CUT Annual Report 2011
The Annual Report is a premier publication that reports on institutional development and successes.
The Annual Report is a premier publication that reports on institutional development and successes.
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>CUT</strong> ANNUAL REPORT <strong>2011</strong> | 65<br />
FACILITIES AND MAJOR CAPITAL PROJECTS<br />
Since the University’s incorporation of the Welkom Campus in 2004, particular attention has been paid to the development of its academic<br />
infrastructure and the Programme Qualification Mix (PQM).<br />
<strong>CUT</strong> is one of the better maintained universities in the country, despite current maintenance backlogs and inadequate funding. Six<br />
construction projects took place or is currently in process on the Bloemfontein and Welkom campuses, as reported in 2010. The total<br />
budget for all six projects is approximately R284 million. The projects, which are at different stages of development, are:<br />
Completed in <strong>2011</strong>:<br />
• 24-hr Student Academic Support Centre (Bloemfontein Campus)<br />
• Welkom Campus are the Teacher Education and Student Academic Support Building<br />
Student Academic Support Centre