12.12.2016 Views

bomtrm

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Column Descriptions (Continued)<br />

Name Null? Type Description<br />

PROGRAM_UPDATE_DATE NULL DATE Enhanced Who column<br />

WIP_ENTITY_ID NOT NULL NUMBER WIP repetitive assembly<br />

Identifier<br />

LINE_ID NOT NULL NUMBER WIP line Identifier<br />

DAILY_PRODUCTION_RATE NOT NULL NUMBER Schedule daily quantity<br />

PROCESSING_WORK_DAYS NOT NULL NUMBER Processing work days<br />

STATUS_TYPE NOT NULL NUMBER Status of repetitive schedule<br />

FIRM_PLANNED_FLAG NOT NULL NUMBER Control for MRP rescheduling<br />

ALTERNATE_BOM_DESIGNATOR NULL VARCHAR2(10) Alternate bill of material used<br />

in repetitive schedule<br />

COMMON_BOM_SEQUENCE_ID NULL NUMBER Common bill Identifier<br />

BOM_REVISION NULL VARCHAR2(3) Inventory item revision code<br />

BOM_REVISION_DATE NULL DATE Date of inventory item revision<br />

used to explode the bill of<br />

material used in the schedule<br />

ALTERNATE_ROUTING_DESIGNATOR NULL VARCHAR2(10) Alternate routing used in a<br />

repetitive schedule<br />

COMMON_ROUTING_SEQUENCE_ID NULL NUMBER Common routing Identifier<br />

ROUTING_REVISION NULL VARCHAR2(3) Routing revision code<br />

ROUTING_REVISION_DATE NULL DATE Routing revision date<br />

FIRST_UNIT_START_DATE NOT NULL DATE First unit start date<br />

FIRST_UNIT_COMPLETION_DATE NOT NULL DATE First unit completion date<br />

LAST_UNIT_START_DATE NOT NULL DATE Last unit start date<br />

LAST_UNIT_COMPLETION_DATE NOT NULL DATE Last unit completion date<br />

DATE_RELEASED NULL DATE Date on which repetitive<br />

schedule is released<br />

DATE_CLOSED NULL DATE Date on which the repetitive<br />

schedule is set to Complete –<br />

No charges or to Cancelled<br />

QUANTITY_COMPLETED NOT NULL NUMBER Current quantity completed on<br />

the schedule<br />

DESCRIPTION NULL VARCHAR2(240) Descriptive text<br />

DEMAND_CLASS NULL VARCHAR2(30) Type of demand the schedule<br />

satisfies<br />

MATERIAL_ACCOUNT NOT NULL NUMBER General Ledger account to<br />

accumulate material charges for<br />

a repetitive schedule<br />

MATERIAL_OVERHEAD_ACCOUNT NOT NULL NUMBER General Ledger account to<br />

accumulate material overhead<br />

charges for a repetitive<br />

schedule<br />

RESOURCE_ACCOUNT NOT NULL NUMBER General Ledger account to<br />

accumulate resource charges for<br />

a repetitive schedule<br />

OVERHEAD_ACCOUNT NOT NULL NUMBER General Ledger account to<br />

accumulate overhead charges for<br />

a repetitive schedule<br />

OUTSIDE_PROCESSING_ACCOUNT NOT NULL NUMBER General Ledger account to<br />

accumulate outside processing<br />

charges for a repetitive<br />

schedule<br />

MATERIAL_VARIANCE_ACCOUNT NOT NULL NUMBER General Ledger account to<br />

accumulate material variances<br />

for a repetitive schedule<br />

OVERHEAD_VARIANCE_ACCOUNT NOT NULL NUMBER General Ledger account to<br />

accumulate overhead variances<br />

for a repetitive schedule<br />

RESOURCE_VARIANCE_ACCOUNT NOT NULL NUMBER General Ledger account to<br />

accumulate resource variances<br />

for a repetitive schedule<br />

Oracle Proprietary, Confidential Information––Use Restricted by Contract<br />

3 – 842 Oracle Bills of Material Technical Reference Manual

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!