13.12.2012 Views

LUNAR EXPEDITION PLAN

LUNAR EXPEDITION PLAN

LUNAR EXPEDITION PLAN

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ii msr' -fe*fc<br />

(2) flight test operations and maintenance to be<br />

performed by the responsible crews. In consideration of this,<br />

present and near future systems experience gained in the aerospace<br />

area vill be applied to the Lunex program to assist in the<br />

identification of training equipment. She training for this<br />

program must be conducted in the most realistic environment<br />

practicable.<br />

(3) Post mission maintenance and test equipment.<br />

b. Equipment Selection:<br />

Selection of training equipment will be based on the<br />

following general rules:<br />

(1) Maximum utilization will be made of training<br />

equipment programmed for other missile and space system training<br />

programs.<br />

(2) During the initial phases, equipment programmed<br />

for test, development, and the expedition programs will be<br />

used to the maximum extent practicable when regular training<br />

periods can positively be scheduled In the use of that equipment.<br />

The lack of availability of such equipment will result in<br />

degradation of training.<br />

(3) Equipment selection will be made in consideration<br />

of future and/or subsequent programs to provide maximum<br />

training capability in similar systems with m-< "•*"•""• cost,<br />

(k) Maximum use and development of training films,<br />

training graphics, and synthetic training aids, and devices will<br />

be made to reduce requirements for critical operational items<br />

during the Initial phases of the program.<br />

(5) Training equipment will be identified in sufficient<br />

time to enable procurement and delivery In advance of<br />

equipment for use in the flight test and expedition program.<br />

c. Harming lactors:<br />

Planning factors for determination of Training Equipment<br />

Requirements:<br />

presently available, definitive planning factors upon which<br />

over-all equipment requirements may be based cannot be provided.<br />

However, for preliminary planning, the following factors may<br />

be applied to subsystems of the program to determine order of<br />

M<br />

9.12 VDLAR-S-U58<br />

AMMM<br />

VECnCr

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!