Failures of main gas pipelines PJSC “UKRTRANSGAZ” during 2015-2016

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Failure <strong>of</strong> <strong>main</strong> pipeline «АTI» on the 178 th кm<br />

1. Failure caused by through fault <strong>of</strong> pipe (crack) on the pipe<br />

<strong>of</strong> cold rolling.<br />

2. The failure was caused likely by cycle load for this pipe<br />

section which seemed to be appeared <strong>during</strong> construction<br />

when cold rolling had been performed with technological<br />

process disruption .<br />

3. The failure was eliminated by 88 workers and 30 special<br />

purpose vehicles :<br />

• 49 workers <strong>of</strong> Main Pipeline Division PRYKARPATTRANSGAZ<br />

• 37 workers <strong>of</strong> Construction Division UKRGASPROMBUD<br />

• 2 workers <strong>of</strong> Centre for Technical Inspection TECHDIAGAS<br />

4. Emergency recovery works:<br />

• start: 7 36 p.m 29.08.16<br />

• finish: 9 10 p.m 02.08.16<br />

• duration: 98 hours<br />

5. Gas leakage 445 thous. mcm, cost UAH 2,7mln.