04.06.2016 Views

Tropeano-1984-Earth_Surface_Processes_and_Landforms

Tropeano-1984-Earth_Surface_Processes_and_Landforms

Tropeano-1984-Earth_Surface_Processes_and_Landforms

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table 111. Storm events <strong>and</strong> related soil loss in the survey period (22 months)<br />

Albugnano (Plots A 1-2-3 combined) Mongardino (Plot M 1) S. Vittoria d'Alba (Plot C 3)<br />

Peak Soil Peak Soil Peak Soil<br />

Date Rainfall intens. loss Date Rainfall intens. loss Date<br />

Rainfall intens. loss v1<br />

(mm) (-/min) Wm) (mm) (mm/min) (dm) (-1 (-/mi4 (dm) 8<br />

16 May 1981 24.0 093 1492 13 July 1981 368 1.00 182 16-28 June 1981 74.0 040 70 g<br />

26-27 May 1981 54.0 0.43 997 17 July 1981 21.0 1.20 692 7 Aug. 1981 25.8 0.83 800<br />

22-28 June 1981 1W3 0.77 1282 9 Aug. 1981 42.6 1.17 21613(*' 11 Aug. 1981<br />

27.6 0.45 151.0 8<br />

2-3 July 1981 19.6 0.38 580 17 Aug. 1981 26.2 1.00 322 5 June 1982 160 0.40 0 2<br />

18 July 1981 46.0 0.75 2 18W*) 10 Sep. 1981 33.0 066 188 26 June 1982 23.2 1.49 18.0<br />

11 Aug. 1981 41.5 0-66 344 17 July 1982 26.6 073 332 23 July 1982 44.6 0.95 24.0<br />

17 Aug. 1981 23.6 0.58 205 23 July 1982 27.4 040 197 6 Aug. 1982 13.0 0.46 04 g<br />

31 Aug. 1982 24.6 1-44 519 24 July 1982 19.0 074 432 5 Sep. 1982 8.2 018 1.7<br />

6-7 Sep. 1982 36.6 0.80 506 6-17 Aug. 1982 27.0 1.00 266<br />

20-28 Aug. 1982 31.2 0.75 587<br />

31 Aug. 1982 276 071 592<br />

24-25 Sep. 1982 18.8 1.24 277<br />

(*) Actual data unknown, because both traps <strong>and</strong> drums were filled totally by water <strong>and</strong> sediments.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!