13.12.2012 Views

LUNAR EXPEDITION PLAN

LUNAR EXPEDITION PLAN

LUNAR EXPEDITION PLAN

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

mm<br />

"Stal^<br />

Determination of quantities, reparable-cverhaulHBodiflcatlon<br />

planning, control etc., shall be accomplished and directed<br />

by a permanently organized and active groin) composed of personnel<br />

representing the engineering, production, materiel, reliability,<br />

quality control, procurement and contract departments, and the<br />

various affected sections within these departments such as<br />

, design, test, planners, etc., attending as required. Die AUK<br />

vlll have a member assigned to this group for surveillance<br />

i\i purposes and to provide logistic guidance on problems which may<br />

__ require advice from the Air Force.<br />

Persons assigned to the group shall be veil qualified by<br />

- reason of experience and technical ability.<br />

Ihe procedures and paperwork involved shall be streamlined,<br />

taking due cognizance of the powers and capabilities of the<br />

- :; above group to permit maximum flexibility in planning and the<br />

~*^~ quickest possible response to changes and emergency situations.<br />

J^ Ihe group will pay particular attention to control of<br />

hi-value items and Items critical to the needs of the expedition<br />

and test program. Such items, particularly those potentially<br />

subject to imminent redesign, will be rigorously screened to<br />

assure economical Inventory and the best possible repair,<br />

overhaul and modificai v.on planning at all times.<br />

She group shall be responsible for the following:<br />

a. Immediate adjustment of inventories and reorder<br />

points resulting from changes to the delivery schedule, the<br />

test program, and for engineering changes.<br />

b. Inventory review and adjustment of initially<br />

established stock levels and/or reorder points in light of<br />

latest experience gained from the test program every time<br />

reorder or minimum stock levels are reached.<br />

c. Review of stock levels, and adjustment and/or<br />

disposition of non-moving Items on a continuing basis, but at<br />

intervals not to exceed sixty (6*0) days for any individual hi-<br />

TftlUe items and 180 days for otft* j **>!«, w «••*-. ntVr Intmrmla.<br />

"as agreed upon by the Contractor and the Contracting Officer.<br />

Shis is to Include the return to production of axqr surplus<br />

quantities for^jework to later design requirements.<br />

VDUR-&-k5Q<br />

Tkh tfwwM cWtohs Wmmtai aBcttim Ha nailaMl M M •* M> tMMd ftotx >HMI M* W*I

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!