14.12.2012 Views

Key Issues Report of the Porirua City Council - Environmental ...

Key Issues Report of the Porirua City Council - Environmental ...

Key Issues Report of the Porirua City Council - Environmental ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

application whilst managing its adverse environmental effects as well as<br />

potential adverse effects upon it from nearby activities.<br />

4.78 The NPSET contains policies that are relevant to <strong>the</strong> Transpower resource<br />

consent. Policy 1 relates to <strong>the</strong> recognition <strong>of</strong> <strong>the</strong> benefits <strong>of</strong> <strong>the</strong> provision <strong>of</strong><br />

electricity transmission including maintaining security <strong>of</strong> supply and effective<br />

operation.<br />

4.79 Policies 2 – 8 <strong>of</strong> <strong>the</strong> NPSET are also relevant to <strong>the</strong> Transpower resource<br />

consent. These policies cover a combination <strong>of</strong> <strong>the</strong> managing <strong>of</strong> <strong>the</strong> effects on<br />

<strong>the</strong> environment <strong>of</strong> transmission line activities whilst affording recognition for<br />

such activities.<br />

5 SUMMARY OF CONSENTS<br />

5.1 There are potentially some applications for landuse resource consent required<br />

under <strong>the</strong> provisions <strong>of</strong> <strong>the</strong> <strong>Porirua</strong> <strong>City</strong> District Plan also. These relate to <strong>the</strong><br />

undertaking <strong>of</strong> Earthworks in <strong>the</strong> Rural Zone for <strong>the</strong> construction <strong>of</strong> <strong>the</strong><br />

"Proposed Track after Construction" which is partially located outside <strong>of</strong> <strong>the</strong><br />

designation as shown on Sheet AC09 (Construction Access Plans). Also new<br />

vehicle crossings onto roads in <strong>the</strong> Rural Zone require ei<strong>the</strong>r Controlled Activity<br />

land use consent 29 (<strong>of</strong>f PCC roads) or Discretionary land use consent (<strong>of</strong>f State<br />

Highways) 30 . It is considered that applications for <strong>the</strong>se could be deferred to<br />

into <strong>the</strong> future once final design <strong>of</strong> <strong>the</strong> construction works is completed.<br />

5.2 It is quite probable that an application for resource consent may be required in<br />

<strong>the</strong> future for <strong>the</strong> re-establishment <strong>of</strong> <strong>the</strong> <strong>Porirua</strong> Gun Club on ano<strong>the</strong>r site. The<br />

<strong>Porirua</strong> Gun Club will no longer be able to occupy this site should <strong>the</strong> proposed<br />

NoR be approved and given effect to. It is not considered that this is necessary<br />

to be applied for as part <strong>of</strong> <strong>the</strong> current proposal and probably not appropriate<br />

given that <strong>the</strong>y may well not have confirmed an alternative site yet.<br />

5.3 Depending on <strong>the</strong> location <strong>of</strong> <strong>the</strong> proposals identified above, as well as<br />

applicable District Plan provisions, <strong>the</strong>re may be a need to obtain affected<br />

persons approvals (Section 95E <strong>of</strong> <strong>the</strong> Resource Management Act 1991) and/or<br />

that <strong>the</strong> matter is potentially processed on a notified/limited basis. This is<br />

potentially more likely to be <strong>the</strong> case in <strong>the</strong> instance <strong>of</strong> a resource consent<br />

application for <strong>the</strong> re-establishment <strong>of</strong> <strong>the</strong> gun club being applied for due to<br />

such effects as noise.<br />

6 PERMITTED BASELINE AND EXISTING ENVIRONMENT<br />

6.1 As part <strong>of</strong> <strong>the</strong> commissioning <strong>of</strong> this report, <strong>the</strong> EPA has requested <strong>the</strong><br />

provision <strong>of</strong> details <strong>of</strong> <strong>the</strong> permitted baseline and existing environment for <strong>the</strong><br />

resource consents applied for within PCC's jurisdiction. The EPA has also<br />

29 Rule D4.1.2(iv) <strong>of</strong> <strong>the</strong> <strong>Porirua</strong> <strong>City</strong> District Plan.<br />

30 Rule D4.1.4(iv) <strong>of</strong> <strong>the</strong> <strong>Porirua</strong> <strong>City</strong> District Plan.<br />

22

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!