Research Journal of Science & IT Management - RJSITM - The ...
Research Journal of Science & IT Management - RJSITM - The ...
Research Journal of Science & IT Management - RJSITM - The ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Tabel.1 WQI resume Table<br />
No Y e a r<br />
W Q I<br />
1 2 3 4 5 7 8 6 9 10<br />
STB STB STB STB STB STB STB STB STB STB<br />
Bendung<br />
Curug<br />
BTB 10 BTB 23 BTB 35 BTB 45<br />
PAM<br />
Buaran<br />
PAM<br />
P.Gadung<br />
BTB 49 BTB 51<br />
PAM<br />
Pejompong<br />
an<br />
Divisi I Divisi I Divisi I Divisi I Divisi I Divisi I Divisi I Divisi I Divisi I Divisi I<br />
Kab. Kab. Kab. Kab. Jakarta Jakarta Jakarta Jakarta Jakarta<br />
Karawang<br />
Bekasi Bekasi Bekasi Bekasi Timur Timur Timur Timur Timur<br />
1 2007 WQI Value 55,20 51,76 53,06 56,11 51,99 48,85 50,26 52,80 48,41 49,94<br />
Result average average average average average bad average average bad bad<br />
2 2008 WQI Value 60,30 54,09 49,71 55,33 53,91 53,77 54,57 49,46 50,58 45,13<br />
Result average average bad average average average average bad average bad<br />
3 2009 WQI Value 66,97 61,50 50,85 58,33 56,79 50,78 51,47 52,99 53,21 51,39<br />
Result average average average average average average average average average average<br />
4 2010 WQI Value 62,88 57,79 51,61 52,23 53,11 50,36 48,77 48,94 48,81 48,61<br />
Result average average average average average average bad bad bad bad<br />
5 2011 WQI Value 62,72 57,42 60,01 56,82 47,83 51,23 47,90 46,73 48,18 49,34<br />
Result average average average average bad average bad bad bad bad<br />
6 2012 WQI Value 55,89 54,56 56,63 55,30 55,35 56,13 51,62 54,80 53,93 54,72<br />
Result average average average average average average average average average average<br />
7 2012 WQI Value 62,87 60,02 62,54 59,36 58,46 58,72 57,75 59,29 59,07 58,96<br />
Validation Result average average average average average average average average average average<br />
2.5 Economic analysis<br />
Economic studies <strong>of</strong> energy utilization in the West Tarum channel will analyze the economic<br />
feasibility <strong>of</strong> investing in small-scale hydropower plants in several locations <strong>of</strong> West Tarum channels,<br />
which include analysis <strong>of</strong> net present value, the rate <strong>of</strong> return analysis and cost benefit ratio.<br />
Tabel 2. Construction cost for microhydro type Vortex gravitation<br />
Economic analysis <strong>of</strong> investment development <strong>of</strong> small-scale micro power plants in West Tarum<br />
channels that includes the break-even analysis, ratio analysis and cost benefit analysis <strong>of</strong> Net present<br />
value can be seen in attachment 1, the analysis <strong>of</strong> rate <strong>of</strong> return (IRR analysis) to analyze the level <strong>of</strong><br />
interest rates can be seen in attachment 2, In Figure.13 the breakeven point (BEP) investment in the<br />
micro power plants reached 5 th .<br />
www.theinternationaljournal.org > RJS<strong>IT</strong>M: Volume: 02, Number: 02, December-2012 Page 44