4*3-1-1.5 Static Vests—The static-test program will include<br />

design and structural substantiation testing to demonstrate<br />

structural integrity of the Manned lunar and Cargo Fayloada.<br />

Structural substantiation testing to design loads and<br />

temperatures will be accomplished on a full-size stub tank, identical<br />

(except for length) to the Lunar Landing Stage tank, this<br />

will ensure that load introduction and takeout will be representative<br />

of the flight article.<br />

One complete interstage adapter will be tested to ultimate<br />

design loads under appropriate environmental conditions, The adapter<br />

will be attached to a stub tank Identical to the Lunar Launching<br />

Stage tank section in every respect except length, to ensure realistic<br />

load introduction and takeout-<br />

A stub tank will also be used to demonstrate the integrity<br />

of the Lunar Launch Stage tank construction under design loads and<br />

environments. Methods of introducing the payload vehicle loads into<br />

the adapter section and thus the Lunar Launch Stage tanks will be<br />

determined.<br />

Tests will also be run on full-size tank bulkheads.<br />

These will be attached to a segment of typical tank structure,<br />

adequate to allov the bulkhead behavior to be representative of<br />

that of the flight article under design conditions. These bulkheads<br />

will be tested to ultimate design loads to ensure their structural<br />

reliability at all points within the fligit regime.<br />

Ground handling equipment tests will cover critical<br />

fittings and Joints for structural substantiation of these items<br />

under design conditions.<br />

4.3-2 DESIGN EVALUATION 3ESTS<br />

Component design evaluation testing is defined here as Informal<br />

testing conducted by the vehicle contractor, or vendor test<br />

labs, for the purpose of basic design evaluation prior to production<br />

release, and to pinpoint critical areas in prototype packages.<br />

Qualification testing is defined as those formal tests performed<br />

on flight-type hardware to demonstrate compliance with design<br />

specifications. A qualification test plan will be prepared approximately_9Q_days-after<br />

engineering-go-ahead outlining the" qualification<br />

test conditions. The qualification tests are to be performed in<br />

strict accordance with written and approved detailed test procedures,<br />

and witnessed by the Air Force, of an approved representative.<br />

^-37 j^^TOiAR-S-458<br />

Thlf 4tamtM (MMlni ftfamofiMi vffttfiM Hi* natbMt M w af II* Untod Warn wJtaln flat «wa*I»a *f "* Bt».—f Im, Wto<br />

II, U.S.C-, SKdan 7W and 7*4, *• honiMluton m nmlstFm af wlifck 1» am Mannar fa aa maw!luring" aanaa h mmblMtmi k* •»•<br />

/

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!