13.12.2012 Views

LUNAR EXPEDITION PLAN

LUNAR EXPEDITION PLAN

LUNAR EXPEDITION PLAN

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

'~*3!-.,..,..•-..... ;X*) ^ype IV. Special training provided by ATC<br />

training detachment Instructors at the Bite of the organization<br />

requiring the training.<br />

(6) TeBtlnq Programs:<br />

(a) Component - the testing of the components of<br />

a sub-system, such as the guidance package, or ecological<br />

package.<br />

(b) Subsystem - components assembled Into a subsystem<br />

as the Re-Entry Vehicle Subsystem and tested as a unit.<br />

(c) Integrated System - the Re-Entry Vehicle,<br />

lunar Launching Stage and lunar landing Stage assembled together<br />

and tested as a whole system.<br />

c. Assumptions:<br />

(1) Die man-rated lunar transport Vehicle vlll be<br />

available for use by the lunar Expedition In I968.<br />

(2) ATC personnel -will observe, participate and study<br />

the training programs developed for current research and<br />

development programs conducted under other government agencies<br />

and/or contractors. x<br />

(3) AJH 80-lU vill be used at a guide for accomplishing<br />

the program testing.<br />

(k) The terminology for normal levels of maintenance,<br />

i.e., organizational., field, depot, and shop, vehicle assembly<br />

and maintenance as specified in AFW (AMC) letter MM, dated<br />

25 July i960, subject: Standard Maintenance Terms and Maintenance<br />

Facility nomenclature for Missile Weapon Systems frill<br />

apply.<br />

(5) The Air Force Maintenance policy of maximum<br />

maintenance at the lowest feasible level vlll prevail.<br />

(6) Sue to the time phasing of the subsystems, special<br />

consideration must be given to the training facilities requirements<br />

funding for the Re-Entry Vehicle technical training<br />

programs^<br />

(7) Testing Pates:<br />

->-. . »>>~*^&) Start of Component Testing Dates are:<br />

t He-Entry Vehicle - June 1963-<br />

^2. lunar launch Stage -February 1965-<br />

93^ ' *" WDLAR-Swfc58<br />

oHId

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!