Introduction by the Chairman of the Board of Directors<br />
Introduction by the<br />
Chairman of the Board of Directors<br />
Ladies and gentlemen,<br />
The company posted a very favorable income result in 2<strong>012</strong>, despite unfavorable impacts in the area of mandatory purchasing<br />
from renewable energy sources. We achieved 105% of our income target when correction factors are included, and the<br />
company posted net income of CZK 4,306 million. The company also met the prescribed quality parameters for electricity<br />
supply, as well as operational safety and reliability standards. Streamlining of internal processes was another significant<br />
accomplishment.<br />
In early 2<strong>012</strong>, we took an important step in improving management of distribution assets. The Asset Management project<br />
implemented at ČEZ <strong>Distribuce</strong> had the objective of managing distribution assets more effectively, in both technical and<br />
economic terms. A revised management model, supported by a reorganization, went into effect on February 1, 2<strong>012</strong>. The new<br />
model is based on a unified view of capital expenditure and an optimized planning and prioritizing process. At the same time,<br />
we introduced active management of internal and external suppliers, and imposed stricter controls on our dealings with them.<br />
In our standard line management, we implemented the Design-to-Cost method, which is being used more and more at<br />
CEZ Group to optimize the technical aspects of strategic construction projects.<br />
From the moment it became technically possible to connect installations for generation of electricity from renewable sources to<br />
the Czech Republic Power System until the end of 2<strong>012</strong>, ČEZ <strong>Distribuce</strong> processed 19,365 new applications and approved<br />
over 8,000 sets of project documentation. As of the last day of 2<strong>012</strong>, a total of 6,097 new renewable power sources with an<br />
aggregate total of nearly 215 MW of generation capacity had been connected to ČEZ <strong>Distribuce</strong>’s network. Most applications,<br />
a large number of which were submitted in the last few weeks of the year, related to roof-top photovoltaic power plants. I would<br />
like to take this opportunity to thank all the employees who took on the task of processing the extraordinarily large number of<br />
applications for connection of new generation installations.<br />
In 2<strong>012</strong> we successfully defended our prestigious “Safe Enterprise” status. By obtaining this certificate, we reaffirmed that we<br />
are aware of our responsibility towards all who may be impacted by our activities, as well as of our duty to meet high standards<br />
in protecting their health and safety. All companies of CEZ Group have been tasked with finding more room for improvement in<br />
their internal processes and procedures. In our case, we will be doing so primarily through the Provision of Services within<br />
CEZ Group project, which will bring about a substantial reduction in intra-corporate red tape and reduce costs even further.<br />
In years past we demonstrated our ability to deal with complex change. This gives me confidence that our company has<br />
everything it takes to successfully meet demanding goals, ensure high quality of electricity supplies, and maintain grid safety.<br />
007<br />
Dear business partners, dear co-workers,<br />
allow me on behalf of the Board of Directors of ČEZ <strong>Distribuce</strong> to thank you for your support and cooperation in the past year.<br />
Richard Vidlička<br />
Chairman of the Board of Directors<br />
and General Manager<br />
ČEZ <strong>Distribuce</strong>, a. s.