- Page 1: Northeast San Fernando Valley Draft
- Page 6: Table of Figures Fig. 1 - The Three
- Page 10: Land Use and Planning A key goal of
- Page 14: What Sets the Northeast Valley Apar
- Page 18: Challenges Facing the Northeast Val
- Page 22: The SCAG RTP/SCS 2012-2035 Regional
- Page 26: Northeast Valley Disadvantages •
- Page 30: ensuring that public transit modes
- Page 34: Northeast Valley housing and indust
- Page 38: San Fernando Road and Mall Area San
- Page 42: Panorama Mall/Panorama City Shoppin
- Page 46: Other Critical Areas Lake View Terr
- Page 50: The industrial/manufacturing vacanc
- Page 54:
Challenges of Growth The populace o
- Page 58:
Bob Hope Airport; local universitie
- Page 62:
East San Fernando Valley Transit Co
- Page 66:
The most sophisticated transit opti
- Page 70:
within the communities have aged an
- Page 74:
Town Center and TOD Features Sustai
- Page 78:
necessary, have not existed previou
- Page 82:
Industry and Manufacturing Industri
- Page 86:
an us Baoa Center aor Maret Charate
- Page 90:
New Jobs in Sustainability The nort
- Page 94:
Changing Fortunes The now-aging sub
- Page 98:
Environment & Remediation To this v
- Page 102:
Recreation and Amenities Northeast
- Page 106:
Resources and Opportunities Problem
- Page 110:
Rental Car Fees Many states and cit
- Page 114:
the businesses, transportation acce
- Page 118:
Appendix A - Environmental Mapping
- Page 122:
Groundwater Threats Indicator Fig.
- Page 126:
Diesel Particulate Matter Fig. 37 -
- Page 130:
RSEI Chemical Releases & Toxic Expo
- Page 134:
Linguistic Isolation Fig. 45 - Ling
- Page 138:
Poverty Fig. 49 - Poverty Source: M
- Page 142:
Appendix C - Pacific Electric Red C
- Page 146:
pedestrians to feel secure at night
- Page 150:
• Maintain a balance between qual
- Page 154:
• Land Use, Planning & Centers Ro