strong>in</strong>t owner of such data <strong>and</strong><br />

<strong>in</strong>formation obta<strong>in</strong>ed from such sole risk operations upon payment <strong>in</strong> cash <strong>to</strong> the Sole<br />

Risk Participants of an amount equal <strong>to</strong>………per cent (..……%) of the amount it<br />

would have contributed <strong>to</strong> the Jo<strong>in</strong>t Account if such operations had been carried out as<br />

part of the Jo<strong>in</strong>t Operations.<br />

7.5.2 Jo<strong>in</strong>t Drill<strong>in</strong>g as a Result of Sole Risk Geophysical Survey<br />

If the sole risk operations carried out under Section 7.2 a) result <strong>in</strong> the identification of a<br />

prospect which the Operat<strong>in</strong>g Committee approves for drill<strong>in</strong>g for the Jo<strong>in</strong>t Account,<br />

then each Non-Sole Risk Participant with respect <strong>to</strong> such operations who has not previously<br />

<strong>in</strong> accordance with Section 7.5.1 obta<strong>in</strong>ed access <strong>to</strong> such data <strong>and</strong> <strong>in</strong>formation <strong>and</strong><br />

who wishes or is obliged <strong>to</strong> participate <strong>in</strong> the drill<strong>in</strong>g of a well on such prospect or development<br />

program shall pay the Sole Risk Participants with respect <strong>to</strong> such operations,<br />

<strong>in</strong> cash, an amount equal <strong>to</strong>…………. per cent (………….%) of the amount it would<br />

have contributed <strong>to</strong> the Jo<strong>in</strong>t Account had such operations been carried out as part of the<br />

Jo<strong>in</strong>t Operations. Such payment shall be made before the commencement of drill<strong>in</strong>g of<br />

such well, <strong>and</strong> the Parties mak<strong>in</strong>g the payment shall thereupon receive from the Sole<br />

Risk Participants all data <strong>and</strong> <strong>in</strong>formation obta<strong>in</strong>ed from the sole risk operations <strong>and</strong><br />

shall become a jo<strong>in</strong>t owner of such data <strong>and</strong> <strong>in</strong>formation.<br />

7.5.3 Additional Activities as a Result of Sole Risk Drill<strong>in</strong>g<br />

If sole risk operations carried out under Section 7.2 b) or 7.2 c) result <strong>in</strong> a particular<br />

Discovery or result <strong>in</strong> a decision by the Sole Risk Participants or one or some of them <strong>to</strong><br />

carry out appraisal drill<strong>in</strong>g or a development programme with respect <strong>to</strong> a particular<br />

Deposit, then the Sole Risk Participants shall <strong>in</strong> each case notify the Non-Sole Risk Participants<br />

thereof. Any Non-Sole Risk Participant who wishes <strong>to</strong> participate <strong>in</strong> appraisal<br />

drill<strong>in</strong>g or a development Programme relat<strong>in</strong>g <strong>to</strong> that Deposit shall notify the Sole Risk<br />

Participants of its participation with<strong>in</strong> twenty eight (28) days <strong>in</strong> case of appraisal drill<strong>in</strong>g<br />

<strong>and</strong> with<strong>in</strong> n<strong>in</strong>ety days (90) days <strong>in</strong> case of a development programme <strong>and</strong> such<br />

Non-Sole Risk Participant must pay <strong>to</strong> the Sole Risk Participant(s) an amount equal <strong>to</strong><br />

the amount it would have contributed <strong>to</strong> the Jo<strong>in</strong>t Account had such sole risk operations<br />

been carried out as part of the Jo<strong>in</strong>t Operations plus a penalty equal <strong>to</strong> ………..per cent<br />

(……… %) of such amount. Such amount shall be paid, <strong>in</strong> cash, before the commencement<br />

of the appraisal drill<strong>in</strong>g or development Programme <strong>in</strong> question (<strong>in</strong> the curren-<br />

33


cies <strong>in</strong> which Cash Advances were made by the Sole Risk Participants) plus <strong>in</strong>terest at<br />

the Cost of Funds Rate from the date of notification from the Sole Risk Participants <strong>to</strong><br />

the Non-Sole Risk Participants until the date of payment. Such Payment shall be credited<br />

<strong>to</strong> the Sole Risk Participant or, if more than one, <strong>to</strong> each Sole Risk Participant <strong>in</strong> the<br />

proportion that its Percentage Interest bears <strong>to</strong> the sum of the Percentage Interests of all<br />

the Sole Risk Participants or <strong>in</strong> such other proportion as they may have agreed under<br />

Section 7.4.6. However <strong>in</strong> case of participation <strong>in</strong> a development programme the Non-<br />

Sole Risk Participant may elect <strong>to</strong> pay the Sole Risk Participants' share of cost of the<br />

development until such amounts have been paid.<br />

7.6 Sole Risk Development <strong>and</strong> Development by Less than All Parties<br />

7.6.1 Sole Risk Preparation of a Development Programme<br />

In the event the Operat<strong>in</strong>g Committee rejects a proposal <strong>to</strong> prepare a development Programme<br />

<strong>and</strong> Budget for a particular Deposit <strong>and</strong> provided that any appraisal Programme<br />

approved by the Operat<strong>in</strong>g Committee <strong>in</strong> relation <strong>to</strong> that Deposit has been completed or<br />

any AFE <strong>in</strong> respect of appraisal work <strong>in</strong>cluded <strong>in</strong> an appraisal work <strong>in</strong>cluded <strong>in</strong> an appraisal<br />

Programme has been rejected by the Operat<strong>in</strong>g Committee, any Party may prepare<br />

<strong>and</strong> submit a proposed development Programme <strong>and</strong> Budget for such Deposit <strong>to</strong><br />

the Parties <strong>and</strong> the Operat<strong>in</strong>g Committee shall meet <strong>and</strong> consider it as soon as practicable<br />

after its proposal.<br />

7.6.2 Sole Risk Proposal of a Development Programme<br />

(a) In the event the Operat<strong>in</strong>g Committee does not approve a development Programme<br />

<strong>and</strong> Budget submitted <strong>in</strong> accordance with Section 5.4.1 or Section<br />

7.6.1, then any Party may give notice <strong>to</strong> the other Parties of its <strong>in</strong>tention <strong>to</strong> develop<br />

the Discovery at sole risk. Such notice shall be accompanied by details of<br />

its proposed development Programme <strong>and</strong> Budget. The other Parties may give<br />

counter notice with<strong>in</strong> sixty (60) days that they wish <strong>to</strong> participate <strong>in</strong> the development.<br />

If all the other Parties elect <strong>to</strong> participate, the Parties shall proceed<br />

with the development accord<strong>in</strong>gly, <strong>and</strong> the provisions of Section 5.4.2 shall apply<br />

upon the Danish Energy Agency approv<strong>in</strong>g the development plan.<br />

(b) If the development of a Discovery is carried out <strong>in</strong> accordance with Section<br />

7.6.2(a) then the Party or the Parties which prepared the development Programme<br />

<strong>and</strong> Budget shall be entitled <strong>to</strong> charge all reasonable costs <strong>in</strong>curred <strong>in</strong><br />

the preparation thereof <strong>to</strong> the Jo<strong>in</strong>t Account <strong>to</strong>gether with <strong>in</strong>terest calculated on<br />

a day <strong>to</strong> day basis at the rate of one per cent (1%) above the Cost of Funds Rate<br />

from the date on which the costs were <strong>in</strong>curred <strong>to</strong> the date of repayment, <strong>in</strong>clusive.<br />

34


7.6.3 Development by Less than All Parties<br />

In the event that follow<strong>in</strong>g approval by the Operat<strong>in</strong>g Committee of a development Programme<br />

<strong>and</strong> Budget pursuant <strong>to</strong> Section 5.4.1, or follow<strong>in</strong>g any notice served under<br />

Section 7.6.2 (a) less than all the Parties elect <strong>to</strong> participate <strong>in</strong> the development of a<br />

Discovery, those Parties which elected <strong>to</strong> participate shall be entitled <strong>to</strong> proceed <strong>to</strong> develop<br />

the Discovery at their sole cost <strong>and</strong> risk <strong>in</strong> accordance with the relevant Programme<br />

<strong>and</strong> Budget; provided that if the Danish Energy Agency's approval of the development<br />

plan is conditional on such development plan be<strong>in</strong>g amended, then the Parties<br />

participat<strong>in</strong>g <strong>in</strong> the development shall give notice <strong>to</strong> the other Parties of such<br />

amendments <strong>and</strong> with<strong>in</strong> twenty-eight (28) days of such notice:<br />

(i) any of the Parties participat<strong>in</strong>g may, by notice <strong>to</strong> all the other Parties, elect not<br />

<strong>to</strong> proceed; <strong>and</strong>/or<br />

(ii) any of the Parties not participat<strong>in</strong>g may by notice <strong>to</strong> all the other Parties elect<br />

<strong>to</strong> do so.<br />

Those Parties which at the expiration of the said period of twenty-eight (28) days are<br />

participat<strong>in</strong>g <strong>in</strong> the development shall be obligated <strong>to</strong> carry it out.<br />

7.6.4 Less than All Parties Proceed<br />

In the event that follow<strong>in</strong>g the Danish Energy Agency approv<strong>in</strong>g the development plan<br />

<strong>in</strong> which all the Parties are participat<strong>in</strong>g, any of the Parties elects not <strong>to</strong> proceed with the<br />

development under Section 5.4.2 the other Parties shall be entitled <strong>to</strong> proceed with the<br />

development <strong>in</strong> accordance with the approved development plan (as amended) <strong>and</strong> if<br />

they do so proceed shall be obligated <strong>to</strong> carry out the development.<br />

7.6.5 Percentage Interest <strong>in</strong> Sole Risk Development<br />

(a) In the event that less than all the Parties participate <strong>in</strong> the development of a<br />

Discovery <strong>in</strong> which no sole risk drill<strong>in</strong>g has been carried out, then, unless all<br />

the Parties participat<strong>in</strong>g <strong>in</strong> such development unanimously agree otherwise, the<br />

Percentage Interest of each Party <strong>in</strong> such development shall be the proportion<br />

that its Percentage Interest bears <strong>to</strong> the <strong>to</strong>tal of the Percentage Interests of all<br />

participat<strong>in</strong>g Parties.<br />

(b) In the event that less than all Parties participate <strong>in</strong> a development of a Discovery<br />

<strong>in</strong> respect of which sole risk drill<strong>in</strong>g has been carried out then, unless the<br />

Parties participat<strong>in</strong>g <strong>in</strong> such development unanimously agree otherwise:<br />

(i) if the orig<strong>in</strong>al Sole Risk Participant <strong>in</strong> the first such sole risk drill<strong>in</strong>g<br />

(or if more than one such participant, all such participants) participates<br />

<strong>in</strong> the development, then the Percentage Interest <strong>in</strong> such development<br />

of each Party which was not an orig<strong>in</strong>al Sole Risk Party shall equal its<br />

35


Percentage Interest <strong>in</strong> the Licence, <strong>and</strong> the rema<strong>in</strong><strong>in</strong>g Percentage Interest<br />

<strong>in</strong> the development shall be held by the orig<strong>in</strong>al Sole Risk Participant<br />

(if more than one, <strong>in</strong> proportion <strong>to</strong> their Percentage Interest <strong>in</strong><br />

the Licence or <strong>in</strong> such other proportions as they may have agreed),<br />

(ii) if less than all such orig<strong>in</strong>al Sole Risk Participants participate <strong>in</strong> the<br />

development, then the calculation under (i) above shall first be performed<br />

as though all such orig<strong>in</strong>al Sole Risk Participants were participat<strong>in</strong>g.<br />

The Percentage Interest <strong>in</strong> such development of those orig<strong>in</strong>al<br />

Sole Risk Participants who do not participate shall then be allocated <strong>to</strong><br />

all the participat<strong>in</strong>g Parties, <strong>in</strong> proportion <strong>to</strong> the percentage <strong>in</strong>terest<br />

obta<strong>in</strong>ed <strong>in</strong> such prelim<strong>in</strong>ary calculation.<br />

7.6.6 Rights <strong>in</strong> the Sole Risk Development<br />

Any Party which does not participate <strong>in</strong> the development of a Discovery shall have no<br />

further rights <strong>in</strong> such development.<br />

7.6.7 Sub-Area<br />

Development of a Discovery by less than all Parties will <strong>in</strong> respect of the area comprised<br />

there<strong>in</strong> be regarded as creat<strong>in</strong>g a Sub-Area, <strong>and</strong> this Agreement shall as far as<br />

possible apply <strong>in</strong>dependently <strong>in</strong> the manner of a separate contract <strong>to</strong> such Sub Area <strong>and</strong><br />

apply mutatis mut<strong>and</strong>is <strong>to</strong> the <strong>in</strong>terests of the Parties participat<strong>in</strong>g <strong>in</strong> the sole risk development<br />

subject <strong>to</strong> the provision of Section 9.1 (a) provided that<br />

(a) forfeiture upon default under Section 11.3.3 with respect <strong>to</strong> operations shall<br />

mean forfeiture of the Default<strong>in</strong>g Party’s Percentage Interest <strong>in</strong> the entire Licence<br />

Area, subject <strong>to</strong> the follow<strong>in</strong>g provisions:<br />

(i) The Non-Default<strong>in</strong>g Parties who are also Sole Risk Participants for<br />

any particular sole risk operation shall have the right <strong>to</strong> acquire the<br />

Default<strong>in</strong>g Party’s Percentage Interest <strong>in</strong> the sole risk operation <strong>and</strong><br />

relevant property <strong>and</strong> Sub-Area, subject <strong>to</strong> the provisions of Section<br />

11.3 as applied mutatis mut<strong>and</strong>is <strong>to</strong> such sole risk operation, property<br />

or Sub-Area, <strong>and</strong><br />

(ii) All Non-Default<strong>in</strong>g Parties shall have the right <strong>to</strong> acquire the Default<strong>in</strong>g<br />

Party’s Percentage Interest <strong>in</strong> the rema<strong>in</strong>der of the Licence area,<br />

subject <strong>to</strong> the provisions of Section 11.3;<br />

(b) the Sole Risk Participants shall have a right of access <strong>to</strong> the Sub-Area; <strong>and</strong><br />

(c) there shall be no separate right of assignment or withdrawal <strong>and</strong> accord<strong>in</strong>gly<br />

Article 9 shall not apply <strong>in</strong>dependently <strong>to</strong> such separate contract.<br />

36


Non-participat<strong>in</strong>g Parties shall be <strong>in</strong>demnified by participat<strong>in</strong>g Parties <strong>in</strong> the manner described<br />

<strong>in</strong> Section 7.4.1.<br />

37


8. DISPOSAL OF HYDROCARBONS<br />

8.1 Right <strong>and</strong> Obligation<br />

Subject <strong>to</strong> Section 11.3.1 each of the Parties participat<strong>in</strong>g <strong>in</strong> a development shall have<br />

the right <strong>and</strong> be obliged <strong>to</strong> take <strong>in</strong> k<strong>in</strong>d <strong>and</strong> separately dispose of its Percentage Interest<br />

share of the <strong>to</strong>tal quantities of <strong>Hydrocarbon</strong>s available under this Agreement, provided<br />

always that the Opera<strong>to</strong>r shall have the right <strong>to</strong> use <strong>in</strong> any operations relat<strong>in</strong>g there<strong>to</strong> as<br />

much of such <strong>Hydrocarbon</strong>s as may be needed by it therefor. Each of such Parties shall<br />

have the obligation <strong>to</strong> lift <strong>and</strong> separately dispose of its Percentage Interest share of all<br />

<strong>Hydrocarbon</strong>s produced <strong>and</strong>/or s<strong>to</strong>red at such po<strong>in</strong>t or po<strong>in</strong>ts of delivery, at such times,<br />

<strong>in</strong> such quantities <strong>and</strong> <strong>in</strong> accordance with such off-take procedures as may be agreed.<br />

8.2 Lift<strong>in</strong>g/Off-take Procedures for <strong>Hydrocarbon</strong>s<br />

The Parties participat<strong>in</strong>g <strong>in</strong> a development shall meet as soon as practicable follow<strong>in</strong>g<br />

the approval of a development plan <strong>in</strong> accordance with Section … of the Licence <strong>and</strong><br />

shall prior <strong>to</strong> the proposed commencement of production agree necessary supplemental<br />

provisions <strong>to</strong> this Agreement cover<strong>in</strong>g lift<strong>in</strong>g/off-take <strong>and</strong> operat<strong>in</strong>g procedures <strong>in</strong> respect<br />

of such development <strong>in</strong>clud<strong>in</strong>g for gaseous <strong>Hydrocarbon</strong>s (natural gas) any necessary<br />

gas balanc<strong>in</strong>g procedures.<br />

8.3 Failure <strong>to</strong> Lift Liquid <strong>Hydrocarbon</strong>s<br />

In the event that any of the Parties for any reason fails <strong>to</strong> lift such quantities of liquid<br />

<strong>Hydrocarbon</strong>s as are <strong>to</strong> be lifted by it <strong>in</strong> accordance with agreed offtake procedures or<br />

consistently nom<strong>in</strong>ates less than its full entitlement of liquid <strong>Hydrocarbon</strong>s <strong>and</strong> thereby<br />

<strong>in</strong> the reasonable op<strong>in</strong>ion of the Opera<strong>to</strong>r prejudices the efficiency of the production operation,<br />

the Opera<strong>to</strong>r shall arrange <strong>to</strong> lift, or have lifted, the relevant underlifted quantity<br />

of liquid <strong>Hydrocarbon</strong>s of said Party or Parties <strong>and</strong> shall dispose of the same at such<br />

prices as it can reasonably obta<strong>in</strong> <strong>in</strong> all the circumstances <strong>and</strong> shall credit <strong>to</strong> said Party<br />

or Parties the price obta<strong>in</strong>ed therefore net of the costs <strong>and</strong> expense of such sale <strong>and</strong> after<br />

deduction of a reasonable h<strong>and</strong>l<strong>in</strong>g fee.<br />

8.4 (Deleted)<br />

38


9. ASSIGNMENTS AND ENCUMBRANCES<br />

9.1 Assignments<br />

As used <strong>in</strong> this Article 9, "assign" refers <strong>to</strong> both the assignment of benefits, rights <strong>and</strong><br />

<strong>in</strong>terests <strong>and</strong> <strong>to</strong> the transfer of duties, obligations <strong>and</strong> liabilities, <strong>and</strong> "assignment", "assignee"<br />

<strong>and</strong> "assignor" shall be construed accord<strong>in</strong>gly.<br />

Subject <strong>to</strong> the provisions <strong>in</strong> Section 9.2 each of the Parties here<strong>to</strong> shall have the right at<br />

any time <strong>to</strong> assign <strong>in</strong> whole or part its benefits, duties <strong>and</strong> obligations under this<br />

Agreement, provided, however that:<br />

(a) no Party may assign any right, title, <strong>in</strong>terest, benefit, duty or obligation <strong>in</strong> or<br />

under the Licence or this Agreement separately, it be<strong>in</strong>g the <strong>in</strong>tent hereof that<br />

any such assignment <strong>in</strong> or under the Licence must carry with it the equivalent<br />

right, title, <strong>in</strong>terest, benefit, duty <strong>and</strong> obligation <strong>in</strong> <strong>and</strong> under this Agreement,<br />

<strong>and</strong> vice versa <strong>and</strong> so that, for the avoidance of doubt, any assignment of all or<br />

part of the Party’s Percentage Interest shall <strong>in</strong>clude such Party’s correspond<strong>in</strong>g<br />

<strong>in</strong>terest <strong>in</strong> any Sole Risk project <strong>and</strong> (if applicable) Sub-Area, <strong>and</strong> vice versa;<br />

(b) any assignee must be of technical <strong>and</strong> f<strong>in</strong>ancial st<strong>and</strong><strong>in</strong>g sufficient <strong>to</strong> perform<br />

the duties <strong>and</strong> obligations hereunder <strong>to</strong> the extent of the <strong>in</strong>terest <strong>and</strong> property<br />

assigned;<br />

(c) any assignment shall be subject <strong>to</strong> the terms <strong>and</strong> provisions of this Agreement<br />

<strong>and</strong> the assignee shall assume <strong>and</strong> agree <strong>to</strong> perform or pay the assignor's duties,<br />

obligations <strong>and</strong> liabilities hereunder <strong>to</strong> the extent of the <strong>in</strong>terest assigned <strong>and</strong><br />

whether such duties, obligations <strong>and</strong> liabilities are <strong>in</strong>curred prior <strong>to</strong> or after the<br />

effective date of such assignment;<br />

(d) no Party may assign its right, title, benefits, <strong>in</strong>terests, duties or obligations or<br />

any part thereof without the prior written consent of the other Parties <strong>to</strong> such<br />

assignment <strong>and</strong> all terms <strong>and</strong> conditions pert<strong>in</strong>ent there<strong>to</strong> provided, however,<br />

that such consent will not be unreasonably withheld if the assignee is a company<br />

or a corporation which on request can demonstrate that it has adequate<br />

technical <strong>and</strong> f<strong>in</strong>ancial resources <strong>to</strong> meet its obligations hereunder <strong>in</strong>clud<strong>in</strong>g<br />

ab<strong>and</strong>onment obligations <strong>and</strong> the provisions of any necessary security for the<br />

fulfilment of the obligations under the Licence <strong>in</strong> substitution (whether <strong>in</strong><br />

whole or <strong>in</strong> part) for the security provided by the assignor <strong>and</strong> the other provisions<br />

<strong>and</strong> conditions hereunder have been satisfied <strong>and</strong> met <strong>and</strong> provided further<br />

that a Party who fails <strong>to</strong> notify the assign<strong>in</strong>g Party that it is withhold<strong>in</strong>g its<br />

consent on the aforesaid grounds with<strong>in</strong> thirty (30) days of be<strong>in</strong>g notified by<br />

the assign<strong>in</strong>g Party of the proposal <strong>to</strong> assign <strong>and</strong> the identity of the proposed<br />

39


assignee <strong>and</strong> the other provisions <strong>and</strong> conditions of this Article hav<strong>in</strong>g been<br />

satisfied <strong>and</strong> met shall be deemed <strong>to</strong> have given its consent;<br />

(e) no such assignment shall be b<strong>in</strong>d<strong>in</strong>g on any of the non-assign<strong>in</strong>g Parties here<strong>to</strong><br />

until the day on which the assignor furnished <strong>to</strong> each of the non-assign<strong>in</strong>g Parties<br />

a certified copy of the f<strong>in</strong>al assignment agreement(s) <strong>and</strong> any other documents<br />

<strong>in</strong>clusive of all terms <strong>and</strong> conditions pert<strong>in</strong>ent <strong>to</strong> such assignment such<br />

documents <strong>to</strong> <strong>in</strong>clude a written <strong>in</strong>strument (<strong>in</strong> form <strong>and</strong> content <strong>to</strong> the reasonable<br />

satisfaction of the Parties <strong>and</strong> duly executed by the assignee) accept<strong>in</strong>g<br />

<strong>and</strong> assum<strong>in</strong>g all of the obligations under this Agreement <strong>in</strong>sofar as the <strong>in</strong>terest<br />

assigned is concerned;<br />

(f) no Party may assign any right, title, <strong>in</strong>terest, benefit, duty, obligation or liability<br />

<strong>in</strong> or under the Licence or this Agreement without obta<strong>in</strong><strong>in</strong>g the written<br />

consent of the Danish Energy Agency <strong>to</strong> such assignment;<br />

(g) any Party assign<strong>in</strong>g all or part of its <strong>in</strong>terest <strong>in</strong> or under this Agreement or the<br />

Licence shall rema<strong>in</strong> liable <strong>to</strong> the other Parties for all obligations attach<strong>in</strong>g <strong>to</strong><br />

the <strong>in</strong>terest assigned which are <strong>in</strong>curred prior <strong>to</strong> the effective date of such assignment,<br />

<strong>and</strong> such obligations shall <strong>in</strong> addition become the obligations of the<br />

assignee;<br />

(h) all costs <strong>and</strong> expenses perta<strong>in</strong><strong>in</strong>g <strong>to</strong> any assignment shall be the responsibility<br />

of the assignor;<br />

(i) notwithst<strong>and</strong><strong>in</strong>g the provisions <strong>in</strong> Sections 9.1 (a)-(h), Nordsøfonden always<br />

shall be entitled <strong>to</strong> assign, <strong>in</strong> whole or <strong>in</strong> part, its rights <strong>in</strong> <strong>and</strong> under this<br />

Agreement <strong>and</strong> the Licence <strong>to</strong> the State, <strong>to</strong> a company owned by the State, or<br />

<strong>to</strong> a Subsidiary of any such company. The State or the company <strong>to</strong> which such<br />

rights <strong>and</strong> obligations are transferred shall similarly be entitled <strong>to</strong> assign its<br />

rights <strong>and</strong> obligations <strong>in</strong> whole or <strong>in</strong> part <strong>to</strong> the State, <strong>to</strong> a company owned by<br />

the State, or <strong>to</strong> a Subsidiary of any such company. Upon an assignment pursuant<br />

<strong>to</strong> this Section 9.1 (i) the assignee shall assume the correspond<strong>in</strong>g obligations<br />

which, as of the time of the assignment, were the responsibility of the assignor<br />

<strong>in</strong> its capacity as a Party; <strong>and</strong><br />

(j) a Party may not <strong>in</strong>clude a clause <strong>in</strong> the assignment agreement <strong>to</strong> the effect that<br />

the agreement shall be term<strong>in</strong>ated if the preferred right <strong>and</strong> option <strong>to</strong> purchase<br />

accord<strong>in</strong>g <strong>to</strong> Section 9.2 is exercised.<br />

40


9.2 Option <strong>to</strong> Purchase<br />

9.2.1 Bona Fide Offer <strong>and</strong> Exercise of the Option<br />

If any Party receives or makes a bona fide offer which it or (as the case may be) the prospective<br />

purchaser is will<strong>in</strong>g <strong>to</strong> accept for the purchase of all or a part of such Party’s<br />

Percentage Interest <strong>and</strong> the prospective purchaser (whether another Party or a third<br />

party) is able <strong>to</strong> purchase such <strong>in</strong>terest, the Party receiv<strong>in</strong>g or mak<strong>in</strong>g said offer shall<br />

give written notice thereof <strong>to</strong> each of the other Parties, <strong>in</strong>clud<strong>in</strong>g <strong>in</strong> said notice the name<br />

<strong>and</strong> addres of the prospective purchaser, the price offered <strong>and</strong> all other pert<strong>in</strong>ent terms<br />

<strong>and</strong> conditions of the offer. The other Parties, for a period of sixty (60) days after the receipt<br />

of said notice, shall have the prior <strong>and</strong> preferred right <strong>and</strong> option, <strong>in</strong> proportion <strong>to</strong><br />

their respective Percentage Interests <strong>to</strong> purchase the <strong>in</strong>terest covered by said offer. If<br />

fewer than all of the other Parties desire <strong>to</strong> exercise such right <strong>and</strong> option, they shall<br />

have the right <strong>to</strong> purchase the <strong>in</strong>terest covered by said offer <strong>in</strong> proportion <strong>to</strong> the respective<br />

Percentage Interests of those elect<strong>in</strong>g <strong>to</strong> purchase.<br />

9.2.2 No Parties Exercise the Option<br />

If none of the other Parties exercises said right <strong>and</strong> option by giv<strong>in</strong>g written notice of its<br />

acceptance with<strong>in</strong> sixty (60) days after receipt of the above-mentioned notice, the Party<br />

which received or made said offer shall be entitled <strong>to</strong> receive the written approval of the<br />

other Parties, subject <strong>to</strong> the provisions of Sections 9.1 (a)-(j), <strong>and</strong> may complete the sale<br />

<strong>to</strong> the prospective purchaser <strong>in</strong> accordance with said offer with<strong>in</strong> six (6) months after<br />

the expiration of said period of sixty (60) days; provided that, if the Party which receives<br />

or makes said offer fails <strong>to</strong> complete the sale with<strong>in</strong> said period of six (6)<br />

months, the preferred right <strong>and</strong> option of the other Parties under Section 9.2.1 shall be<br />

considered as revived, <strong>and</strong> the Party which received or made said offer shall not complete<br />

the sale <strong>to</strong> the prospective purchaser unless <strong>and</strong> until said offer aga<strong>in</strong> has been presented<br />

<strong>to</strong> the other Parties, as here<strong>in</strong>above provided, <strong>and</strong> said other Parties aga<strong>in</strong> have<br />

failed <strong>to</strong> elect <strong>to</strong> purchase on the terms <strong>and</strong> conditions of said offer. All offers at any<br />

time made <strong>to</strong> or by any Party for the purchase of its Percentage Interest covered hereby<br />

shall be subject <strong>to</strong> all the terms <strong>and</strong> conditions of Section 9.2.1. The six (6) months period<br />

here<strong>in</strong>above provided shall be extended as may reasonably be necessary <strong>to</strong> secure<br />

the approval of the assignment by the appropriate governmental authorities, provided<br />

the Party acts expeditiously <strong>in</strong> attempt<strong>in</strong>g <strong>to</strong> secure governmental approval.<br />

41


9.2.3 Exceptions<br />

Sections 9.2.1 <strong>and</strong> 9.2.2 above shall not apply <strong>to</strong>:<br />

(a) any assignment by a Party <strong>to</strong> an Affiliate of that Party,<br />

(b) any assignment or disposition of the Percentage Interest of a Party by corporate<br />

merger or consolidation, or<br />

any assignment under Section 9.1 (i).<br />

9.3 Encumbrances<br />

Noth<strong>in</strong>g conta<strong>in</strong>ed <strong>in</strong> this Article 9 shall prevent a Party from mortgag<strong>in</strong>g, pledg<strong>in</strong>g or<br />

otherwise encumber<strong>in</strong>g all or part of its <strong>in</strong>terests <strong>in</strong> the Licence <strong>and</strong> <strong>in</strong> <strong>and</strong> under this<br />

Agreement for the purpose of security relat<strong>in</strong>g <strong>to</strong> f<strong>in</strong>ance, provided that:<br />

(a) such Party shall rema<strong>in</strong> liable for all obligations relat<strong>in</strong>g <strong>to</strong> such <strong>in</strong>terest; <strong>and</strong><br />

(b) the encumbrance shall be subject <strong>to</strong> any necessary approval of the Danish Energy<br />

Agency <strong>and</strong> be expressly subord<strong>in</strong>ated <strong>to</strong> the rights of the other Parties<br />

under this Agreement.<br />

42


10. WITHDRAWAL<br />

10.1 Rights<br />

10.1.1 Notice of Withdrawal<br />

Any Party may, subject <strong>to</strong> the other provisions hereof, at any time give notice <strong>to</strong> the<br />

other Parties that it wishes <strong>to</strong> withdraw from the Licence <strong>and</strong> this Agreement by offer<strong>in</strong>g<br />

its Percentage Interest <strong>to</strong> such other Parties. With<strong>in</strong> n<strong>in</strong>ety (90) days of receipt of<br />

such notice, any other Party may similarly give notice that it wishes <strong>to</strong> withdraw from<br />

the Licence <strong>and</strong> this Agreement by likewise offer<strong>in</strong>g its Percentage Interest <strong>to</strong> the other<br />

Parties. If all the other Parties give such notice, the Parties shall be deemed <strong>to</strong> have decided<br />

<strong>to</strong> ab<strong>and</strong>on the Jo<strong>in</strong>t Operations <strong>and</strong> the Licence shall be surrendered on the earliest<br />

possible date. If less than all the Parties give such notice, the withdraw<strong>in</strong>g Parties<br />

shall withdraw from the Licence <strong>and</strong> this Agreement on the earliest possible date <strong>and</strong><br />

shall assign their respective <strong>in</strong>terests <strong>in</strong> the Licence <strong>and</strong> <strong>in</strong> <strong>and</strong> under this Agreement <strong>to</strong><br />

the non-withdraw<strong>in</strong>g Parties without any compensation whatsoever.<br />

10.1.2 Work Obligations <strong>to</strong> be Fulfilled<br />

Subject <strong>to</strong> Section 10.2.6 no Party shall have any right <strong>to</strong> withdraw hereunder until all<br />

Work Obligations shall have been fulfilled.<br />

10.1.3 Withdrawal from a Development Programme<br />

Subject <strong>to</strong> Section 10.2.6 no Party participat<strong>in</strong>g <strong>in</strong> a development Programme may<br />

withdraw from the Licence <strong>and</strong> this Agreement prior <strong>to</strong> the completion of all the works<br />

comprised <strong>in</strong> such development Programme.<br />

10.1.4 Approval by the Danish Energy Agency<br />

A Party may only withdraw from the Licence <strong>and</strong> this Agreement after the Danish Energy<br />

Agency has approved that the conditions of the Licence for such withdrawal have<br />

been met with.<br />

10.2 Conditions<br />

10.2.1 Allocation of Percentage Interests<br />

A withdraw<strong>in</strong>g Party shall assign all of its said <strong>in</strong>terest <strong>to</strong> such non-withdraw<strong>in</strong>g Parties<br />

as wish or are obliged <strong>to</strong> accept, <strong>and</strong> the said <strong>in</strong>terest shall (unless otherwise agreed by<br />

such non-withdraw<strong>in</strong>g Parties) be allocated <strong>to</strong> them <strong>in</strong> the proportion <strong>in</strong> which their respective<br />

Percentage Interests prior <strong>to</strong> the effective date of withdrawal (as here<strong>in</strong>after def<strong>in</strong>ed)<br />

bear <strong>to</strong> the <strong>to</strong>tal of the same.<br />

43


10.2.2 Execution of Documents<br />

A withdraw<strong>in</strong>g Party shall execute <strong>and</strong> deliver any <strong>and</strong> all documents necessary <strong>to</strong> effect<br />

such assignment <strong>and</strong> a withdrawal shall not be effective <strong>and</strong> b<strong>in</strong>d<strong>in</strong>g upon the Parties<br />

until the date upon which the documents have been approved by the Danish Energy<br />

Agency <strong>and</strong> by the Parties (the agreement of the Parties not <strong>to</strong> be unreasonably withheld)<br />

<strong>and</strong> shall be <strong>in</strong> full force <strong>and</strong> effect ("the effective date of withdrawal").<br />

10.2.3 Ma<strong>in</strong>tenance of the Licence<br />

A withdraw<strong>in</strong>g Party shall promptly jo<strong>in</strong> <strong>in</strong> all actions required by the other Parties for<br />

the ma<strong>in</strong>tenance of the Licence, provided that its participation <strong>in</strong> such action shall not<br />

cause it <strong>to</strong> <strong>in</strong>cur after the date on which notice of withdrawal shall have been given any<br />

f<strong>in</strong>ancial obligations except as provided <strong>in</strong> this Article 10.<br />

10.2.4 Costs <strong>and</strong> Expenses<br />

A withdraw<strong>in</strong>g Party shall pay all costs <strong>and</strong> expenses, <strong>in</strong>clud<strong>in</strong>g any f<strong>in</strong>es <strong>and</strong> penalties,<br />

<strong>in</strong>curred by the other Parties <strong>in</strong> connection with such withdrawal.<br />

10.2.5 No Encumbrances, Liens <strong>and</strong> Charges<br />

A withdraw<strong>in</strong>g Party shall not be allowed <strong>to</strong> withdraw from the Licence <strong>and</strong> this<br />

Agreement if its <strong>in</strong>terest is subject <strong>to</strong> any encumbrances, liens or charges unless the<br />

other Parties are will<strong>in</strong>g <strong>to</strong> accept the assignment subject <strong>to</strong> such additional encumbrances.<br />

10.2.6 Liability for Approved Programme <strong>and</strong> Budget<br />

Unless the Party or Parties acquir<strong>in</strong>g its <strong>in</strong>terest agree <strong>to</strong> accept the withdraw<strong>in</strong>g Party's<br />

liabilities <strong>and</strong> obligations, a withdraw<strong>in</strong>g Party shall rema<strong>in</strong> liable <strong>and</strong> obligated for its<br />

Percentage Interest share of all expenditure accru<strong>in</strong>g <strong>to</strong> the Jo<strong>in</strong>t Account under any<br />

Programme <strong>and</strong> Budget approved by the Operat<strong>in</strong>g Committee prior <strong>to</strong> the date on<br />

which notice of withdrawal is given even if the operations concerned are <strong>to</strong> be implemented<br />

thereafter.<br />

10.2.7 Liability for Ab<strong>and</strong>onment<br />

A withdraw<strong>in</strong>g Party shall rema<strong>in</strong> liable <strong>and</strong> obligated for its share of all net costs <strong>and</strong><br />

obligations that <strong>in</strong> any way relate <strong>to</strong> the ab<strong>and</strong>onment of Jo<strong>in</strong>t Operations or a sole risk<br />

project <strong>in</strong> which such withdraw<strong>in</strong>g Party participated. Unless otherwise agreed, such<br />

share shall be the proportion which the withdraw<strong>in</strong>g Party's cumulative lift<strong>in</strong>gs of <strong>Hydrocarbon</strong>s<br />

up <strong>to</strong> the effective date of withdrawal bears <strong>to</strong> the aggregate cumulative lift<strong>in</strong>gs<br />

of <strong>Hydrocarbon</strong>s of all the Parties up <strong>to</strong> the occurrence of ab<strong>and</strong>onment, <strong>and</strong> prior<br />

<strong>to</strong> withdrawal such withdraw<strong>in</strong>g Party shall provide the other Parties with such security<br />

44


therefor as is acceptable <strong>to</strong> all such other Parties based upon the then best estimate of<br />

aggregate cumulative lift<strong>in</strong>gs.<br />

45


11. DEFAULT IN PAYMENT<br />

11.1 Failure <strong>to</strong> Pay<br />

If any Party ("Default<strong>in</strong>g Party") fails <strong>to</strong> pay <strong>in</strong> full its share of any Advance by the due<br />

date:<br />

(a) the Opera<strong>to</strong>r shall as soon as reasonably practicable notify by facsimile all the<br />

Parties of such default;<br />

(b) with the exception of the Default<strong>in</strong>g Party each Party ("Non-Default<strong>in</strong>g Party")<br />

shall contribute, as here<strong>in</strong>after provided, a share of the amount <strong>in</strong> default <strong>in</strong> the<br />

proportion that its Percentage Interest bears <strong>to</strong> the <strong>to</strong>tal of the Percentage Interests<br />

of the Non-Default<strong>in</strong>g Parties <strong>and</strong> pend<strong>in</strong>g receipt of such additional contributions<br />

the Opera<strong>to</strong>r shall use reasonable endeavours <strong>to</strong> make arrangements<br />

<strong>to</strong> meet any commitments fall<strong>in</strong>g due either by borrow<strong>in</strong>g the necessary f<strong>in</strong>ance<br />

from outside sources or by mak<strong>in</strong>g the necessary f<strong>in</strong>ance available itself<br />

<strong>and</strong> all costs of any such f<strong>in</strong>ance shall be charged <strong>to</strong> the Non-Default<strong>in</strong>g Party<br />

<strong>and</strong> added <strong>to</strong> the amount <strong>in</strong> default <strong>and</strong> paid by the Non-Default<strong>in</strong>g Parties, f<strong>in</strong>ance<br />

made available by the Opera<strong>to</strong>r shall bear <strong>in</strong>terest calculated on a<br />

day-<strong>to</strong>-day basis at a rate equal <strong>to</strong> two per cent (2%) above the Costs of Funds<br />

Rate <strong>in</strong> effect from time <strong>to</strong> time;<br />

(c) with<strong>in</strong> three (3) Work<strong>in</strong>g Days follow<strong>in</strong>g the notification by the Opera<strong>to</strong>r under<br />

(a) above, the Opera<strong>to</strong>r shall notify all the Parties of the liability of each of the<br />

Non-Default<strong>in</strong>g Parties <strong>to</strong> contribute <strong>to</strong> the amount <strong>in</strong> default <strong>and</strong> <strong>in</strong> addition<br />

the cost of <strong>and</strong> <strong>in</strong>terest on funds used or provided by the Opera<strong>to</strong>r under (b)<br />

above, <strong>and</strong> shall request further advances on the expiry of the six (6) Work<strong>in</strong>g<br />

Days specified <strong>in</strong> (d) below; <strong>and</strong><br />

(d) if such default cont<strong>in</strong>ues for more than six (6) Work<strong>in</strong>g Days after the date of<br />

notification by the Opera<strong>to</strong>r each of the Non-Default<strong>in</strong>g Parties shall on the<br />

Work<strong>in</strong>g Day next follow<strong>in</strong>g such sixth (6th) Work<strong>in</strong>g Day pay the amount notified<br />

under (c) above, <strong>and</strong> thereafter shall cont<strong>in</strong>ue <strong>to</strong> pay, <strong>in</strong> addition <strong>to</strong> its<br />

share of subsequent Advances, the same proportion of that part of all such subsequent<br />

Advances attributable <strong>to</strong> the Default<strong>in</strong>g Party <strong>and</strong> <strong>in</strong> addition the cost<br />

of the <strong>in</strong>terest on funds used or provided by the Opera<strong>to</strong>r under (b) above until<br />

such time as the Default<strong>in</strong>g Party has remedied its defaults <strong>in</strong> full or until forfeiture,<br />

as here<strong>in</strong>after provided, <strong>and</strong> failure by any Party <strong>to</strong> make such payments<br />

shall likewise <strong>and</strong> with the same results render that Party <strong>in</strong> default.<br />

46


11.2 Remedy of Default<br />

The Default<strong>in</strong>g Party shall have the right <strong>to</strong> remedy the default at any time prior <strong>to</strong> forfeiture,<br />

as here<strong>in</strong>after provided, by payment <strong>in</strong> full <strong>to</strong> the Opera<strong>to</strong>r or, if the<br />

Non-Default<strong>in</strong>g Parties have paid any amounts under Section 11.1 (d), the<br />

Non-Default<strong>in</strong>g Parties, <strong>in</strong> proportion <strong>to</strong> the amounts so paid by them, of all amounts <strong>in</strong><br />

respect of which the Default<strong>in</strong>g Party is <strong>in</strong> default <strong>to</strong>gether with <strong>in</strong>terest thereon calculated<br />

at the rate of five per cent (5%) above the Cost of Funds Rate from <strong>and</strong> <strong>in</strong>clud<strong>in</strong>g<br />

the due date for payment of such amounts until the actual date of payment.<br />

11.3 Cont<strong>in</strong>uation of Default<br />

11.3.1 No Right <strong>to</strong> <strong>Hydrocarbon</strong>s<br />

If any default cont<strong>in</strong>ues for more than six (6) Work<strong>in</strong>g Days after the date of notification<br />

by the Opera<strong>to</strong>r under Section 11.1 (a) then, for so long as the default so cont<strong>in</strong>ues,<br />

the Default<strong>in</strong>g Party shall not be entitled <strong>to</strong> its Percentage Interest of <strong>Hydrocarbon</strong>s produced<br />

thereafter which shall <strong>in</strong>stead be owned by the Non-Default<strong>in</strong>g Parties <strong>in</strong> the proportions<br />

which their respective Percentage Interests bear <strong>to</strong> the <strong>to</strong>tal of the same.<br />

11.3.2 No Right <strong>to</strong> Representation or Vot<strong>in</strong>g<br />

Dur<strong>in</strong>g the cont<strong>in</strong>uation of any default the Default<strong>in</strong>g Party shall not be entitled <strong>to</strong> be<br />

represented at meet<strong>in</strong>gs of the Operat<strong>in</strong>g Committee or any sub-committee thereof nor<br />

<strong>to</strong> vote thereat (so that the vot<strong>in</strong>g <strong>in</strong>terest of each Party other than the Default<strong>in</strong>g Party<br />

shall be <strong>in</strong> the proportion which its Percentage Interest bears <strong>to</strong> the <strong>to</strong>tal of the Percentage<br />

Interests of such Parties) <strong>and</strong> shall have no further access <strong>to</strong> any data <strong>and</strong> <strong>in</strong>formation<br />

relat<strong>in</strong>g <strong>to</strong> the Jo<strong>in</strong>t Operations. The Default<strong>in</strong>g Party shall be bound by decisions<br />

of the Operat<strong>in</strong>g Committee made dur<strong>in</strong>g the cont<strong>in</strong>uation of the default <strong>and</strong> shall be<br />

solely responsible for the payment of all additional adm<strong>in</strong>istrative costs <strong>and</strong> expenses<br />

occasioned by such default.<br />

11.3.3 Forfeiture<br />

In the event that the default cont<strong>in</strong>ues for more than sixty (60) days then each of the<br />

Non-Default<strong>in</strong>g Parties shall have the right <strong>to</strong> claim forfeiture <strong>and</strong> <strong>to</strong> acquire, by notice<br />

<strong>to</strong> the other Parties given with<strong>in</strong> thirty (30) days after such period of sixty (60) days, the<br />

<strong>in</strong>terest of the Default<strong>in</strong>g Party <strong>in</strong> the Licence <strong>and</strong> <strong>in</strong> <strong>and</strong> under this Agreement ("Defaulted<br />

Interest") or, if more than one (1) Non-Default<strong>in</strong>g Party exercises such right, its<br />

proportionate share of the <strong>in</strong>terest of the Default<strong>in</strong>g Party <strong>in</strong> the Licence <strong>and</strong> <strong>in</strong> <strong>and</strong> under<br />

this Agreement, such share be<strong>in</strong>g the proportion <strong>in</strong> which its Percentage Interest<br />

bears <strong>to</strong> the <strong>to</strong>tal Percentage Interests of such Non-Default<strong>in</strong>g Parties. If none of the<br />

Non-Default<strong>in</strong>g Parties exercises such right, then, without prejudice <strong>to</strong> any rights of the<br />

Non-Default<strong>in</strong>g Parties, the Parties shall unless all the Non-Default<strong>in</strong>g Parties agree <strong>in</strong>-<br />

47


ternally <strong>and</strong> with the Default<strong>in</strong>g Party <strong>to</strong> cont<strong>in</strong>ue <strong>to</strong> fund the Default<strong>in</strong>g Party’s share<br />

be deemed <strong>to</strong> have decided <strong>to</strong> ab<strong>and</strong>on the Jo<strong>in</strong>t Operations <strong>and</strong> each Party, <strong>in</strong>clud<strong>in</strong>g<br />

the Default<strong>in</strong>g Party, shall <strong>in</strong> addition <strong>to</strong> each Party's unpaid share of costs <strong>and</strong> expenses<br />

<strong>in</strong> connection with the Jo<strong>in</strong>t Operations, pay its Percentage Interest share of the costs of<br />

ab<strong>and</strong>on<strong>in</strong>g the Jo<strong>in</strong>t Operations. If <strong>in</strong> such case any Party is unable <strong>to</strong> pay its Percentage<br />

Interest share, the other Parties shall <strong>in</strong>demnify each other proportionally. It is provided,<br />

however, that no ab<strong>and</strong>onment shall be allowed under this provision if the default<br />

occurs before satisfaction of the Work Obligations. In these circumstances all Non-<br />

Default<strong>in</strong>g Parties shall be required <strong>to</strong> take up their proportionate share of the Defaulted<br />

Interest, <strong>and</strong> each Party <strong>in</strong>clud<strong>in</strong>g the Default<strong>in</strong>g Party shall pay its Percentage Interest<br />

share of the cost of the Work Obligations. In the event that any Non-Default<strong>in</strong>g Party<br />

takes up a share of the Defaulted Interest greater than the proportion <strong>in</strong> respect of which<br />

it has been pay<strong>in</strong>g Advances <strong>in</strong> respect of the Defaulted Interest, it shall forthwith after<br />

elect<strong>in</strong>g <strong>to</strong> or becom<strong>in</strong>g bound <strong>to</strong> acquire the Defaulted Interest pay <strong>to</strong> the Jo<strong>in</strong>t Account<br />

for the credit of the appropriate Party or Parties who have paid Advances <strong>in</strong> respect of<br />

the Defaulted Interest such amounts as appropriate so that all such Non-Default<strong>in</strong>g Parties<br />

will have borne the Advances <strong>in</strong> respect of the amount <strong>in</strong> default, <strong>and</strong> <strong>in</strong>terest as<br />

provided <strong>in</strong> Section 11.1 (b), <strong>in</strong> proportion <strong>to</strong> the respective shares <strong>in</strong> which they receive<br />

the Defaulted Interest. Further, <strong>in</strong> event the Non-Default<strong>in</strong>g Parties take up the Defaulted<br />

Interest <strong>in</strong> proportions other than the proportions <strong>in</strong> which dur<strong>in</strong>g the period of<br />

default they lifted <strong>Hydrocarbon</strong>s which but for the default would have been lifted by the<br />

Default<strong>in</strong>g Party, fair <strong>and</strong> equitable adjustment shall be made between the Parties so<br />

that all such Non-Default<strong>in</strong>g Parties receive Petroleum or its value <strong>in</strong> the same proportions<br />

as they receive the Defaulted Interest.<br />

11.3.4 Acquisition<br />

Any forfeiture <strong>and</strong> acquisition of the <strong>in</strong>terest of the Default<strong>in</strong>g Party <strong>in</strong> the Licence <strong>and</strong><br />

<strong>in</strong> <strong>and</strong> under this Agreement shall be:<br />

(a) subject <strong>to</strong> any necessary consent of the Danish Energy Agency;<br />

(b) without prejudice <strong>to</strong> any other rights of each Party other than the Default<strong>in</strong>g<br />

Party;<br />

(c) so forfeited <strong>and</strong> acquired free of any charges <strong>and</strong> encumbrances;<br />

(d) effective as of the date of default; <strong>and</strong><br />

(e) subject <strong>to</strong> the Default<strong>in</strong>g Party rema<strong>in</strong><strong>in</strong>g liable <strong>and</strong> obligated for its share of<br />

all net costs <strong>and</strong> obligations that <strong>in</strong> any way relate <strong>to</strong> the ab<strong>and</strong>onment of Jo<strong>in</strong>t<br />

Operations or a sole risk project <strong>in</strong> which the Default<strong>in</strong>g Party participated.<br />

Said share shall be determ<strong>in</strong>ed <strong>in</strong> the manner set forth <strong>in</strong> Section 10.2.7;<br />

48


<strong>and</strong> the Default<strong>in</strong>g Party shall promptly jo<strong>in</strong> <strong>in</strong> such actions as may be necessary or desirable<br />

<strong>to</strong> obta<strong>in</strong> any necessary consent of the Danish Energy Agency <strong>and</strong> shall execute<br />

<strong>and</strong> deliver any <strong>and</strong> all documents necessary <strong>to</strong> effect any such forfeiture <strong>and</strong> acquisition.<br />

11.3.5 The obligations of the Default<strong>in</strong>g Party <strong>and</strong> the rights of the Non-Default<strong>in</strong>g Parties<br />

shall survise the surrender of the Licence, ab<strong>and</strong>onment of Jo<strong>in</strong>t Operations <strong>and</strong> term<strong>in</strong>ation<br />

of this Agreement.<br />

49


12. MISCELLANEOUS<br />

12.1 Covenant<br />

Without prejudice <strong>to</strong> the responsibilities of the Opera<strong>to</strong>r under Section 3.3, each Party<br />

hereby covenants with each other Party that it will comply with all the applicable provisions<br />

<strong>and</strong> requirements of the Licence <strong>and</strong> will do all such acts <strong>and</strong> th<strong>in</strong>gs with<strong>in</strong> its<br />

control as may be necessary <strong>to</strong> keep <strong>and</strong> ma<strong>in</strong>ta<strong>in</strong> the Licence <strong>in</strong> force <strong>and</strong> effect.<br />

12.2 Relationship<br />

12.2.1 Relationship under the Agreement<br />

It is expressly agreed that it is not the purpose or <strong>in</strong>tention of this Agreement <strong>to</strong> create,<br />

nor shall the same be construed as creat<strong>in</strong>g, any partnership.<br />

12.2.2 Third Party Claims<br />

Subject <strong>to</strong> Sections 3.3.3 <strong>and</strong> 3.13.2 the Opera<strong>to</strong>r may charge <strong>to</strong> the Jo<strong>in</strong>t Account any<br />

amounts paid <strong>in</strong> settlement of claims from third parties which has resulted from the<br />

Jo<strong>in</strong>t Operations <strong>in</strong>clud<strong>in</strong>g costs, expenses <strong>and</strong> damages as specified <strong>in</strong> Section 3.1 of<br />

the Account<strong>in</strong>g Procedure. Any other Party, hav<strong>in</strong>g observed the provisions <strong>in</strong> Section<br />

3.13.3, which has been made <strong>to</strong> pay any such amounts <strong>to</strong> a third party shall immediately<br />

notify the other Parties <strong>and</strong> furnish the Opera<strong>to</strong>r with all <strong>in</strong>formation necessary <strong>to</strong> determ<strong>in</strong>e<br />

whether the amounts paid <strong>in</strong>clud<strong>in</strong>g costs, expenses <strong>and</strong> damages are chargeable<br />

<strong>to</strong> the Jo<strong>in</strong>t Account.<br />

12.2.3 Reimbursement of the Opera<strong>to</strong>r<br />

When reimbursement is claimed accord<strong>in</strong>g <strong>to</strong> Section 12.2.2 second sentence the Opera<strong>to</strong>r<br />

shall submit an AFE <strong>and</strong>/or a revised Budget <strong>to</strong> the Parties for approval by the Operat<strong>in</strong>g<br />

Committee, <strong>and</strong> when the same is approved the Opera<strong>to</strong>r shall follow the procedures<br />

laid down <strong>in</strong> this Agreement <strong>and</strong> the Account<strong>in</strong>g Procedure <strong>to</strong> effect reimbursement.<br />

12.2.4 Interest<br />

Any amount reimbursed accord<strong>in</strong>g <strong>to</strong> Section 12.2.2 shall bear <strong>in</strong>terest from the day<br />

said amount was paid by the Party be<strong>in</strong>g reimbursed for said amount <strong>and</strong> <strong>to</strong> the day of<br />

reimbursement which <strong>in</strong>terest is <strong>to</strong> be calculated on a day-<strong>to</strong>-day basis at a rate equal <strong>to</strong><br />

two per cent (2%) above the Cost of Funds Rate <strong>in</strong> effect from time <strong>to</strong> time.<br />

50


12.2.5 Mutual Indemnification<br />

Without prejudice <strong>to</strong> the other provisions of this Agreement, each Party hereby undertakes<br />

<strong>to</strong> <strong>in</strong>demnify each other Party for such <strong>in</strong>demnify<strong>in</strong>g Party's Percentage Interest<br />

share of any claim by or liability <strong>to</strong> (<strong>in</strong>clud<strong>in</strong>g any costs <strong>and</strong> expenses necessarily <strong>in</strong>curred<br />

<strong>in</strong> respect of such claim or liability) any person not be<strong>in</strong>g a Party here<strong>to</strong> aris<strong>in</strong>g<br />

from or <strong>in</strong> connection with the Jo<strong>in</strong>t Operations. If any Party is unable <strong>to</strong> pay its Percentage<br />

Interest share, said share shall subject <strong>to</strong> <strong>and</strong> <strong>in</strong> accordance with Article 11<br />

hereof be paid proportionally by the other Parties.<br />

12.3 Confidentiality<br />

12.3.1 Ma<strong>in</strong> Rule <strong>and</strong> Exceptions<br />

All data <strong>and</strong> <strong>in</strong>formation acquired or received by any Party under this Agreement shall<br />

be held confidential dur<strong>in</strong>g the cont<strong>in</strong>uance of this Agreement <strong>and</strong> for a period of five<br />

(5) Years thereafter <strong>and</strong> shall not be divulged <strong>in</strong> any way <strong>to</strong> any third party, without the<br />

prior written approval of all the Parties, provided that any Party may, without such approval,<br />

disclose such data <strong>and</strong> <strong>in</strong>formation:<br />

(a) <strong>to</strong> any Affiliate upon obta<strong>in</strong><strong>in</strong>g a similar undertak<strong>in</strong>g of confidentiality from<br />

such Affiliate;<br />

(b) <strong>to</strong> any outside professional consultants, upon obta<strong>in</strong><strong>in</strong>g a similar undertak<strong>in</strong>g of<br />

confidentiality from such consultants;<br />

(c) <strong>to</strong> any bank, <strong>in</strong>surance company or f<strong>in</strong>ancial <strong>in</strong>stitution from which the Party is<br />

seek<strong>in</strong>g <strong>to</strong> obta<strong>in</strong> f<strong>in</strong>anc<strong>in</strong>g or <strong>in</strong>surance company, provided that before disclos<strong>in</strong>g<br />

such <strong>in</strong>formation such Party shall obta<strong>in</strong> a similar undertak<strong>in</strong>g of confidentiality<br />

from such bank, <strong>in</strong>surance company or f<strong>in</strong>ancial <strong>in</strong>stitution;<br />

(d) <strong>to</strong> the extent required by the Licence or any other applicable law or the regulations<br />

of any recognised s<strong>to</strong>ck exchange, <strong>in</strong> which a Party or any of its Affiliates<br />

are listed or ordered by a court or authority of applicable jurisdiction provided<br />

that the Party so ordered endeavours <strong>to</strong> give prior notice <strong>to</strong> the other Parties;<br />

(e) <strong>to</strong> the extent that the same has become generally available <strong>to</strong> the public, otherwise<br />

than through a breach of this Section 12.3 by Party, any of its Affiliates or<br />

any employee, officer or agent of such Party or its Affiliates; or<br />

(f) <strong>to</strong> a bona fide potential assignee or employees or agents of such assignee upon<br />

obta<strong>in</strong><strong>in</strong>g an undertak<strong>in</strong>g of confidentiality correspond<strong>in</strong>g <strong>to</strong> that of the Parties.<br />

In the event of any Party ceas<strong>in</strong>g <strong>to</strong> hold a Percentage Interest, such Party shall nevertheless<br />

rema<strong>in</strong> bound by Section 12.3.<br />

51


The Opera<strong>to</strong>r may disclose such data <strong>and</strong> <strong>in</strong>formation <strong>to</strong> such persons as may be necessary<br />

<strong>in</strong> connection with the conduct of the Jo<strong>in</strong>t Operations upon obta<strong>in</strong><strong>in</strong>g a similar undertak<strong>in</strong>g<br />

of confidentiality from such persons provided that the Opera<strong>to</strong>r shall promptly<br />

<strong>in</strong>form the other Parties of the names of such persons <strong>and</strong> the data <strong>and</strong> <strong>in</strong>formation disclosed<br />

<strong>to</strong> them.<br />

12.3.2 Exchange of Data <strong>and</strong> Information<br />

The Opera<strong>to</strong>r may, with approval of the Operat<strong>in</strong>g Committee <strong>and</strong> on such terms <strong>and</strong><br />

conditions as the Operat<strong>in</strong>g Committee may determ<strong>in</strong>e, exchange any such data <strong>and</strong> <strong>in</strong>formation<br />

for other similar data <strong>and</strong> <strong>in</strong>formation <strong>and</strong> the Opera<strong>to</strong>r shall promptly provide<br />

all the Parties with a copy of the agreement relat<strong>in</strong>g <strong>to</strong> such exchange <strong>to</strong>gether with<br />

the data <strong>and</strong> <strong>in</strong>formation acquired.<br />

12.4 Public Announcements<br />

The Opera<strong>to</strong>r shall be responsible for the preparation <strong>and</strong> release of all public announcements<br />

<strong>and</strong> statements regard<strong>in</strong>g the Jo<strong>in</strong>t Operations, provided that:<br />

(a) no such public announcement or statement shall be issued or made unless prior<br />

there<strong>to</strong> all of the Parties have been furnished with a copy thereof with a period<br />

of consideration of at least 2 Work<strong>in</strong>g Days <strong>and</strong> the approval of the Operat<strong>in</strong>g<br />

Committee has been obta<strong>in</strong>ed; <strong>and</strong><br />

(b) a Party can itself make a public announcement or statement regard<strong>in</strong>g the Jo<strong>in</strong>t<br />

Operations if prior there<strong>to</strong> it furnishes all the other Parties with a copy of such<br />

announcement or statement <strong>and</strong> obta<strong>in</strong>s the consent of all the other Parties,<br />

which consent shall not be unreasonably withheld or delayed; <strong>and</strong><br />

(c) notwithst<strong>and</strong><strong>in</strong>g the above, the Opera<strong>to</strong>r shall be entitled <strong>to</strong> issue rout<strong>in</strong>e announcements<br />

concern<strong>in</strong>g the Jo<strong>in</strong>t Operations without the prior written approval<br />

of the Operat<strong>in</strong>g Committee. Copy of written announcements shall be<br />

forwarded <strong>to</strong> the Parties by the Opera<strong>to</strong>r simultaneously.<br />

Where a public announcement or statement becomes necessary or desirable because of<br />

danger <strong>to</strong> or loss of life, damage <strong>to</strong> property or of pollution aris<strong>in</strong>g under this Agreement,<br />

the Opera<strong>to</strong>r shall be authorised <strong>to</strong> issue <strong>and</strong> make such announcement or statement<br />

without prior approval of the Operat<strong>in</strong>g Committee if prompt contact with the<br />

other Parties has not proved possible, but shall promptly furnish all the Parties with a<br />

copy thereof. Notwithst<strong>and</strong><strong>in</strong>g the forego<strong>in</strong>g, but subject <strong>to</strong> Section 12.3, each Party<br />

shall be entitled <strong>to</strong> <strong>in</strong>clude <strong>in</strong>formation of a general character concern<strong>in</strong>g the Jo<strong>in</strong>t Operations<br />

<strong>in</strong> communications <strong>to</strong> which the public will have access.<br />

52


12.5 Force Majeure<br />

The obligations of each of the Parties hereunder, other than the obligations <strong>to</strong> make<br />

payments of money, shall be suspended dur<strong>in</strong>g the period <strong>and</strong> <strong>to</strong> the extent that such<br />

Party is prevented or h<strong>in</strong>dered <strong>in</strong> whole or <strong>in</strong> part from comply<strong>in</strong>g therewith by "Force<br />

Majeure" (as here<strong>in</strong>after def<strong>in</strong>ed). In such event, such Party shall give notice of suspension<br />

as soon as reasonably possible <strong>to</strong> the other Parties stat<strong>in</strong>g the date <strong>and</strong> extent of<br />

such suspension <strong>and</strong> the cause thereof. Any of the Parties whose obligations have been<br />

suspended as aforesaid shall resume the performance of such obligations as soon as reasonably<br />

possible after the removal of the cause <strong>and</strong> shall so notify all the other Parties.<br />

In this Section 12.5, "Force Majeure" means any circumstance which could not reasonably<br />

be foreseen <strong>and</strong> reasonably overcome <strong>and</strong> is beyond the reasonable control of<br />

such Party <strong>in</strong>clud<strong>in</strong>g (<strong>in</strong> so far as beyond such control but without prejudice <strong>to</strong> the generality<br />

of the forego<strong>in</strong>g expression) strikes, lock-outs <strong>and</strong> labour disputes, but such<br />

Party shall not be obliged <strong>to</strong> settle any labour dispute except <strong>in</strong> such manner as it shall<br />

<strong>in</strong> its sole judgement consider fit, <strong>and</strong> <strong>in</strong> compliance with any law or governmental order,<br />

rule, regulation or direction, if (<strong>and</strong> only if) the same is issued by governmental<br />

agencies or bodies <strong>in</strong> <strong>Denmark</strong> or by the European Union or by any other organisation<br />

with authority with<strong>in</strong> <strong>Denmark</strong>. A lack of funds shall not constitute "Force Majeure".<br />

12.6 Arbitration<br />

Any dispute between the Parties aris<strong>in</strong>g out of or <strong>in</strong> connection with this Agreement<br />

shall be f<strong>in</strong>ally settled by a board of arbitration consist<strong>in</strong>g of an umpire <strong>and</strong> two other<br />

arbitra<strong>to</strong>rs. The board of arbitration shall be appo<strong>in</strong>ted at the request of any one of the<br />

Parties <strong>to</strong> the dispute. When such request has been made, the Party or Parties which are<br />

compla<strong>in</strong>ants <strong>to</strong> the case shall nom<strong>in</strong>ate a s<strong>in</strong>gle arbitra<strong>to</strong>r, <strong>and</strong> the Party or Parties<br />

which are defendants <strong>to</strong> the case shall nom<strong>in</strong>ate a s<strong>in</strong>gle arbitra<strong>to</strong>r, such nom<strong>in</strong>ations <strong>to</strong><br />

be made with<strong>in</strong> thirty (30) days of receipt of the notice referr<strong>in</strong>g the dispute <strong>to</strong> arbitration.<br />

The two arbitra<strong>to</strong>rs thus nom<strong>in</strong>ated shall, with<strong>in</strong> thirty (30) days, unanimously<br />

nom<strong>in</strong>ate the umpire, who shall be the chairman of the board of arbitration. If an agreement<br />

on such nom<strong>in</strong>ation cannot be arrived at either Party may request the President of<br />

the Supreme Court of <strong>Denmark</strong> <strong>to</strong> nom<strong>in</strong>ate the umpire. The President of the Supreme<br />

Court of <strong>Denmark</strong> may also be requested <strong>to</strong> appo<strong>in</strong>t one of the other arbitra<strong>to</strong>rs <strong>in</strong> case<br />

either the compla<strong>in</strong><strong>in</strong>g or the defend<strong>in</strong>g Party or Parties fail <strong>to</strong> do so with<strong>in</strong> the time<br />

limit prescribed. The board of arbitration shall have its seat <strong>in</strong> Copenhagen, unless otherwise<br />

agreed between the Parties <strong>to</strong> the case. The board of arbitration shall make its<br />

decisions on the basis of Danish law. In the event that a majority of the board of arbitration<br />

cannot agree on a result, the umpire shall have the decid<strong>in</strong>g vote. Any awards made<br />

by the board of arbitration shall be f<strong>in</strong>al <strong>and</strong> b<strong>in</strong>d<strong>in</strong>g upon the Parties <strong>to</strong> the case <strong>and</strong><br />

shall be enforceable without the necessity of any judgement be<strong>in</strong>g rendered thereupon.<br />

53


Subject <strong>to</strong> the provisions hereof, the arbitration shall be conducted accord<strong>in</strong>g <strong>to</strong> the<br />

rules of Danish law, <strong>in</strong>clud<strong>in</strong>g the Danish Act on Arbitration (Act. No. 553 af 24th June<br />

2005), <strong>and</strong> <strong>to</strong> the extent specified <strong>in</strong> said rules, the Danish courts shall have jurisdiction<br />

accord<strong>in</strong>g <strong>to</strong> Section 12.7. The language of the arbitration shall be English <strong>and</strong> all<br />

documents shall be remitted <strong>to</strong> the arbitration <strong>in</strong> their orig<strong>in</strong>al form <strong>to</strong>gether with an<br />

English translation unless the parties <strong>to</strong> the dispute agree that the language shall be Danish.<br />

12.7 Applicable Law <strong>and</strong> Jurisdiction<br />

12.8 Notices<br />

This Agreement shall be governed by <strong>and</strong> construed <strong>in</strong> accordance with Danish law <strong>and</strong><br />

subject <strong>to</strong> Section 12.6 each of the Parties hereby submits <strong>to</strong> the jurisdiction of the<br />

courts of <strong>Denmark</strong>.<br />

Unless otherwise expressly provided here<strong>in</strong>, all notices under this Agreement shall be <strong>in</strong><br />

writ<strong>in</strong>g <strong>and</strong> may be given by deliver<strong>in</strong>g the same by h<strong>and</strong>, or by send<strong>in</strong>g the same by<br />

recorded delivery post, telex (if any) or facsimile transmission <strong>to</strong> the attention of the<br />

representative of the Operat<strong>in</strong>g Committee of each Party at the latest address <strong>and</strong><br />

telex/facsimile number provided by such representative. Any such notice given as<br />

aforesaid shall, <strong>in</strong> the case of notice given by h<strong>and</strong>, by recorded delivery post or by<br />

telex, be deemed <strong>to</strong> have been given at the time of delivery by h<strong>and</strong>, by recorded post or<br />

at the time of transmission of the telex provided that <strong>in</strong> the latter case the transmission is<br />

evidenced by the receipt by the transmitt<strong>in</strong>g Party of the correct au<strong>to</strong>matic answerback<br />

of the receiv<strong>in</strong>g Party <strong>and</strong> <strong>in</strong> case of notice given by facsimile transmission, be deemed<br />

<strong>to</strong> have been given or received on the first Work<strong>in</strong>g Day next follow<strong>in</strong>g the day of receipt.<br />

Notices may be sent <strong>in</strong> the Danish or English language.<br />

12.9 Danish Government<br />

This Agreement <strong>and</strong> any amendments, exceptions or additions here<strong>to</strong> shall be subject <strong>to</strong><br />

the approval of the Danish Energy Agency. The Danish Energy Agency shall receive<br />

one of the orig<strong>in</strong>al executed copies of this Agreement. This Agreement shall <strong>in</strong> no way<br />

limit the authority of the Danish Government or any part thereof <strong>to</strong> exercise its authority<br />

accord<strong>in</strong>g <strong>to</strong> the law <strong>and</strong> the prevail<strong>in</strong>g rules <strong>and</strong> regulations <strong>and</strong> which are at any time<br />

<strong>in</strong> force for activities covered by this Agreement.<br />

54


13. DEFINITIONS AND INTERPRETATIONS<br />

13.1 Def<strong>in</strong>itions<br />

In this Agreement:<br />

(a) "Account<strong>in</strong>g Procedure" means the procedure set out <strong>in</strong> Appendix A here<strong>to</strong>;<br />

(b) "Advance" means a payment of cash required <strong>to</strong> be made <strong>to</strong> the Opera<strong>to</strong>r pursuant<br />

<strong>to</strong> this Agreement;<br />

(c) "AFE" means authority for expenditure;<br />

(d) "Affiliate" means <strong>in</strong> relation <strong>to</strong> any Party any company which is a Subsidiary<br />

of such Party or a company of which such Party is a Subsidiary or a company<br />

which is another Subsidiary of a company of which such Party is a Subsidiary;<br />

(e) "Budget" means any Budget <strong>in</strong> respect of a Programme;<br />

(f) "Cost of Funds Rate" means for Kroner a rate equal <strong>to</strong> one (1) month CIBOR<br />

(Copenhagen Interbank Offered Rate) as quoted by Danmarks Nationalbank<br />

(the central bank of <strong>Denmark</strong>) <strong>and</strong> for currencies other than Kroner a rate equal<br />

<strong>to</strong> one-month LIBOR (London Interbank Offered Rate) as quoted <strong>in</strong> the F<strong>in</strong>ancial<br />

Times for the relevant currency on the first day of the relevant period.<br />

(g) "Discovery" means any discovery of <strong>Hydrocarbon</strong>s as referred <strong>to</strong> <strong>in</strong> Section 4,<br />

Subsection 2 of the Licence;<br />

(h)<br />

(i) "<strong>Hydrocarbon</strong>s" means hydrocarbons <strong>in</strong> the liquid, gaseous or solid state,<br />

found <strong>in</strong> a natural condition <strong>in</strong> the subsoil;<br />

(j) "Jo<strong>in</strong>t Account" means the account established <strong>and</strong> ma<strong>in</strong>ta<strong>in</strong>ed by the Opera<strong>to</strong>r<br />

<strong>to</strong> record all Advances, expenditures <strong>and</strong> receipts <strong>in</strong> the conduct of Jo<strong>in</strong>t Operations;<br />

(k) "Jo<strong>in</strong>t Operations" means all Jo<strong>in</strong>t Operations of the Parties conducted <strong>in</strong> accordance<br />

with this Agreement;<br />

(l) "Jo<strong>in</strong>t <strong>Hydrocarbon</strong>s" means all <strong>Hydrocarbon</strong>s won <strong>and</strong> saved under the Jo<strong>in</strong>t<br />

Operations;<br />

(m) "Jo<strong>in</strong>t Property" means all property acquired or held for use <strong>in</strong> connection with<br />

the Jo<strong>in</strong>t Operations;<br />

(n) "Kroner" or "DKK" means Danish Kroner;<br />

(o) "Licence" means Licence No.____ for <strong>Exploration</strong> for <strong>and</strong> Production of <strong>Hydrocarbon</strong>s<br />

issued by the M<strong>in</strong>ister for Transport <strong>and</strong> Energy <strong>and</strong> shall <strong>in</strong>clude<br />

55


any other Licence issued <strong>to</strong> the Parties <strong>in</strong> substitution or partial substitution<br />

therefore;<br />

(p) "Licence Area" means the area at any time covered by the Licence;<br />

(q) "Managerial or Supervisory Personnel" means a party's designated managers or<br />

supervisors who are responsible for on site drill<strong>in</strong>g, construction or production<br />

<strong>and</strong> related operations, or any other field operations, any employees of such<br />

party who function at a management level equivalent or superior <strong>to</strong> the forego<strong>in</strong>g,<br />

<strong>and</strong> the officers <strong>and</strong> direc<strong>to</strong>rs of such party.<br />

(r) "Material" means equipment or supplies;<br />

(s) "Month" means a calendar month;<br />

(t) "Non-Opera<strong>to</strong>r" means a Party other than the Opera<strong>to</strong>r;<br />

(u) "Operat<strong>in</strong>g Committee" means the committee established pursuant <strong>to</strong> Section<br />

4.1;<br />

(v) "Opera<strong>to</strong>r" means the Party at any time designated as such under Article 3, act<strong>in</strong>g<br />

<strong>in</strong> that capacity <strong>and</strong> not as the owner of a Percentage Interest;<br />

(w) "Orig<strong>in</strong>al State Participation Share" means Nordsøfonden's orig<strong>in</strong>al Percentage<br />

Interest at the time this Agreement was signed.<br />

(x) "Parties" means the Parties <strong>to</strong> this Agreement <strong>and</strong> their respective successors<br />

<strong>and</strong> assigns;<br />

(y) "Percentage Interest" means for each of the Parties the undivided Percentage<br />

Interest held at any time by it pursuant <strong>to</strong> this Agreement <strong>and</strong> the Licence or,<br />

where the context so requires, <strong>in</strong> any sole risk development, <strong>and</strong> <strong>in</strong>cludes its<br />

correspond<strong>in</strong>g entitlement <strong>to</strong> <strong>Hydrocarbon</strong>s won <strong>and</strong> saved under the Licence;<br />

(z) "Programme" means any Programme of operations;<br />

(aa) "Quarter" means a period of three (3) Months end<strong>in</strong>g March 31st, June 30th,<br />

September 30th or December 31st <strong>in</strong> any Year;<br />

(bb) "Sub-Area" means at any given time, any part of the Licence Area, be<strong>in</strong>g delimited<br />

by surface area but apply<strong>in</strong>g only <strong>to</strong> that <strong>in</strong>terpreted closure of any geological<br />

structure or stratigraphic trap <strong>in</strong> which the relevant reservoir or reservoirs<br />

exists, which is subject <strong>to</strong> development by less than all Parties <strong>and</strong> <strong>in</strong><br />

which the entire Percentage Interest there<strong>in</strong> is owned by those of the Parties<br />

carry<strong>in</strong>g out the development;<br />

(cc) "Subsidiary" means <strong>in</strong> relation <strong>to</strong> a company any other company more than<br />

fifty per cent (50%) of whose s<strong>to</strong>ck is owned, directly or <strong>in</strong>directly, by such<br />

first company;<br />

56


(dd) "Subsoil Act" means the Consolidated Act No. 889 of 4 July 2007 on the use of<br />

the Danish Subsoil, as amended by Act No. 1400 of 27 December 2008.<br />

(ee) "USD" or "USD" means USD of the United States of America;<br />

(ff) "Work<strong>in</strong>g Day" means a day upon which the banks are open for bus<strong>in</strong>ess <strong>in</strong><br />

<strong>Denmark</strong> exclud<strong>in</strong>g Saturdays <strong>and</strong> Sundays;<br />

(gg) "Work Obligations" means the work program which the Parties are obligated <strong>to</strong><br />

carry out accord<strong>in</strong>g <strong>to</strong> Subsection (1) of Section 4 <strong>and</strong> Annex 2 of the Licence;<br />

<strong>and</strong><br />

(hh) "Year" means when spelled with a capital "Y" a calendar year beg<strong>in</strong>n<strong>in</strong>g on<br />

January 1st., while year spelled with a small "y" means a year beg<strong>in</strong>n<strong>in</strong>g on<br />

any date.<br />

13.2 Interpretations<br />

In this Agreement:<br />

(a) reference <strong>to</strong> any statute, statu<strong>to</strong>ry provision or statu<strong>to</strong>ry <strong>in</strong>strument <strong>in</strong>cludes a<br />

reference <strong>to</strong> that statute, statu<strong>to</strong>ry provision or statu<strong>to</strong>ry <strong>in</strong>strument as from<br />

time <strong>to</strong> time amended, extended or re-enacted;<br />

(b) reference <strong>to</strong> the s<strong>in</strong>gular <strong>in</strong>cludes a reference <strong>to</strong> plural <strong>and</strong> vice versa;<br />

(c) reference <strong>to</strong> any gender <strong>in</strong>cludes a reference <strong>to</strong> all other genders;<br />

(d) unless the context otherwise requires, reference <strong>to</strong> any Section or Article is <strong>to</strong> a<br />

Section or Article of this Agreement; <strong>and</strong><br />

(e) the head<strong>in</strong>gs here<strong>in</strong> are used for convenience only <strong>and</strong> shall not affect the construction<br />

or validity of this Agreement.<br />

IN WITNESS WHEREOF, the Parties have caused this Agreement <strong>to</strong> be executed by<br />

their duly authorised representatives as of the day <strong>and</strong> year first above written.<br />

By ______________________________<br />

_________________________________<br />

57


By ______________________________<br />

_________________________________<br />

By ______________________________<br />

_________________________________<br />

By _______________________________<br />

Nordsøfonden<br />

58


DRAFT MODEL<br />

February 2009<br />

LICENCE X/XX<br />

Xxxx Group<br />

JOINT OPERATING AGREEMENT<br />

APPENDIX A<br />

ACCOUNTING PROCEDURE


Licence ……. - Account<strong>in</strong>g Procedure<br />

INDEX<br />

ARTICLE I: PREFACE AND GENERAL PROVISIONS<br />

1.1 Preface<br />

1.2 Report<strong>in</strong>g <strong>to</strong> Authorities<br />

1.3 Change of Account<strong>in</strong>g Procedure<br />

1.4 Currency<br />

1.5 Def<strong>in</strong>itions<br />

1.6 Disagreements<br />

1.7 Monetary Limits<br />

1.8 Sole Risk<br />

1.9 Separate Account<strong>in</strong>g<br />

1.10 Adjustments<br />

ARTICLE II: BUDGETS AND FORECASTS<br />

2.1 <strong>Exploration</strong> <strong>and</strong> Appraisal Budgets<br />

2.2 Development <strong>and</strong> Production Budgets<br />

2.3 Budget Approval <strong>and</strong> Amendment<br />

2.3.1 Capital Budgets<br />

2.3.2 Adm<strong>in</strong>istrative <strong>and</strong> Operat<strong>in</strong>g Expense<br />

ARTICLE III: JOINT ACCOUNT<br />

3.1 Charges<br />

3.1.1 Licence Fees<br />

3.1.2 Damages <strong>and</strong> Losses<br />

3.1.3 Offices <strong>and</strong> Field Expenses<br />

3.1.4 Insurance <strong>and</strong> Third Party Claims<br />

3.1.5 Legal Costs<br />

3.1.6 Material<br />

3.1.7 Number not used<br />

3.1.8 Personnel<br />

3.1.9 Services<br />

3.1.10 Taxes<br />

3.1.11 Transportation<br />

3.1.12 Sole Risk<br />

3.1.13 Other Expenditures<br />

3.2 Credits<br />

3.2.1 Disposals<br />

3.2.2 Interests <strong>and</strong> Miscellaneous<br />

3.2.3 Material <strong>and</strong> Property<br />

3.2.4 Sole Risk<br />

3.2.5 Insurance<br />

3.2.6 Claims<br />

3.2.7 Other<br />

ARTICLE IV: BOOKS AND RECORDS<br />

4.1 Account<strong>in</strong>g Records<br />

4.1.1 Account<strong>in</strong>g Codes<br />

4.1.2 Jo<strong>in</strong>t Account<br />

4.1.3 Access<br />

4.1.4 Investment Records<br />

i - A<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

2<br />

2<br />

2<br />

2<br />

2<br />

3<br />

3<br />

3<br />

4<br />

4<br />

4<br />

5<br />

5<br />

5<br />

5<br />

5<br />

5<br />

5<br />

5<br />

6<br />

6<br />

7<br />

7<br />

7<br />

7<br />

7<br />

8<br />

8<br />

8<br />

8<br />

8<br />

8<br />

8<br />

8<br />

9<br />

9<br />

9<br />

9<br />

9<br />

9


Licence ……. - Account<strong>in</strong>g Procedure<br />

4.1.5 Presence <strong>in</strong> <strong>Denmark</strong><br />

4.1.6 AFE Reference<br />

4.2 Bank Accounts<br />

4.3 Material Classification<br />

4.4 Other Property<br />

4.5 Warehouse<br />

4.5.1 Mark<strong>in</strong>gs<br />

4.5.2 Records<br />

4.5.3 Major Material H<strong>and</strong>l<strong>in</strong>g Charges<br />

4.5.4 M<strong>in</strong>or Material H<strong>and</strong>l<strong>in</strong>g Charges<br />

4.5.5 Forward<strong>in</strong>g<br />

ARTICLE V: MATERIAL<br />

5.1 Disposals<br />

5.1.1 Surplus Materials<br />

5.1.2 Notification <strong>to</strong> Non-Opera<strong>to</strong>rs<br />

5.1.3 Bidd<strong>in</strong>g<br />

5.1.4 Disposal<br />

5.1.5 Donations<br />

5.1.6 Limitation of Disposals<br />

5.1.7 Condition "D" Material<br />

5.2 Evaluation<br />

5.3 Purchases<br />

5.3.1 Warranty<br />

5.3.2 Charges <strong>to</strong> Jo<strong>in</strong>t Account<br />

5.4 Sales <strong>and</strong> Loans<br />

ARTICLE VI: CASH CALL, BILLING AND REPORTING REQUIREMENTS<br />

6.1 Cash Calls <strong>and</strong> Advances<br />

6.1.1 Cash Call<br />

6.1.2 Specification<br />

6.1.3 Currency<br />

6.1.4 Payments<br />

6.1.5 Limitations<br />

6.1.6 Interest<br />

6.1.7 Forecast<br />

6.2 Bill<strong>in</strong>g Statement <strong>and</strong> Schedules<br />

6.2.1 Monthly Bill<strong>in</strong>g Statement<br />

6.2.2 Classifications<br />

6.2.3 Currency<br />

6.3 Monthly Cash Reconciliation<br />

6.4 Cost Control Report<br />

6.4.1 Capital Expenditures<br />

6.4.2 Adm<strong>in</strong>istrative <strong>and</strong> Operat<strong>in</strong>g Expenditures<br />

6.5 Inven<strong>to</strong>ries<br />

6.5.1 Inven<strong>to</strong>ries<br />

6.5.2 Notice<br />

6.5.3 Surpluses, Shortages <strong>and</strong> Adjustments<br />

6.5.4 Special Inven<strong>to</strong>ries<br />

6.6 Production Report<br />

ARTICLE VII: CONTROL PROCEDURES<br />

ii - A<br />

9<br />

9<br />

9<br />

9<br />

10<br />

10<br />

10<br />

10<br />

10<br />

10<br />

10<br />

11<br />

11<br />

11<br />

11<br />

11<br />

11<br />

11<br />

11<br />

11<br />

11<br />

12<br />

12<br />

12<br />

12<br />

13<br />

13<br />

13<br />

13<br />

13<br />

13<br />

13<br />

13<br />

14<br />

14<br />

14<br />

14<br />

14<br />

14<br />

14<br />

14<br />

15<br />

15<br />

15<br />

15<br />

15<br />

15<br />

15<br />

16


Licence ……. - Account<strong>in</strong>g Procedure<br />

7.1 Audits<br />

7.1.1 Access<br />

7.1.2 Notice<br />

7.1.3 Costs<br />

7.1.4 Report<br />

7.1.5 Adjustments<br />

7.1.6 Disagreements<br />

7.1.7 Time Limits<br />

7.1.8 Proprietary <strong>and</strong> Confidential Information<br />

7.1.9 Third Party Contract<br />

7.2 AFEs<br />

7.2.1 Request for AFE<br />

7.2.2 Information<br />

7.2.3 Approval<br />

7.2.4 Deemed Approval (not applicable dur<strong>in</strong>g the pre-drill<strong>in</strong>g phase)<br />

7.2.5 Authority for the Opera<strong>to</strong>r<br />

7.3 Cost Control<br />

iii - A<br />

16<br />

16<br />

16<br />

16<br />

16<br />

16<br />

16<br />

16<br />

16<br />

17<br />

17<br />

17<br />

17<br />

17<br />

17<br />

18<br />

18


Licence ….. - Account<strong>in</strong>g Procedure<br />

ACCOUNTING PROCEDURE<br />

ARTICLE I: PREFACE AND GENERAL PROVISIONS<br />

1.1 Preface<br />

1 - A<br />

The purpose of this Account<strong>in</strong>g Procedure is <strong>to</strong> establish account<strong>in</strong>g pr<strong>in</strong>ciples <strong>and</strong><br />

procedures, which will aid the proper <strong>and</strong> efficient carry<strong>in</strong>g out of the Jo<strong>in</strong>t Operations <strong>and</strong><br />

will result <strong>in</strong> the true cost of the Jo<strong>in</strong>t Operations be<strong>in</strong>g reflected <strong>in</strong> the Jo<strong>in</strong>t Account. It is the<br />

<strong>in</strong>tent <strong>and</strong> underst<strong>and</strong><strong>in</strong>g of the Parties that the Opera<strong>to</strong>r shall, subject <strong>to</strong> the provisions of the<br />

Agreement, neither ga<strong>in</strong> nor lose by reason of the fact that he acts as the Opera<strong>to</strong>r. Each of<br />

the Parties shall provide funds sufficient <strong>to</strong> cover all costs of the Jo<strong>in</strong>t Operations, such funds<br />

<strong>to</strong> be provided <strong>to</strong> the Opera<strong>to</strong>r by each Party <strong>in</strong> proportion <strong>to</strong> its Percentage Interest at the<br />

time of the <strong>in</strong>currence of the costs.<br />

1.2 Report<strong>in</strong>g <strong>to</strong> Authorities<br />

The Opera<strong>to</strong>r shall at all times ensure that all account<strong>in</strong>g data <strong>and</strong> other <strong>in</strong>formation relat<strong>in</strong>g<br />

<strong>to</strong> the Jo<strong>in</strong>t Operations is available <strong>in</strong> such a form as <strong>to</strong> facilitate all required report<strong>in</strong>g <strong>to</strong><br />

governmental authorities, both for the Opera<strong>to</strong>r <strong>and</strong> for the Non-Opera<strong>to</strong>rs. Each Party shall<br />

receive a copy of all reports <strong>and</strong> <strong>in</strong>formation relat<strong>in</strong>g <strong>to</strong> the Jo<strong>in</strong>t Operations, which are<br />

forwarded <strong>to</strong> governmental authorities by the Opera<strong>to</strong>r.<br />

1.3 Change of Account<strong>in</strong>g Procedure<br />

If one (1) of the Parties is of the op<strong>in</strong>ion that a change <strong>in</strong> the Account<strong>in</strong>g Procedure is<br />

desirable <strong>to</strong> rectify an <strong>in</strong>equity, or for other reasons, it may forward a proposal for<br />

amendment of the Account<strong>in</strong>g Procedure <strong>to</strong> the Opera<strong>to</strong>r who will arrange for the matter <strong>to</strong><br />

be discussed at an Operat<strong>in</strong>g Committee meet<strong>in</strong>g, or at a meet<strong>in</strong>g of an appropriate sub-committee.<br />

The Account<strong>in</strong>g Procedure may be amended with the agreement of all the Parties,<br />

subject <strong>to</strong> the approval of the Danish Energy Agency.<br />

1.4 Currency<br />

The Jo<strong>in</strong>t Account shall be ma<strong>in</strong>ta<strong>in</strong>ed <strong>in</strong> Kroner. However, all Budgets, forecasts <strong>and</strong> reports<br />

will also present the ma<strong>in</strong> figures thereof <strong>in</strong> Dollars or the currency normally used by the<br />

Opera<strong>to</strong>r, provided the Operat<strong>in</strong>g Committee so approves. Translation of foreign currency<br />

transactions <strong>in</strong><strong>to</strong> Kroner shall be based on the rates published by the Danish National Bank<br />

<strong>and</strong> procedures approved by the Operat<strong>in</strong>g Committee.<br />

1.5 Def<strong>in</strong>itions<br />

In addition <strong>to</strong> the def<strong>in</strong>itions <strong>in</strong> the Agreement, the follow<strong>in</strong>g shall apply <strong>in</strong> this Account<strong>in</strong>g<br />

Procedure:<br />

(a) "Agreement" means the Jo<strong>in</strong>t Operat<strong>in</strong>g Agreement of which this Account<strong>in</strong>g<br />

Procedure forms part;


Licence ….. - Account<strong>in</strong>g Procedure<br />

(b) "Cash Call" means a request for payment of cash by the Opera<strong>to</strong>r <strong>to</strong> the Parties;<br />

2 - A<br />

(c) "Controllable Material" means the Material, which <strong>in</strong> the petroleum <strong>in</strong>dustry<br />

usually is subject <strong>to</strong> record, control <strong>and</strong> <strong>in</strong>ven<strong>to</strong>ry;<br />

(d) "Account<strong>in</strong>g Committee" means an account<strong>in</strong>g sub-committee established by the<br />

Operat<strong>in</strong>g Committee pursuant <strong>to</strong> the Agreement;<br />

(e) "Accruals" means record<strong>in</strong>g of charges <strong>and</strong> credits for work performed but not<br />

booked at the end of the account<strong>in</strong>g period, regardless of whether <strong>in</strong>voices or<br />

credits have been received.<br />

1.6 Disagreements<br />

In the event of a conflict between the Parties with respect <strong>to</strong> this Account<strong>in</strong>g Procedure, the<br />

Account<strong>in</strong>g Committee, if any, or the Operat<strong>in</strong>g Committee shall meet <strong>and</strong> <strong>in</strong> good faith<br />

attempt <strong>to</strong> settle the conflict with the <strong>in</strong>tent that no Party shall ga<strong>in</strong> or lose at the expense of<br />

the other Parties.<br />

1.7 Monetary Limits<br />

It is the <strong>in</strong>tent that the monetary limits set forth <strong>in</strong> various sections of the Account<strong>in</strong>g<br />

Procedure shall be reviewed <strong>and</strong> adjusted from time <strong>to</strong> time by agreement of all the Parties <strong>in</strong><br />

order <strong>to</strong> be <strong>in</strong> accordance with changes <strong>in</strong> prices <strong>and</strong> operat<strong>in</strong>g conditions.<br />

1.8 Sole Risk<br />

In the event that one (1) or more of the Parties engages <strong>in</strong> sole risk operations, then, <strong>to</strong> the<br />

extent appropriate, the Account<strong>in</strong>g Procedure will apply <strong>to</strong> such sole risk operations but<br />

separate accounts, books, bank accounts <strong>and</strong> other records shall be established <strong>and</strong><br />

ma<strong>in</strong>ta<strong>in</strong>ed for such sole risk operations <strong>in</strong> such a manner that the statements <strong>and</strong> bill<strong>in</strong>g<br />

relat<strong>in</strong>g <strong>to</strong> the Jo<strong>in</strong>t Account do not reflect the sole risk operations.<br />

1.9 Separate Account<strong>in</strong>g<br />

If it becomes appropriate <strong>to</strong> segregate Jo<strong>in</strong>t Account matters, whether for the purpose of<br />

"r<strong>in</strong>g-fence" tax treatment or otherwise, the Opera<strong>to</strong>r will ma<strong>in</strong>ta<strong>in</strong> books <strong>and</strong> records <strong>and</strong> act<br />

otherwise with respect <strong>to</strong> the Jo<strong>in</strong>t Operations <strong>in</strong> order <strong>to</strong> facilitate such segregation. If requests<br />

from other Parties for special records should cause a significant additional workload<br />

<strong>and</strong>/or costs, such costs should be borne by the request<strong>in</strong>g Party(ies).<br />

1.10 Adjustments<br />

All bill<strong>in</strong>g <strong>and</strong> statements presented by the Opera<strong>to</strong>r <strong>to</strong> the other Parties shall be presumed <strong>to</strong><br />

be true <strong>and</strong> correct until shown otherwise, <strong>and</strong> shall be paid as presented except for obvious<br />

errors. Such payment shall not prejudice the right of any Non-Opera<strong>to</strong>r <strong>to</strong> question the<br />

charges or credits accru<strong>in</strong>g <strong>to</strong> the Jo<strong>in</strong>t Account, <strong>and</strong> the Opera<strong>to</strong>r shall take immediate steps<br />

<strong>to</strong> clarify, expla<strong>in</strong> <strong>and</strong> adjust any queried charges or credits. Requests for corrections shall be<br />

made with<strong>in</strong> the time limit specified <strong>in</strong> Section 7.1.7.


Licence ….. - Account<strong>in</strong>g Procedure<br />

ARTICLE II: BUDGETS AND FORECASTS<br />

2.1 <strong>Exploration</strong> <strong>and</strong> Appraisal Budgets<br />

3 - A<br />

Each exploration <strong>and</strong> appraisal Budget prepared under the Agreement shall conta<strong>in</strong><br />

commitments <strong>and</strong> expenditures <strong>in</strong> accordance with normal practice <strong>in</strong> the petroleum <strong>in</strong>dustry<br />

<strong>and</strong> shall <strong>in</strong>clude;<br />

(a) an estimate of the <strong>to</strong>tal cost of the relevant Programme <strong>in</strong> Kroner <strong>and</strong> a<br />

sub-division of such <strong>to</strong>tal <strong>in</strong><strong>to</strong> each ma<strong>in</strong> classification of cost <strong>and</strong> with a reference<br />

<strong>to</strong> assumptions regard<strong>in</strong>g exchange rates, <strong>in</strong>flation etc.;<br />

(b) an estimate by Year of the amount of each currency <strong>in</strong> which such <strong>to</strong>tal cost is <strong>to</strong><br />

be paid, except for the first Budget Year, which will be stated separately for each<br />

Quarter of such Year;<br />

(c) a schedule of estimated Jo<strong>in</strong>t Account warehouse s<strong>to</strong>ck movement;<br />

(d) an estimate of the manpower requirements <strong>to</strong> carry out the relevant Programme;<br />

(e) an estimate of the tim<strong>in</strong>g <strong>and</strong> value of the commitments by Quarter (be<strong>in</strong>g<br />

contracts or other orders placed or goods purchased) <strong>to</strong> be made under the<br />

Budget, identify<strong>in</strong>g ma<strong>in</strong> components separately; <strong>and</strong><br />

(f) such other estimates relat<strong>in</strong>g <strong>to</strong> expenditures <strong>to</strong> be made dur<strong>in</strong>g the three (3) Years<br />

after the period covered by such Budget, as shall be requested by any Party; <strong>and</strong><br />

2.2 Development <strong>and</strong> Production Budgets<br />

Each development <strong>and</strong> production Budget prepared under the Operat<strong>in</strong>g Agreement shall<br />

conta<strong>in</strong> commitments <strong>and</strong> expenditures <strong>in</strong> accordance with normal practice <strong>in</strong> the petroleum<br />

<strong>in</strong>dustry <strong>and</strong> shall <strong>in</strong>clude;<br />

(a) an estimate of the <strong>to</strong>tal cost of the relevant Programme <strong>and</strong> operations <strong>in</strong> Kroner<br />

<strong>and</strong> a sub-division of such <strong>to</strong>tal <strong>in</strong><strong>to</strong> each ma<strong>in</strong> classification of cost <strong>and</strong> with a<br />

reference <strong>to</strong> assumptions regard<strong>in</strong>g exchange rates, <strong>in</strong>flation etc.;<br />

(b) an estimate by Year of the amount of each currency <strong>in</strong> which such <strong>to</strong>tal cost is <strong>to</strong><br />

be paid, except for the first com<strong>in</strong>g Budget Year, which will be stated separately<br />

for each Quarter of such Year;<br />

(c) a schedule of estimated Jo<strong>in</strong>t Account warehouse s<strong>to</strong>ck movement;<br />

(d) an estimate of the manpower requirements <strong>to</strong> carry out the relevant Programme;<br />

(e) an estimate by Year of the tim<strong>in</strong>g <strong>and</strong> value of the commitments <strong>to</strong> carry out the<br />

Programme for each ma<strong>in</strong> classification of cost; <strong>and</strong><br />

(f) an estimate of annual operat<strong>in</strong>g costs for the first five (5) Years of production.


Licence ….. - Account<strong>in</strong>g Procedure<br />

4 - A<br />

(g) cont<strong>in</strong>gencies for unknown price, scope or volume deviations <strong>in</strong> a development<br />

Budget shall appear as separate budget items.<br />

2.3 Budget Approval <strong>and</strong> Amendment<br />

2.3.1 Capital Budgets<br />

Approval of capital Budgets does not permit the Opera<strong>to</strong>r <strong>to</strong> enter <strong>in</strong><strong>to</strong> any commitments or<br />

<strong>in</strong>cur any expenditures for any item <strong>in</strong>cluded <strong>in</strong> said Budgets until an AFE is approved by the<br />

Operat<strong>in</strong>g Committee as provided <strong>in</strong> the Agreement <strong>and</strong> Section 7.2.4. here<strong>in</strong>.<br />

2.3.2 Adm<strong>in</strong>istrative <strong>and</strong> Operat<strong>in</strong>g Expense<br />

Approval of adm<strong>in</strong>istrative <strong>and</strong> operat<strong>in</strong>g expense Budgets permits the Opera<strong>to</strong>r without<br />

prior approval of the Parties <strong>to</strong> issue AFE's cover<strong>in</strong>g the full Year <strong>and</strong> <strong>to</strong> record such<br />

expenditures <strong>in</strong> the Jo<strong>in</strong>t Account, except for major exceptional operat<strong>in</strong>g expenditures (e.g.<br />

workover of wells) that shall require a separate approved AFE as stated <strong>in</strong> Section 2.3.1.<br />

above.


Licence ….. - Account<strong>in</strong>g Procedure<br />

ARTICLE III: JOINT ACCOUNT<br />

3.1 Charges<br />

5 - A<br />

Subject <strong>to</strong> the limitations here<strong>in</strong>after set forth, <strong>and</strong> <strong>to</strong> the other relevant provisions of the<br />

Agreement, the Opera<strong>to</strong>r shall, with proper documentation, charge the Jo<strong>in</strong>t Account with<br />

the follow<strong>in</strong>g items of expenditure <strong>in</strong> so far as the expenditure has been duly authorized <strong>and</strong><br />

relates <strong>to</strong> <strong>and</strong> is necessary for the conduct of the Jo<strong>in</strong>t Operations:<br />

3.1.1 Licence Fees<br />

Licence fees paid by the Opera<strong>to</strong>r on behalf of the Parties <strong>in</strong> connection with the Jo<strong>in</strong>t<br />

Operations.<br />

3.1.2 Damages <strong>and</strong> Losses<br />

All expenses <strong>in</strong>curred for the repair or replacement of damaged or lost Jo<strong>in</strong>t Property,<br />

provided that all <strong>in</strong>surance coverage shall be appropriately credited. The Opera<strong>to</strong>r shall<br />

separately <strong>and</strong> without delay <strong>in</strong>form the Non-Opera<strong>to</strong>rs <strong>in</strong> writ<strong>in</strong>g of any <strong>in</strong>cident <strong>in</strong>volv<strong>in</strong>g<br />

expenses estimated <strong>to</strong> be <strong>in</strong> excess of two hundred <strong>and</strong> fifty thous<strong>and</strong> Kroner (DKK<br />

250,000), with documentation as may be reasonably requested. Incidents <strong>in</strong>volv<strong>in</strong>g smaller<br />

amounts shall be reported on a monthly basis.<br />

3.1.3 Offices <strong>and</strong> Field Expenses<br />

The net cost of establish<strong>in</strong>g <strong>and</strong> operat<strong>in</strong>g offices, field offices, warehouses, shore bases <strong>and</strong><br />

other facilities used for the Jo<strong>in</strong>t Operations. If any such facilities serve more than the Jo<strong>in</strong>t<br />

Operations, the costs shall be allocated <strong>in</strong> an equitable manner as approved by the Operat<strong>in</strong>g<br />

Committee <strong>in</strong> the Budget. However, dur<strong>in</strong>g the exploration <strong>and</strong> appraisal period, office<br />

expenses may, with the agreement of all Parties, be charged <strong>to</strong> the Jo<strong>in</strong>t Account at a fixed<br />

rate as approved by the Operat<strong>in</strong>g Committee <strong>in</strong> the Budget.<br />

3.1.4 Insurance <strong>and</strong> Third Party Claims<br />

Premiums paid for <strong>in</strong>surance coverage obta<strong>in</strong>ed <strong>in</strong> accordance with the Operat<strong>in</strong>g Agreement,<br />

<strong>and</strong> expenditures <strong>in</strong>curred <strong>in</strong> settlement of claims from third parties.<br />

3.1.5 Legal Costs<br />

All legal costs <strong>and</strong> expenses aris<strong>in</strong>g from the h<strong>and</strong>l<strong>in</strong>g of claims <strong>and</strong> disputes <strong>in</strong> connection<br />

with the Jo<strong>in</strong>t Operations except those aris<strong>in</strong>g <strong>in</strong> connection with disputes among the Parties.<br />

All such costs <strong>and</strong> expenses shall be subject <strong>to</strong> the provisions conta<strong>in</strong>ed <strong>in</strong> Sections 3.13.2 <strong>and</strong><br />

3.13.3 of the Agreement.<br />

3.1.6 Material<br />

(a) Material purchased by the Opera<strong>to</strong>r from third parties for use <strong>in</strong> the Jo<strong>in</strong>t<br />

Operations shall be charged <strong>to</strong> the Jo<strong>in</strong>t Account at cost after deduct<strong>in</strong>g all trade<br />

<strong>and</strong> discounts received. Transport costs <strong>and</strong> h<strong>and</strong>l<strong>in</strong>g, <strong>in</strong>surance, duties <strong>and</strong> other<br />

related costs are also chargeable <strong>to</strong> the Jo<strong>in</strong>t Account.<br />

(b) Material transferred from the Opera<strong>to</strong>r or its Affiliates for use <strong>in</strong> the Jo<strong>in</strong>t<br />

Operations shall be charged <strong>to</strong> the Jo<strong>in</strong>t Account at a value determ<strong>in</strong>ed as follows:<br />

New Material - Condition "A"


Licence ….. - Account<strong>in</strong>g Procedure<br />

6 - A<br />

Material, which has not been used <strong>and</strong> is <strong>in</strong> a new condition shall be classified as<br />

Condition "A" <strong>and</strong> charged <strong>to</strong> the Jo<strong>in</strong>t Account at cost <strong>to</strong> the Opera<strong>to</strong>r, but not<br />

exceed<strong>in</strong>g the current market value.<br />

Used Material - Condition "B"<br />

Material which has been used, but is <strong>in</strong> sound <strong>and</strong> serviceable condition <strong>and</strong><br />

suitable <strong>to</strong> be reused without repair, shall be classified as Condition "B" <strong>and</strong><br />

charged <strong>to</strong> the Jo<strong>in</strong>t Account at seventy-five per cent (75%) of what its value<br />

would be if it were <strong>in</strong> Condition "A".<br />

Used Material - Condition "C"<br />

Material, which is suitable for use after recondition<strong>in</strong>g, shall be classified as<br />

Condition "C" <strong>and</strong> charged <strong>to</strong> the Jo<strong>in</strong>t Account at fifty per cent (50%) or less of<br />

what its value would be if it were <strong>in</strong> Condition "A". After recondition<strong>in</strong>g the<br />

Material will not exceed the Condition "B" value.<br />

Material - Condition "D"<br />

Material, which is obsolete or not usable for its orig<strong>in</strong>al purpose, shall be priced at<br />

a value commensurate with its use.<br />

(c) Accumulation of surplus s<strong>to</strong>cks of Material shall be avoided.<br />

(d) Material, which will be used partially or on a temporary basis, may be charged <strong>to</strong><br />

the Jo<strong>in</strong>t Account on terms <strong>and</strong> conditions <strong>to</strong> be agreed by the Operat<strong>in</strong>g<br />

Committee. Such charges shall never exceed market rates available through third<br />

parties for comparable Material.<br />

(e) The Opera<strong>to</strong>r shall promptly credit the Jo<strong>in</strong>t Account for Material returned <strong>to</strong> the<br />

Opera<strong>to</strong>r or with any adjustments received from a supplier or manufacturer.<br />

(f) The Opera<strong>to</strong>r shall be entitled <strong>to</strong> make a reasonable charge <strong>to</strong> cover f<strong>in</strong>anc<strong>in</strong>g <strong>and</strong><br />

s<strong>to</strong>rage cost of draw<strong>in</strong>g Material from the Opera<strong>to</strong>r's s<strong>to</strong>ck.<br />

The basis for such charge shall be reviewed annually <strong>and</strong> be subject <strong>to</strong> the prior<br />

approval of the Operat<strong>in</strong>g Committee.<br />

3.1.7 Number not used<br />

3.1.8 Personnel<br />

All costs for the Opera<strong>to</strong>r's personnel shall be computed <strong>and</strong> charged <strong>to</strong> the Jo<strong>in</strong>t Account on<br />

an equitable basis, primarily tak<strong>in</strong>g <strong>in</strong><strong>to</strong> consideration the percentage of the <strong>to</strong>tal cost of each<br />

such employee <strong>to</strong> the Opera<strong>to</strong>r that is equivalent <strong>to</strong> the percentage of such employee's entire<br />

work<strong>in</strong>g time, which is spent on the Jo<strong>in</strong>t Operations. For the avoidance of doubt, the <strong>to</strong>tal<br />

cost of such employees <strong>to</strong> the Opera<strong>to</strong>r shall take <strong>in</strong><strong>to</strong> consideration allowances <strong>and</strong> benefits,<br />

retirement benefits, relocation expenses <strong>and</strong> similar costs. The cost of personnel of other<br />

Parties or third parties who are work<strong>in</strong>g under the direct control of the Opera<strong>to</strong>r shall be<br />

charged <strong>to</strong> the Jo<strong>in</strong>t Account. Any travel <strong>and</strong> relocation expenses <strong>in</strong>curred by such personnel


Licence ….. - Account<strong>in</strong>g Procedure<br />

7 - A<br />

<strong>and</strong> required for the conduct of the Jo<strong>in</strong>t Operations shall also be charged <strong>to</strong> the Jo<strong>in</strong>t<br />

Account.<br />

If agreed by all Parties, the Opera<strong>to</strong>r may propose a fixed hourly rate <strong>to</strong> be charged for<br />

personnel of different categories (e.g. professional staff <strong>and</strong> support<strong>in</strong>g staff, etc.). The<br />

rates shall be based on the above pr<strong>in</strong>ciples <strong>and</strong> the rates shall be presented <strong>and</strong> approved<br />

<strong>in</strong> connection with the annual budget.<br />

3.1.9 Services<br />

The cost of consultants <strong>and</strong> other services <strong>and</strong> facilities provided by third parties (<strong>in</strong>clud<strong>in</strong>g<br />

Non-Opera<strong>to</strong>rs) for the Jo<strong>in</strong>t Operations, unless otherwise chargeable under this Account<strong>in</strong>g<br />

Procedure.<br />

The costs of services <strong>and</strong> facilities provided by the Opera<strong>to</strong>r or its Affiliates shall be charged<br />

<strong>to</strong> the Jo<strong>in</strong>t Account on an equitable basis, provided that such charges shall not exceed the<br />

rates for comparable services available <strong>to</strong> the Jo<strong>in</strong>t Operations from third parties <strong>and</strong> that the<br />

prior approval of the Operat<strong>in</strong>g Committee is necessary if the Opera<strong>to</strong>r or its Affiliates wish<br />

<strong>to</strong> provide services or facilities the charges of which will <strong>in</strong>dividually exceed two hundred <strong>and</strong><br />

fifty thous<strong>and</strong> Kroner (DKK 250,000).<br />

3.1.10 Taxes<br />

All taxes, duties <strong>and</strong> other governmental levies, which have been <strong>in</strong>curred <strong>and</strong> paid by the<br />

Opera<strong>to</strong>r on behalf of the Jo<strong>in</strong>t Operations, shall be charged <strong>to</strong> the Jo<strong>in</strong>t Account. For the<br />

avoidance of doubt, royalties <strong>and</strong> direct taxes imposed on the Parties are not chargeable <strong>to</strong><br />

the Jo<strong>in</strong>t Account.<br />

3.1.11 Transportation<br />

(a) Travel <strong>and</strong> relocation expenses, when these are required for the conduct of the<br />

Jo<strong>in</strong>t Operation. All charges <strong>to</strong> the Jo<strong>in</strong>t Account shall be <strong>in</strong> accordance with the<br />

Opera<strong>to</strong>r's normal practice, <strong>and</strong> <strong>in</strong>clude expenses for families <strong>and</strong> households,<br />

when appropriate. Relocation expenses at the term<strong>in</strong>ation of work for the Jo<strong>in</strong>t<br />

Operation will be based on a return <strong>to</strong> the home of record, except if the employee<br />

is relocated for the benefit of another operation, <strong>in</strong> which case the costs shall not be<br />

charged <strong>to</strong> the Jo<strong>in</strong>t Account.<br />

(b) All costs <strong>to</strong> transport <strong>and</strong> h<strong>and</strong>le Material for use <strong>in</strong> the Jo<strong>in</strong>t Operations, unless<br />

otherwise chargeable under this Account<strong>in</strong>g Procedure.<br />

3.1.12 Sole Risk<br />

No expenditures <strong>in</strong> connection with sole risk operations shall be charged <strong>to</strong> the Jo<strong>in</strong>t Account<br />

without the prior approval of all the Parties.<br />

3.1.13 Other Expenditures<br />

Any other expenditures not covered by the expenditures otherwise described <strong>in</strong> this<br />

Account<strong>in</strong>g Procedure which the Opera<strong>to</strong>r <strong>in</strong> accordance with the Agreement <strong>in</strong>curs <strong>and</strong><br />

which are necessary <strong>and</strong> proper for the Jo<strong>in</strong>t Operations.


Licence ….. - Account<strong>in</strong>g Procedure<br />

3.2 Credits<br />

The Opera<strong>to</strong>r shall credit <strong>to</strong> the Jo<strong>in</strong>t Account the follow<strong>in</strong>g:<br />

3.2.1 Disposals<br />

Any amounts received from the disposal of Material or other Jo<strong>in</strong>t Property.<br />

8 - A<br />

3.2.2 Interests <strong>and</strong> Miscellaneous<br />

Any amounts received as <strong>in</strong>terest or otherwise with respect <strong>to</strong> the Jo<strong>in</strong>t Property or<br />

accumulated <strong>in</strong> connection with the Jo<strong>in</strong>t Operations.<br />

3.2.3 Material <strong>and</strong> Property<br />

Any amounts received as a result of the return of Material or other property.<br />

3.2.4 Sole Risk<br />

Any amounts received from third parties or from Parties engaged <strong>in</strong> sole risk activities for<br />

services or for use of Jo<strong>in</strong>t Property.<br />

3.2.5 Insurance<br />

Any amounts received pursuant <strong>to</strong> <strong>in</strong>surance claims made by the Opera<strong>to</strong>r <strong>in</strong> respect of<br />

<strong>in</strong>surance carried for the benefit of all the Parties.<br />

3.2.6 Claims<br />

Any amounts received pursuant <strong>to</strong> claims made by the Opera<strong>to</strong>r on behalf of the Parties <strong>and</strong><br />

any other event giv<strong>in</strong>g rise <strong>to</strong> a receipt (<strong>in</strong>clud<strong>in</strong>g <strong>in</strong>terest) by the Opera<strong>to</strong>r on behalf of the<br />

Parties.<br />

3.2.7 Other<br />

Any other amounts of revenues or credits, which accrue <strong>in</strong> any manner <strong>in</strong> connection with the<br />

Jo<strong>in</strong>t Operations.


Licence ….. - Account<strong>in</strong>g Procedure<br />

ARTICLE IV: BOOKS AND RECORDS<br />

4.1 Account<strong>in</strong>g Records<br />

9 - A<br />

4.1.1 Account<strong>in</strong>g Codes<br />

The Opera<strong>to</strong>r shall, upon request, provide the Non-Opera<strong>to</strong>rs with a copy of any account<strong>in</strong>g<br />

codes it uses, or proposes <strong>to</strong> use, <strong>in</strong> connection with the Account<strong>in</strong>g Procedure.<br />

4.1.2 Jo<strong>in</strong>t Account<br />

The Jo<strong>in</strong>t Account shall be ma<strong>in</strong>ta<strong>in</strong>ed <strong>to</strong> reflect the current status of the Jo<strong>in</strong>t Operations, <strong>to</strong><br />

the extent that all major amounts for work carried out, but not yet paid, shall be <strong>in</strong>cluded <strong>and</strong><br />

identified <strong>in</strong> the accounts as Accruals <strong>in</strong> connection with month-end clos<strong>in</strong>gs. At the end of<br />

each Year all significant outst<strong>and</strong><strong>in</strong>g identifiable debits <strong>and</strong> credits shall be recorded as<br />

Accruals.<br />

4.1.3 Access<br />

The Non-Opera<strong>to</strong>rs shall with reasonable notice have free access <strong>to</strong> all books <strong>and</strong> records<br />

conta<strong>in</strong><strong>in</strong>g charges <strong>and</strong> credits <strong>to</strong> the Jo<strong>in</strong>t Account, <strong>in</strong>clud<strong>in</strong>g the support<strong>in</strong>g detail.<br />

4.1.4 Investment Records<br />

The Opera<strong>to</strong>r shall ma<strong>in</strong>ta<strong>in</strong> detailed records of the <strong>in</strong>vestments carried <strong>in</strong> the Jo<strong>in</strong>t Account<br />

<strong>in</strong> such a manner as <strong>to</strong> enable an effective reconciliation of a physical <strong>in</strong>ven<strong>to</strong>ry.<br />

4.1.5 Presence <strong>in</strong> <strong>Denmark</strong><br />

All books <strong>and</strong> records, <strong>in</strong>clud<strong>in</strong>g the support<strong>in</strong>g detail or true copies thereof relat<strong>in</strong>g <strong>to</strong> the<br />

Jo<strong>in</strong>t Account, shall be physically present <strong>in</strong> <strong>Denmark</strong>.<br />

4.1.6 AFE Reference<br />

Investments recorded <strong>in</strong> the Jo<strong>in</strong>t Account shall carry a reference number <strong>to</strong> the AFE(s) under<br />

which the expenditure has been approved.<br />

4.2 Bank Accounts<br />

The Opera<strong>to</strong>r shall establish separate bank accounts <strong>in</strong> Kroner <strong>and</strong> other currencies <strong>in</strong> which<br />

Cash Calls are made <strong>to</strong> cover transactions for the Jo<strong>in</strong>t Account. The Non-Opera<strong>to</strong>rs shall be<br />

notified of the banks, the account numbers <strong>and</strong> other relevant <strong>in</strong>formation. The bank accounts<br />

shall at all times be kept at the lowest possible level consistent with an effective operation.<br />

The Opera<strong>to</strong>r shall obta<strong>in</strong> the best available terms for <strong>in</strong>terest, <strong>and</strong> <strong>in</strong>terest earned shall<br />

promptly be credited <strong>to</strong> the Jo<strong>in</strong>t Account or distributed.<br />

4.3 Material Classification<br />

The Opera<strong>to</strong>r shall use the Material Classification Manual recommended by the Council of<br />

Petroleum Accountants Society of North America as the basic guidel<strong>in</strong>e for classification of<br />

jo<strong>in</strong>tly owned Material, unless another list<strong>in</strong>g is approved by the Operat<strong>in</strong>g Committee. The<br />

Opera<strong>to</strong>r shall also <strong>in</strong>clude such other Material <strong>in</strong> the Controllable Material category as is<br />

considered desirable for operational or f<strong>in</strong>ancial control purposes.


Licence ….. - Account<strong>in</strong>g Procedure<br />

4.4 Other Property<br />

10 - A<br />

Jo<strong>in</strong>tly owned property shall be marked <strong>in</strong> such a manner as <strong>to</strong> enable an effective<br />

reconciliation of a physical <strong>in</strong>ven<strong>to</strong>ry.<br />

4.5 Warehouse<br />

4.5.1 Mark<strong>in</strong>gs<br />

Materials shall be marked or s<strong>to</strong>red <strong>in</strong> such manner as <strong>to</strong> enable an effective reconciliation of<br />

a physical <strong>in</strong>ven<strong>to</strong>ry.<br />

4.5.2 Records<br />

The Opera<strong>to</strong>r shall ma<strong>in</strong>ta<strong>in</strong> detailed records of all Controllable Materials charged <strong>to</strong> <strong>and</strong>/or<br />

s<strong>to</strong>red <strong>in</strong> a warehouse for the Jo<strong>in</strong>t Operations. The records shall be segregated by category<br />

<strong>and</strong> <strong>in</strong>clude all Materials which are physically present <strong>in</strong> the warehouse.<br />

4.5.3 Major Material H<strong>and</strong>l<strong>in</strong>g Charges<br />

Transportation costs, cus<strong>to</strong>ms duties <strong>and</strong> other significant amounts shall be recorded as part<br />

of the Material cost.<br />

4.5.4 M<strong>in</strong>or Material H<strong>and</strong>l<strong>in</strong>g Charges<br />

Local <strong>and</strong> m<strong>in</strong>or transportation <strong>and</strong> h<strong>and</strong>l<strong>in</strong>g charges for Material, which are chargeable <strong>to</strong><br />

the warehouse s<strong>to</strong>ck account, may be accumulated <strong>in</strong> a separate warehouse sub-account<br />

conta<strong>in</strong><strong>in</strong>g h<strong>and</strong>l<strong>in</strong>g <strong>and</strong> transportation costs from vendor <strong>to</strong> warehouse. When Materials are<br />

issued from the warehouse s<strong>to</strong>ck <strong>to</strong> the Jo<strong>in</strong>t Operations, a proportionate share of the<br />

sub-account shall be charged <strong>to</strong> the Jo<strong>in</strong>t Operations <strong>in</strong> addition <strong>to</strong> the cost of the item, the<br />

basic pr<strong>in</strong>ciple be<strong>in</strong>g that when the warehouse s<strong>to</strong>ck has been exhausted, the balance <strong>in</strong> the<br />

transportation sub-account will also be nil.<br />

4.5.5 FORWARDING<br />

Transportation <strong>and</strong> h<strong>and</strong>l<strong>in</strong>g expenses from the warehouse <strong>to</strong> the operations - <strong>and</strong> return -<br />

shall be charged directly <strong>to</strong> the operation <strong>in</strong>volved.


Licence ….. - Account<strong>in</strong>g Procedure<br />

ARTICLE V: MATERIAL<br />

5.1 Disposals<br />

11 - A<br />

5.1.1 Surplus Materials<br />

The Opera<strong>to</strong>r shall make timely disposal of idle <strong>and</strong> surplus Material charged <strong>to</strong> the Jo<strong>in</strong>t<br />

Account.<br />

5.1.2 Notification <strong>to</strong> Non-Opera<strong>to</strong>rs<br />

For all items which have an orig<strong>in</strong>al value of two hundred <strong>and</strong> fifty thous<strong>and</strong> Kroner (DKK<br />

250,000) or more, the Non-Opera<strong>to</strong>rs shall be notified of the <strong>in</strong>tended disposal, the orig<strong>in</strong>al<br />

purchase price, current book value <strong>and</strong> an estimate of the price which can be obta<strong>in</strong>ed by sale<br />

<strong>to</strong> a third party.<br />

5.1.3 Bidd<strong>in</strong>g<br />

With<strong>in</strong> twenty (20) days of receiv<strong>in</strong>g such a notice, the Non-Opera<strong>to</strong>rs shall <strong>in</strong>form the<br />

Opera<strong>to</strong>r if they are <strong>in</strong>terested <strong>in</strong> purchas<strong>in</strong>g the item <strong>and</strong> at what price. Sales at prices below<br />

the estimated obta<strong>in</strong>able price shall be approved by the Operat<strong>in</strong>g Committee.<br />

5.1.4 Disposal<br />

If no Parties are <strong>in</strong>terested <strong>in</strong> mak<strong>in</strong>g a purchase, the Opera<strong>to</strong>r may proceed with the disposal,<br />

provided that all disposals of items hav<strong>in</strong>g an orig<strong>in</strong>al value <strong>in</strong> excess of two hundred <strong>and</strong> fifty<br />

thous<strong>and</strong> Kroner (DKK 250,000) shall be approved by the Operat<strong>in</strong>g Committee.<br />

5.1.5 Donations<br />

Non-Opera<strong>to</strong>rs shall be advised <strong>in</strong> advance of donations of all jo<strong>in</strong>tly owned Material.<br />

Donations with a <strong>to</strong>tal value <strong>in</strong> excess of ten thous<strong>and</strong> Kroner (DKK 10,000) require<br />

Operat<strong>in</strong>g Committee approval.<br />

5.1.6 Limitation of Disposals<br />

If disposal of Jo<strong>in</strong>t Property other than Material is required, the Operat<strong>in</strong>g Committee shall<br />

decide the terms <strong>and</strong> conditions of such disposal for all items hav<strong>in</strong>g an orig<strong>in</strong>al value of two<br />

hundred <strong>and</strong> fifty thous<strong>and</strong> Kroner (DKK 250,000) or more. Items with an orig<strong>in</strong>al value<br />

under two hundred <strong>and</strong> fifty thous<strong>and</strong> Kroner (DKK 250,000) may be disposed of with due<br />

regard <strong>to</strong> the Parties' <strong>in</strong>terests.<br />

5.1.7 Condition "D" Material<br />

Material classified as Condition "D" (as def<strong>in</strong>ed under Section 3.1.6.) may be disposed of as<br />

needed.<br />

5.2 Evaluation<br />

The Opera<strong>to</strong>r shall annually review the condition of the jo<strong>in</strong>tly owned Material <strong>and</strong> determ<strong>in</strong>e<br />

if a change <strong>in</strong> the value thereof is warranted. If so, the Opera<strong>to</strong>r shall make a proper charge <strong>to</strong><br />

the Jo<strong>in</strong>t Account reflect<strong>in</strong>g the change <strong>and</strong> <strong>in</strong>form the Non-Opera<strong>to</strong>rs of the action taken <strong>and</strong><br />

the reasons for the change <strong>in</strong> value. Write-offs <strong>in</strong> excess of two hundred <strong>and</strong> fifty thous<strong>and</strong><br />

Kroner (DKK 250,000) <strong>in</strong> <strong>to</strong>tal shall be approved by the Operat<strong>in</strong>g Committee.


Licence ….. - Account<strong>in</strong>g Procedure<br />

5.3 Purchases<br />

12 - A<br />

5.3.1 Warranty<br />

The Opera<strong>to</strong>r does not warrant the Material charged <strong>to</strong> the Jo<strong>in</strong>t Account beyond the<br />

guarantees received from the supplier or manufacturer, but shall promptly credit the Jo<strong>in</strong>t<br />

Account with any adjustment received by a supplier or manufacturer. Material transferred<br />

from the Opera<strong>to</strong>r, Non-Opera<strong>to</strong>rs or Affiliates which appears <strong>to</strong> be defective at the time it<br />

was transferred shall either promptly be repaired for the account of the transferr<strong>in</strong>g Party or<br />

returned for a full credit <strong>to</strong> the Jo<strong>in</strong>t Account.<br />

5.3.2 Charges <strong>to</strong> Jo<strong>in</strong>t Account<br />

Material purchased by the Opera<strong>to</strong>r shall be charged <strong>to</strong> the Jo<strong>in</strong>t Account as provided <strong>in</strong><br />

Section 3.1.6.<br />

5.4 Sales <strong>and</strong> Loans<br />

To the extent it can do so without any detrimental effect <strong>to</strong> the Jo<strong>in</strong>t Operations, the Opera<strong>to</strong>r<br />

may sell, rent or lend jo<strong>in</strong>tly owned Material <strong>to</strong> third parties. The Opera<strong>to</strong>r shall <strong>in</strong>form the<br />

Non-Opera<strong>to</strong>rs <strong>and</strong> seek their prior approval if any f<strong>in</strong>ancial or operational risk is <strong>in</strong>volved, or<br />

if the amount <strong>in</strong>volved is <strong>in</strong> excess of two hundred <strong>and</strong> fifty thous<strong>and</strong> Kroner (DKK 250,-<br />

000).


Licence ….. - Account<strong>in</strong>g Procedure<br />

ARTICLE VI: CASH CALL, BILLING AND REPORTING REQUIREMENTS<br />

13 - A<br />

6.1 Cash Calls <strong>and</strong> Advances<br />

Dur<strong>in</strong>g the pre-drill<strong>in</strong>g phase, cash calls may be issued <strong>and</strong> paid on a Quarterly basis, if all<br />

Parties so agree.<br />

6.1.1 Cash Call<br />

Not less than ten (10) days prior <strong>to</strong> the beg<strong>in</strong>n<strong>in</strong>g of any Month <strong>in</strong> respect of which the<br />

Opera<strong>to</strong>r requires funds, the Opera<strong>to</strong>r shall furnish the Parties with a Cash Call request<strong>in</strong>g an<br />

Advance or Advances for such Month. The amount requested <strong>in</strong> a Cash Call shall be the<br />

Opera<strong>to</strong>r's estimate of the amount required from the Parties <strong>to</strong> enable the Opera<strong>to</strong>r <strong>to</strong> defray<br />

the net cash payments, be<strong>in</strong>g cash payments less cash receipts, due <strong>in</strong> the relevant Month<br />

under obligations properly <strong>in</strong>curred by the Opera<strong>to</strong>r <strong>in</strong> connection with the Jo<strong>in</strong>t Operations.<br />

6.1.2 Specification<br />

Each Cash Call shall specify, <strong>in</strong> respect of each Advance, the amount of each currency<br />

required by major AFE <strong>and</strong>/or Budget category as requested by the Operat<strong>in</strong>g Committee,<br />

the bank account or accounts <strong>to</strong> which payment is <strong>to</strong> be made <strong>and</strong> the due date on which<br />

payment is required. The due date or dates on which payment of an Advance or Advances is<br />

or are required shall be the date or dates on which the Opera<strong>to</strong>r estimates that it will be<br />

mak<strong>in</strong>g a substantial amount of the net cash payments described here<strong>in</strong>. The amount<br />

requested <strong>in</strong> each such Advance shall be the Opera<strong>to</strong>r's estimate of the net cash payments <strong>to</strong><br />

be made on each such date <strong>to</strong>gether with any smaller sums which it estimates will be payable<br />

between the due date for payment of such Advance <strong>and</strong> the due date on which payment of the<br />

next Advance has been or will be required. Such estimate shall be based on the latest<br />

<strong>in</strong>formation available <strong>to</strong> the Opera<strong>to</strong>r at the time the Cash Call is made. If it becomes<br />

necessary <strong>to</strong> change the amount or the due date of any Advance, the Opera<strong>to</strong>r shall provide at<br />

least five (5) Work<strong>in</strong>g Days prior notice <strong>to</strong> the Parties.<br />

6.1.3 Currency<br />

Unless otherwise agreed by the Operat<strong>in</strong>g Committee, Cash Calls shall be made <strong>in</strong> Kroner or<br />

<strong>in</strong> a currency other than Kroner, but only <strong>to</strong> the extent that the expenditures are contractually<br />

required <strong>to</strong> be paid <strong>in</strong> such other currency.<br />

6.1.4 Payments<br />

Follow<strong>in</strong>g a Cash Call, each Party shall pay <strong>to</strong> the Opera<strong>to</strong>r for the Jo<strong>in</strong>t Account a share of<br />

each Advance <strong>in</strong> proportion <strong>to</strong> its Percentage Interest <strong>in</strong> sufficient time <strong>to</strong> be credited <strong>to</strong> the<br />

bank account on the due date specified <strong>in</strong> the Cash Call. If any Party fails <strong>to</strong> pay <strong>in</strong> full its<br />

share of any Advance by the due date, the default provisions of the Agreement shall apply.<br />

6.1.5 Limitations<br />

The Opera<strong>to</strong>r shall restrict the funds of the Parties held for the Jo<strong>in</strong>t Account <strong>to</strong> a level<br />

consistent with that required for the current conduct of the Jo<strong>in</strong>t Operations <strong>in</strong> accordance<br />

with Section 6.1.2. above.<br />

6.1.6 Interest<br />

Any <strong>in</strong>terest from the jo<strong>in</strong>t bank accounts received by the Opera<strong>to</strong>r shall be credited <strong>to</strong> the<br />

Jo<strong>in</strong>t Account each Month or promptly distributed.


Licence ….. - Account<strong>in</strong>g Procedure<br />

14 - A<br />

6.1.7 Forecast<br />

Each Cash Call forwarded by the Opera<strong>to</strong>r shall be accompanied by a forecast pursuant <strong>to</strong><br />

which the Opera<strong>to</strong>r specifies the details of the anticipated Cash Calls for the two (2) Months<br />

after the Month covered by the Cash Call.<br />

6.2 Bill<strong>in</strong>g Statement <strong>and</strong> Schedules<br />

Dur<strong>in</strong>g the pre-drill<strong>in</strong>g phase Statements <strong>and</strong> Schedules may be issued on a Quarterly basis, if<br />

all Parties so agree.<br />

6.2.1 Monthly Bill<strong>in</strong>g Statement<br />

The Opera<strong>to</strong>r shall send a report <strong>to</strong> the Parties with<strong>in</strong> twenty-five (25) days follow<strong>in</strong>g the end<br />

of each Month on all payments made <strong>and</strong> all receipts obta<strong>in</strong>ed by the Opera<strong>to</strong>r <strong>in</strong> connection<br />

with the Jo<strong>in</strong>t Operations dur<strong>in</strong>g such Month, <strong>in</strong> sufficient detail <strong>to</strong> form the basis for the<br />

annual tax return <strong>and</strong> other reports required by the Danish authorities.<br />

6.2.2 Classifications<br />

Such report shall be made on a bill<strong>in</strong>g statement which shall show the net <strong>to</strong>tal of all payments<br />

(less all receipts) relat<strong>in</strong>g <strong>to</strong> the Jo<strong>in</strong>t Account <strong>and</strong> each Party's Percentage Interest share<br />

thereof <strong>and</strong> shall be accompanied by bill<strong>in</strong>g schedules divid<strong>in</strong>g such payments <strong>and</strong> receipts<br />

<strong>in</strong><strong>to</strong> ma<strong>in</strong> classifications of expenditure <strong>in</strong>dicative of the nature thereof <strong>and</strong> <strong>in</strong> accordance with<br />

the approved Budgets. The bill<strong>in</strong>g schedules shall also show cumulative net <strong>to</strong>tals of all<br />

payments (less all receipts). In addition, any <strong>in</strong>terest received <strong>and</strong> any unusual payments <strong>and</strong><br />

receipts shall be <strong>in</strong>dicated separately.<br />

6.2.3 Currency<br />

All bill<strong>in</strong>g statements <strong>and</strong> schedules shall be <strong>in</strong> Kroner. All payments made <strong>and</strong> receipts<br />

obta<strong>in</strong>ed <strong>in</strong> currencies other than Kroner <strong>and</strong> the rates used for their translation <strong>to</strong> Kroner<br />

shall be identified <strong>in</strong> the bill<strong>in</strong>g schedules.<br />

6.3 Monthly Cash Reconciliation<br />

As at the end of each Month <strong>in</strong> which the Opera<strong>to</strong>r has received funds, the Opera<strong>to</strong>r shall<br />

make a separate reconciliation for each currency between:<br />

(a) the cumulative <strong>to</strong>tal of Advances received by the Opera<strong>to</strong>r from the Parties <strong>in</strong> such<br />

currency, <strong>and</strong><br />

(b) the cumulative <strong>to</strong>tal of cash payments, net of cash receipts other than <strong>in</strong>terest,<br />

made <strong>in</strong> such currency by the Opera<strong>to</strong>r as reflected <strong>in</strong> the bill<strong>in</strong>g statement for such<br />

Month.<br />

6.4 Cost Control Report<br />

6.4.1 Capital Expenditures<br />

The Opera<strong>to</strong>r shall, with<strong>in</strong> twenty-five (25) days follow<strong>in</strong>g the end of each Month, prepare<br />

<strong>and</strong> forward <strong>to</strong> the Non-Opera<strong>to</strong>rs a report (status of open AFEs) show<strong>in</strong>g a comparison<br />

between the approved AFE amount, the cost <strong>to</strong> date <strong>and</strong> the estimated f<strong>in</strong>al cost for the work<br />

covered by each AFE. In the case of a major project, the AFEs shall be grouped <strong>to</strong>gether <strong>and</strong><br />

be <strong>in</strong>cluded <strong>in</strong> the best estimate of the f<strong>in</strong>al cost for such project. The Opera<strong>to</strong>r shall make<br />

appropriate comments by budget break-down relat<strong>in</strong>g <strong>to</strong> the progress of the project <strong>in</strong>


Licence ….. - Account<strong>in</strong>g Procedure<br />

relation <strong>to</strong> the amount expended <strong>to</strong> date <strong>and</strong> the estimated f<strong>in</strong>al cost.<br />

15 - A<br />

6.4.2 Adm<strong>in</strong>istrative <strong>and</strong> Operat<strong>in</strong>g Expenditures<br />

The adm<strong>in</strong>istrative <strong>and</strong> operat<strong>in</strong>g expenditures shall, with<strong>in</strong> twenty-five (25) days follow<strong>in</strong>g<br />

the end of each Month, be reported compared <strong>to</strong> the annual Budget.<br />

6.5 Inven<strong>to</strong>ries<br />

6.5.1 Inven<strong>to</strong>ries<br />

A complete <strong>in</strong>ven<strong>to</strong>ry shall be taken at reasonable <strong>in</strong>tervals, <strong>and</strong> at least annually for<br />

warehouse s<strong>to</strong>ck, cover<strong>in</strong>g all Controllable Material charged <strong>to</strong> the Jo<strong>in</strong>t Account.<br />

6.5.2 Notice<br />

The Non-Opera<strong>to</strong>rs shall receive at least thirty (30) days' notice of the <strong>in</strong>tention <strong>to</strong> take an<br />

<strong>in</strong>ven<strong>to</strong>ry <strong>and</strong> shall have the right <strong>to</strong> be represented when the <strong>in</strong>ven<strong>to</strong>ry is taken. If the<br />

Opera<strong>to</strong>r is tak<strong>in</strong>g an <strong>in</strong>ven<strong>to</strong>ry on a cont<strong>in</strong>uous basis, the Non-Opera<strong>to</strong>rs shall be <strong>in</strong>formed of<br />

the schedule <strong>to</strong> enable them <strong>to</strong> be present if desired. Failure of a Non-Opera<strong>to</strong>r <strong>to</strong> be present<br />

after hav<strong>in</strong>g received such notice shall b<strong>in</strong>d such Non-Opera<strong>to</strong>r <strong>to</strong> accept the result of the<br />

<strong>in</strong>ven<strong>to</strong>ry.<br />

6.5.3 Surpluses, Shortages <strong>and</strong> Adjustments<br />

The Opera<strong>to</strong>r shall, with<strong>in</strong> sixty (60) days of the completion of an <strong>in</strong>ven<strong>to</strong>ry, furnish the<br />

Non-Opera<strong>to</strong>rs with copies of the <strong>in</strong>ven<strong>to</strong>ry, show<strong>in</strong>g surpluses, shortages <strong>and</strong> adjustments<br />

made, with the relevant explanations.<br />

6.5.4 Special Inven<strong>to</strong>ries<br />

Any Non-Opera<strong>to</strong>r may, with reasonable notice <strong>and</strong> at his own expense, require the Opera<strong>to</strong>r<br />

<strong>to</strong> take a special <strong>in</strong>ven<strong>to</strong>ry of the Material charged <strong>to</strong> the Jo<strong>in</strong>t Account, <strong>and</strong> shall have the<br />

right <strong>to</strong> be represented when the <strong>in</strong>ven<strong>to</strong>ry is taken.<br />

6.6 Production Report<br />

The Opera<strong>to</strong>r shall, with<strong>in</strong> twenty-five (25) days follow<strong>in</strong>g the end of each Month after the<br />

commencement of any production prepare <strong>and</strong> forward <strong>to</strong> the Non-Opera<strong>to</strong>rs a report<br />

conta<strong>in</strong><strong>in</strong>g at least the follow<strong>in</strong>g <strong>in</strong>formation by category:<br />

Open<strong>in</strong>g S<strong>to</strong>ck<br />

Production at Wellhead<br />

Consumption<br />

Re-<strong>in</strong>jection<br />

Flared Quantities<br />

Lift<strong>in</strong>gs<br />

Clos<strong>in</strong>g S<strong>to</strong>ck.<br />

With<strong>in</strong> five (5) Work<strong>in</strong>g Days after the end of a Month a provisional report shall be<br />

forwarded by telex or telefax.<br />

If required due <strong>to</strong> the type of operation, a reconciliation of the Parties' share of production<br />

shall be <strong>in</strong>cluded.


Licence ….. - Account<strong>in</strong>g Procedure<br />

ARTICLE VII: CONTROL PROCEDURES<br />

7.1 Audits<br />

16 - A<br />

7.1.1 Access<br />

All Non-Opera<strong>to</strong>rs shall at reasonable times dur<strong>in</strong>g normal bus<strong>in</strong>ess hours have free access <strong>to</strong><br />

all books, records, manuals, <strong>in</strong>ven<strong>to</strong>ries <strong>and</strong> property ma<strong>in</strong>ta<strong>in</strong>ed by the Opera<strong>to</strong>r <strong>and</strong> its<br />

Affiliates relat<strong>in</strong>g <strong>to</strong> the Jo<strong>in</strong>t Operations.<br />

7.1.2 Notice<br />

The Non-Opera<strong>to</strong>rs shall give at least thirty (30) days' notice of their <strong>in</strong>tention <strong>to</strong> conduct an<br />

audit <strong>and</strong> make every reasonable effort <strong>to</strong> conduct audits jo<strong>in</strong>tly or simultaneously <strong>in</strong> a<br />

manner, which will result <strong>in</strong> a m<strong>in</strong>imum of <strong>in</strong>convenience <strong>to</strong> the Opera<strong>to</strong>r. The Opera<strong>to</strong>r shall<br />

make all reasonable efforts <strong>to</strong> cooperate with any audit <strong>and</strong> will provide reasonable facilities<br />

<strong>and</strong> assistance therefor.<br />

7.1.3 Costs<br />

The cost of an audit by the Non-Opera<strong>to</strong>rs is not chargeable <strong>to</strong> the Jo<strong>in</strong>t Account, but a copy<br />

of the audit report shall be distributed <strong>to</strong> the Parties participat<strong>in</strong>g <strong>in</strong> the audit with<strong>in</strong> sixty (60)<br />

days of the completion of the audit.<br />

7.1.4 Report<br />

The audit report shall <strong>in</strong>clude all claims aris<strong>in</strong>g from the audit <strong>and</strong> comments relat<strong>in</strong>g <strong>to</strong> the<br />

settlement of outst<strong>and</strong><strong>in</strong>g matters, as well as comments <strong>to</strong> the accounts <strong>and</strong> records.<br />

7.1.5 Adjustments<br />

The Opera<strong>to</strong>r shall reply <strong>to</strong> the report <strong>in</strong> writ<strong>in</strong>g with<strong>in</strong> sixty (60) days <strong>and</strong> promptly record<br />

all adjustments, which have been agreed between the Opera<strong>to</strong>r <strong>and</strong> the Non-Opera<strong>to</strong>rs. If any<br />

such adjustment is <strong>in</strong> excess of one million Kroner (DKK 1,000,000) or equivalent <strong>in</strong> another<br />

currency <strong>in</strong> relation <strong>to</strong> a specific claim, consideration shall also be given <strong>to</strong> the ga<strong>in</strong> or loss of<br />

<strong>in</strong>terest which the Parties may have <strong>in</strong>curred dur<strong>in</strong>g such period that the Parties either have<br />

had the use of or were denied the use of the relevant funds. The computation of any such<br />

<strong>in</strong>terest shall be calculated on a day <strong>to</strong> day basis at the rate of one per cent (1%) above the<br />

Cost of Funds Rate.<br />

7.1.6 Disagreements<br />

Outst<strong>and</strong><strong>in</strong>g claims, which cannot be agreed upon, shall be referred <strong>to</strong> the Account<strong>in</strong>g<br />

Committee, if any, or the Operat<strong>in</strong>g Committee for settlement before go<strong>in</strong>g <strong>to</strong> arbitration.<br />

7.1.7 Time Limits<br />

The Parties' right <strong>to</strong> claim any adjustment shall cease twenty-four (24) Months after the end<br />

of each Year, unless a written request for such adjustment is given <strong>to</strong> the other Parties dur<strong>in</strong>g<br />

such twenty-four (24) Month period. Adjustments <strong>in</strong>volv<strong>in</strong>g or result<strong>in</strong>g from third party<br />

claims, physical <strong>in</strong>ven<strong>to</strong>ries or statu<strong>to</strong>ry requirements are exempt from the twenty-four (24)<br />

Month limitation. Non-Opera<strong>to</strong>rs shall have the right <strong>to</strong> further <strong>in</strong>vestigations <strong>in</strong> relation <strong>to</strong><br />

the outst<strong>and</strong><strong>in</strong>g matter until such matter has been settled.<br />

7.1.8 Proprietary <strong>and</strong> Confidential Information<br />

If an audit of the Opera<strong>to</strong>r <strong>and</strong> Affiliated Companies by the Non-Opera<strong>to</strong>rs <strong>in</strong>volves<br />

<strong>in</strong>formation, which is generally accepted as proprietary <strong>and</strong> confidential, the Opera<strong>to</strong>r may


Licence ….. - Account<strong>in</strong>g Procedure<br />

17 - A<br />

require that such audit is carried out by an external audi<strong>to</strong>r of <strong>in</strong>ternational st<strong>and</strong><strong>in</strong>g act<strong>in</strong>g<br />

under the <strong>in</strong>structions of the Non-Opera<strong>to</strong>rs. Such assistance will, however, be chargeable <strong>to</strong><br />

the Jo<strong>in</strong>t Account.<br />

7.1.9 Third Party Contract<br />

The Opera<strong>to</strong>r shall use his best efforts <strong>to</strong> obta<strong>in</strong> audit rights for the Non Opera<strong>to</strong>rs <strong>in</strong> all<br />

contracts where the Opera<strong>to</strong>r obta<strong>in</strong>s such rights for itself. Audits shall normally be<br />

carried out jo<strong>in</strong>tly <strong>and</strong> <strong>in</strong> any case arranged through the Opera<strong>to</strong>r.<br />

7.2 AFEs<br />

7.2.1 Request for AFE<br />

Before enter<strong>in</strong>g <strong>in</strong><strong>to</strong> a commitment, the Opera<strong>to</strong>r shall, with the exception of expenditures<br />

mentioned <strong>in</strong> Section 2.3.2., request the Parties <strong>to</strong> authorise an AFE at a time when the ma<strong>in</strong><br />

details of the relevant commitment or expenditure can be ascerta<strong>in</strong>ed, but consistent with<br />

giv<strong>in</strong>g the Parties sufficient time <strong>to</strong> consider the matter.<br />

7.2.2 Information<br />

Each AFE shall set forth the follow<strong>in</strong>g <strong>in</strong>formation:<br />

(a) a brief summary of the scope or work covered by the AFE,<br />

(b) an itemised breakdown of expenditures show<strong>in</strong>g separately base cost, <strong>and</strong><br />

allowance for cont<strong>in</strong>gencies,<br />

(c) the assumptions regard<strong>in</strong>g the <strong>in</strong>flation rate <strong>and</strong> exchange rates,<br />

(d) an estimate of phas<strong>in</strong>g of Cash Calls on a monthly basis,<br />

(e) an estimate of the amounts of any alternative currencies required,<br />

(f) the Opera<strong>to</strong>r's direct <strong>and</strong> <strong>in</strong>direct charges, <strong>and</strong><br />

(g) each Party's <strong>to</strong>tal share of expenditure.<br />

Necessary further details <strong>to</strong> support estimated costs will be <strong>in</strong>cluded as attachments <strong>to</strong> the<br />

AFE <strong>to</strong> the extent required by the Operat<strong>in</strong>g committee.<br />

7.2.3 Approval<br />

Any Party, which has voted <strong>in</strong> favour of an AFE, which has been approved by the Operat<strong>in</strong>g<br />

Committee, shall sign an AFE form <strong>in</strong>dicat<strong>in</strong>g its authorization thereof. Copies of the relevant<br />

AFEs show<strong>in</strong>g a sufficient number of authorizations by the Parties shall be promptly<br />

distributed <strong>to</strong> the Parties by the Opera<strong>to</strong>r.<br />

7.2.4 Deemed Approval (not applicable dur<strong>in</strong>g the pre-drill<strong>in</strong>g phase)<br />

If the Opera<strong>to</strong>r requests the Parties <strong>to</strong> authorise an AFE for a <strong>to</strong>tal expenditure not exceed<strong>in</strong>g<br />

one million Kroner (DKK 1,000,000), or such other amount as may be determ<strong>in</strong>ed by the<br />

Operat<strong>in</strong>g Committee, the AFE <strong>in</strong> question shall be deemed <strong>to</strong> be approved <strong>and</strong> shall be<br />

b<strong>in</strong>d<strong>in</strong>g upon the Parties unless with<strong>in</strong> fourteen (14) days after the Parties have received the<br />

AFE, an objection there<strong>to</strong> is made <strong>to</strong> the Opera<strong>to</strong>r by any Party. If an objection is made,


Licence ….. - Account<strong>in</strong>g Procedure<br />

approval shall take place <strong>in</strong> accordance with Section 7.2.3. above.<br />

18 - A<br />

7.2.5 Authority for the Opera<strong>to</strong>r<br />

Approval of an AFE by the Operat<strong>in</strong>g Committee constitutes authority for the Opera<strong>to</strong>r <strong>to</strong><br />

enter <strong>in</strong><strong>to</strong> any commitment or <strong>in</strong>cur any expenditure properly made <strong>in</strong> relation there<strong>to</strong><br />

whether or not payments <strong>in</strong> respect of such commitments <strong>and</strong> expenditures will result <strong>in</strong> the<br />

f<strong>in</strong>al cost of such commitments <strong>and</strong> expenditure exceed<strong>in</strong>g the <strong>to</strong>tal Budget amount or the<br />

AFE, provided that if at any time it becomes apparent that either,<br />

(a) commitments yet <strong>to</strong> be made will, or are likely <strong>to</strong>, cause the <strong>to</strong>tal annual Budget <strong>to</strong><br />

be exceeded by five per cent (5%), or<br />

(b) expenditures <strong>to</strong> be <strong>in</strong>curred under commitments already made will cause an<br />

<strong>in</strong>dividual Budget item or AFE <strong>to</strong> be exceeded by the lesser of ten per cent (10%)<br />

or one million Kroner (DKK 1,000,000) or that the cumulative <strong>to</strong>tal of such excess<br />

expenditures shall, or are likely <strong>to</strong>, exceed five per cent (5%) of the <strong>to</strong>tal annual<br />

Budget,<br />

the Opera<strong>to</strong>r shall immediately notify the Parties <strong>and</strong> shall without delay prepare a revised<br />

AFE <strong>and</strong> if necessary a revised Budget, giv<strong>in</strong>g the reasons for the <strong>in</strong>creased cost, <strong>and</strong> shall<br />

request approval of the revised AFE <strong>and</strong> Budget, <strong>and</strong> shall not enter <strong>in</strong><strong>to</strong> any new<br />

commitment <strong>in</strong> relation <strong>to</strong> the AFE until the revised AFE <strong>and</strong> Budget has been approved by<br />

the Operat<strong>in</strong>g Committee.<br />

7.3 Cost Control<br />

The Opera<strong>to</strong>r shall establish <strong>and</strong> ma<strong>in</strong>ta<strong>in</strong> an effective cost control system for the benefit of<br />

the Jo<strong>in</strong>t Operations. Such system shall <strong>in</strong>clude such controls as may be decided by the<br />

Operat<strong>in</strong>g Committee.


Unofficial translation. In case of discrepancy, the orig<strong>in</strong>al Danish text shall prevail.<br />

CONDITIONS REGARDING PRE-INVESTIGATIONS OFFSHORE<br />

I Coord<strong>in</strong>ation <strong>and</strong> Relation <strong>to</strong> Other Activities<br />

The licensee shall perform the <strong>in</strong>vestigations <strong>in</strong> a proper way so that activities<br />

performed by other licensees <strong>in</strong> pursuance of the Danish Subsoil Act, <strong>in</strong>clud<strong>in</strong>g other<br />

holders of pre-<strong>in</strong>vestigation permits, fish<strong>in</strong>g activities <strong>and</strong> other economic activities, are<br />

not unreasonably obstructed. In particular, it should be noted that <strong>in</strong>vestigations made <strong>in</strong><br />

areas comprised by sole licences <strong>in</strong> accordance with Sections 5 <strong>and</strong> 13 of the Danish<br />

Subsoil Act, shall be performed <strong>in</strong> consideration of these activities. In pursuance of the<br />

present permit, the licensee shall, when necessary, coord<strong>in</strong>ate the activities with the<br />

activities of other licensees. The Danish Energy Agency may order the licensee <strong>to</strong><br />

coord<strong>in</strong>ate the activities with the activities of other licensees.<br />

II Notification <strong>and</strong> Report<strong>in</strong>g<br />

A) Not later than 20 days before the commencement of each <strong>in</strong>vestigation,<br />

notification hereof shall be given <strong>to</strong>:<br />

Rev. 6 Oc<strong>to</strong>ber 2008<br />

Energistyrelsen<br />

(Danish Energy Agency)<br />

Amaliegade 44<br />

DK-1256 Copenhagen K<br />

The notification of the Danish Energy Authority shall <strong>in</strong>clude the <strong>in</strong>formation<br />

stated <strong>in</strong> Annex 1. The notification may be forwarded <strong>to</strong> the Danish Energy<br />

Agency by mail or by e-mail, ens@ens.dk.<br />

The Danish Energy Agency may grant exemptions from the 20 days' time limit.<br />

B) Dur<strong>in</strong>g the <strong>in</strong>vestigations, the licensee shall submit a weekly report by fax or email<br />

<strong>in</strong>clud<strong>in</strong>g the <strong>in</strong>formation given <strong>in</strong> Annex 2 - <strong>to</strong>:<br />

Energistyrelsen (Danish Energy Agency)<br />

Fax No. (+45) 33 11 32 62, e-mail: <strong>in</strong>dv<strong>in</strong>d<strong>in</strong>gsekr@ens.dk<br />

De Nationale Geologiske Undersøgelser for Danmark og Grønl<strong>and</strong><br />

(The Geological Survey of <strong>Denmark</strong> <strong>and</strong> Greenl<strong>and</strong>)<br />

Fax No. (+45) 38 14 20 50, e-mail: SubsurfaceA@geus.dk<br />

The first report is <strong>to</strong> be submitted 8 days after the commencement of the<br />

<strong>in</strong>vestigation. If a fisheries expert is on board, the report shall state the name of<br />

the expert, cf. V below.<br />

1


C) As the <strong>in</strong>vestigations are carried out <strong>and</strong> data become available, the data shall,<br />

free of charge, be sent <strong>to</strong> the Geological Survey of <strong>Denmark</strong> <strong>and</strong> Greenl<strong>and</strong> <strong>and</strong> <strong>to</strong><br />

the Danish Energy Agency accord<strong>in</strong>g <strong>to</strong> the rules stipulated <strong>in</strong> Executive Order<br />

No. 56 of February 4, 2002 on the Submission of Samples <strong>and</strong> Other Information<br />

about the Danish Subsoil.<br />

D) When the <strong>in</strong>vestigations are completed, the follow<strong>in</strong>g <strong>in</strong>formation is <strong>to</strong> be<br />

reported <strong>to</strong> the Danish Energy Agency:<br />

Rev. 6 Oc<strong>to</strong>ber 2008<br />

• For seismic <strong>in</strong>vestigations, start <strong>and</strong> completion dates of the acquisition period<br />

have <strong>to</strong> be stated <strong>to</strong>gether with the <strong>to</strong>tal amount of kilometres (2D)/square<br />

kilometres (3D) acquired. If the <strong>in</strong>vestigation period extends across the turn of<br />

the year, the kilometres/square kilometres acquired shall be reported for each<br />

year. If the <strong>in</strong>vestigation extends across an <strong>in</strong>ternational border, the <strong>to</strong>tal<br />

amount of kilometres/square kilometres acquired <strong>in</strong> each country shall be<br />

reported. For 3D <strong>in</strong>vestigations, also corner coord<strong>in</strong>ates of the <strong>in</strong>vestigation<br />

area shall be reported.<br />

• For other types of pre-<strong>in</strong>vestigations, similar <strong>in</strong>formation about the<br />

<strong>in</strong>vestigation period <strong>and</strong> amount of acquired data has <strong>to</strong> be reported.<br />

III Information on Sale <strong>and</strong> Exchange of Data<br />

On request the licensee shall provide the Danish Energy Agency with complete details<br />

of any sale or exchange of acquired data.<br />

IV Authority Representation<br />

Representatives of the Danish Energy Agency <strong>and</strong> the Geological Survey of <strong>Denmark</strong><br />

<strong>and</strong> Greenl<strong>and</strong> are entitled <strong>to</strong> be present dur<strong>in</strong>g all <strong>in</strong>vestigations made <strong>in</strong> pursuance of<br />

this permit.<br />

All travell<strong>in</strong>g, lodg<strong>in</strong>g <strong>and</strong> board<strong>in</strong>g expenses for the above representatives shall be paid<br />

by the licensee.<br />

V Coord<strong>in</strong>ation with Fish<strong>in</strong>g Activities<br />

If the licensee performs pre-<strong>in</strong>vestigations from a ship, the licensee shall:<br />

• contact Danmarks Fiskeriforen<strong>in</strong>g (Danish Fishermen’s Association), Nordensvej 3,<br />

Taulov, DK-7000 Fredericia, Phone (+45) 70 10 40 40, <strong>to</strong> discuss <strong>in</strong> detail the<br />

plann<strong>in</strong>g of the acquisition <strong>in</strong> order <strong>to</strong> m<strong>in</strong>imise any <strong>in</strong>terference with fish<strong>in</strong>g<br />

activities. If necessary, the Danish Fishermen’s Association may assist <strong>in</strong> appo<strong>in</strong>t<strong>in</strong>g<br />

a fisheries expert.<br />

• ensure that a fisheries expert is present on board the <strong>in</strong>vestigation vessel. The<br />

licensee shall pay all expenses. Fiskeridirek<strong>to</strong>ratet (Danish Direc<strong>to</strong>rate for<br />

Fisheries), Nyropsgade 30, DK-1780 Copenhagen V, Phone (+45) 72 18 56 00, has<br />

<strong>to</strong> approve the qualifications of the fisheries expert. However, it is not necessary <strong>to</strong><br />

2


<strong>in</strong>g a fisheries expert if the vessel only operates <strong>in</strong> a stationary position <strong>and</strong><br />

without <strong>to</strong>w<strong>in</strong>g equipment (geotechnical operations, etc.) or if the vessel solely<br />

operates with<strong>in</strong> the safety zone of 500 metres around a platform.<br />

• enter <strong>in</strong><strong>to</strong> an agreement with the fisheries expert regard<strong>in</strong>g work<strong>in</strong>g hours, salary,<br />

<strong>in</strong>surance, etc. While on board, the fisheries expert shall keep a log of his<br />

observations. Not later than 10 days after his return, the fisheries expert shall<br />

forward the log <strong>to</strong> the Danish Energy Agency as well as a copy <strong>to</strong> the licensee <strong>and</strong><br />

<strong>to</strong> the Danish Direc<strong>to</strong>rate for Fisheries.<br />

• forward <strong>in</strong>formation about the planned <strong>in</strong>vestigations <strong>to</strong> the journal “Fiskeri<br />

Tidende”, Nordensvej 3, Taulov, DK-7000 Fredericia, Phone: (+45) 76 10 96 63,<br />

Fax No.: (+45) 75 45 19 28, e-mail: tl@dkfisk.dk.<br />

VI Special Conditions<br />

If the <strong>in</strong>vestigations are performed <strong>in</strong> areas border<strong>in</strong>g the Polish Cont<strong>in</strong>ental Shelf or<br />

terri<strong>to</strong>rial waters, separate consent shall be obta<strong>in</strong>ed from the Danish Energy Agency<br />

prior <strong>to</strong> the start of the <strong>in</strong>vestigations. A request for such consent shall be submitted not<br />

later than 60 days before it is <strong>in</strong>tended <strong>to</strong> start the <strong>in</strong>vestigations.<br />

Rev. 6 Oc<strong>to</strong>ber 2008<br />

3


Information sheet, offshore, amended 7 Oc<strong>to</strong>ber 2008<br />

INFORMATION SHEET CONCERNING LICENCE TO PERFORM<br />

PRE-INVESTIGATIONS ON DANISH TERRITORY<br />

1. The licensee for whom the <strong>in</strong>vestigation is made:<br />

Name: _______________________________________________<br />

Address: _____________________________________________<br />

Telephone: _______________ Fax: _____________________<br />

2. Opera<strong>to</strong>r:<br />

Name: _______________________________________________<br />

Address: _____________________________________________<br />

Telephone: _______________ Fax: _____________________<br />

3. Contrac<strong>to</strong>r - if different from 2.:<br />

Contact person for Danish authorities:<br />

Name: _______________________________________________<br />

Address: _____________________________________________<br />

Telephone: _______________ Fax: _____________________<br />

1<br />

Annex 1


Information sheet, offshore, amended 7 Oc<strong>to</strong>ber 2008<br />

4. Survey vessel:<br />

Name: __________________ Nationality: _________________<br />

Length: _________________ Width: _____________________<br />

Draught: ________________ Tonnage: ___________________<br />

Length of seismic cable: _________________________________<br />

Capta<strong>in</strong>: ______________________________________________<br />

Size of crew: __________________________________________<br />

5. Party Manager<br />

Name: _______________________________________________<br />

Address: _____________________________________________<br />

Telephone: _______________ Fax: _____________________<br />

6. Contact person for Danish authorities/representative <strong>in</strong> <strong>Denmark</strong><br />

Name: _______________________________________________<br />

Address: _____________________________________________<br />

Telephone: _______________ Fax: _____________________<br />

7. Visits <strong>to</strong> Danish ports:<br />

Ports: ________________________________________________<br />

Time: ________________________________________________<br />

Purpose: ______________________________________________<br />

2


Information sheet, offshore, amended 7 Oc<strong>to</strong>ber 2008<br />

8. Investigation programme:<br />

Period: _______ Size: _____________ Km: _____________<br />

Position of area where the <strong>in</strong>vestigation is started: _____________<br />

_____________________________________________________<br />

The <strong>in</strong>vestigation area: ___________________________________<br />

_____________________________________________________<br />

Specification of the first week’s <strong>in</strong>vestigation programme: ______<br />

_____________________________________________________<br />

9. Investigation methods, <strong>in</strong>clud<strong>in</strong>g technical specifications of<br />

<strong>in</strong>strumentation, cable, energy source <strong>and</strong> process<strong>in</strong>g method:<br />

_____________________________________________________<br />

_____________________________________________________<br />

10. Estimated time schedule for the process<strong>in</strong>g of collected data:<br />

Implementation: ________________________________________<br />

Term<strong>in</strong>ation: __________________________________________<br />

Company name: ________________________________________<br />

Address: _____________________________________________<br />

Telephone: _______________ Fax: _____________________<br />

3


Information sheet, offshore, amended 7 Oc<strong>to</strong>ber 2008<br />

11. Information on the geological <strong>in</strong>terpretation of data:<br />

Time schedule: _________________________________________<br />

Company name: ________________________________________<br />

Address: _____________________________________________<br />

Telephone: _______________ Fax: _____________________<br />

12. Any alterations <strong>to</strong> the <strong>in</strong>formation stated shall be submitted <strong>in</strong> writ<strong>in</strong>g <strong>to</strong><br />

the Danish Energy Agency.<br />

4


GUIDELINES FOR<br />

DRILLING<br />

EXPLORATION<br />

1988<br />

(2009)


Danish Energy Agency 2<br />

<strong>Guide</strong>l<strong>in</strong>es for Drill<strong>in</strong>g – <strong>Exploration</strong><br />

Repr<strong>in</strong>t of the <strong>Guide</strong>l<strong>in</strong>es from September 1988, however,<br />

the names <strong>and</strong> addresses of authorities mentioned have<br />

been updated. As the guidel<strong>in</strong>es have otherwise not been<br />

updated for more years, the Danish Energy Agency should<br />

be consulted before us<strong>in</strong>g the drill<strong>in</strong>g guidel<strong>in</strong>es.<br />

Table of Content<br />

EXPLORATION AND APPRAISAL WELLS 3<br />

1. DRILLING PERMIT 4<br />

2. DRILLING PROGRAMME 5<br />

3. SITE AND SUBSOIL SURVEYS 10<br />

4. DRILLING EQUIPMENT AND SUPPLIES 11<br />

5. DRILLING ACTIVITIES 12<br />

6. SAFETY PRECAUTIONS AND DRILLS 15<br />

7. ABNORMAL FORMATION PRESSURE AND HYDROCARBON DETECTION 16<br />

8. TEST PRODUCTION 17<br />

9. EXPLOSIVES AND RADIOACTIVE MATERIALS 18<br />

10. CHANGES IN THE DRILLING PROGRAMME 19<br />

11. ABANDONMENT OF WELLS 20<br />

12. DAILY REPORTS 22<br />

13. DRILLER'S LOG 25<br />

14. FURTHER REPORTING, SUBMISSION AND STORING OF SAMPLES 26<br />

15. SAMPLING AND MEASUREMENTS 32<br />

MINISTRY OF CLIMATE AND ENERGY<br />

Danish Energy Agency<br />

44 Amaliegade<br />

DK- 1256 Copenhagen K<br />

<strong>Denmark</strong><br />

Telephone (+ 45) 33 92 67 00<br />

Facsimile (+ 45) 33 11 47 43


Danish Energy Agency 3<br />

<strong>Guide</strong>l<strong>in</strong>es for Drill<strong>in</strong>g – <strong>Exploration</strong><br />

UNOFFICIAL TRANSLATION<br />

EXPLORATION AND APPRAISAL WELLS<br />

These guidel<strong>in</strong>es apply <strong>to</strong> approval <strong>and</strong> supervision, which <strong>in</strong> consequence<br />

of the Danish subsoil Act have been delegated <strong>to</strong> the<br />

Danish Energy Agency. These guidel<strong>in</strong>es relate <strong>to</strong> exploration <strong>and</strong><br />

appraisal wells for hydrocarbons <strong>and</strong> other m<strong>in</strong>erals, offshore <strong>and</strong><br />

on l<strong>and</strong> as specified <strong>in</strong> Section I of the subsoil Act. However,<br />

some specifications have specific relevance for offshore wells or<br />

wells drilled <strong>to</strong> hydrocarbon targets, <strong>and</strong> may <strong>to</strong> a certa<strong>in</strong> degree<br />

be irrelevant for other purposes. Normally jack up platforms are<br />

used for Danish offshore drill<strong>in</strong>g operations. These guidel<strong>in</strong>es are<br />

therefore primarily adapted <strong>to</strong> jack up operations.<br />

For offshore drill<strong>in</strong>g operations approval <strong>and</strong> supervision for<br />

matters concern<strong>in</strong>g safety <strong>and</strong> health (also cover<strong>in</strong>g<br />

crew-regulations for the drill<strong>in</strong>g related personnel) are regulated<br />

through the Act on Certa<strong>in</strong> Mar<strong>in</strong>e Installations. For such matters<br />

only limited <strong>to</strong>pics are covered by these drill<strong>in</strong>g guidel<strong>in</strong>es.<br />

Reference is made <strong>to</strong> decrees No. 539 dated November 29, 1985<br />

<strong>and</strong> No. 656 dated December 30, 1985 concern<strong>in</strong>g st<strong>and</strong>-by boats<br />

<strong>and</strong> safety zones respectively. Adm<strong>in</strong>istration of these decrees is<br />

h<strong>and</strong>led by the Danish Energy Agency. For drill<strong>in</strong>g operations on<br />

l<strong>and</strong> other central <strong>and</strong> local authorities will have permitt<strong>in</strong>g <strong>and</strong><br />

supervis<strong>in</strong>g functions concern<strong>in</strong>g the various work operations.<br />

Furthermore attention should be given <strong>to</strong> rules about discharge of<br />

chemicals <strong>to</strong> the sea. Adm<strong>in</strong>istration of these rules is h<strong>and</strong>led by<br />

the Danish Environmental Protection Agency.<br />

It must be noted that specifications are given as guidance <strong>and</strong> that<br />

other means of achiev<strong>in</strong>g correspond<strong>in</strong>g conditions regard<strong>in</strong>g<br />

safety <strong>and</strong> <strong>in</strong>formation might be approved.


Danish Energy Agency 4<br />

<strong>Guide</strong>l<strong>in</strong>es for Drill<strong>in</strong>g – <strong>Exploration</strong><br />

1. Drill<strong>in</strong>g Permit<br />

Drill<strong>in</strong>g shall not commence until a drill<strong>in</strong>g permit has been<br />

granted by the Danish Energy Agency.<br />

1.1 Well <strong>in</strong> advance of the requested time for a drill<strong>in</strong>g permit, the<br />

Danish Energy Agency is <strong>to</strong> receive a detailed drill<strong>in</strong>g programme<br />

for the work <strong>in</strong> question <strong>and</strong> detailed documentation for the drill<strong>in</strong>g<br />

platform/rig <strong>to</strong> be used shall be presented. Furthermore, the Agency<br />

shall receive a drill<strong>in</strong>g application, <strong>in</strong>formation on the expected<br />

tim<strong>in</strong>g of the drill<strong>in</strong>g operations <strong>and</strong> economic outl<strong>in</strong>es for the<br />

planned operations.<br />

Information described above may be forwarded <strong>to</strong> the Danish<br />

Energy Agency as it becomes available. All essential parts of the<br />

<strong>in</strong>formation must be forwarded well <strong>in</strong> advance of the start of the<br />

operation.


Danish Energy Agency 5<br />

<strong>Guide</strong>l<strong>in</strong>es for Drill<strong>in</strong>g – <strong>Exploration</strong><br />

2. Drill<strong>in</strong>g Programme<br />

The drill<strong>in</strong>g programme shall (<strong>to</strong>gether with manuals) state<br />

unambiguously how the operations connected <strong>to</strong> the well are<br />

expected <strong>to</strong> be carried out. Parts of the <strong>in</strong>formation required<br />

concern<strong>in</strong>g the drill<strong>in</strong>g programme may be forwarded as separate<br />

appendices <strong>and</strong>, where relevant, reference may be made <strong>to</strong> other<br />

documentation material such as the opera<strong>to</strong>r's general operation<br />

manual, general safety regulations, general regulations for test<br />

production, etc. Material referred <strong>to</strong> must be available <strong>in</strong> the Danish<br />

Energy Agency.<br />

The drill<strong>in</strong>g programme must state whether hydrogen sulphide<br />

preparedness will be needed <strong>and</strong> if this is the case the programme<br />

must state how <strong>and</strong> when it will be established.<br />

6 copies of the drill<strong>in</strong>g programmes, (some <strong>in</strong>formation <strong>in</strong> fewer<br />

copies, e.g. detailed geological <strong>in</strong>formation <strong>in</strong> 4 copies, <strong>and</strong> site<br />

surveys <strong>in</strong> duplicate) shall be submitted at least 3 weeks before<br />

drill<strong>in</strong>g is scheduled <strong>to</strong> start. The programme shall conta<strong>in</strong> the<br />

follow<strong>in</strong>g:<br />

2.1 The well number <strong>in</strong> the Danish Energy Agency number<strong>in</strong>g system.<br />

2.2 The name of the well. Wells not named by the opera<strong>to</strong>r will be<br />

named by the Danish Energy Agency.<br />

2.3 Name of opera<strong>to</strong>r <strong>and</strong> <strong>in</strong>formation on the opera<strong>to</strong>r's organisation <strong>in</strong><br />

connection with the drill<strong>in</strong>g operations. (For offshore operations<br />

reference may be made <strong>to</strong> a separate mann<strong>in</strong>g-/organisation-plan).<br />

2.4 Well surface position <strong>and</strong> maximum <strong>to</strong>lerance on this position. The<br />

position shall be given <strong>in</strong> geographical <strong>and</strong> Universal Transverse<br />

Merca<strong>to</strong>r (UTM) co-ord<strong>in</strong>ates.<br />

2.5 Ownership <strong>and</strong> name of drill<strong>in</strong>g platform/rig. (This <strong>in</strong>formation<br />

may be submitted later, cf. section 1.1).<br />

2.6 Water depth/ground level elevation.<br />

2.7 Expected rotary kelly bush<strong>in</strong>g (RKB) elevation above reference<br />

level when platform/equipment is ready <strong>to</strong> start drill<strong>in</strong>g. For jack up<br />

platforms the elevation shall be measured from mean sea level<br />

(msl).<br />

2.8 Estimated <strong>to</strong>tal well depth, positions for targets <strong>and</strong> planned well<br />

trajec<strong>to</strong>ry.


Danish Energy Agency 6<br />

<strong>Guide</strong>l<strong>in</strong>es for Drill<strong>in</strong>g – <strong>Exploration</strong><br />

2.9 Depth <strong>to</strong> <strong>and</strong> description of the anticipated geological horizons <strong>and</strong><br />

eras.<br />

a) Stratigraphic column show<strong>in</strong>g <strong>and</strong> describ<strong>in</strong>g anticipated<br />

lithology, as well as stat<strong>in</strong>g the planned cas<strong>in</strong>g po<strong>in</strong>ts.<br />

b) Representative, <strong>in</strong>terpreted seismic sections near the planned<br />

well (normally 2 <strong>in</strong>tersect<strong>in</strong>g l<strong>in</strong>es).<br />

c) Depth <strong>and</strong> time structure maps show<strong>in</strong>g primary <strong>and</strong><br />

secondary prospects as well as time <strong>and</strong> possibly depth<br />

structure maps for other key horizons with a scale of not less<br />

than 1:25,000.<br />

d) The velocity functions used <strong>in</strong> the area.<br />

e) A prospect description of primary <strong>and</strong> secondary objectives.<br />

2.10 Programme for the position<strong>in</strong>g of cas<strong>in</strong>g.<br />

The programme shall conta<strong>in</strong>:<br />

a) Diameter of drilled hole.<br />

b) Cas<strong>in</strong>g dimension.<br />

c) Weight <strong>and</strong> quality of cas<strong>in</strong>g with reference <strong>to</strong> recognised<br />

st<strong>and</strong>ard.<br />

d) Planned sett<strong>in</strong>g depth for the cas<strong>in</strong>g.<br />

e) Strategy for center<strong>in</strong>g of cas<strong>in</strong>g, <strong>in</strong>clud<strong>in</strong>g type of exterior<br />

packers, where relevant.<br />

f) Programme for cement<strong>in</strong>g of cas<strong>in</strong>g, <strong>in</strong>clud<strong>in</strong>g type of<br />

cement, estimated height of cement beh<strong>in</strong>d the cas<strong>in</strong>g, <strong>and</strong><br />

strategy for calculations of necessary volumes of cement.<br />

g) Demonstration of the sufficiency of the cas<strong>in</strong>g str<strong>in</strong>g strength<br />

with regard <strong>to</strong> burst, collapse, <strong>and</strong> tension. Reference may be<br />

made <strong>to</strong> Company Procedure for cas<strong>in</strong>g design calculation,<br />

cf. beg<strong>in</strong>n<strong>in</strong>g of chapter 2. In this case the parameters used <strong>in</strong><br />

the design (pressure, cement<strong>in</strong>g height, mud density etc.)<br />

must be stated.<br />

h) Procedure <strong>and</strong> m<strong>in</strong>imum requirements for test<strong>in</strong>g the<br />

formation strength after drill<strong>in</strong>g out the <strong>in</strong>dividual cas<strong>in</strong>gs,<br />

<strong>in</strong>clud<strong>in</strong>g calculations demonstrat<strong>in</strong>g that the required<br />

formation strength is sufficient for drill<strong>in</strong>g <strong>to</strong> the next cas<strong>in</strong>g<br />

sett<strong>in</strong>g depth.


Danish Energy Agency 7<br />

<strong>Guide</strong>l<strong>in</strong>es for Drill<strong>in</strong>g – <strong>Exploration</strong><br />

i) Precautions <strong>to</strong> be taken if the required formation strength is<br />

not obta<strong>in</strong>ed.<br />

2.11 Drill<strong>in</strong>g fluid programme, conta<strong>in</strong><strong>in</strong>g the follow<strong>in</strong>g:<br />

a) A detailed description of the types of drill<strong>in</strong>g fluid <strong>to</strong> be used<br />

specify<strong>in</strong>g density, rheological properties etc.<br />

b) A detailed description of the components of the drill<strong>in</strong>g<br />

fluids. Reference may be made <strong>to</strong> relevant chemical data<br />

sheets.<br />

c) A detailed description of check equipment <strong>and</strong> procedures for<br />

the drill<strong>in</strong>g fluid or reference <strong>to</strong> relevant st<strong>and</strong>ard, which will<br />

be, followed (e.g. API RP 13B).<br />

d) Procedure for moni<strong>to</strong>r<strong>in</strong>g the drill<strong>in</strong>g fluid volume.<br />

e) A list of the quantities of safety related material (e.g. baryte<br />

<strong>and</strong> cement) <strong>to</strong> be s<strong>to</strong>red on the drill<strong>in</strong>g platform dur<strong>in</strong>g<br />

normal operations <strong>and</strong> an argumentation for these quantities<br />

(cf. section 5.8).<br />

2.12 Logg<strong>in</strong>g programme, conta<strong>in</strong><strong>in</strong>g <strong>in</strong>formation on types of logs <strong>to</strong> be<br />

run at various <strong>in</strong>tervals.<br />

2.13 Programme for tak<strong>in</strong>g geological samples, <strong>in</strong>clud<strong>in</strong>g a cor<strong>in</strong>g<br />

programme.<br />

2.14 Tentative programme for test production. F<strong>in</strong>al test programme<br />

shall when applicable be submitted <strong>and</strong> be approved separately (cf.<br />

Chapter 8).<br />

2.15 Description of method for <strong>and</strong> maximum vertical <strong>in</strong>terval between<br />

measur<strong>in</strong>g the well <strong>in</strong>cl<strong>in</strong>ation <strong>and</strong> direction.<br />

2.16 Blow-out preventers, etc. (cf. chapter 4 <strong>and</strong> 5).<br />

a) A list of the blow-out prevention equipment available<br />

onboard the drill<strong>in</strong>g platform, specify<strong>in</strong>g manufacturer, size,<br />

work<strong>in</strong>g pressure, <strong>and</strong> arrangement. Information regard<strong>in</strong>g<br />

the control system operat<strong>in</strong>g the blow-out preventer stack. A<br />

list of the blow-out prevention equipment available on the<br />

drill floor ready for mount<strong>in</strong>g on the drill pipe.<br />

b) Procedure for kick control, stat<strong>in</strong>g i.a., the data <strong>and</strong><br />

calculations which by rout<strong>in</strong>e are updated <strong>to</strong> ensure the<br />

necessary background for h<strong>and</strong>l<strong>in</strong>g emergency situations.<br />

Information on how blow-out preventers, measur<strong>in</strong>g<br />

equipment, drill<strong>in</strong>g fluid circulation <strong>and</strong> mix<strong>in</strong>g equipment<br />

are expected <strong>to</strong> be used under such conditions.


Danish Energy Agency 8<br />

<strong>Guide</strong>l<strong>in</strong>es for Drill<strong>in</strong>g – <strong>Exploration</strong><br />

c) Programme for drills <strong>in</strong> connection with equipment as mentioned<br />

<strong>in</strong> sections 2.16.a <strong>and</strong> 2.16.b.<br />

d) Programme for pressure test<strong>in</strong>g of blow-out preventers <strong>and</strong><br />

cas<strong>in</strong>g at different stages <strong>in</strong> the drill<strong>in</strong>g operations.<br />

(This <strong>in</strong>formation may be submitted separately, cf. section 1.1).<br />

2.17 Abnormal pressures.<br />

a) An evaluation of the possibilities of encounter<strong>in</strong>g<br />

overpressured zones with the well <strong>in</strong> question. This should be<br />

based on seismic data <strong>and</strong>/or experience from neighbour<strong>in</strong>g<br />

wells.<br />

b) A description of methods <strong>and</strong> procedures <strong>to</strong> be used for<br />

detect<strong>in</strong>g any overpressure <strong>in</strong> the well.<br />

2.18 An evaluation of the possibilities of encounter<strong>in</strong>g zones with<br />

poisonous gases with the well, <strong>in</strong>clud<strong>in</strong>g description of methods for<br />

detect<strong>in</strong>g <strong>and</strong> h<strong>and</strong>l<strong>in</strong>g of same.<br />

2.19 An evaluation of the possibilities of encounter<strong>in</strong>g gas pockets <strong>in</strong> the<br />

well <strong>in</strong> question based on seismic data <strong>and</strong> experience from neighbour<strong>in</strong>g<br />

wells, <strong>in</strong>clud<strong>in</strong>g the possibility of encounter<strong>in</strong>g shallow as<br />

well as deep gas pockets.<br />

2.20 A list of any other possible significant deviations from the<br />

geological/drill<strong>in</strong>g prognosis which may be encountered dur<strong>in</strong>g the<br />

drill<strong>in</strong>g of the well, (e.g. saltzones, swell<strong>in</strong>g clay, high pressured<br />

zones) <strong>and</strong> <strong>in</strong>formation on precautions planned <strong>in</strong> this connection.<br />

2.21 A summary sequence of all operations <strong>in</strong>clud<strong>in</strong>g an estimate of the<br />

time required for the different ma<strong>in</strong> operations (typical as a time<br />

versus depth curve i.e. drill<strong>in</strong>g curve). The summary shall give a<br />

general description of the operations, <strong>in</strong>clud<strong>in</strong>g <strong>in</strong>formation on any<br />

special safety related requirements (caused by e.g. possible gas<br />

pocket or abnormal pressure).<br />

2.22 Information regard<strong>in</strong>g function, name, address <strong>and</strong> nationality of<br />

the contrac<strong>to</strong>r companies <strong>to</strong> be employed for the well <strong>in</strong> question.<br />

Information about companies carry<strong>in</strong>g out less critical functions<br />

may be forwarded just before the start of the drill<strong>in</strong>g operation cf.<br />

section 1.1.<br />

2.23 Tentative programme for plugg<strong>in</strong>g the well <strong>and</strong> for re-establish<strong>in</strong>g<br />

the well site. This programme may be submitted at a later stage, cf.<br />

section 1.1 <strong>and</strong> chapter 11. F<strong>in</strong>al programme must be submitted for<br />

separate approval.


Danish Energy Agency 9<br />

<strong>Guide</strong>l<strong>in</strong>es for Drill<strong>in</strong>g – <strong>Exploration</strong><br />

2.24 Description of preparedness for h<strong>and</strong>l<strong>in</strong>g hydrogen sulphide <strong>and</strong><br />

other dangerous gases <strong>in</strong>clud<strong>in</strong>g <strong>in</strong>formation on equipment,<br />

supplies, tra<strong>in</strong><strong>in</strong>g <strong>and</strong> drills. Reference may be made <strong>to</strong> Company<br />

Safety Manual, cf. beg<strong>in</strong>n<strong>in</strong>g of chapter 2.<br />

2.25 Cont<strong>in</strong>gency plan for use <strong>in</strong> the event of major accidents or<br />

emergency situations regard<strong>in</strong>g safety as well as environment.<br />

Reference may be made <strong>to</strong> Company Safety/Pollution Manual, cf.<br />

beg<strong>in</strong>n<strong>in</strong>g of chapter 2.


Danish Energy Agency 10<br />

<strong>Guide</strong>l<strong>in</strong>es for Drill<strong>in</strong>g – <strong>Exploration</strong><br />

3. Site <strong>and</strong> Subsoil Surveys<br />

Site <strong>and</strong> subsoil surveys for the well site <strong>in</strong> question shall at least<br />

<strong>in</strong>clude the <strong>in</strong>formation listed below. Reports conta<strong>in</strong><strong>in</strong>g data from<br />

the surveys as well as <strong>in</strong>terpretations <strong>and</strong> evaluations shall be<br />

forwarded <strong>to</strong> the Danish Energy Agency <strong>and</strong> the Geological Survey<br />

of <strong>Denmark</strong> <strong>and</strong> Greenl<strong>and</strong>. When tak<strong>in</strong>g samples of material, a<br />

separate set of samples has <strong>to</strong> be taken <strong>and</strong> forwarded <strong>to</strong> the<br />

Geological Survey. Size <strong>and</strong> pack<strong>in</strong>g accord<strong>in</strong>g <strong>to</strong> agreement with<br />

the Geological Survey.<br />

3.1 Location surveys determ<strong>in</strong><strong>in</strong>g foundation <strong>and</strong> stability conditions<br />

shall be carried out before a drill<strong>in</strong>g permit can be given.<br />

3.2 While position<strong>in</strong>g <strong>and</strong> operat<strong>in</strong>g a drill<strong>in</strong>g platform foundation <strong>and</strong><br />

anchor stability shall be checked with relevant frequency.<br />

3.3 The exact position of any neighbour<strong>in</strong>g cables, pipel<strong>in</strong>es, wells etc.<br />

must be determ<strong>in</strong>ed.<br />

3.4 To the extent possible the subsoil from the sea-bed <strong>to</strong> levels deeper<br />

than the anticipated <strong>to</strong>tal depth of the well shall be exam<strong>in</strong>ed by up<strong>to</strong>-date<br />

- primarily seismic - methods. Data collection <strong>and</strong><br />

process<strong>in</strong>g are <strong>to</strong> be adapted <strong>to</strong> the various depth <strong>in</strong>tervals <strong>to</strong> obta<strong>in</strong><br />

optimal <strong>in</strong>formation about all <strong>in</strong>tervals.<br />

3.5 For the well location <strong>in</strong> question, an evaluation shall be made of all<br />

conditions on the sea-bed <strong>and</strong> <strong>in</strong> the subsoil which might be of importance<br />

for the safety of the planned drill<strong>in</strong>g operations or for the<br />

nearby <strong>in</strong>stallations.<br />

The evaluation shall as a m<strong>in</strong>imum comprise:<br />

a) Any limitations on position<strong>in</strong>g <strong>and</strong> anchor<strong>in</strong>g of drill<strong>in</strong>g<br />

platforms <strong>and</strong> auxiliary crafts <strong>to</strong> avoid damage <strong>to</strong> pipel<strong>in</strong>es,<br />

cables, etc. as well as unnecessary drill<strong>in</strong>g risks.<br />

b) The possible presence of objects which might affect the<br />

drill<strong>in</strong>g operation or the drill<strong>in</strong>g platform (boulders, wrecks,<br />

other wells, etc.).<br />

c) Possibility of penetrat<strong>in</strong>g gasbear<strong>in</strong>g zones.<br />

d) Possibility of penetrat<strong>in</strong>g particularly weak zones.<br />

e) Possibility of penetrat<strong>in</strong>g zones with abnormal pressures.


Danish Energy Agency 11<br />

<strong>Guide</strong>l<strong>in</strong>es for Drill<strong>in</strong>g – <strong>Exploration</strong><br />

4. Drill<strong>in</strong>g Equipment <strong>and</strong> Supplies<br />

4.1 Before a drill<strong>in</strong>g permit can be given, the Danish Energy Agency<br />

must have received general <strong>in</strong>formation as well as documentation<br />

<strong>and</strong> certificates for the drill<strong>in</strong>g platform/drill<strong>in</strong>g rig. The<br />

acceptability of the platform/rig for the specific operation/location<br />

must be documented.<br />

4.2 A "Chemical Manual" cover<strong>in</strong>g all dangerous substances used<br />

while operat<strong>in</strong>g shall be prepared. For offshore operations more<br />

detailed guidel<strong>in</strong>es are given by the Danish Energy Agency.


Danish Energy Agency 12<br />

<strong>Guide</strong>l<strong>in</strong>es for Drill<strong>in</strong>g – <strong>Exploration</strong><br />

5. Drill<strong>in</strong>g Activities<br />

5.1 Dur<strong>in</strong>g drill<strong>in</strong>g operations, all necessary steps shall be taken <strong>to</strong><br />

prevent explosion, blowouts, pollution, or other damage. Safety<br />

related equipment shall be <strong>in</strong>stalled as drill<strong>in</strong>g operations progress<br />

<strong>and</strong> shall comply with the follow<strong>in</strong>g requirements. Apart from<br />

possible drill<strong>in</strong>g when sett<strong>in</strong>g the conduc<strong>to</strong>r pipe, drill<strong>in</strong>g must not<br />

be carried out before blowout preventers/diverter system <strong>and</strong><br />

related equipment have been <strong>in</strong>stalled <strong>and</strong> tested.<br />

5.2 The well must be cased. The cas<strong>in</strong>g shoes shall - with due<br />

consideration of geological conditions - be set at depths sufficient<br />

<strong>to</strong> ensure complete control of the well at all times.<br />

a) Drive/conduc<strong>to</strong>r pipe (cas<strong>in</strong>g) shall be set at such a depth<br />

below seabed that unconsolidated formations are supported<br />

<strong>and</strong> a stable hole ensured for <strong>in</strong>itial drill<strong>in</strong>g operations.<br />

Prior <strong>to</strong> drill<strong>in</strong>g out from the drive/conduc<strong>to</strong>r cas<strong>in</strong>g, a<br />

diverter system shall be <strong>in</strong>stalled <strong>and</strong> tested operationally.<br />

b) Surface cas<strong>in</strong>g shall be <strong>in</strong>stalled <strong>in</strong> such a manner that a good<br />

anchorage of the blow-out preventer is secured. Surface<br />

cas<strong>in</strong>g shall be cemented <strong>to</strong> seabed or ground level. The<br />

cement shall be given sufficient time <strong>to</strong> set before further<br />

drill<strong>in</strong>g is carried out.<br />

A harden<strong>in</strong>g test for the cement used shall be carried out on<br />

the surface.<br />

Prior <strong>to</strong> drill<strong>in</strong>g out from surface cas<strong>in</strong>g, the blow-out<br />

preventer <strong>and</strong> the kill <strong>and</strong> choke systems shall be <strong>in</strong>stalled.<br />

These shall normally <strong>in</strong>clude at least one annular preventer<br />

<strong>and</strong> a system of ram preventers conta<strong>in</strong><strong>in</strong>g at least one set of<br />

pipe rams <strong>and</strong> one set of bl<strong>in</strong>d or shear type bl<strong>in</strong>d rams<br />

<strong>to</strong>gether with kill <strong>and</strong> choke l<strong>in</strong>es connected <strong>to</strong> the choke<br />

manifold. After the <strong>in</strong>stallation, all rams <strong>and</strong> connections<br />

shall be function <strong>and</strong> pressure tested <strong>to</strong> pressures approved by<br />

the Danish Energy Agency.<br />

c) Intermediate cas<strong>in</strong>g shall be <strong>in</strong>stalled <strong>and</strong> cemented <strong>in</strong> such a<br />

way that full control of the well is ma<strong>in</strong>ta<strong>in</strong>ed at all times.<br />

Intermediate cas<strong>in</strong>g shall be cemented at least 200 m <strong>in</strong><strong>to</strong> the<br />

previous cas<strong>in</strong>g but shall if relevant, for <strong>in</strong>stance as<br />

protection for ground water, be cemented right <strong>to</strong> the surface.<br />

The cement<strong>in</strong>g <strong>and</strong> center<strong>in</strong>g programmes shall endeavour <strong>to</strong><br />

secure that all zones conta<strong>in</strong><strong>in</strong>g hydrocarbons as well as all<br />

<strong>in</strong>tervals with abnormal pressures are isolated.


Danish Energy Agency 13<br />

<strong>Guide</strong>l<strong>in</strong>es for Drill<strong>in</strong>g – <strong>Exploration</strong><br />

Prior <strong>to</strong> drill<strong>in</strong>g out from <strong>in</strong>termediate <strong>and</strong> subsequent<br />

cas<strong>in</strong>gs, a complete blow-out preventer, <strong>and</strong> kill <strong>and</strong> choke<br />

systems shall be <strong>in</strong>stalled. Normally the blow-out preventer<br />

system shall <strong>in</strong>clude at least one annular preventer <strong>and</strong> a<br />

system of ram preventers conta<strong>in</strong><strong>in</strong>g at least 2 sets of pipe<br />

rams, l set of bl<strong>in</strong>d rams <strong>and</strong> 1 set of shear rams. The last two<br />

may be comb<strong>in</strong>ed <strong>in</strong> 1 set of shear type bl<strong>in</strong>d rams. After<br />

<strong>in</strong>stallation, all rams <strong>and</strong> connections shall be function <strong>and</strong><br />

pressure tested <strong>to</strong> pressures approved by the Danish Energy<br />

Agency.<br />

d) Production cas<strong>in</strong>g must be cemented as stipulated for the<br />

<strong>in</strong>termediate cas<strong>in</strong>g.<br />

e) A l<strong>in</strong>er must be cemented over its full length. When plac<strong>in</strong>g<br />

<strong>and</strong> cement<strong>in</strong>g the l<strong>in</strong>er, consideration shall be given <strong>to</strong> the<br />

best possible isolation of hydrocarbon bear<strong>in</strong>g <strong>and</strong>/or<br />

abnormally pressured zones.<br />

5.3 Normally cement bond log or temperature survey must be run when<br />

surface or <strong>in</strong>termediate cas<strong>in</strong>g have been cemented without good<br />

cement return <strong>to</strong> surface/sea-bed. The cementation of production<br />

cas<strong>in</strong>g <strong>and</strong> l<strong>in</strong>ers must be checked with cement bond logg<strong>in</strong>g.<br />

5.4 Cas<strong>in</strong>g str<strong>in</strong>gs shall be of such a diameter, weight <strong>and</strong> grade, as<br />

well as designed <strong>and</strong> <strong>in</strong>stalled <strong>in</strong> such a way that they can withst<strong>and</strong><br />

any mechanical <strong>and</strong> chemical <strong>in</strong>fluence which may be expected <strong>in</strong><br />

the well dur<strong>in</strong>g drill<strong>in</strong>g, test<strong>in</strong>g, <strong>and</strong> stimulation.<br />

5.5 After the cas<strong>in</strong>g str<strong>in</strong>gs have been <strong>in</strong>stalled <strong>and</strong> cemented they shall<br />

be pressure tested <strong>in</strong> accordance with the approved drill<strong>in</strong>g<br />

programme. For each cas<strong>in</strong>g the pressure test shall be adapted <strong>to</strong><br />

the <strong>in</strong>ternal pressure <strong>to</strong> which the cas<strong>in</strong>g may be exposed.<br />

5.6 The <strong>in</strong>stallation of used cas<strong>in</strong>gs is not permitted unless these have<br />

been adequately tested <strong>and</strong> <strong>in</strong>spected <strong>in</strong> advance by an <strong>in</strong>dependent<br />

<strong>in</strong>spection company <strong>and</strong> satisfac<strong>to</strong>ry strength of pipes <strong>and</strong> connections<br />

can be documented.<br />

5.7 Pressure test<strong>in</strong>g of the formation strength below the cas<strong>in</strong>g shoe<br />

shall be performed <strong>in</strong> accordance with the approved drill<strong>in</strong>g<br />

programme.<br />

5.8 It must be possible <strong>to</strong> h<strong>and</strong>le drill<strong>in</strong>g fluid loss or <strong>to</strong> <strong>in</strong>crease the<br />

fluid density without delay. Dur<strong>in</strong>g rout<strong>in</strong>e operations sufficient<br />

spare amounts of mud mix<strong>in</strong>g materials must therefore be s<strong>to</strong>cked<br />

on the platform/well site. Furthermore a sufficient s<strong>to</strong>ck of<br />

chemicals for h<strong>and</strong>l<strong>in</strong>g possible hydrogen sulphide must be<br />

available (if hydrogen sulphide can be expected, cf. beg<strong>in</strong>n<strong>in</strong>g of<br />

chapter 2).


Danish Energy Agency 14<br />

<strong>Guide</strong>l<strong>in</strong>es for Drill<strong>in</strong>g – <strong>Exploration</strong><br />

5.9 Before the drill str<strong>in</strong>g is pulled out of the hole the well shall be<br />

observed <strong>and</strong> found <strong>to</strong> be stable.<br />

Dur<strong>in</strong>g tripp<strong>in</strong>g the well shall be moni<strong>to</strong>red carefully for fluid<br />

loss/ga<strong>in</strong>.<br />

5.10 Dur<strong>in</strong>g drill<strong>in</strong>g, the drill<strong>in</strong>g fluid recondition<strong>in</strong>g equipment shall be<br />

used <strong>to</strong> the necessary extent <strong>to</strong> separate gas <strong>and</strong> cutt<strong>in</strong>gs from the<br />

fluid.<br />

5.11 The density of the drill<strong>in</strong>g fluid shall be tested regularly <strong>and</strong> at least<br />

every hour.<br />

5.12 Oilbased mud or mud conta<strong>in</strong><strong>in</strong>g chemicals which can be<br />

particularly detrimental <strong>to</strong> the health or environment, can only be<br />

utilised when approval is given by the Danish Energy Agency,<br />

(approval by other authorities may also be necessary).<br />

5.13 The disassembly or other ma<strong>in</strong>tenance of blow-out preventers may<br />

take place only when the well is secured aga<strong>in</strong>st blow-out by a<br />

m<strong>in</strong>imum of 2 <strong>in</strong>dependent <strong>and</strong> tested barriers, accepted by the<br />

Danish Energy Agency <strong>in</strong> general or specifically.<br />

5.14 Pressure or operational test<strong>in</strong>g of the blow-out preventers <strong>and</strong> the<br />

connected equipment shall be carried out regularly <strong>and</strong> after<br />

disassembly, as well as when drill<strong>in</strong>g operations or other conditions<br />

make it reasonable.<br />

5.15 The hydrostatic pressure <strong>in</strong> the well may only <strong>in</strong> connection with<br />

test<strong>in</strong>g be reduced <strong>to</strong> such a level that the formation fluid can flow<br />

<strong>to</strong> the borehole.<br />

5.16 Dur<strong>in</strong>g drill<strong>in</strong>g operations the Licensee is required at all times <strong>and</strong><br />

with necessary accuracy <strong>to</strong> keep track of the well trajec<strong>to</strong>ry.<br />

Measurements which determ<strong>in</strong>e <strong>in</strong>cl<strong>in</strong>ation <strong>and</strong> azimuth shall be<br />

taken at <strong>in</strong>tervals secur<strong>in</strong>g the necessary knowledge of the well<br />

course. For deviated wells the measurements shall be taken at<br />

<strong>in</strong>tervals not exceed<strong>in</strong>g 100 m, while bigger <strong>in</strong>tervals <strong>and</strong> possibly<br />

omission of azimuth determ<strong>in</strong>ation can be accepted <strong>in</strong> the case of<br />

almost vertical wells. Such measurements shall be carried out while<br />

drill<strong>in</strong>g below the surface cas<strong>in</strong>g or from another specified depth<br />

approved or required by the Danish Energy Agency.


Danish Energy Agency 15<br />

<strong>Guide</strong>l<strong>in</strong>es for Drill<strong>in</strong>g – <strong>Exploration</strong><br />

6. Safety Precautions <strong>and</strong> Drills<br />

6.1 Dur<strong>in</strong>g the operations there must be preparedness for h<strong>and</strong>l<strong>in</strong>g<br />

escape of poisonous gases (e.g. <strong>in</strong> case of a kick). This<br />

preparedness can be omitted <strong>in</strong> cases where it prior <strong>to</strong> the operation<br />

can be demonstrated that no hydrogen sulphide or other poisonous<br />

gases can be met <strong>in</strong> the well. If hydrogen sulphide or other<br />

poisonous gases are encountered all necessary safety precautions<br />

shall be taken <strong>to</strong> prevent accidents <strong>and</strong> the Danish Energy Agency<br />

shall be notified.<br />

6.2 At the end of each shift, the offgo<strong>in</strong>g crew shall -each with<strong>in</strong> his<br />

area of responsibility - <strong>in</strong>form the oncom<strong>in</strong>g crew of any defects<br />

that have been detected but not repaired. The offgo<strong>in</strong>g crew shall<br />

furthermore <strong>in</strong>form the <strong>in</strong>com<strong>in</strong>g crew about the work<strong>in</strong>g<br />

conditions <strong>and</strong> changes that have taken place. The <strong>in</strong>com<strong>in</strong>g crew<br />

shall make certa<strong>in</strong> that the equipment is <strong>in</strong> satisfac<strong>to</strong>ry condition.<br />

6.3 For each drill<strong>in</strong>g crew, pit level drills shall be carried out at least<br />

once a week.<br />

6.4 For each drill<strong>in</strong>g crew, weekly drills shall be carried out cover<strong>in</strong>g<br />

precautions <strong>to</strong> be taken <strong>in</strong> the event of kick.<br />

6.5 Tra<strong>in</strong><strong>in</strong>g <strong>and</strong> drills concern<strong>in</strong>g h<strong>and</strong>l<strong>in</strong>g of hydrogen sulphide shall<br />

be conducted <strong>to</strong> the degree relevant.<br />

6.6 Safety meet<strong>in</strong>gs <strong>and</strong> drills shall be recorded.<br />

6.7 Dur<strong>in</strong>g <strong>in</strong>spection, <strong>in</strong>spec<strong>to</strong>rs from the Danish Energy Agency may<br />

<strong>in</strong> consultation with the opera<strong>to</strong>r require drills as mentioned <strong>in</strong><br />

items 6.3, 6.4 <strong>and</strong> 6.5 <strong>to</strong> be conducted.


Danish Energy Agency 16<br />

<strong>Guide</strong>l<strong>in</strong>es for Drill<strong>in</strong>g – <strong>Exploration</strong><br />

7. Abnormal Formation Pressure <strong>and</strong> <strong>Hydrocarbon</strong> Detection<br />

7.1 Moni<strong>to</strong>r<strong>in</strong>g <strong>and</strong> registration of data for evaluation of formation <strong>and</strong><br />

pore pressures <strong>and</strong> for determ<strong>in</strong>ation of hydrocarbon content <strong>in</strong><br />

relation <strong>to</strong> the drill<strong>in</strong>g fluid density, drill<strong>in</strong>g rate, etc. shall be<br />

carried out from the drive/conduc<strong>to</strong>r pipe shoe <strong>and</strong> shall be<br />

cont<strong>in</strong>ued till the well has been plugged.<br />

7.2 Recognised measur<strong>in</strong>g methods, parameters, <strong>and</strong> calculation<br />

methods shall be used at all times <strong>in</strong> evaluation of the possibility of<br />

encounter<strong>in</strong>g abnormal pressures.


Danish Energy Agency 17<br />

<strong>Guide</strong>l<strong>in</strong>es for Drill<strong>in</strong>g – <strong>Exploration</strong><br />

8. Test Production<br />

8.1 Before test production of a well can be carried out all relevant logs<br />

shall be submitted <strong>to</strong> <strong>and</strong> the test programme be approved by the<br />

Danish Energy Agency.<br />

8.2 Test production, perforat<strong>in</strong>g, hydraulic fractur<strong>in</strong>g, acidiz<strong>in</strong>g or<br />

other chemical treatment of the well may only take place when<br />

special safety precautions, relevant for the operation, are observed.<br />

The above-mentioned operations shall normally be started <strong>and</strong><br />

preferably take place <strong>in</strong> daylight. Test production is not <strong>to</strong> take<br />

place when safety is adversely affected by weather <strong>and</strong> w<strong>in</strong>d<br />

conditions.<br />

Test production <strong>in</strong> open hole is normally not allowed if the packer<br />

is <strong>in</strong> direct contact with the formation.<br />

Test production shall be performed <strong>in</strong> such a way that the well is<br />

not damaged unnecessarily.<br />

Caution shall be exercised <strong>to</strong> prevent accidental escape of<br />

chemicals <strong>and</strong> hydrocarbons <strong>to</strong> the environment.<br />

8.3 Before start-up of test production, the drill<strong>in</strong>g platform/drill<strong>in</strong>g site<br />

shall be specially prepared for the operation:<br />

All necessary fire precautions shall be taken. The fire fight<strong>in</strong>g<br />

equipment shall be ready for immediate use.<br />

Valves, l<strong>in</strong>es, <strong>and</strong> vessels <strong>in</strong> the entire production system <strong>and</strong><br />

where relevant blow-out preventers shall be pressure <strong>and</strong> function<br />

tested.<br />

Where relevant st<strong>and</strong>-by vessels/nearby <strong>in</strong>habitants shall be alerted.<br />

Before the operation commences, all persons who are <strong>to</strong> participate<br />

<strong>in</strong> the test operation shall take part <strong>in</strong> a safety meet<strong>in</strong>g.<br />

8.4 Well perforation may be carried out by experienced personnel only.<br />

Extreme caution shall be exercised <strong>to</strong> prevent accidental fir<strong>in</strong>g.<br />

Perforation of a completed well shall take place under safety<br />

conditions correspond<strong>in</strong>g <strong>to</strong> daylight (e.g. illum<strong>in</strong>ation of<br />

equipment, mann<strong>in</strong>g <strong>and</strong> possibilities for safe evacuation).<br />

8.5 If radio transmitters or other equipment may constitute a hazard <strong>in</strong><br />

connection with the use of explosives, this equipment must not be<br />

used while such operations are <strong>in</strong> progress. Non drill<strong>in</strong>g related<br />

radio equipment, e.g. transmitters onboard vessels, helicopters <strong>and</strong><br />

radio stations, which are not at a safe distance from the drill<strong>in</strong>g site<br />

must be considered.<br />

8.6 The burners may be ignited by remote control systems only.


Danish Energy Agency 18<br />

<strong>Guide</strong>l<strong>in</strong>es for Drill<strong>in</strong>g – <strong>Exploration</strong><br />

9. Explosives <strong>and</strong> Radioactive Materials<br />

9.1 Explosive charges for the perforat<strong>in</strong>g guns shall be s<strong>to</strong>red <strong>in</strong><br />

properly earthed metal conta<strong>in</strong>ers. Explosives shall be s<strong>to</strong>red <strong>in</strong><br />

rooms specially approved for this purpose. De<strong>to</strong>na<strong>to</strong>rs, prima cord<br />

<strong>and</strong> perforation charges shall be s<strong>to</strong>red separately.<br />

Explosives shall be h<strong>and</strong>led by specially tra<strong>in</strong>ed personnel only.<br />

9.2 Radioactive materials shall be s<strong>to</strong>red <strong>in</strong> an approved way <strong>and</strong><br />

h<strong>and</strong>led by specially tra<strong>in</strong>ed personnel only.


Danish Energy Agency 19<br />

<strong>Guide</strong>l<strong>in</strong>es for Drill<strong>in</strong>g – <strong>Exploration</strong><br />

10. Changes <strong>in</strong> the Drill<strong>in</strong>g Programme<br />

10.1 Changes concern<strong>in</strong>g safety <strong>and</strong> other substantial changes relative <strong>to</strong><br />

the exist<strong>in</strong>g drill<strong>in</strong>g programme must not take place without prior<br />

consent from the Danish Energy Agency.<br />

10.2 In emergencies the drill<strong>in</strong>g programme may be altered without<br />

prior consent. In such cases, the Danish Energy Agency must be<br />

notified immediately of the alterations <strong>and</strong> the reason for them.


Danish Energy Agency 20<br />

<strong>Guide</strong>l<strong>in</strong>es for Drill<strong>in</strong>g – <strong>Exploration</strong><br />

11. Ab<strong>and</strong>onment of Wells<br />

Prior <strong>to</strong> the ab<strong>and</strong>onment of a well the hole must be plugged<br />

accord<strong>in</strong>g <strong>to</strong> procedure approved by the Danish Energy Agency.<br />

11.1 Normally, an exploration well shall be ab<strong>and</strong>oned permanently<br />

when drill<strong>in</strong>g operations as well as relevant logg<strong>in</strong>g <strong>and</strong> test<br />

production have been carried out. Under special circumstances the<br />

Danish Energy Agency may permit a well <strong>to</strong> be ab<strong>and</strong>oned<br />

temporarily without permanent plugg<strong>in</strong>g. To obta<strong>in</strong> such<br />

permission the Licensee must submit an application <strong>in</strong>dicat<strong>in</strong>g how<br />

<strong>and</strong> when the well is <strong>to</strong> be ab<strong>and</strong>oned permanently or operations<br />

will be resumed. Furthermore, the application must describe the<br />

responsibility <strong>and</strong> supervision situation dur<strong>in</strong>g the temporary<br />

ab<strong>and</strong>onment.<br />

11.2 Application for permission <strong>to</strong> s<strong>to</strong>p operations <strong>and</strong> <strong>to</strong> plug<br />

(permanently or temporarily) <strong>and</strong> ab<strong>and</strong>on a well, shall <strong>to</strong>gether<br />

with a copy of essential logs <strong>and</strong> other relevant documentation<br />

material, if any, be available <strong>to</strong> the Danish Energy Agency at least<br />

24 hours before estimated commencement of the actual<br />

ab<strong>and</strong>onment activities.<br />

In the application the Licensee shall give the reasons for the<br />

planned plugg<strong>in</strong>g <strong>and</strong> specify how the plugg<strong>in</strong>g will take place <strong>and</strong><br />

how the plugs will be checked. The well site condition after the<br />

ab<strong>and</strong>onment <strong>and</strong> procedures for verification of this must<br />

furthermore be stated.<br />

11.3 In cases where the well is uncased opposite permeable zones,<br />

plugg<strong>in</strong>g shall be carried out so that there can be no flow of fluid<br />

through the hole (normally by cement<strong>in</strong>g at least 50 m below <strong>and</strong><br />

above the <strong>in</strong>dividual zones).<br />

11.4 Where there is an open hole below the deepest cas<strong>in</strong>g, a cement<br />

plug shall be placed <strong>in</strong> such a manner that it extends at least 50 m<br />

above <strong>and</strong> below the cas<strong>in</strong>g shoe.<br />

The <strong>to</strong>p of the cement plug shall be located by load test<strong>in</strong>g. Where<br />

the condition of the formation makes cement<strong>in</strong>g difficult, a<br />

mechanical plug may be positioned <strong>in</strong> the cas<strong>in</strong>g, with<strong>in</strong> 50 m from<br />

the shoe as an alternative <strong>to</strong> the cement plug below the shoe. In<br />

addition, a cement plug, at least 50 m long shall be placed on <strong>to</strong>p of<br />

this plug.<br />

The performed plugg<strong>in</strong>g of the open hole section shall be pressure<br />

tested for sufficient time <strong>and</strong> with enough differential pressure <strong>to</strong><br />

detect a possible leak or mechanical failure of the plug.


Danish Energy Agency 21<br />

<strong>Guide</strong>l<strong>in</strong>es for Drill<strong>in</strong>g – <strong>Exploration</strong><br />

11.5 Perforated zones must be plugged with cement so that no fluid flow<br />

<strong>to</strong> or from the well is possible. Where possible perforated <strong>in</strong>tervals<br />

shall be isolated with cement plugs through the <strong>in</strong>dividual<br />

perforated zones <strong>and</strong> with 50 m long cement plugs below the<br />

lowermost perforation <strong>and</strong> above the uppermost perforation.<br />

Alternatively the perforated zones can be isolated by a comb<strong>in</strong>ation<br />

of a mechanical plug squeeze cement<strong>in</strong>g of the perforations <strong>and</strong><br />

cement plugg<strong>in</strong>g above the mechanical plug.<br />

11.6 If a l<strong>in</strong>er has been used, a cement plug shall be placed <strong>in</strong> such a<br />

manner that the plug extends 50 m above <strong>and</strong> below the po<strong>in</strong>t of<br />

suspension. Alternatively a mechanical plug followed by a 50 m<br />

long cement plug can be set just above the l<strong>in</strong>er hanger. The <strong>to</strong>p of<br />

the plug shall be located by load test<strong>in</strong>g <strong>and</strong> the plug shall be<br />

pressure tested as specified <strong>in</strong> item 11.4.<br />

11.7 In the <strong>in</strong>nermost cas<strong>in</strong>g a cement plug must be placed from the shoe<br />

depth of the previous cas<strong>in</strong>g <strong>and</strong> 100 m up.<br />

11.8 It must be ensured that no communication from down hole<br />

formation <strong>to</strong> the sea-bed/surface via any cas<strong>in</strong>g annulus is possible.<br />

11.9 A cement plug, at least 100 m long, shall be placed near the<br />

surface.<br />

11.10 The <strong>to</strong>tal weight of the cement plugs <strong>in</strong> the well <strong>and</strong> the weight of<br />

the fluid between the plugs shall ensure that as a m<strong>in</strong>imum the<br />

system is <strong>in</strong> balance with any pressure which may develop <strong>in</strong> the<br />

borehole.<br />

11.11 When a well is ab<strong>and</strong>oned the orig<strong>in</strong>al state of the well site shall be<br />

re-established. Where reasonable departure from this requirement<br />

may be approved by the Danish Energy Agency (approval by other<br />

authorities may also be necessary).<br />

When ab<strong>and</strong>on<strong>in</strong>g a well, the condition of the well site shall be<br />

verified. Obta<strong>in</strong>ed documentation shall be submitted <strong>to</strong> the Danish<br />

Energy Agency.


Danish Energy Agency 22<br />

<strong>Guide</strong>l<strong>in</strong>es for Drill<strong>in</strong>g – <strong>Exploration</strong><br />

12. Daily Reports<br />

From the time when the drill<strong>in</strong>g platform (drill<strong>in</strong>g equipment)<br />

arrives at the well site <strong>and</strong> until the well site is left aga<strong>in</strong>, the<br />

Danish Energy Agency shall daily, before 11:00 a.m., by telex or<br />

other acceptable means, receive reports on operations <strong>and</strong> results<br />

dur<strong>in</strong>g the last 24 hours. The reports shall at least cover the<br />

activities till 06:00 a.m. on the report<strong>in</strong>g day. The Danish Energy<br />

Agency may establish special rules for report<strong>in</strong>g dur<strong>in</strong>g weekends<br />

<strong>and</strong> holidays. Technical <strong>and</strong> geological <strong>in</strong>formation conta<strong>in</strong>ed <strong>in</strong><br />

the daily reports <strong>to</strong> the Danish Energy Agency must also be<br />

submitted <strong>to</strong> the Geological Survey of <strong>Denmark</strong> <strong>and</strong> Greenl<strong>and</strong>.<br />

The Danish Energy Agency may set up more detailed rules for the<br />

presentation of the reports. The report<strong>in</strong>g must at least conta<strong>in</strong> the<br />

follow<strong>in</strong>g <strong>in</strong>formation:<br />

12.1 Report<strong>in</strong>g date.<br />

12.2 The number <strong>and</strong> name of the well.<br />

12.3 Drill<strong>in</strong>g platform/drill<strong>in</strong>g rig.<br />

12.4 Opera<strong>to</strong>r<br />

12.5 Total days on the drill<strong>in</strong>g site.<br />

12.6 Present operation.<br />

12.7 Present well depth.<br />

12.8 Progress dur<strong>in</strong>g the last 24 hours.<br />

12.9 Detailed description of operations dur<strong>in</strong>g the last 24 hours,<br />

cover<strong>in</strong>g essential results as well as a description of operational<br />

problems.<br />

When relevant, at least the follow<strong>in</strong>g shall be covered:<br />

a) Significant (down hole) loss or ga<strong>in</strong> <strong>in</strong> drill<strong>in</strong>g fluid system.<br />

b) Problems with well stability.<br />

c) Problems <strong>in</strong> controll<strong>in</strong>g or moni<strong>to</strong>r<strong>in</strong>g well direction.<br />

d) Substantial deviation from the anticipated geological<br />

conditions.<br />

e) Substantial deviation from anticipated formation pressures.


Danish Energy Agency 23<br />

<strong>Guide</strong>l<strong>in</strong>es for Drill<strong>in</strong>g – <strong>Exploration</strong><br />

f) Cas<strong>in</strong>g operations, <strong>in</strong>clud<strong>in</strong>g cas<strong>in</strong>g data (diameter, weight<br />

<strong>and</strong> type, as well as sett<strong>in</strong>g depth), cement<strong>in</strong>g data (density,<br />

volume, expected <strong>to</strong>p) <strong>and</strong> outl<strong>in</strong>e of the cement<strong>in</strong>g<br />

operations (circulation rate, pressure development, ga<strong>in</strong> or<br />

loss of fluids as well as other <strong>in</strong>dications, if any, of good or<br />

bad cement<strong>in</strong>g quality).<br />

g) Pressure tests of both equipment <strong>and</strong> formation.<br />

h) Logg<strong>in</strong>g, <strong>in</strong>dicat<strong>in</strong>g <strong>in</strong>tervals logged <strong>and</strong> problems, if any.<br />

i) Test production, list<strong>in</strong>g pr<strong>in</strong>cipal results from the test<strong>in</strong>g,<br />

<strong>in</strong>clud<strong>in</strong>g the development of fluid <strong>and</strong> gas production as well<br />

as of pressures <strong>and</strong> temperatures. Furthermore pr<strong>in</strong>cipal data<br />

for produced fluids (e.g. densities, gas composition <strong>and</strong> for<br />

produced water <strong>in</strong>formation on tracer concentrations, salt<br />

content <strong>and</strong> resistivity) must be given.<br />

j) Performed plugg<strong>in</strong>g operations, <strong>in</strong>clud<strong>in</strong>g results from test<strong>in</strong>g<br />

of the plugs.<br />

k) Performed perforation, stat<strong>in</strong>g <strong>in</strong>tervals perforated,<br />

perforation density <strong>and</strong> type.<br />

l) Performed hydraulic <strong>and</strong> chemical treatment of formation,<br />

<strong>in</strong>clud<strong>in</strong>g pr<strong>in</strong>cipal <strong>in</strong>formation on the operations carried out.<br />

12.10 Pr<strong>in</strong>cipal data for the drill<strong>in</strong>g fluid, <strong>in</strong>clud<strong>in</strong>g density <strong>and</strong><br />

temperature <strong>in</strong> <strong>and</strong> out of the borehole, viscosity, water loss, pH, oil<br />

content, tracer concentration, <strong>and</strong> other ma<strong>in</strong> components.<br />

12.11 The gas content of the drill<strong>in</strong>g fluid out of the borehole dur<strong>in</strong>g<br />

drill<strong>in</strong>g, connection <strong>and</strong> trip, <strong>in</strong>dicat<strong>in</strong>g <strong>to</strong>tal gas <strong>and</strong> gas<br />

components <strong>in</strong>clud<strong>in</strong>g at least C1 <strong>to</strong> C4 <strong>and</strong> hydrogen sulphide.<br />

Furthermore similar <strong>in</strong>formation on background gas for circulated<br />

drill<strong>in</strong>g fluid must be given.<br />

12.12 Bit diameter <strong>and</strong> type.<br />

12.13 Description of drill str<strong>in</strong>g assembly.<br />

12.14 Latest cas<strong>in</strong>g diameter.<br />

12.15 Latest cas<strong>in</strong>g sett<strong>in</strong>g depth.<br />

12.16 Test pressure for formation below the cas<strong>in</strong>g.<br />

12.17 Maximum permissible surface pressure with actual drill<strong>in</strong>g fluid


Danish Energy Agency 24<br />

<strong>Guide</strong>l<strong>in</strong>es for Drill<strong>in</strong>g – <strong>Exploration</strong><br />

density.<br />

12.18 Wave height <strong>and</strong> direction.<br />

12.19 W<strong>in</strong>d force <strong>and</strong> direction.<br />

12.20 Barometric pressure <strong>and</strong> air temperature.<br />

12.21 Performed directional surveys.<br />

12.22 The well <strong>in</strong>cl<strong>in</strong>ation <strong>and</strong> direction, as well as horizontal <strong>and</strong><br />

vertical position, as calculated from the latest directional survey.<br />

12.23 Description of the geological formations penetrated dur<strong>in</strong>g the<br />

report<strong>in</strong>g period, <strong>in</strong>dicat<strong>in</strong>g depth, lithology, colour, gra<strong>in</strong> size,<br />

porosity <strong>and</strong> - when possible - expected geological age, <strong>in</strong>clud<strong>in</strong>g<br />

detailed results from the prelim<strong>in</strong>ary core descriptions.<br />

12.24 Quantitative as well as qualitative <strong>in</strong>formation on hydrocarbon<br />

<strong>in</strong>dications.<br />

12.25 Drill<strong>in</strong>g speed <strong>in</strong> the penetrated layers.<br />

12.26 Pr<strong>in</strong>cipal results from logs run.<br />

12.27 Costs for the last 24 hours.<br />

12.28 Accumulated costs.


Danish Energy Agency 25<br />

<strong>Guide</strong>l<strong>in</strong>es for Drill<strong>in</strong>g – <strong>Exploration</strong><br />

13. Driller's Log<br />

13.1 The drill<strong>in</strong>g platform shall have a daily log, correspond<strong>in</strong>g <strong>to</strong> IADC<br />

st<strong>and</strong>ard, onboard. The log shall be kept at least <strong>in</strong> duplicate. One<br />

copy shall be filed at the opera<strong>to</strong>r's office <strong>in</strong> <strong>Denmark</strong>. The other<br />

copy shall be reta<strong>in</strong>ed on the platform until drill<strong>in</strong>g of the<br />

concerned well has been f<strong>in</strong>ished.<br />

13.2 The log shall be filled <strong>in</strong> after each shift <strong>and</strong> it shall give relevant<br />

description of the work, which has been accomplished, as well as<br />

conta<strong>in</strong> a list of names <strong>and</strong> positions of the persons responsible for<br />

the various operations carried out.


Danish Energy Agency 26<br />

<strong>Guide</strong>l<strong>in</strong>es for Drill<strong>in</strong>g – <strong>Exploration</strong><br />

14. Further Report<strong>in</strong>g, Submission <strong>and</strong> S<strong>to</strong>r<strong>in</strong>g of Samples<br />

The Danish Energy Agency <strong>and</strong>/or the Geological Survey of<br />

<strong>Denmark</strong> <strong>and</strong> Greenl<strong>and</strong> must receive certa<strong>in</strong> samples as well as<br />

reports on results from surface <strong>and</strong> downhole measurements.<br />

14.1 While drill<strong>in</strong>g the report<strong>in</strong>g shall among others <strong>in</strong>clude the<br />

follow<strong>in</strong>g:<br />

a) A "Mud, Pressure <strong>and</strong> Temperature Log", shall be send <strong>to</strong> the<br />

Danish Energy Agency <strong>and</strong> the Geological Survey of<br />

<strong>Denmark</strong> <strong>and</strong> Greenl<strong>and</strong>. The logs must be send <strong>to</strong> the<br />

Danish Energy Agency at the latest <strong>to</strong>gether with the open<br />

hole logs from the given hole section. The Geological Survey<br />

of <strong>Denmark</strong> <strong>and</strong> Greenl<strong>and</strong> shall receive the logs<br />

cont<strong>in</strong>uously, each time a log sheet is completed. F<strong>in</strong>al logs<br />

have <strong>to</strong> be forwarded <strong>to</strong> the Energy Agency <strong>and</strong> the<br />

Geological Survey when the well has reached f<strong>in</strong>al depth.<br />

b) "Well Site" geological report, as well as core descriptions, if<br />

any, shall be forwarded cont<strong>in</strong>uously <strong>to</strong> the Danish Energy<br />

Agency <strong>and</strong> the Geological Survey of <strong>Denmark</strong> <strong>and</strong><br />

Greenl<strong>and</strong>.<br />

c) A "Drill<strong>in</strong>g Mud Report", shall be forwarded <strong>to</strong> the<br />

Geological Survey of <strong>Denmark</strong> <strong>and</strong> Greenl<strong>and</strong> after<br />

term<strong>in</strong>ation of drill<strong>in</strong>g operations.<br />

d) Ord<strong>in</strong>ary wire l<strong>in</strong>e logg<strong>in</strong>g: l transparent <strong>and</strong> 1 paper copy for<br />

each pr<strong>in</strong>ted scale (normally at least 1:200 <strong>and</strong> 1:1000) of all<br />

log runs shall be forwarded <strong>to</strong> the Danish Energy Agency <strong>and</strong><br />

the Geological Survey of <strong>Denmark</strong> <strong>and</strong> Greenl<strong>and</strong>. Logs<br />

where the raw data are recorded on magnetic tape must be<br />

send <strong>to</strong> the Geological Survey of <strong>Denmark</strong> <strong>and</strong> Greenl<strong>and</strong> <strong>in</strong><br />

a st<strong>and</strong>ard format which can be read by the Survey without<br />

difficulties (normally Schlumberger L.I.S. format is used). A<br />

table of contents must follow the tape.<br />

Edited magnetic tapes must be send <strong>to</strong> the Geological Survey<br />

of <strong>Denmark</strong> <strong>and</strong> Greenl<strong>and</strong> <strong>in</strong> the same way <strong>to</strong>gether with a<br />

verification list <strong>and</strong> a paper log of the tape contents.<br />

The material must be forwarded immediately after<br />

preparation.<br />

Furthermore, if called for by the drill<strong>in</strong>g situation, the Danish<br />

Energy Agency may also require that "Field Pr<strong>in</strong>ts" be<br />

forwarded without delay.


Danish Energy Agency 27<br />

<strong>Guide</strong>l<strong>in</strong>es for Drill<strong>in</strong>g – <strong>Exploration</strong><br />

e) Directional surveys: The results from surveys shall be<br />

forwarded <strong>to</strong> the Danish Energy Agency <strong>and</strong> the Geological<br />

Survey of <strong>Denmark</strong> <strong>and</strong> Greenl<strong>and</strong> when they are available.<br />

f) Composite, processed <strong>and</strong> <strong>in</strong>terpreted logs, <strong>in</strong>clud<strong>in</strong>g<br />

parameter list<strong>in</strong>g, shall <strong>to</strong>gether with a process<strong>in</strong>g report <strong>and</strong><br />

a justification for choice of parameters be submitted <strong>to</strong> the<br />

Danish Energy Agency <strong>and</strong> the Geological Survey of<br />

<strong>Denmark</strong> <strong>and</strong> Greenl<strong>and</strong>.<br />

g) Vertical seismic profile (VSP). One set of st<strong>and</strong>ard processed<br />

results on paper must be forwarded <strong>to</strong> the Danish Energy<br />

Agency <strong>and</strong> the Geological Survey of <strong>Denmark</strong> <strong>and</strong><br />

Greenl<strong>and</strong>. Furthermore the data must be forwarded <strong>to</strong> the<br />

Geological Survey of <strong>Denmark</strong> <strong>and</strong> Greenl<strong>and</strong> on magnetic<br />

tape <strong>to</strong>gether with a detailed description of the format used<br />

<strong>and</strong> the data conta<strong>in</strong>ed.<br />

14.2 Samples (cutt<strong>in</strong>gs, cores, fluids).<br />

14.2.1 The follow<strong>in</strong>g geological types <strong>and</strong> quantities of samples are <strong>to</strong> be<br />

forwarded <strong>to</strong> the Geological Survey of <strong>Denmark</strong> <strong>and</strong> Greenl<strong>and</strong>:<br />

a) Cutt<strong>in</strong>gs. A set of washed <strong>and</strong> dried samples, taken at the<br />

same <strong>in</strong>tervals as samples for the Licensee's own use, shall be<br />

forwarded <strong>to</strong> the Geological Survey of <strong>Denmark</strong> <strong>and</strong><br />

Greenl<strong>and</strong> upon term<strong>in</strong>ation of drill<strong>in</strong>g operations.<br />

b) Cutt<strong>in</strong>gs. Wet samples, taken at the same <strong>in</strong>tervals as samples<br />

for the Licensee's own use, shall be forwarded <strong>to</strong> the<br />

Geological Survey of <strong>Denmark</strong> <strong>and</strong> Greenl<strong>and</strong> not later than<br />

2 weeks after they have been taken. From each sample<br />

<strong>in</strong>terval above Base Upper Cretaceous the sample size must<br />

be at least 1000 g. From sample <strong>in</strong>tervals below Base Upper<br />

Cretaceous the sample size shall – whenever possible - be at<br />

least 1000 g.<br />

c) Sample (1 litre) of the drill<strong>in</strong>g fluid from the <strong>in</strong>let side taken<br />

after each qualitative change of additives <strong>and</strong> before test<br />

production. Further samples must be taken <strong>to</strong> ensure <strong>in</strong>tervals<br />

of not more than 300 metres (drilled depth) between consecutive<br />

samples.<br />

d) Side wall cores. Rema<strong>in</strong><strong>in</strong>g material shall be s<strong>to</strong>red at the<br />

Geological Survey of <strong>Denmark</strong> <strong>and</strong> Greenl<strong>and</strong> not later than<br />

one year after the well is completed. If samples are prepared<br />

for paleo-analysis, one set of paleon<strong>to</strong>logic or palynologic<br />

slides (orig<strong>in</strong>al or extra set) shall be forwarded <strong>to</strong> the<br />

Geological Survey of <strong>Denmark</strong> <strong>and</strong> Greenl<strong>and</strong> after the<br />

analysis is completed.


Danish Energy Agency 28<br />

<strong>Guide</strong>l<strong>in</strong>es for Drill<strong>in</strong>g – <strong>Exploration</strong><br />

e) Cores. The material shall be s<strong>to</strong>red at the Geological Survey<br />

of <strong>Denmark</strong> <strong>and</strong> Greenl<strong>and</strong> not later than one year after<br />

completion of the well. This time period may upon request be<br />

prolonged by the Danish Energy Agency.<br />

−<br />

−<br />

−<br />

When the cores are s<strong>to</strong>red <strong>in</strong> <strong>Denmark</strong> the Licensee, the<br />

Geological Survey <strong>and</strong> the Danish Energy Agency may freely<br />

<strong>in</strong>spect the material <strong>and</strong> may - after consult<strong>in</strong>g the Danish<br />

Energy Agency - take samples for further analysis.<br />

The core material shall from it is taken till it is s<strong>to</strong>red at the<br />

Geology Survey be s<strong>to</strong>red <strong>in</strong> such a way that representatives<br />

from the supervis<strong>in</strong>g authority at the Licensee's expense have<br />

unimpeded access <strong>to</strong> <strong>in</strong>spect the material <strong>in</strong> so far as it is<br />

reasonable <strong>and</strong> <strong>to</strong> take samples for additional analysis.<br />

Cores shall be used <strong>to</strong> obta<strong>in</strong> <strong>in</strong>formation concern<strong>in</strong>g the<br />

specific layers penetrated <strong>and</strong> <strong>in</strong> the long-term establishment<br />

of general <strong>in</strong>formation on the Danish subsoil. It is therefore<br />

important that core material be kept as <strong>in</strong>tact as possible.<br />

Samples should be sawed or drilled out. The Danish Energy<br />

Agency can at any time require special procedures <strong>to</strong> be<br />

followed <strong>in</strong> connection with h<strong>and</strong>l<strong>in</strong>g of <strong>and</strong> sample tak<strong>in</strong>g<br />

from cores.<br />

Unless another procedure is agreed with the Danish Energy Agency<br />

the follow<strong>in</strong>g shall be followed:<br />

Core chips: To avoid unnecessary damage of the core<br />

material only essential chips should be taken. Chips, which<br />

are not immediately needed, shall be taken by saw<strong>in</strong>g or<br />

drill<strong>in</strong>g (e.g. reference samples). If it is necessary <strong>to</strong> take<br />

chips at the well site (e.g. for quick paleon<strong>to</strong>logical dat<strong>in</strong>g)<br />

this shall be done with care <strong>and</strong> the chips shall whenever<br />

possible be taken where the core already is broken.<br />

Drill<strong>in</strong>g of plugs: A 1" diameter horizontal plug shall be<br />

taken for each, 0.3 m of core. At the same depth a<br />

supplementary plug (normally 1½") may be taken for special<br />

core analysis. Furthermore a 1" diameter vertical plug may be<br />

taken for each 1.5 m core.<br />

Additional plugg<strong>in</strong>g requires accept from the Danish Energy<br />

Agency. The Danish Energy Agency may when justified<br />

require additional plugg<strong>in</strong>g <strong>to</strong> be done by the Licensee.<br />

Slabb<strong>in</strong>g of cores: For each 1 m core a 15 cm long,<br />

undisturbed section shall be wax-sealed <strong>and</strong> s<strong>to</strong>red. For the<br />

rema<strong>in</strong><strong>in</strong>g core material eccentric slabb<strong>in</strong>g - as shown below<br />

- shall be performed.


Danish Energy Agency 29<br />

<strong>Guide</strong>l<strong>in</strong>es for Drill<strong>in</strong>g – <strong>Exploration</strong><br />

Further work can be carried out after the programme for the<br />

work has been discussed with the Danish Energy Agency.<br />

All core material (i.e. the wax-sealed sections, part A, B <strong>and</strong><br />

C <strong>to</strong>gether with plugs) shall be s<strong>to</strong>red at the Geological<br />

Survey of <strong>Denmark</strong> <strong>and</strong> Greenl<strong>and</strong> as soon as practicable <strong>and</strong><br />

at the latest l year after completion of the well. Part B shall be<br />

glued <strong>in</strong> a tray or a section of plywood by the Licensee.<br />

Permission must be obta<strong>in</strong>ed from the Danish Energy Agency<br />

if cores are <strong>to</strong> be s<strong>to</strong>red <strong>in</strong> <strong>Denmark</strong> outside the Geological<br />

Survey Central Core S<strong>to</strong>rage Facilities.<br />

f) Samples of formation fluid from each test produced <strong>in</strong>terval.<br />

If possible, 2 litres of all produced liquids. When samples of<br />

separa<strong>to</strong>r gas are taken for PVT-analyses, a correspond<strong>in</strong>g<br />

sample shall be taken <strong>and</strong> forwarded <strong>to</strong> the Geological<br />

Survey of <strong>Denmark</strong> <strong>and</strong> Greenl<strong>and</strong>. Whenever possible, the<br />

fluid samples shall be sent <strong>to</strong> the Geological Survey of<br />

<strong>Denmark</strong> <strong>and</strong> Greenl<strong>and</strong> <strong>in</strong> conta<strong>in</strong>ers which can be reta<strong>in</strong>ed<br />

by the Survey. If the conta<strong>in</strong>ers shall be returned the Licensee<br />

<strong>and</strong> the Geological Survey of <strong>Denmark</strong> <strong>and</strong> Greenl<strong>and</strong> must<br />

agree on the time from which rental may be charged <strong>to</strong> the<br />

Survey. The Licensee must furthermore cover all transport<br />

costs.<br />

14.2.2 Mark<strong>in</strong>g. All samples collected by the Licensee shall bear a label<br />

stat<strong>in</strong>g name of the well <strong>and</strong> depth (depth <strong>in</strong>terval) from which the<br />

sample is taken. The label must be made <strong>in</strong> a way that ensures<br />

permanent sample identification.<br />

14.2.3 Pack<strong>in</strong>g. The samples must be packed so that the possibility of<br />

long-term identification <strong>and</strong> s<strong>to</strong>rage is ensured. Fluid samples from<br />

formation <strong>and</strong> production tests f) <strong>and</strong> c) <strong>and</strong> samples of drill<strong>in</strong>g<br />

mud shall be packed so that quality <strong>and</strong> quantity are not affected<br />

dur<strong>in</strong>g transportation.


Danish Energy Agency 30<br />

<strong>Guide</strong>l<strong>in</strong>es for Drill<strong>in</strong>g – <strong>Exploration</strong><br />

14.3 Reports on analyses of samples from the borehole. Copies of<br />

descriptions <strong>and</strong> reports shall be forwarded <strong>to</strong> the Danish Energy<br />

Agency <strong>and</strong> the Geological Survey of <strong>Denmark</strong> <strong>and</strong> Greenl<strong>and</strong>,<br />

<strong>in</strong>clud<strong>in</strong>g, among others, the follow<strong>in</strong>g <strong>in</strong>formation:<br />

a) Reports on stratigraphic, sedimen<strong>to</strong>logic <strong>and</strong> paleon<strong>to</strong>logic<br />

analyses.<br />

b) Core descriptions.<br />

c) Colour pho<strong>to</strong>s of all cores shall be submitted. Each pho<strong>to</strong><br />

shall show well name, core number, depth, <strong>and</strong> scale as well<br />

as <strong>to</strong>p <strong>and</strong> bot<strong>to</strong>m data. Furthermore, a copy of all other<br />

pho<strong>to</strong>s from the h<strong>and</strong>l<strong>in</strong>g of core material (e.g. tak<strong>in</strong>g of<br />

plugs) must be forwarded.<br />

d) Conventional core analyses.<br />

e) Special core analyses.<br />

f) Petrophysical measurements of core material.<br />

g) Qualitative <strong>and</strong> quantitative water analysis if formation water<br />

is produced.<br />

h) PVT report <strong>in</strong>dicat<strong>in</strong>g qualitative <strong>and</strong> quantitative<br />

composition of fluid samples from any test productions.<br />

i) Reports on source rock analyses.<br />

14.4 Reports on test production.<br />

14.4.1 Reports conta<strong>in</strong><strong>in</strong>g pressure <strong>and</strong> temperature profiles <strong>in</strong> the well<br />

<strong>and</strong> at the surface as well as separa<strong>to</strong>r conditions, choke size,<br />

operational sequence, production rates <strong>and</strong> cumulative production.<br />

14.4.2 For all test productions a summaris<strong>in</strong>g <strong>and</strong> conclud<strong>in</strong>g report shall<br />

be prepared. The report must be forwarded <strong>to</strong> the Danish Energy<br />

Agency <strong>and</strong> the Geological Survey of <strong>Denmark</strong> <strong>and</strong> Greenl<strong>and</strong> not<br />

later than 4 months after the term<strong>in</strong>ation of the well. The report<br />

shall as a m<strong>in</strong>imum comprise the follow<strong>in</strong>g <strong>in</strong>formation:<br />

a) Information on the <strong>in</strong>dividual test productions, <strong>in</strong>clud<strong>in</strong>g<br />

perforat<strong>in</strong>g pattern <strong>and</strong> <strong>in</strong>terval, description of any<br />

stimulations, or other operations performed <strong>to</strong> stabilise or<br />

<strong>in</strong>crease production.<br />

b) A list<strong>in</strong>g of measured data used for analys<strong>in</strong>g the test<br />

production.


Danish Energy Agency 31<br />

<strong>Guide</strong>l<strong>in</strong>es for Drill<strong>in</strong>g – <strong>Exploration</strong><br />

c) A list<strong>in</strong>g of non-measured parameters used <strong>in</strong> the analysis of<br />

the test production <strong>and</strong> a documented explanation for the<br />

choice of parameters.<br />

d) A list<strong>in</strong>g of calculated values from the test production,<br />

<strong>in</strong>clud<strong>in</strong>g among others permeability, extrapolated pressure,<br />

radius of <strong>in</strong>vestigation, <strong>and</strong> flow efficiency.<br />

e) All type curves <strong>and</strong> plots used for analys<strong>in</strong>g the test<br />

productions <strong>in</strong>dicat<strong>in</strong>g match po<strong>in</strong>t.<br />

f) A detailed discussion of the achieved results <strong>and</strong><br />

<strong>in</strong>terpretations hereof.<br />

14.5 F<strong>in</strong>al report<strong>in</strong>g: At the latest 6 months after the completion of a<br />

well the follow<strong>in</strong>g reports shall be forwarded:<br />

14.5.1 Summaris<strong>in</strong>g technical/geological report (copy each for the Danish<br />

Energy Agency <strong>and</strong> the Geological Survey of <strong>Denmark</strong> <strong>and</strong><br />

Greenl<strong>and</strong>) at least conta<strong>in</strong><strong>in</strong>g:<br />

a) List<strong>in</strong>g of the well's pr<strong>in</strong>cipal data, name, position <strong>in</strong><br />

geographical <strong>and</strong> Universal Transverse Merca<strong>to</strong>r (UTM)<br />

co-ord<strong>in</strong>ates, drill<strong>in</strong>g rig, water depth/ground level, reference<br />

level, opera<strong>to</strong>r, contrac<strong>to</strong>r, dates of the <strong>in</strong>cluded operations,<br />

<strong>to</strong>tal time spent, <strong>and</strong> <strong>to</strong>tal depth of the well <strong>in</strong>dicat<strong>in</strong>g<br />

geological age at TD.<br />

b) Summary of the progress of drill<strong>in</strong>g operation, stat<strong>in</strong>g<br />

technical problems, if any, <strong>and</strong> discussion hereof.<br />

c) Summary of geological <strong>in</strong>formation obta<strong>in</strong>ed dur<strong>in</strong>g the<br />

drill<strong>in</strong>g operation.<br />

d) List<strong>in</strong>g of <strong>in</strong>stalled cas<strong>in</strong>gs <strong>and</strong> results of cement<strong>in</strong>g.<br />

e) Detailed description <strong>in</strong>clud<strong>in</strong>g layout draw<strong>in</strong>g of the well<br />

status when complet<strong>in</strong>g the operation.<br />

f) Composit log with ma<strong>in</strong> <strong>in</strong>formation from the well stat<strong>in</strong>g at<br />

least core- <strong>and</strong> test <strong>in</strong>tervals, position of cas<strong>in</strong>gs, cement <strong>and</strong><br />

plugs <strong>to</strong>gether with lithology <strong>and</strong> selected logs.<br />

14.5.2 One set of summary accounts for economy <strong>and</strong> for time split <strong>in</strong><strong>to</strong><br />

ma<strong>in</strong> operations shall be forwarded <strong>to</strong> the Danish Energy Agency.<br />

14.5.3 A discussion of the results obta<strong>in</strong>ed, time spent, <strong>and</strong> economy<br />

related <strong>to</strong> expectations <strong>to</strong> be forwarded <strong>in</strong> one copy <strong>to</strong> the Danish<br />

Energy Agency.


Danish Energy Agency 32<br />

<strong>Guide</strong>l<strong>in</strong>es for Drill<strong>in</strong>g – <strong>Exploration</strong><br />

15. Sampl<strong>in</strong>g <strong>and</strong> Measurements<br />

15.1 When drill<strong>in</strong>g is <strong>in</strong> progress, the Licensee shall take cutt<strong>in</strong>gs of all<br />

lithologies from all geological formations penetrated. The sampl<strong>in</strong>g<br />

shall commence immediately after return of the drill<strong>in</strong>g fluid is<br />

established. The <strong>in</strong>terval between the samples shall not exceed 10<br />

m. However, when drill<strong>in</strong>g <strong>in</strong> formations which may conta<strong>in</strong><br />

hydrocarbons, the <strong>in</strong>tervals shall not exceed 3 m.<br />

15.2 When prepar<strong>in</strong>g the drill<strong>in</strong>g programme <strong>and</strong> dur<strong>in</strong>g drill<strong>in</strong>g<br />

operations, the Licensee should aim at obta<strong>in</strong><strong>in</strong>g sidewall cores<br />

from <strong>in</strong>tervals where it is relevant, e.g. for dat<strong>in</strong>g of geological<br />

horizons, determ<strong>in</strong>ation of lithology or evaluation of the potential<br />

reservoir or source rock. The Licensee shall carry out relevant<br />

analyses based on the sidewall cores taken.<br />

15.3 The Licensee - with due consideration of safety aspects - shall aim<br />

at obta<strong>in</strong><strong>in</strong>g core <strong>in</strong>formation from all potentially significant hydrocarbon<br />

bear<strong>in</strong>g reservoirs. Sufficient cor<strong>in</strong>g shall be done <strong>to</strong> ensure<br />

satisfac<strong>to</strong>ry <strong>in</strong>formation for the evaluation of the reservoir <strong>and</strong> the<br />

necessary analyses shall be performed.<br />

15.4 When prepar<strong>in</strong>g the drill<strong>in</strong>g programme <strong>and</strong> dur<strong>in</strong>g drill<strong>in</strong>g<br />

operations the Licensee shall see that sufficient logs are run <strong>in</strong> the<br />

well <strong>to</strong> obta<strong>in</strong> satisfac<strong>to</strong>ry geologic, geophysic, hydrocarbon <strong>and</strong><br />

stratigraphic <strong>in</strong>formation from the layers penetrated.<br />

15.5 When essential for the evaluation of the hydrocarbon potential or<br />

whenever measurement of the formation pressure <strong>in</strong> another way<br />

might give valuable <strong>in</strong>formation the Licensee shall attempt <strong>to</strong> carry<br />

out pressure measurements <strong>and</strong> take fluid samples from relevant<br />

penetrated horizons.<br />

15.6 Penetrated formations with potentially important hydrocarbon<br />

shows must - if possible - be test produced. Test production shall be<br />

carried out <strong>in</strong> such a way that as much relevant <strong>in</strong>formation as<br />

feasible is obta<strong>in</strong>ed concern<strong>in</strong>g fluids produced, production<br />

capacity of the formation <strong>and</strong> possibly the size of the reservoir.<br />

When relevant for the evaluation of the hydrocarbon content <strong>and</strong>/or<br />

production mechanism, test production shall be carried out from<br />

water bear<strong>in</strong>g zones, which may have connection <strong>to</strong> the<br />

hydrocarbon bear<strong>in</strong>g formations.