14.09.2015 Views

Table of Contents

Council Meeting Minutes 20 March 2012 - West Tamar Council

Council Meeting Minutes 20 March 2012 - West Tamar Council

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

20 March 2012<br />

36/12 CNCL 1 NOTICE OF MOTION - CR JOY ALLEN: BEACONSFIELD IMPROVEMENT<br />

COMMITTEE TOWNSCAPE PLAN<br />

1) Motion<br />

That council gives permission for the Beaconsfield Improvement Committee<br />

to move Stage 4 <strong>of</strong> the Beaconsfield townscape plan to Stage 1, to advertise<br />

tenders for the project and provide the relevant funds in the 2012/2013<br />

budget.<br />

2) Background<br />

Stage 4 <strong>of</strong> the plan is the development <strong>of</strong> a paved courtyard area in Jubilee<br />

Park which includes planting, paving, an imitation waterwheel and a<br />

backdrop depicting the Grubb Shaft building. The committee would like this<br />

stage <strong>of</strong> the plan brought forward for two reasons. One is that council has<br />

removed the large tree in Jubilee Park which provides a good opportunity to<br />

develop this area. The second is that committee members are currently<br />

pursuing a quote from Aurora to look at changing the overhead power in<br />

West St to underground power. If viable, this needs to be done before other<br />

works can be achieved along the main street. If this is an option for the<br />

committee it needs to be done now as when the Beaconsfield Gold Mine<br />

closes there is the opportunity to look at the underground power cable<br />

running along Weld St towards the Batman Bridge turn<strong>of</strong>f.<br />

The Beaconsfield Improvement Committee is an external committee <strong>of</strong><br />

council and Crs Holmdahl and I are council representative on this<br />

committee, I am currently the chair <strong>of</strong> this committee.<br />

The Beaconsfield Improvement Committee was formed in April 2006<br />

following the Beaconsfield Mine Rockfall incident. The West Tamar<br />

Community Recovery Sub-committee identified that the Beaconsfield<br />

community would benefit by substantial improvements to Beaconsfield.<br />

These improvements were to assist in the community recovery process and<br />

improve the experience for visitors by encouraging people to stop and spend<br />

time in Beaconsfield.<br />

The committee was formed in September 2006. The purpose <strong>of</strong> the<br />

committee is to provide direction and a whole <strong>of</strong> community approach to the<br />

improvement <strong>of</strong> Beaconsfield. Its mission is Renewing Beaconsfield into the<br />

future.<br />

The committees’ outcomes are:<br />

• To inspire and empower the local community to develop a shared<br />

vision for Beaconsfield;<br />

• To develop a main street program that aligns with civic pride and<br />

heritage values;<br />

• Through identified improvements encourage investment and job<br />

creation in Beaconsfield and environs;<br />

• Enhance the town/precinct to become a catalyst for tourism and<br />

economic growth.<br />

The committee’s strategic plan was ratified by council in 2007.<br />

47

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!