06.09.2015 Views

VENEZUELA ENERGY IN FIGURES - Servicios IESA

VENEZUELA ENERGY IN FIGURES - Servicios IESA

VENEZUELA ENERGY IN FIGURES - Servicios IESA

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Since 2008 Venezuela has been receiving gas from Colombia through the Transcaribeño Antonio Ricaurte<br />

pipeline. During 2012 Venezuela received from Colombia on average 187 million cubic feet per day of gas,<br />

resulting in a total supply of 7,514 million cubic feet of gas per day (MMCFD).<br />

11<br />

GAS AVAILABILITY BY SOURCE<br />

3<br />

12<br />

%<br />

GRAFICO<br />

74<br />

PDVSA PETRÓLEO<br />

PDVSA GAS<br />

JO<strong>IN</strong>T VENTURES<br />

CCHEVRON & ECOPETROL<br />

PURCHASES<br />

Of the total natural gas available in 2012, 28 percent was for the domestic market to meet the needs<br />

of the electricity, steel, cement, aluminum, household, marketing and petrochemicals<br />

Transport and distribution<br />

The Venezuelan distribution system for methane gas comprise a 5,031 kilometers pipe line network with width<br />

variances. The main systems are listed below:<br />

• Anaco – Barquisimeto<br />

• Anaco – Jose / Anaco - Puerto La Cruz<br />

• Anaco – Puerto Ordaz<br />

• Ulé – Amuay<br />

• Interconnection Coast – West<br />

• Interconnection Center East - West<br />

• Pipeline Transcaribeño Antonio Ricaurte<br />

With these facilities by 2012 the demand of more<br />

than 353,000 commercial and residential users was<br />

met, 91 percent of which were located in La Gran<br />

Caracas.<br />

In 2012 were incorporated 521 km of new lines:<br />

Phase I of the pipeline under construction G / J Jose<br />

Francisco Bermudez, Section Cumana-Daisy Barbecue:<br />

295 Km<br />

New segment Morón-Barquisimeto (ENELBAR IV):<br />

• Phase I - 55 Km (completed)<br />

• Phase II - 22 Km<br />

Pipeline under construction Altagracia-Arichuna expansion<br />

of Anaco- Barquisimeto system, stretch Altagracia<br />

(N50) - Guatopo (N-A10): 13 km<br />

Expansion of Anaco - Puerto Ordaz system:<br />

• Pipeline Soto-Epa: 29 Km<br />

• West Lejos-Morichal Pipeline section: 37.7 Km<br />

• Pipeline stretch Morichal - Mamo: 34.7 Km<br />

Branch line methane gas distribution to Ezequiel<br />

Zamora Power Plant: 2.6 Km<br />

Branch line methane gas distribution to La Raisa<br />

Power Plant: 5 Km<br />

Branch line methane gas distribution to El Sitio<br />

Power Plant: 1.7 Km<br />

Branch line methane gas distribution to San Diego<br />

de Cabrutica Power Plant: 25 Km<br />

47

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!