12.12.2016 Views

bomtrm

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

WIP_PAC_ACTUAL_COST_DETAILS<br />

WIP_PAC_PERIOD_BALANCES<br />

WIP_PARAMETERS<br />

WIP_PERIOD_BALANCES<br />

Stores the cost of each resoure, overhead, outside processing<br />

and job close transation by entity, period, cost group No<br />

table description<br />

Stores periodic balance of all WIP entities within a cost<br />

group by period No table description<br />

WIP specific organization level parameters (See page<br />

3 – 831)<br />

Job and schedule charges, by accounting period (See page<br />

3 – 835)<br />

WIP_REPETITIVE_ITEMS Line/assembly associations (See page 3 – 838)<br />

WIP_REPETITIVE_SCHEDULES Repetitive schedules (See page 3 – 841)<br />

WIP_REQUIREMENT_OPERATIONS<br />

WIP_REQ_OPERATION_COST_DETAILS<br />

WIP_SCRAP_VALUES<br />

WIP_SO_ALLOCATIONS<br />

Components required by jobs and schedules (See page<br />

3 – 844)<br />

Costs for material requirements in an average costing<br />

organization No table description<br />

Cost information for assembly scrap transactions No table<br />

description<br />

Allocations of job assemblies to sales orders No table<br />

description<br />

WIP_TRANSACTIONS WIP resource transactions (See page 3 – 851)<br />

WIP_TRANSACTION_ACCOUNTS<br />

WIP_TXN_ALLOCATIONS<br />

WIP_TXN_INTERFACE_ERRORS<br />

Debits and credits due to resource transactions (See page<br />

3 – 855)<br />

Resource transaction allocations for repetitive schedules No<br />

table description<br />

Errors encountered during resource and move transaction<br />

processing<br />

Oracle Proprietary, Confidential Information––Use Restricted by Contract<br />

High–Level Design<br />

2 – 41

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!