The use of bridges on the inside of the hull where one sees<br />

the bottom ends of the clamps of the previous icture<br />

6. Plugs and sternpost<br />

The plugs, the sternpost and the lowest lift were drilled<br />

vertically for four pieces of threaded stock (studs).<br />

Holes were drilled in the aft part of lift 1 of the plug to<br />

lighten it. Given the uncertainty as to the eventual position<br />

of the ballast, no other holes were drilled in the lower lifts.<br />

The lifts of the sternpost and one of the three plug were<br />

glued together.<br />

Four temporary "bridges" were placed in the upper hull to<br />

anchor the studs, thus allowing the plug and the sternpost to<br />

be attached to the upper hull.<br />

The bottom of the four studs permitting the removal of<br />

the plug from the upper hull<br />

7. The full rough hull