09.03.2017 Views

The Ultimate Guide to Investing in Cheshire & Warrington

The Ultimate Guide to Investing in Cheshire & Warrington

The Ultimate Guide to Investing in Cheshire & Warrington

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PROTOS<br />

PROTOS IS THE DESTINATION OF CHOICE FOR ENERGY,<br />

INNOVATION AND INDUSTRY; A STRATEGIC ENERGY<br />

HUB THAT WILL DELIVER JOBS AND INVESTMENT AND<br />

BE THE CATALYST FOR REGENERATION AND GROWTH.<br />

Set on the south bank of the Manchester Ship Canal,<br />

between Ellesmere Port and Chester, the 54ha site taps <strong>in</strong><strong>to</strong><br />

the emerg<strong>in</strong>g <strong>in</strong>dustrial strategy <strong>to</strong> stimulate growth and<br />

<strong>in</strong>vestment <strong>in</strong><strong>to</strong> the area. Pro<strong>to</strong>s is the only energy-focused<br />

development <strong>in</strong> the Government’s recently-unveiled<br />

Northern Powerhouse Investment Opportunities Portfolio,<br />

which will attract £5 billon of <strong>in</strong>vestment across 13 projects.<br />

Key po<strong>in</strong>ts regard<strong>in</strong>g Pro<strong>to</strong>s <strong>in</strong>clude:<br />

• 54 hectares of consented development with a<br />

masterplan for 280 hectares of development<br />

• Phase One <strong>in</strong>frastructure complete with significant<br />

improvements <strong>to</strong> the road network<br />

• A 21.5 MW Biomass facility currently under construction<br />

and due <strong>to</strong> be commissioned <strong>in</strong> 2017<br />

• An adjacent 19-turb<strong>in</strong>e w<strong>in</strong>d farm <strong>in</strong> operation by<br />

Peel Energy<br />

• Pro<strong>to</strong>s offers the ability <strong>to</strong> accommodate large-scale<br />

uses between 50,000 and 350,000 sq. ft.<br />

• Delivery of Phase Two will <strong>in</strong>clude further <strong>in</strong>frastructure;<br />

an Energy from Waste facility; and a UK Power Reserve<br />

facility<br />

• An opportunity for direct power availability which can<br />

support large energy users<br />

• Two <strong>in</strong>ternational airports with<strong>in</strong> close proximity<br />

• Over a quarter of the UK’s population with<strong>in</strong> a two-hour<br />

drive from site (18 million people)<br />

• Access <strong>to</strong> a highly-skilled workforce and strong<br />

connections <strong>to</strong> local education <strong>in</strong>stitutions<br />

• Opportunities at the University of Chester’s Thorn<strong>to</strong>n<br />

Science Park<br />

www.thisispro<strong>to</strong>s.com<br />

16

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!