20.01.2017 Views

EN metal working machinery

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Bending brakes<br />

Accessories for bending brakes GBP<br />

XXManual quick release clamping for fast tool<br />

changes (standard for R, S and Servo)<br />

XXHydraulic top tool clamping "WILA" for easy<br />

tool changes within seconds (optional)<br />

XXStandard centring rail with optional,<br />

tempered and polished Multi-V die<br />

XXMovable front support brackets (standard<br />

for R, S and Servo)<br />

XXCNC-controlled, motorised table crowning<br />

(standard for S and Servo series)<br />

XXRear stop system with R axis<br />

(standard for S and Servo series)<br />

XXCustom design rear stop fingers<br />

XXDelta X (option)<br />

XXHydraulic tool clamping (option)<br />

Commissioning &<br />

professional initial training<br />

When purchasing a Metallkraft machine, we<br />

recommend that customers call in one of our<br />

specialists to complete commissioning and provide<br />

induction training on site.<br />

Commissioning and<br />

initial training for<br />

standard machines<br />

Initial training &<br />

training for CNC<br />

controls<br />

Duration of<br />

commissioning and<br />

initial training for<br />

custom machines*<br />

Art. no.<br />

EINWMET<br />

EINWCNCMET<br />

EINWGBPMET<br />

* DBM, MBBS, FSM, HTBS, MSBM Pro, controlled PRM<br />

and MRB, GBP, LMS 400A and <strong>metal</strong> band saws with<br />

X-control<br />

154<br />

Commissioning includes:<br />

XXInstalling the machine<br />

X X(Unloading and transporting the machine to the<br />

installation location; providing the electrical and<br />

pneumatic connections, and the floor anchors or<br />

assembly plates are the purchaser's responsibility.)<br />

XXCleaning, tooling and aligning<br />

XXChecking all functions<br />

Initial training on the machine includes:<br />

XXan exhaustive explanation of the controls<br />

XXan explanation of the individual functions<br />

XXSetting and explaining the basic parameters<br />

XXExplaining the safety instructions as per best<br />

practices<br />

For programmable models, additionally:<br />

XXan exhaustive explanation of the controls<br />

XXan explanation of the individual functions<br />

XXSetting and explaining the basic parameters<br />

XXExplaining the safety instructions as per best<br />

practices<br />

Duration of commissioning and initial training:<br />

8 hours per day, including travel times to and from<br />

the site, plus travel expenses at 0.69 € per km,<br />

plus any charges for overnight stays as applicable.<br />

If the initial training time is 8 hours, the travel time<br />

is invoiced at 48 €/hour.<br />

This also applies for any different or additional<br />

services, which must be ordered separately on site<br />

and will be invoiced on individual basis.<br />

If the customer requires and requests installation<br />

and connecting of the machine, the customer is<br />

obliged to support our technician to the best of<br />

customer's ability and to provide the required<br />

helpers, tools and equipment at customer's own<br />

expense.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!