ČEZ <strong>Distribuce</strong>, a. s.<br />

Capital Expenditure<br />

Distribution Grid CAPEX<br />

Capital expenditure in 2<strong>012</strong> focused primarily on MV and LV projects. A total of CZK 6,536 million was invested in MV and LV plant<br />

and equipment in 2<strong>012</strong>. The projects included, in particular, rebuilds and upgrades of medium- and low-voltage underground<br />

cables and overhead power lines and construction of new MV/LV distribution transformer stations. A substantial portion of the<br />

projects (both new construction and rebuilds) was undertaken to meet demand for capacity from both producers and customers.<br />

Capital expenditures on HV projects totaled CZK 1,065 million. These consisted mostly of transmission/distribution substations,<br />

overhead HV lines (rebuilds and new construction), and projects undertaken to meet customer demand.<br />

Capital expenditures on customer-initiated projects totaled CZK 3,666 million.<br />

Most Significant Projects<br />

Internal projects:<br />

Ostrava Poruba, rebuild of 110/22 kV transformer station<br />

Babylon, rebuild of 110 kV substation, own consumption and mass remote control<br />

Turnov, construction of new 110/35 kV transformer station<br />

Jablonec nad Nisou South, construction of new 110/22 kV transformer station<br />

Přeštice, rebuild of 110 kV substation<br />

Řeporyje, complete rebuild of 110 kV substation and I&C system<br />

Mírovka, 400/110 kV transformer station, substation rebuild, phase two<br />

029<br />

Projects to meet customer requirements:<br />

Tuchlovice Transformer Station, increase resistance to short circuits<br />

Kladno West – Tuchlovice, reinforce 110 kV power line<br />

Other<br />

Other investment in capital projects, totaling CZK 993 million, went on activities that are ancillary to the core business of electricity<br />

distribution, upgrades of operational and control systems in particular. During the year a new unified dispatch system was<br />

rolled out for ČEZ <strong>Distribuce</strong>, a. s.