12.12.2016 Views

bomtrm

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Column Descriptions<br />

Name Null? Type Description<br />

SCHEDULED_FLAG NOT NULL NUMBER Whether a scheduled or<br />

unscheduled assembly<br />

WIP_ENTITY_ID (PK) NOT NULL NUMBER WIP Flow schedule Identifier<br />

ORGANIZATION_ID NOT NULL NUMBER Organization Identifier<br />

LAST_UPDATE_DATE NOT NULL DATE Standard Who column<br />

LAST_UPDATED_BY NOT NULL NUMBER Standard Who column<br />

CREATION_DATE NOT NULL DATE Standard Who column<br />

CREATED_BY NOT NULL NUMBER Standard Who column<br />

LAST_UPDATE_LOGIN NULL NUMBER Standard Who column<br />

REQUEST_ID NULL NUMBER Enhanced Who column<br />

PROGRAM_APPLICATION_ID NULL NUMBER Enhanced Who column<br />

PROGRAM_ID NULL NUMBER Enhanced Who column<br />

PROGRAM_UPDATE_DATE NULL DATE Enhanced Who column<br />

PRIMARY_ITEM_ID NULL NUMBER Inventory item Identifier for<br />

the assembly the Flow schedule<br />

creates<br />

CLASS_CODE NOT NULL VARCHAR2(10) Accounting class associated<br />

with the Flow schedule<br />

SCHEDULED_START_DATE NOT NULL DATE Date on which the Flow schedule<br />

is scheduled to start<br />

DATE_CLOSED NULL DATE Last unit actual completion<br />

date<br />

PLANNED_QUANTITY NOT NULL NUMBER Flow schedule initial planned<br />

quantity<br />

QUANTITY_COMPLETED NOT NULL NUMBER Current Flow schedule quantity<br />

completed<br />

MPS_SCHEDULED_COMPLETION_DATE NULL DATE Date used by MRP to relieve the<br />

MPS for the Flow schedule (used<br />

by MRP only)<br />

MPS_NET_QUANTITY NULL NUMBER Quantity used by MRP to relieve<br />

MPS for the Flow schedule (used<br />

by MRP only)<br />

BOM_REVISION NULL VARCHAR2(3) Inventory item revision code<br />

ROUTING_REVISION NULL VARCHAR2(3) Routing revision code<br />

BOM_REVISION_DATE NULL DATE Date of inventory item revision<br />

used to explode the bill of<br />

materials used in the Flow<br />

schedule<br />

ROUTING_REVISION_DATE NULL DATE Routing revision date<br />

ALTERNATE_BOM_DESIGNATOR NULL VARCHAR2(10) Alternate bill of material used<br />

in a Flow schedule<br />

ALTERNATE_ROUTING_DESIGNATOR NULL VARCHAR2(10) Alternate routing used in a<br />

Flow schedule<br />

COMPLETION_SUBINVENTORY NULL VARCHAR2(10) Default completion subinventory<br />

for assemblies completed by the<br />

Flow schedule<br />

COMPLETION_LOCATOR_ID NULL NUMBER Default completion locator<br />

identifier for assemblies<br />

completed by the Flow schedule<br />

MATERIAL_ACCOUNT NULL NUMBER General Ledger account to<br />

accumulate material charges for<br />

a Flow schedule<br />

MATERIAL_OVERHEAD_ACCOUNT NULL NUMBER General Ledger account to<br />

accumulate material overhead<br />

charges for a Flow schedule<br />

RESOURCE_ACCOUNT NULL NUMBER General Ledger account to<br />

accumulate resource charges for<br />

a Flow schedule<br />

OUTSIDE_PROCESSING_ACCOUNT NULL NUMBER General Ledger account to<br />

accumulate outside processing<br />

charges for a Flow schedule<br />

Oracle Proprietary, Confidential Information––Use Restricted by Contract<br />

Detailed Design<br />

3 – 813

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!